1. Introduction

Reporting Period: August – February 2017

Site Name/Location: Airly Mine, Capertee, NSW

Summary of Consents and Licences:

Airly Mine Contact Details:

2

Any Change?

DA162/91 (Mod 6) Yes

(Replaced by Development Consent SSD_5581 on 31 January 2017)

SSD_5581 No

ML1331 No

EPL12374 No

A232 No

Position Key Contact Contact Details

Mine Manager Bob Miller (02) 6359 2101

Email: [email protected]

Environment and Community

Coordinator Sam Price

Office: (02) 6359 2108 Mobile: 0427 647 657

Email: [email protected]

Page 3: Airly Mine - Centennial Coal

2. Operations Summary

Material Approved Limit

(and source)

This Reporting

Period since

previous CCC

(August 2016)

Year to Date Annual

Forecast

Waste Rock/

Overburden N/A N/A N/A N/A

ROM Coal 1.8MT/annum 351kt 73kt 790kt

Reject N/A N/A N/A N/A

Saleable Product N/A 351kt 73kt 790kt

Railing 382kt 25kt 695kt

3

Page 4: Airly Mine - Centennial Coal

4

Current Workings

Page 5: Airly Mine - Centennial Coal

5

Current & Projected Workings

Page 6: Airly Mine - Centennial Coal

Overview of 2016 Performance

• Nil environmental “non compliance” recorded

• Production levels exceeded both budget and forecast

• Bord and pillar mining methods employed including:

• Development extended into Genowlan Mesa

• Permanent employment numbers increased from 68 to

72 persons

• Continued to supply domestic customer (Eraring ) and

export customers through PWCS and PKCT.

• Completed exploration drilling programme

• Received PAC decision on Airly Extension Project

6

Page 7: Airly Mine - Centennial Coal

Projections for 2017

Operating context

• Maintain bord and pillar operations

• Undertake a trial development (Panel) beneath

increased depth of cover

- Assess strata conditions and coal quality

- Determine optimum roadway support

• Implement the provisions contained in Airly Extension

development consent.

• Complete feasibility report for Phase 2 Mining

- Option study on equipment selection

7

Page 8: Airly Mine - Centennial Coal

3. Environmental Performance

8 Gang-gang Cockatoo

Page 9: Airly Mine - Centennial Coal

Airly Mine – Noise Monitoring

• Airly Mine has no specific noise monitoring requirements or noise criteria in either

the Project Approval (DA 162/91) or EPL12374.

• Airly Mine is currently preparing a Noise Management Plan (NMP) in accordance

with SSD_5581.

Airly Mine Adopted Noise Criteria for 2016 Noise Monitoring:

9

Airly Mine Adopted Noise Monitoring Criteria

Location Day/Evening/Night Criteria. LAeq,

15minute

Night Criteria. LA1,1minute

Location A N/A N/A

Location B 35 45

Location C N/A N/A

Location D N/A N/A

Location E N/A N/A

Location F N/A N/A

Page 10: Airly Mine - Centennial Coal

Airly Mine – Noise Monitoring Results

Location Compliant?

Location A IA <30 IA N/A Yes

Location B IA IA IA 35 Yes

Location C <30 35 <20 N/A Yes

Location D IA IA IA N/A Yes

Location E IA <25 IA N/A Yes

Location F IA <30 <30 N/A Yes

10

• LAeq,15minute noise monitoring was conducted at Airly Mine on 13th & 14th

November 2016 for locations A, B and D; and on 20th and 21st November

2016 for locations C, E and F.

IA = Inaudible

Page 11: Airly Mine - Centennial Coal

Airly Mine – Air Quality Monitoring Results

11

Location

Air Quality (g/m2/month)

Dust Deposition Gauge Results

Aug 2016 Sep 2016 Oct 2016 Nov 2016 Dec 2016 Jan 2017

DM1 0.4 0.4 0.6 1.4 1.3 0.8

DM2 0.3 0.1 0.6 0.6 0.9 1

DM3 0.6 0.4 0.6 0.6 1.4 0.4

DM4 0.3 0.2 0.6 0.5 0.8 2.2

Non-compliance

Compliance

• *Sample contaminated by external factors such as bird droppings.

