NESTLE ABAJI EIA PRESENTATION

74
PRESENTATION OF EIA REPORT ON NESTLE NIGERIA ABAJI GREEN FIELD WATER FACTORY (NNAGFWF) PROJECT Prepared by RAMBIGAS NIGERIA LIMITED, for NESTLE NIGERIA PLC MAY, 2014 VIEW OF THE PROJECT AREA FROM ONE OF THE HILL OUTCROPS

Transcript of NESTLE ABAJI EIA PRESENTATION

Page 1: NESTLE  ABAJI  EIA  PRESENTATION

PRESENTATION OF EIA REPORT ON NESTLE NIGERIA ABAJI GREEN FIELD

WATER FACTORY (NNAGFWF) PROJECT Prepared by

RAMBIGAS NIGERIA LIMITED,for

NESTLE NIGERIA PLC MAY, 2014

VIEW OF THE PROJECT AREA FROM ONE OF THE HILL OUTCROPS

Page 2: NESTLE  ABAJI  EIA  PRESENTATION

SITE VERIFICATION

SITE VERIFICATION TEAM DURING THE SITE VISIT

SITE VERIFICATION A SITE VERIFICATION

VISIT WAS CONDUCTED, ON JULY 17th 2013 TO GIVE THE MINISTRY OFFICIAL A FIRST HAND INFORMATION AND ACTUAL PICTURE OF THE PROJECT SITE / ENVIRONMENT.

REMARKS: PROJECT ASSIGNED TO CATEGORY III, TWO SEASON’S DATA GATHERING AND IN-HOUSE REVIEW.

Page 3: NESTLE  ABAJI  EIA  PRESENTATION

SCOPING WORKHOP

PICTURES OF SCOPING WORKSHOP SCOPING WORKSHOP

SCOPING WORKSHOP TO EXPLAIN THE PROPOSED EIA, AND ITS BENEFITS

TO THE HOST COMMUNITY WAS HELD

ON 17th SEPTEMBER, 2013 WITH THE

REPRESENTATIVE OF THE MINISTER OF

ENVIRONMENT, REPRESENTING THE

DIRECTOR, EIA DIVISION PRESENT

Page 4: NESTLE  ABAJI  EIA  PRESENTATION

FIELD WORK / DATA GATHERING

EQUIPMENTS AND SAMPLES

IMMEDIATELY AFTER THE SCOPING WORKSHOP FIELD WORK COMMENCED.

SAMPLES WERE COLLECTED FROM VARIOUS LOCATIONS WITHIN AND OUTSIDE THE PROJECT SITE

CALIBRATED EQUIPMENT WERE USED FOR BOTH INSITU – AND LABORATORY

QA /QC WERE OBSERVED TO PRESERVE SAMPLES FOR LABORATORY ANALYSIS

Page 5: NESTLE  ABAJI  EIA  PRESENTATION

FIELD WORK / DATA GATHERING

Field work for Physico-chemical and Ecology parameters / studies

Multidisciplinary team used for field work and report preparation followed immediately

FIELD WORK FOR BOTH WET AND DRY SEASONS WERE CONDUCTED IN SEPTEMBER 2013, AND JANUARY 2014 RESPECTIVELY.

A MINISTRY OFFICIAL WAS ASSIGNED TO SUPERVISE THE ACTIVITIES.

Page 6: NESTLE  ABAJI  EIA  PRESENTATION

THE REPORT CONTAINS EIGHT CHAPTERS WITH REFERENCE , BIBLIOGRAPHY AND APPENDICES IN LINE WITH THE EIA WRITING FORMAT OF THE FMENV.

This report is presented in Eight Chapters as follows:   Chapter One - Consists of introduction with the EIA Terms of Reference (TOR), relevant background

information about Nestle Nigeria Plc (the Applicant), and Legal/Administrative Framework for EIA in Nigeria.

  Chapter Two - discusses the project justification and presents the need/value of the

project and project development options.   Chapter Three - describes the proposed project, location, project activities, excavation,

construction, waste management, commissioning, operation and the project schedule.   Chapter Four – We have baseline condition of the study area and Information on socio- economic and

health status of the area. Consultation activities with stakeholders-Government Agencies, the public and the host communities within the project are presented here.

  Chapter Five - Details of Associated and Potential Environmental Impacts of the proposed Project are

highlighted in this chapter.   Chapter Six - discusses the Mitigation Measures for the identified adverse impacts.   Chapter Seven - recommends a cost-effective Environmental Management Plan to adopt

throughout the project life cycle. It also recommends an environmental monitoring and wastes management programme and outlines the plans for site restoration and remediation after closure/abandonment.

  Chapter Eight - gives the conclusion and offers advice on project implementation.

References and appendices are also included in this section.

STRUCTURE OF THE REPORT

Page 7: NESTLE  ABAJI  EIA  PRESENTATION

EXECUTIVE SUMMARYTHE EXECUTIVE SUMMARY DESCRIBE IN BRIEF, THE CONTENT OF THE EIA REPORT.

