    DIRECTORATE GENERAL OF SYSTEMS & DATA MANAGEMENT

    www.icegate.gov.inwww.cbec.gov.in

    CENTRAL BOARD OF EXCISE

    & CUSTOMS

    Local Area Network (LAN) Project

    Testing of Equipped LAN at other than Stand-alone Ranges

    &

    Operational Training on installed LAN equipment

    http://www.icegate.gov.in/http://www.cbec.gov.in/http://www.cbec.gov.in/http://www.icegate.gov.in/
  • 7/31/2019 Non Range ATP Process v5

    2/19

    PricewaterhouseCoopers

    Directorate General of Systems & Data Management2

    Slide 22 11-Aug-12

    Contents

    ATP

    Roles

    Process and Support

    Product Testing

  • 7/31/2019 Non Range ATP Process v5

    3/19

    PricewaterhouseCoopers

    Directorate General of Systems & Data Management3

    Slide 3

    ATP and Roles

    ATP (Acceptance test process) : This process involves seriesof standard agreed tests to establish the following with

    respect to the LAN infrastructure deployed at CBEC offices :

    Verification of BoM Installation Quality Checks

    Functionality Check of the equipment installed

    LAN connectivity and integration with WAN, (if installed)

  • 7/31/2019 Non Range ATP Process v5

    4/19

    PricewaterhouseCoopers

    Directorate General of Systems & Data Management4

    Slide 4

    Roles

    HP: Hewlett-Packard is the Lead Service Providerimplementing the CBEC LAN Project

    PwC: PricewaterhouseCoopers is the Project Manager for

    the project and would carry out the Acceptance Testprocess. PwC/their outsourced representatives from CMSwould be visiting all sites to conduct the tests.

    Lead Nodal Officer ( in charge of the building) is

    expected to facilitate the acceptance process and sign offon the Acceptance document immediately aftercompletion. He would coordinate with other co-locatedCBEC offices to facilitate ATP on scheduled dates.

  • 7/31/2019 Non Range ATP Process v5

    5/19

    PricewaterhouseCoopers

    Directorate General of Systems & Data Management5

    Slide 5

    Process and Support Prior information would be provided to lead Nodal Officer ( 3

    days in advance) regarding scheduling of ATP. Changes in theproposed dates may be minimised to enable overall adherenceto project schedule .

    ATP would be carried out by PWC and HP representative inpresence of Lead Nodal Officer or his nominee (s) ( sinceadherence to schedule is necessary).

    The team visiting for ATP from PWC and HP would brief thelead nodal officer / nominee (s) about processes,documentation and steps.

    Any queries or clarification by CBEC officer during ATPprocess would be answered by local PWC and HP teams.Other queries may be escalated immediately to central

    teams of M/s PWC/ HP. ATP activities may take one day or more ( according to the

    size of the location). Local assistance would be requestedaccordingly.

  • 7/31/2019 Non Range ATP Process v5

    6/19

    PricewaterhouseCoopers

    Directorate General of Systems & Data Management6

    Slide 6

    Process and Support contd.

    During ATP operations of various products wouldbe demonstrated and on-site training provided by HP.

    IT in-charge of the building should also be part of

    the process. If possible electrical in-charge may also

    be included.

    Lead Nodal officer needs to sign-off on the test

    results and ATP documents. Any minor observations

    may be noted at time of sign off on the ATP documentitself.

    A copy of ATP report would be provided to Nodal

    officer for his reference and records.

  • 7/31/2019 Non Range ATP Process v5

    7/19PricewaterhouseCoopers

    Directorate General of Systems & Data Management7

    Slide 7

    General Instructions regarding Product

    Testing ( Details as per ATP document)

    Thin Client

    Check for Physical damage, if any and record .

    Switch ON the thin client

    Enter User Name and Password provided by HP Personnel

    Check for application access e.g. ACES.

    Printing through Network laser/line Printer and/or directly connected

    printer (deskjet)

    Check for physical damage, if any and record

    Switch ON the Printer

    Create a test page in Open office installed in Thin Client

    Fire a Print out on the Printer configured

  • 7/31/2019 Non Range ATP Process v5

    8/19PricewaterhouseCoopers

    Directorate General of Systems & Data Management8

    Slide 8

    Scanner

    Check for Physical damage, if any and record Switch ON the Scanner

    Take any document scan and save the document

    Open the document to verify if the scanning was

    performed properly

    Print Server

    Check for physical damage if any and record.

    Switch on the server Check general functionality

    Simultaneously Fire Printouts from more than one Thin

    Client to test the functionality of Print Queue.

    Product Testing contd.

  • 7/31/2019 Non Range ATP Process v5

    9/19PricewaterhouseCoopers

    Directorate General of Systems & Data Management9

    Slide 9

    Power Equipment

    Different sets of acceptance process has been formulated

    for sites

    - With DG and UPS

    - With UPS only

    The appropriate test process is to be chosen andconducted.

    The test process is designed to establish the following :

    Out put voltage of DG and UPS at various stages.