• Airly Mine has four depositional dust gauges located across site. These gauges are

monitored monthly for compliance.

• Depositional dust monitoring results from the previous CCC meeting (Aug 2016 - Jan 2017)

are provided below.

Page 12: Airly Mine - Centennial Coal

Airly Mine – Air Quality Monitoring Results

12

Page 13: Airly Mine - Centennial Coal

Airly Mine - Meteorological Monitoring

13

Month Total Rainfall (mm) Minimum Temperature (oC) Maximum Temperature (

oC)

Aug-16 43.8 -3.1 19.1

Sep-16 144.2 0.4 19.7

Oct-16 71.6 0.9 26.1

Nov-16 98.2 1.4 30.2

Dec-16 80 5.7 34

Jan-17 37.4 11.7 38.3

Page 14: Airly Mine - Centennial Coal

Airly Mine – Water Monitoring Results

14

Discharge water quality

pH

Total

Suspended

Solids (mg/L)

Electrical

Conductivity

(μS/cm)

Oil & Grease

(mg/L)

January 2016 – January 2017

LDP1 No discharge

LDP2 No discharge

LDP3 No discharge

Non-compliance

Compliance

Page 15: Airly Mine - Centennial Coal

Airly Mine – Subsidence Monitoring

• An REF has been approved for the installation of another

subsidence monitoring line over the 121 Panel. This will

be installed during February 2017.

• Pillar monitoring in 121 Panel under the subsidence line

will be installed during February 2017

• Extraction in this area will be later in 2017

• Quotes are being sourced for Photogrammetry survey

15

Page 16: Airly Mine - Centennial Coal

Subsidence

Monitoring Line

16

Page 17: Airly Mine - Centennial Coal

Airly Mine Extension Project Update

• The Airly Mine Extension Project was approved on

15/12/16

• Management Plans are currently being prepared and will

be submitted on a staged basis over the next 3-6 months

• An Extraction Plan for first workings within the Cliff Zone

is being prepared

• Other Extraction Plans will follow

• Awaiting Federal Dept. of Environment approval

17

Page 18: Airly Mine - Centennial Coal

Airly Mine 2016 Drilling Program Update

• The drilling program was completed on 20 January 2017

• NPWS have completed the access roadworks and will

do the rehabilitation works

18

Page 19: Airly Mine - Centennial Coal

2016 Shallow Piezometers

• ARP 11 approx. 25m

deep monitoring Lithgow

Seam water level and

quality

• ARP 12 approx. 6m deep

monitoring Grotto

surface/ alluvial water

level and quality

• ARP 14 approx. 6m deep

monitoring Oasis surface/

alluvial flow water level

and quality

19

Page 20: Airly Mine - Centennial Coal

2016 Deep Water Monitoring Bores

20

Page 21: Airly Mine - Centennial Coal

2016 Deep Monitoring Holes

• ARP 13 monitors:

– Upper Permian (Lithgow Seam)

– Shoalhaven

– Devonian

• ARP 14 monitors:

– Narabeen/ Permian boundary

– Shoalhaven

– Devonian

21

Page 22: Airly Mine - Centennial Coal

4. Environmental Management

22

Page 23: Airly Mine - Centennial Coal

Airly Mine – Cultural Heritage

23

Historically: Four (4) sites have been undermined

45-1-2746 (Artefact Scatter) - Dec 2010

45-1-2763 (Artefact Scatter) – Mar 2011

45-1-2761 (Shelter) – Jul 2011

45-1-2762 (Artefact Scatter) – Sep 2015

Previous 3 Months: No Sites undermined

Upcoming 3 Months: One site (45-1-2748) to be undermined; a pre and post

monitoring inspection will be carried out as per the ACHMP.