IT FOCUSES ON THE IMPORTANT FINDINGS, OBSERVATIONS AND REMARKS CONTAINED IN THE MAIN BODY OF THE REPORT

THE HIGHLIGHT OF THE EXECUTIVE SUMMARY THERFORE INCLUDES:

INTRODUCTION THE PROPONENT: BRIEF HISTORY OF NESTLE NIGERIA PLCTHE TERMS OF REFERENCESCOPE OF THE EIAEIA PREMISESBENEFITS OF THE EIAEXTRACTS OF RELEVANT LAWS AND GUIDELINES : EIA ACT, NESREA ACT, SON AND NAFDAC LAWS AND GUIDELINES ETCEIA METHODOLOGY AND STRUCTURE JUSTIFICATION FOR THE PROJECT AND PROJECT ALTERNATIVESDESCRIPTION OF THE EXISTING ENVIRONMENTAL CONDITION IN TERMS OF WEATHER, PHYSICAL ENVIRONMENTAL AND SOCIAL ENVIRONMENTASSOCITED AND POTENTIAL IMPACTSMITIGATION MEASURESENVIRONMENTAL MANAGEMENT PLANRECOMMENDATION AND CONCLUSION

Page 8: NESTLE  ABAJI  EIA  PRESENTATION

CHAPTER ONE

Details in the body of the report

Nestle’s contributions to the Nigerian economy and the company share value policy are contained here.

THIS BASICALLY INTRODUCED THE SUBJECT OF THE EIA AND THE PROPONENT AS WELL AS THE ADMISTRATIVE AND LEGAL FRAMEWORK OF THE STUDIES

PROPONENT – NESTLE NIGERIA PLC

PROJECT – WATER PROCESSING

PROJECT NAME- NESTLE NIGERIA ABAJI GREEN FIELD WATER FACTORY

EIA LAWS/ GUIDELINES

BENEFITS ETC

Page 9: NESTLE  ABAJI  EIA  PRESENTATION

PROJECT JUSTIFICATION- ONE MAJOR JUSTIFICATION for the implementation of the proposed project was the cost of transporting bottled water from Nestle existing water factory in Agbara, Ogun State to the northern part of the Nation. The proposed project was intended to reduce cost and bring Nestle water nearer its esteemed customers.

CHAPTER TWO

Page 10: NESTLE  ABAJI  EIA  PRESENTATION

CHAPTER TWO CONT. OTHER

JUSTIFICATIONS To expand Nestlé

water business in Nigeria.

To provide job opportunities to Nigerians .

PROJECT COST AND BENEFITS

Value of The Project The cost of sitting the proposed

Nestlé Nigeria Greenfield Water Factory is estimated at over Five Billion Naira (N5b).

Benefits of The Project

Foreign Investment Attraction to the Nation

Creation of Job Opportunities in the Country

Revenue Generation for Government

Rural Development, in particular Abaji Municipal Area Council Territory

Page 11: NESTLE  ABAJI  EIA  PRESENTATION

CHAPTER TWO CONT.

Project implementation as proposed was chosen after critical consideration of the other alternatives

These are also backed up by Nestle’s long term planning and programme of increasing their shareholders value

PROJECT ALTERNATIVE The project alternatives

considered includes: The no project option The site relocation

consideration The process /

technology option The implementation

of project as proposed.

Reason for Project implementation as proposed

Growth of the potable water industry

Reduction of cost of production

Availability of water reservouir that supports the volume of production

Use of Best Available Technology

Sustainability of the Project

Page 12: NESTLE  ABAJI  EIA  PRESENTATION

PROJECT DESCRIPTIONThe Project is given a broad overview here in terms of

1. Location – Abaji Area Council 2. Size – 11.4 hectares of land acquired 3. Layout – Administrative and production halls,

Utility blocks and social services 4. Summary of existing environmental condition 5. Process – Simple water treatment involving

filtration with sand beds, UV treatment and reverse osmosis

6. Waste Management

CHAPTER THREE

Page 13: NESTLE  ABAJI  EIA  PRESENTATION

MAP OF THE PROJECT AREA, SHOWING RELATIVE DISTANCE TO EXISTING COMMUNITIES AND ROADS TO

THE NNAGFWF PROJECT SITE

Page 14: NESTLE  ABAJI  EIA  PRESENTATION

CONTOUR MAP SHOWING THE SITE LAYOUT AND GPS CO-ORDINATES OF THE SITE.

Page 15: NESTLE  ABAJI  EIA  PRESENTATION

PLANT LAYOUT SHOWING THE AREA TO BE DEVELOPED AND EQUIPMENT LAYOUT FOR THE PROPOSED PLANT

Page 16: NESTLE  ABAJI  EIA  PRESENTATION

S/N Particulars Details

1 Location

Village Mandereji

Town Abaji

State FCT Abuja

2 Co-ordinates (UTM) N 943314.62, E 272210.94N 943350.47, E 272643.74N 943055.39, E 272678.66N 943059.24, E 272523.46N 943082.14, E 272245.24

3 Elevation above sea Level 128m – 580m

4 Climatic condition Predominant Annual Wind Direction :East, Southwest, and WestAnnual mean Max Temp: 36.5oCAnnual mean Min Temp:19.6 oC

5 Present land use at proposed site farming

6 Nearest Highway / Road Lokoja- Abuja ( Trunck A2)

7 Defence Installation None within 10km radius

8 Nearest Industrial park International Truck park <0.5km opposite the project site

9 Nearest Airport Abuja international Airport about 90km N

10 Nearest Village Mandereji, 1Km N

11 Nearest Town Abaji, 2 Km S

12 Nearest river Yawuti River 2km N

13 Hills and Valleys Some are present in and nearby

14 Archeologically important places None within 6km radius

15 Nearest place of tourist / religious importance Churches and mosques around Village and Town.

16 Ecological Sensitive area (National Parks / Wild life reserves) None within 6km radius

17 List of Industries Pipeline Product and Marketing Company (PPMC) 3.2km N

18 Topography of the proposed site Partly plain two out crop hills

19 Nature of soil clayey

20 Major crops in the study area Guinea Corn, beni-seed and Cassava, Millet, groundnut, Mango

Table 3.2: Environmental Setting of the Project Area

Page 17: NESTLE  ABAJI  EIA  PRESENTATION
Page 18: NESTLE  ABAJI  EIA  PRESENTATION
Page 19: NESTLE  ABAJI  EIA  PRESENTATION

Raw Water Process Description The water purifying process is a very simple one, similar to what obtains in the

NW Agbara factory.