    UPS Battery backup time of 15 minutes. Un-interrupted power supply change over.

    Auto start/shut down of DG in case of power failure.

    Manual start/shut down of DG.

    Product Testing contd.

  • 7/31/2019 Non Range ATP Process v5

    10/19PricewaterhouseCoopers

    Directorate General of Systems & Data Management10

    Slide 10

    Contact Details of Central TeamsHP

    Landline: 011- 26877966 for the ATP and training period

    ForHardware :- Akshat Sinha : email : [email protected]

    - Suresh Lodhi : email : [email protected]

    ForNetworking:- Ravinder Kumar : email : [email protected]

    ForUPS and Diesel Generator sets:- Debashish Dutta : email : [email protected]

    PWC- Landline : 011-24121419- Abhik Chopra : email : [email protected]

    - Tripti Batra : email : [email protected]

    - Cdr Deepak Uppal (Retd) : email : [email protected]

    Directorate of SystemsCentral Excise & Service Tax Formations:

    Shri Suresh Kumar Additional Director email: [email protected]

    Customs Formations:

    Shri Yogendra Garg, Additional director email: [email protected]

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
  • 7/31/2019 Non Range ATP Process v5

    11/19

    PricewaterhouseCoopersDirectorate General of Systems & Data Management

    11Slide 11

    Operational Training

    The objective of this training is to familiarize users with theproducts installed and its usage

    This training would go hand in hand with the ATP drill.

    Audience:

    Thin client/ Printer/Scanner All application users

    Diesel Generator/ UPS Admin office or Electrical Vendor in-charge of Electrical system for the building

    Print Server/ Switch

    Nodal Officer / Officer(s) familiar with IT

  • 7/31/2019 Non Range ATP Process v5

    12/19

    PricewaterhouseCoopersDirectorate General of Systems & Data Management

    12Slide 12

    Operational Training Thin Client

    Thin Client How to switch ON and OFF

    Login into Thin Client

    Launch Applications Firefox (Web Browser)/ Citrix client/ Open office

    Login in to application

    Take Printouts

    Basic Troubleshooting Power and LAN cables

    Monitor (TFT)/Mouse and Keyboard cables

    Powering Issues/ Keyboard or Mouse detection

    Check for Internet Protocol (IP) address

    LAN Connectivity testing

  • 7/31/2019 Non Range ATP Process v5

    13/19

    PricewaterhouseCoopersDirectorate General of Systems & Data Management

    13Slide 13

    Operational Training Network Printer

    Network Printer

    How to switch ON and OFF

    Loading of Paper

    Take Test Printouts

    Basic Troubleshooting Power and LAN cables

    Check for Internet Protocol (IP) address

    Removing Paper Jam

    Toner replacement

  • 7/31/2019 Non Range ATP Process v5

    14/19

    PricewaterhouseCoopersDirectorate General of Systems & Data Management

    14Slide 14

    Operational Training Deskjet Printer

    Deskjet Printer How to switch ON and OFF

    Loading of Paper

    Take Test Printouts

    Basic Troubleshooting

    Power and Universal Serial Bus (USB) cables

    Removing Paper Jam

    Toner replacement

  • 7/31/2019 Non Range ATP Process v5

    15/19

    PricewaterhouseCoopersDirectorate General of Systems & Data Management

    15Slide 15

    Operational Training Scanner

    Scanner How to switch ON and OFF

    Loading of Paper

    Scanning a document

    Basic Troubleshooting

    Power and Universal Serial Bus (USB) cables

    Removing Paper Jam

  • 7/31/2019 Non Range ATP Process v5

    16/19

  • 7/31/2019 Non Range ATP Process v5

    17/19

    PricewaterhouseCoopersDirectorate General of Systems & Data Management

    17Slide 17

    Operational Training - Switch

    Switch Bring to notice of Nodal officer the location of switches

    Handover the Rack Keys

    Identify a switch

    Basic Troubleshooting

    Call Helpdesk for troubleshooting

    Power and LAN cables connection

    Login in to Switch

    Identification of what is Console Cable and what purpose it is to be used

    How to switch ON and OFF switch in case instructed from Helpdesk

  • 7/31/2019 Non Range ATP Process v5

    18/19

    PricewaterhouseCoopersDirectorate General of Systems & Data Management

    18Slide 18

    Operational Training Diesel Generator

    Diesel Generator How to switch between Auto and Manual mode

    Manual Starting procedure

    How to check for Diesel (Fuel Tank) available status

    Oil status

    How to read Voltage and Current meter reading;

    Basic Troubleshooting

    Call Helpdesk for Troubleshooting

  • 7/31/2019 Non Range ATP Process v5

    19/19

    PricewaterhouseCoopersDirectorate General of Systems & Data Management

    19Slide 19

    Operational Training UPS

    UPS Identify Input and Output Isolators

    ON and OFF position of Isolators

    How to read errors or notification on UPS LCD (there is a display on the UPS)

    screen

    Basic Troubleshooting

    Call Helpdesk for Troubleshooting and narrate the error on the display

    If Electrician is present: Check for Input and output voltage