Low level subsidence and tilt as a result of

mining, does not pose a risk of harm to these

sites

Fencing activities completed to help mitigate

against potential harm

Page 24: Airly Mine - Centennial Coal

Airly Mine – Cultural Heritage

24

Page 25: Airly Mine - Centennial Coal

Airly Mine – Rehabilitation & Land Management

• Airly Mine does not currently have any land available or

subject to rehabilitation works. This is not likely to change until

mine closure.

• Rehabilitation cost estimate review completed in August 2016.

• Weed spraying program implemented and continuing during

summer 2016-17.

• Surrounding Mine owned land continues to be leased out for

agricultural purposes – cattle grazing systems.

• Riparian restoration of Airly Creek on-going.

• Tree screen maintenance conducted as required.

25

Page 26: Airly Mine - Centennial Coal

Airly Mine – Flora, Fauna & Aquatic Ecology Monitoring

26

• Flora and fauna monitoring activities were

conducted by RPS in spring and summer

2016.

• Aquatic ecology monitoring activities were

completed at Airly during November and

December 2016.

• Stygofauna monitoring is scheduled for

February 2017.

Glossy-black Cockatoos

Leaf-tailed Gecko

Page 27: Airly Mine - Centennial Coal

5. Summary of Incidents / Non-compliances

(CCC Period: Aug 2016 – Jan 2017)

Were all conditions of the relevant approval(s) complied with? DA162/91 YES

ML1331 YES

EPL12374 YES

A232 YES

27

Statement of Compliance:

Relevant

Approval

Condition # Condition

summary

Compliance

Status

Comment / Description

Nil

Non-compliance Summary:

Incident Summary:

Nature of

Incident

Detail of Incident Detail of Mitigation / Remediation

Nil

Page 28: Airly Mine - Centennial Coal

6. Community Engagement

• Airly Mine representatives attended and provided updates at the Capertee Valley

Progress Association (CVPA) Monthly Meetings;

• Airly Mine representative cooked the BBQ for the train visit to Capertee on the 21st

August 2016 and for the Australia Day event at the Capertee Hall on 26th January

2017.

28

Sponsorship:

• Kandos/Rylstone Show;

• Rylstone Street Feast;

• Capertee Public School;

• Capertee Hall.

Page 29: Airly Mine - Centennial Coal

7. Community Complaints

• No community complaints were received in 2016 or in January 2017.

• Airly Mine Community Complaints Register is publically available on the Centennial

Coal website.

29

Community Complaints Register 2016.

Jan

-16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan

-17 Total

Air 0 0 0 0 0 0 0 0 0 0 0 0 0

Water 0 0 0 0 0 0 0 0 0 0 0 0 0

Noise 0 0 0 0 0 0 0 0 0 0 0 0 0

Other 0 0 0 0 0 0 0 0 0 0 0 0 0

Subsidence 0 0 0 0 0 0 0 0 0 0 0 0 0

Waste 0 0 0 0 0 0 0 0 0 0 0 0 0

Visual 0 0 0 0 0 0 0 0 0 0 0 0 0

0

Page 30: Airly Mine - Centennial Coal

Correspondence Regarding Water Flow Gap/ Genowlan

Creek

• Correspondence received from CVA on 23/9/16 stating concerns

over alleged loss of flow in Gap/ Genowlan Creek and requesting

and investigation by Airly.

• GHD conducted a review of Airly operations and measured flows in

Gap Creek

– Mining was being conducted on the west side of Airly Gap at the time

– Water flows continued to be closely aligned with major rainfall events

– Water flow patterns (increase and decrease in flow) have not changed with

mining

• The report concluded there was no evidence of a change in stream

hydrology in Gap/ Genowlan Creek as a result of mining operations

30

Page 31: Airly Mine - Centennial Coal

8. Activities proposed for the Next Period

Environment

o Scheduled monitoring and reporting

Systems

o Continue to prepare environmental management plans.

o Implementation of compliance database.

Water

o Routine monitoring and reporting

Rehabilitation and Mine Closure

o Nil

Biodiversity

o Routine monitoring and reporting

Approvals

o Submit management plans required under the consent

o Submit Extraction Plan for First Workings in the Cliff Zone

31