Raw water pumping Raw water would be pumped from deep borehole (150m) with submersible pump

and sent for treatment / purification which consist of filtration and reverse osmosis processes.Raw water purification

Raw water will be purified by filtration in sand filters and reverse osmosis process.Preform conversion

Preforms would be fed into a high pressure blower to convert to PET bottles. (i.e Packaging Material for Production)Water Filling and capping

Preformed PET bottles will be filled to the required volume and capped by the filler and capping machines respectively.Labeling and Coding

Filled and capped bottles would then be transferred via conveyors to the labeling and coding machines where the necessary NAFDAC and SON coding requirements will be applied.Wrapping, and Palletizing

Labeled bottles are further transferred by conveyor to the palletizer where they will be packed and shrink-wrapped into 20x0.6L and stretch wrapped on to a pallet into 3x4x6 units of 20x0.6L. The pallet is the unit for loading on to trucks for transportation to their various Distributors Depot.

WATER TREATMENT PROCESS

Page 20: NESTLE  ABAJI  EIA  PRESENTATION

INPUTS VOLUME

T

ANTICIPATED LOSSES/WASTE % T

OUTPUTS

T

ENV. IMPACTS

Raw water (m3)

116,700 15 17,505 99,195

To be treated before discharge

PET 700 1.0 7.0 693 To be recycled

Plastic 130 0.2 0.3 129.70 To be sold as scrap

Caps 32 0.1 0.03 31.97 To be recycled

Preforms

550 1.5 8.25 541.75 To be recycled

Trays 15.49 1.5 3,938 258,562

To be sold as scrap

Pallets 1200units

5.0 60.0 1140 To be sold as scrap

ENERGY SOURCE

INPUT OUTPUT LOSSES

ENV. IMPACT

PHCN (KW/Electrical Load)

- - - -

GENERATOR (KW / Electrical Load)

2280 1600 680 Minimal impact as only efficiency is over 70%

DIESEL (AGO) Lt / month. 315,360 220,752 94,608

NATURAL GAS (m3) - - - -

LPG Kg / hr.

10.4 8.32 2.08

Minimal impact

LIFE CYCLE ANALYSIS

Page 21: NESTLE  ABAJI  EIA  PRESENTATION

WASTE MANAGEMENT - LIQUID

Page 22: NESTLE  ABAJI  EIA  PRESENTATION

WASTE MANAGEMENT- SOLID

Page 23: NESTLE  ABAJI  EIA  PRESENTATION

DESCRIPTION OF THE PROJECT ENVIRONMENT

4.1 Introduction This chapter highlights the current environmental condition of the

proposed site. It is essentially to generate BASELINE DATA that will form the basis for impact monitoring and mitigation. As much as possible exact / empirical data of both physico-chemical parameters and ecological status indicators were captured for immediate and future reference.

The study area of this project covers an area within a radius of 6-km from the center of the proposed NNAGFWF project site. The existing environmental setting is considered as the baseline environmental conditions and are described with respect to climate, hydro-geological, air quality, noise level, water quality, soil quality, vegetation pattern, ecology, socio-economic profile, land use, and places of archaeological importance.

The data have been generated to cover the two major seasons (wet & dry).

Wet seasons sampling was conducted first between Sept 18th and 19th 2013 while dry season was conducted between January 7th and 8th 2014.

CHAPTER FOUR

Page 24: NESTLE  ABAJI  EIA  PRESENTATION
Page 25: NESTLE  ABAJI  EIA  PRESENTATION

TEMPERATURE (MAX) – ( 2001 – 2013)

Table 4.1 Monthly Maximum Temperature, °C in AbujaJan Feb Mar Apr May June Jul Aug Sep Oct Nov Dec

2001 34.7 36.5 37.8 35.5 33.4 31.0 29.0 28.6 28.8 32.3 35.6 36.32002 35.1 36.3 36.9 34.7 34.2 31.7 29.6 28.9 29.7 31.1 33.8 35.42003 35.5 37.3 37.5 35.2 34.5 30.4 29.8 29.1 29.8 31.7 33.4 34.32004 34.8 37.3 37.8 35.0 31.7 30.7 29.9 28.9 30.3 31.7 33.2 35.12005 34.5 38.0 38.0 36.2 32.5 30.5 29.5 28.5 30.3 31.3 34.6 35.02006 35.7 36.1 36.0 37.3 32.3 31.4 30.1 28.1 29.6 31.1 33.8 35.52007 34.6 37.1 38.1 38.0 36.2 30.9 28.6 28.7 29.9 31.6 33.3 30.72008 33.8 37.3 37.5 35.5 33.4 30.6 29.4 28.7 30.1 32.0 34.7 35.32009 34.5 36.6 37.8 34.2 32.6 30.9 29.4 29.2 30.2 30.4 32.9 35.42010 35.3 37.3 37.6 36.6 31.8 30.8 28.7 29.3 29.6 30.0 33.7 35.02011 34.7 35.9 37.7 35.3 33.2 30.7 30.0 28.4 29.8 31.1 34.5 34.92012 34.8 35.9 37.7 34.6 31.6 30.2 28.4 27.9 28.9 30.8 33.6 34.82013 31.9 34.6 38.8 37.4 36.1 33.3 30.6 28.4 29.8 31.1 34.5 34.9

Source: NIMET, Abuja

Page 26: NESTLE  ABAJI  EIA  PRESENTATION

Table 4.2 Monthly Minimum Temperature, °C in AbujaJan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2001 17.3 20.4 24.3 25.0 24.4 22.4 22.2 21.7 21.6 22.0 20.1 18.62002 17.7 21.1 25.0 25.2 24.7 22.8 22.3 22.2 21.9 22.3 20.4 18.12003 19.7 22.4 25.1 25.0 24.7 22.0 22.5 22.3 22.3 22.5 20.8 17.62004 19.2 21.5 24.5 25.1 23.5 22.7 22.3 22.2 22.1 22.5 21.4 18.62005 18.5 24.7 26.3 25.6 24.0 22.9 22.9 22.6 22.5 22.1 20.0 19.72006 22.5 24.6 25.4 25.1 23.8 23.4 23.1 22.1 22.2 22.4 19.5 16.92007 17.8 22.7 21.6 24.1 25.1 21.6 20.9 20.9 20.6 20.4 17.7 14.22008 18.2 20.9 25.4 24.9 24.2 22.9 22.5 22.2 22.3 22.3 20.2 18.72009 20.3 23.2 25.2 24.5 23.3 22.5 22.3 22.3 22.0 21.8 20.0 17.42010 19.2 23.3 25.1 25.7 23.9 23.5 22.3 22.8 22.1 21.8 21.7 17.22011 16.1 22.7 23.0 23.1 24.3 23.1 22.6 21.8 21.7 21.8 18.7 16.02012 18.5 22.7 24.2 24.6 22.6 22.3 21.5 21.4 20.9 21.2 20.2 17.32013 16.7 18.9 22.8 25.1 25.0 23.4 21.8 21.8 21.7 21.8 18.7 16.0

Source: NIMET, Abuja

TEMPERATURE (MIN) – (2001 -2013)

Page 27: NESTLE  ABAJI  EIA  PRESENTATION

Table 4.3 Monthly Average Relative Humidity, % in AbujaJan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2001 43.0 38.0 36.0 63.0 76.0 81.0 85.0 86.0 84.0 80.0 62.0 49.02002 47.0 50.0 60.0 62.0 75.0 80.0 85.0 85.0 84.0 79.0 63.0 41.02003 44.0 28.0 37.0 64.0 72.0 80.0 85.0 83.0 85.0 78.0 60.0 47.02004 37.0 31.0 49.0 63.0 72.0 80.0 87.0 88.0 85.0 73.0 55.0 43.02005 34.0 37.0 57.0 69.0 71.0 79.0 85.0 86.0 84.0 79.0 61.0 45.02006 46.0 45.0 44.0 68.0 71.0 81.0 84.0 85.0 83.0 79.0 64.0 46.02007 46.0 33.0 38.0 68.0 79.0 81.0 85.0 86.0 82.0 85.0 68.0 52.02008 36.0 49.0 56.0 63.0 76.0 82.0 85.0 85.0 84.0 78.0 59.0 52.02009 56.0 56.0 57.0 58.0 76.0 78.0 83.0 87.0 84.0 82.0 54.0 42.02010 34.0 35.0 47.0 75.0 81.0 82.0 88.0 82.0 79.0 68.0 51.0 47.02011 24.0 18.0 33.0 45.0 53.0 67.0 68.0 75.0 69.0 66.0 33.0 36.02012 37.0 35.0 51.0 65.0 76.0 81.0 85.0 86.0 84.0 78.0 61.0 46.02013 39.0 37.0 50.0 65.0 75.0 80.0 84.0 85.0 83.0 78.0 59.0 46.0

Source: NIMET, Abuja

RELATIVE HUMIDITY – (2001- 2013)

Page 28: NESTLE  ABAJI  EIA  PRESENTATION

Table 4.4 Monthly Total Rainfall, mm in AbujaJan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2001 0.0 0.0 0.5 96.0 94.5 152.6 358.5 333.4 245.9 101.6 0.0 0.02002 0.0 0.0 70.5 107.4 82.0 227.7 450.3 487.8 353.1 263.3 6.9 0.02003 0.0 24.0 19.3 82.0 167.7 342.2 482.7 257.6 249.5 82.2 63.3 0.02004 0.0 11.5 0.0 64.3 222.0 310.7 255.6 303.6 164.9 202.7 5.9 0.02005 0.0 0.0 0.0 63.2 93.2 477.0 275.7 202.4 158.3 202.0 0.0 0.02006 13.2 21.5 46.6 32.5 136.2 101.1 189.8 384.5 186.6 199.6 0.0 0.02007 0.0 0.0 24.1 102.6 78.7 159.8 314.9 299.9 240.3 168.2 0.4 0.02008 0.0 0.0 27.0 35.2 65.0 218.9 202.0 370.9 195.0 60.7 0.0 0.02009 6.7 5.7 0.0 75.1 121.5 182.7 154.7 433.8 187.5 226.3 50.6 0.02010 0.0 0.6 7.5 74.2 310.9 174.7 314.8 278.1 283.2 238.2 0.0 0.02011 0.0 43.5 0.0 52.2 105.2 127.5 226.3 183.5 272.6 201.6 0.0 0.02012 0.0 20.6 19.0 52.0 162.8 222.8 376.1 270.5 274.4 228.9 11.0 0.02013 2.5 39.5 28.7 134.1 124.1 162.7 192.8 183.5 272.6 201.6 0.0 0.0

Source: NIMET, Abuja

TOTAL RAINFALL – (2001 – 2013)

Page 29: NESTLE  ABAJI  EIA  PRESENTATION

Table 4.5 Monthly Average Wind speed, Knots (2Kts = 1m/s) in AbujaJan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2001 4.7 5.7 5.8 6.1 5.7 5.5 5.0 4.2 4.6 4.5 5.0 4.62002 4.5 5.8 6.1 6.2 5.6 5.7 5.4 5.3 5.3 5.5 5.3 4.92003 5.5 4.6 5.3 3.7 3.8 3.2 3.3 3.3 3.4 2.6 2.4 2.52004 2.9 2.7 3.0 3.0 3.1 2.9 2.2 2.3 2.8 2.8 2.2 1.92005 1.9 1.9 2.6 3.0 2.4 2.4 2.5 2.1 1.8 2.2 1.6 1.32006 1.2 1.6 2.5 2.5 2.5 2.1 2.3 2.1 2.3 2.4 2.1 2.22007 2.0 2.4 2.6 3.2 3.1 3.2 2.8 2.5 2.2 2.2 2.5 2.12008 2.7 3.3 3.4 4.1 4.4 4.2 4.1 4.3 4.2 4.0 3.3 3.22009 2.8 3.3 3.4 4.1 4.4 4.2 4.1 4.3 4.2 4.0 3.3 3.22010 2.4 3.6 4.5 5.6 4.7 4.5 5.0 4.8 4.7 4.4 5.4 3.52011 4.1 3.7 3.5 5.0 4.9 4.4 4.2 3.6 3.1 2.8 3.0 4.92012 3.6 3.9 3.6 4.9 4.8 4.7 3.7 3.9 3.4 3.1 3.4 5.12013 3.3 3.9 3.8 5.2 4.7 4.5 4.3 4.1 3.2 3.3 3.2 4.1

Source: NIMET, Abuja

WIND SPEED – (2001 - 2013)

Page 30: NESTLE  ABAJI  EIA  PRESENTATION

S/NUTM Northing Easting ELEVATION TSP µg/m3

Wet Dry Wet Dry Wet Dry Wet Dry Wet Dry Wet Dry DryAQC 943762.15 271840.84 547.9 ND ND 4.6 3.0 0.15 ND ND ND 20.9 21.5 ND ND 150AQI 943105.10 272663.26 516.2 ND ND 2.9 2.0 ND ND ND ND 20.5 21.4 ND ND 210AQ2 943306.49 272581.74 520.4 ND ND 3.1 2.0 ND ND ND ND 20.6 21.5 ND ND 210AQ3 943296.05 272466.06 588.2 ND ND 2.9 3.5 <0.1 <0.1 ND ND 20.6 21.5 ND ND 200AQ4 943302.93 272214.64 572.5 ND ND 4.5 2.0 0.15 0.1 ND ND 20.6 21.5 ND ND 190AQ5 943183.09 272213.99 577.1 ND ND 4.2 3.0 0.1 <0.1 ND ND 20.6 21.6 ND ND 160AQ6 943058.28 272455.61 552.0 ND ND 4.2 2.0 0.1 0.1 ND ND 20.6 22.0 ND ND 140

0.1 NS NS

PARAMETERS / READINGS

250

Locations

FMEnv limits

COORDINATES (GPS) UTMNO (ppm) CO (ppm) SO2 (ppm) CH4 (ppm) O2 % H2S (ppm)

NS0.05 20

AIR QUALITY

Page 31: NESTLE  ABAJI  EIA  PRESENTATION
Page 32: NESTLE  ABAJI  EIA  PRESENTATION
Page 33: NESTLE  ABAJI  EIA  PRESENTATION
Page 34: NESTLE  ABAJI  EIA  PRESENTATION

ECOLOGY SAMPLING STATIONS

Page 35: NESTLE  ABAJI  EIA  PRESENTATION

TERMITE HILL IN THE STUDY AREA

Page 36: NESTLE  ABAJI  EIA  PRESENTATION

SHED SNAKE SKIN IN THE STUDY AREA

Page 37: NESTLE  ABAJI  EIA  PRESENTATION

VEGETATION DURING WET AND DRY SEASONS

WET SEASON DRY SEASON

Page 38: NESTLE  ABAJI  EIA  PRESENTATION

ECONOMIC PLANTS WITHIN THE STUDY AREA

Page 39: NESTLE  ABAJI  EIA  PRESENTATION

S/N Scientific Name Family/Sub family Common Name Uses/Economic Importance

1 Parkia clappertoniana Mimosaceae Tiv: nune; African locust bean Fermented seeds used as condiment for soup making.

2 Daniellia oliveri Caesalpinaceae African copaiba balsam Timber, fuel wood

3 Vitex doniana Verbanaceae Black plum Yoruba: orinla Fuel wood, Edible fruits

4 Lophia lanceolata Ochnaceae Ibo: okopia Fuel wood, Edible fruits

5 Piliostigma thonningii Caesalpiniaceae Thonning’s piliostigm Dye yielding, Religions purposes

6 Annona senegalensis Annonaceae Custard apple Medicinal

7 Borassus aethiopum Palmae Borrassus palm Sap tapped for beverage/wine; Used as food, dye yielding, medicinal

8 Ficus polita Moraceae Tiv: kondam Shade tree

9 Azadirachta indica Meliaceae Neem Medicinal

10 Tectonia grandis Verbanaceae Teak Used as poles for high/low tension electric lines

11 Anacardium occidentalis Anacardiaceae Cashew Edible fruit, Medicinal

12 Mangifera indica Anacardiaceae Mango Edible fruit, Medicinal

13 Adansonia digitata Bombaceae Baobab Medicinal fruit, Religious uses

14 Newbouldia laevis Bignoniaceae Newbouldia Medicinal, Religious application

15 Dialium guineense Caesalpiniaceae Blackvelvet tamarind Edible fruits

16 Calotropis procera Asclepiadaceae Calotropis Medicinal uses

17 Elaeis guineensis Palmae Oil palm Palm oil, brooms, etc.

18 Citrus aurantium Rutaceae Orange Edible fruit

19 Cocos nucifera Palmae Coconut Edible fruit

20 Luffa aegyptica Cucurbitaceae Loofah, Loofah gourd Sponge

21 Antidesma venosum Euphorbiaceae Hausa: kirni Edible fruits

22 Celtis integcifolia Ulmaceae Hausa: zuwo Fuel wood, Edible fruits

23 Khaya senegalensis Meliaceae Dry zone mahogany Timber, fuel wood

Table 4.18: Checklist of Common Economic Trees/Plants in the study area.

Page 40: NESTLE  ABAJI  EIA  PRESENTATION

CULTIVATED FARMLANDS WITHIN THE PROJECT SITE

Page 41: NESTLE  ABAJI  EIA  PRESENTATION

EFFECT OF HUMAN ACTIVITIES ON THE ENVIRONMENT

WOOD CUT FOR SALE ANIMALS DRINKING FROM THE STREAM

Page 42: NESTLE  ABAJI  EIA  PRESENTATION

Parameters Abaji TBHFMEnv LimitWHO LimitPhysico-Chemical Examination Wet Dry Wet Dry DryGeneral Appearance Brownish Turbid YellowishColourless ColourlessColour, (Hz) < 5 < 5 < 5 < 5 < 5 15m/l Pt-CoOdourElectrical Conductivity, µS/cm 239.0 249.0 117.0 220.0 34.0 1000.0 250.0Turbidity, NTU 27.6 67.0 4.8 Nil Nil <5pH @ 25°C 6.7 7.3 6.3 7.1 6.6 6.5 - 8.5 6.5 - 8.5Total Dissolved Solids, mg/l 238.3 243.4 92.6 218.4 32.6 500.0Total Solids, mg/l 310.4 311.2 134.7 246.1 60.1Total Hardness, mg/l 92.0 100.0 35.4 95.0 7.9 100.0 150-500Total Alkalinity, mg/l 105.7 113.7 25.5 99.5 9.5 200.0Total Acidity, mg/l Nil Nil Nil Nil NilResidual Chlorine, mg/l N.D. N.D. N.D N.D N.D 0.3Free Carbondioxide, mg/l 19.2 10.6 22.4 14.6 21.3 50.0Ammonical Nitrogen, mg/l 0.95 N.D. N.D N.D N.DChloride, mg/l 13.4 5.9 20.1 2.4 2.4 200.0 250.0Nitrate, mg/l 0.25 0.25 4.00 0.25 0.25 45.00 50.00Nitrite, mg/l 0.09 0.05 N.D. N.D. N.D.Phosphate (Total), mg/l 0.77 0.77 1.50 0.77 0.77Sulphate, mg/l 15.8 10.8 3.2 10.1 3.4 200.0 500.0Silica, mg/l 11.5 13.0 8.5 11.5 9.5 40.0Arsenic, mg/l N.D. N.D. N.D. N.D. N.D. 0.1 0.0Cadmium, mg/l N.D. N.D. N.D. N.D. N.D. 0.0 0.003Calcium, mg/l 85.0 39.7 28.3 17.3 1.6 70.0Chromium (Hexavalent), mg/l N.D. N.D. N.D. N.D. N.D. 0.1 0.05Copper, mg/l 0.042 0.106 0.047 0.004 N.D. 1.00 2.00Iron ( Total), mg/l 0.38 3.10 0.15 0.06 0.06 0.30 0.30Lead, mg/l N.D. N.D. N.D. N.D. N.D. 0.05 0.01Magnesium, mg/l 1.70 15.40 1.70 19.00 1.50 30.00Manganese, mg/l 0.057 0.120 0.015 0.028 0.002 0.05 0.50Zinc, mg/l 0.008 0.137 0.009 N.D. N.D. 5.00 3.00Dissolved Oxygen, mg/l 5.5 6.4 6.2 6.4 6.5 ≥ 2.0Chemical oxygen Demand, mg/l 5.0 5.0 10.0 5.0 5.0 90.0Biochemical Oxygen Demand, mg/l2.0 2.0 5.0 2.0 2.0 50.0Total Petroleum Hydrocarbon N.D. N.D. N.D. N.D. N.D.Miocrobiological ExaminationColiforms, CFU/ml 0 0 140 0 0 0E. Coli, CFU/ml 0 0 30 0 0 0Faecal Streptococci, CFU/ml 0 0 0 0 0 0Staphycoccus Aureus, CFU/ml 0 0 0 0 0 0Salmonella, CFU/ml Absent Absent Absent Absent Absent 0Shigella, CFU/ml Absent Absent Absent Absent Absent 0Clostridia, CFU/ml - - - - - - Pseudomonas, CFU/ml 0 0 0 0 0 0Yeast / Moulds, CFU/ml - - - - - - Aerobic Mesophillic Count, CFU/ml116 223 TNTC 169 183 100

Nestle MBH Mandereji CBH

unobjectionable unobjectionable unobjectionable

Table 4.8: Groundwater Physico-chemical and Microbiological Analysis Results

Page 43: NESTLE  ABAJI  EIA  PRESENTATION

Parameters FMENV LimitWHO LimitPhysico-Chemical Examination Wet Dry Wet DryGeneral Appearance Brownishslightly turbidBrown/turbidColour, (Hz) < 5 < 5 < 5 < 5 15m/l Pt-CoOdour unobjectionable unobjectionableElectrical Conductivity, µS/cm 54.0 53.0 52.0 54.0 1000.0 250.0Turbidity, NTU 18.0 7.5 39.6 7.5 <5pH @ 25°C 6.4 7.1 6.3 7.0 6.5 - 8.5 6.5 - 8.5Total Dissolved Solids, mg/l 50.4 51.7 52.8 51.7 500.0Total Solids, mg/l 103.1 107.3 108.5 116.3Total Hardness, mg/l 14.2 11.9 14.2 11.9 100.0 150-500Total Alkalinity, mg/l 21.8 23.6 21.8 23.6 200.0Total Acidity, mg/l Nil Nil Nil NilResidual Chlorine, mg/l N.D. N.D. N.D. N.D. 0.3Free Carbondioxide, mg/l 20.6 14.2 21.8 14.8 50.0Ammonical Nitrogen, mg/l 0.70 N.D. 0.65 N.D.Chloride, mg/l 5.4 2.4 5.4 2.4 200.0 250.0Nitrate, mg/l 0.75 0.25 0.50 0.25 45.00 50.00Nitrite, mg/l 0.03 0.04 0.01 0.07Phosphate (Total), mg/l 1.50 0.77 2.30 1.50Sulphate, mg/l 2.5 3.4 2.5 4.4 200.0 500.0Silica, mg/l 6.5 10.5 9.0 10.5 40.0Arsenic, mg/l N.D. N.D. N.D. N.D. 0.1 0.0Cadmium, mg/l N.D. N.D. N.D. N.D. 0.0 0.003Calcium, mg/l 10.6 3.2 10.6 3.2 70.0Chromium (Hexavalent), mg/l N.D. N.D. N.D. N.D. 0.1 0.05Copper, mg/l 0.051 0.061 0.125 0.059 1.00 2.00Iron ( Total), mg/l 1.70 1.40 6.20 1.10 0.30 0.30Lead, mg/l N.D. N.D. N.D. N.D. 0.05 0.01Magnesium, mg/l 0.86 2.10 0.86 2.10 30.00Manganese, mg/l 0.012 0.026 0.209 0.022 0.05 0.50Zinc, mg/l 0.045 0.040 0.148 0.051 5.00 3.00Dissolved Oxygen, mg/l 4.0 6.4 5.0 6.4 ≥ 2.0Chemical oxygen Demand, mg/l 20.0 5.0 10.0 5.0 90.0Biochemical Oxygen Demand, mg/l15.0 3.0 5.0 2.0 50.0Total Petroleum Hydrocarbon N.D. N.D. N.D. N.D.Miocrobiological ExaminationColiforms, CFU/ml 6 24 30 0 0E. Coli, CFU/ml 0 0 15 0 0Faecal Streptococci, CFU/ml 0 0 0 0 0Staphycoccus Aureus, CFU/ml 0 0 0 0Salmonella, CFU/ml Absent Absent Absent Absent 0Shigella, CFU/ml Absent Absent Absent Absent 0Clostridia, CFU/ml - - - - …Pseudomonas, CFU/ml 0 0 0 0 0Yeast / Moulds, CFU/ml - - - - …Aerobic Mesophillic Count, CFU/mlTNTC TNTC TNTC TNTC 100

Up Stream SW Down Stream SW

Table 4.9: Surface water Physico-chemical and Microbiological Analysis Results

Page 44: NESTLE  ABAJI  EIA  PRESENTATION

Table 4.11: Results of Soil Physico -chemical and Microbiology of the Study areaParameters SSC SS1 SS2 SS3 SS4 SS5 SS6Physico-Chemical Examination

General Appearance Dark brown Brown Reddish BrownReddish Brown Brown Brown Brown

coarse soil coarse soil coarse soil coarse soil coarse soil moist soil coarse soil

Moisture Content 6.60 4.88 6.98 9.52 0.69 7.38 3.07Total Ash 92.31 91.39 90.22 85.78 97.85 91.52 96.01pH (10% solution) @ 25°C 6.61 6.68 6.68 6.34 6.63 6.72 6.76Insoluble silica Content, % 80.50 79.60 78.70 73.90 86.20 79.80 83.60Organic Matter 1.09 3.73 2.80 4.70 1.46 1.10 0.92Chloride % 0.87 0.86 0.80 1.19 0.91 0.88 0.80Sulphate Content, mg/kg N.D. N.D. N.D. N.D. N.D. N.D. N.D.Total phosphate, mg/kg 42.69 42.95 43.13 43.71 41.77 42.83 43.35Ammonical Nitrogen, mg/kg 5.17 2.31 2.03 11.17 5.06 4.03 4.66Nitrate, mg/kg 6.98 56.15 63.42 N.D. 20.47 48.99 28.33Magnesium, mg/kg 104.50 51.52 87.82 27.52 54.49 105.69 106.76Sodium, % 0.56 0.56 0.52 0.77 0.59 0.57 0.52Potassium, % <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01Iron ( Total), mg/kg 261.58 1566.00 1570.16 528.98 149.10 377.92 524.93Calcium, mg/kg 430.06 636.08 542.10 226.50 896.88 652.40 219.68Manganese, mg/kg 90.15 158.60 61.66 2.01 112.24 74.21 27.30Lead, mg/l 0.25 2.35 1.63 0.84 N.D. 0.81 0.30Chromium (Hexavalent), mg/l N.D. N.D. N.D. N.D. N.D. N.D. N.D.Cadmium, mg/kg 0.42 0.04 0.06 0.03 0.02 0.05 N.D.Copper, mg/l 1.88 8.50 1.68 1.19 2.41 2.09 0.92Zinc, mg/kg 1.12 5.27 2.25 0.52 1.03 1.36 0.24Arsenic, mg/kg N.D. N.D. N.D. N.D. N.D. N.D. N.D.Miocrobiological Examination

Coliforms, CFU/g 0 0 0 0 0 0 0E. Coli, CFU/g 0 0 0 0 0 0 0Faecal Streptococci, CFU/g - - - - - - - Staphycoccus Aureus, CFU/g - - - - - - - Salmonella, CFU/g - - - - - - - Shigella, in 25g - - - - - - - Clostri, CFU/g

Yeast / Moulds, CFU/g TNTC TNTC 300 500 TNTC 200 TNTCTotal Plate Count, CFU/g 2,600 1,600 1,600 600 1,700 1,400 2,500

Wet Season

Page 45: NESTLE  ABAJI  EIA  PRESENTATION

Table 4.12: Results of Soil Physico -chemical and Microbiology of the Study areaParameters SSC SS1 SS2 SS3 SS4 SS5 SS6Physico-Chemical Examination

General Appearance Brown Reddish BrownReddish BrownReddish BrownReddish BrownReddish BrownReddish Brown

coarse soil coarse soil lumpy soil lumpy soil coarse soil coarse soil coarse soil

Moisture Content 0.19 1.85 5.04 7.02 5.30 4.46 2.09Total Ash 98.58 97.16 92.59 89.85 93.31 93.40 96.92pH (10% solution) @ 25°C 7.08 6.98 6.99 6.62 7.37 7.08 7.21Insoluble silica Content, % 82.90 83.70 78.30 72.90 78.60 78.70 83.10Organic Matter 1.23 0.99 2.37 3.13 4.52 2.14 0.99Chloride % 2.92 2.40 2.44 2.11 2.39 2.36 2.72Sulphate Content, mg/kg N.D. N.D. N.D. N.D. N.D. N.D. N.D.Total phosphate, mg/kg 25.29 23.65 25.21 24.92 25.11 25.48 24.50Ammonical Nitrogen, mg/kg 1.02 0.63 0.67 N.D. 0.67 0.68 0.98Nitrate, mg/kg 8.26 7.68 8.18 N.D. 8.15 8.27 15.91Oil/Fat (Chloroform Extract) % 0.23 0.19 0.17 0.21 0.15 0.19 0.17Magnesium, mg/kg 464.35 476.31 242.71 239.76 475.64 234.40 216.93Potassium, % 0.57 0.53 0.41 0.44 0.09 0.05 0.02Iron ( Total), mg/kg 818.39 1492.41 1948.74 2253.70 419.15 688.54 700.93Calcium, mg/kg 2866.30 1960.12 1997.63 1973.33 1957.36 3858.46 2678.10Manganese, mg/kg 87.98 126.15 95.43 119.18 106.10 99.80 122.69Lead, mg/l N.D. N.D. N.D. N.D. N.D. N.D. N.D.Chromium (Hexavalent), mg/l N.D. N.D. N.D. N.D. N.D. N.D. N.D.Cadmium, mg/kg N.D. 0.005 0.005 0.02 N.D. N.D. N.D.Copper, mg/l 4.54 5.14 4.94 4.10 6.69 4.68 3.89Zinc, mg/kg 8.28 3.06 4.30 3.27 4.65 29.37 3.62Arsenic, mg/kg N.D. N.D. N.D. N.D. N.D. N.D. N.D.Miocrobiological Examination

Coliforms, CFU/g 0 0 0 0 0 0 0E. Coli, CFU/g 0 0 0 0 0 0 0Faecal Streptococci, CFU/g - - - - - - - Staphycoccus Aureus, CFU/g - - - - - - - Salmonella, CFU/g - - - - - - - Shigella, in 25g - - - - - - - Clostri, CFU/g

Yeast / Moulds, CFU/g TNTC TNTC 250 TNTC 400 TNTC TNTCTotal Plate Count, CFU/g 4,000 3,200 3,500 4,000 4,100 3,000 2,000

Dry Season

Page 46: NESTLE  ABAJI  EIA  PRESENTATION

4.3.7.1 Physical Properties Physical appearance of the soil encountered in the study area showed that

they could be classified into three categories namely: Juvenile/lacustrine alluvium or hydromorphic soils, Ferrisols/ferruginous, and Lithosols

  a) The Juvenile soils on riverine and lacustrine alluvium have highly heterogeneous

parent material with stratified profiles. They consist of soils of the flood plains, which are permanently or seasonally water logged located mainly on lower slopes and alluvial areas referred to as “fadama”. This type was encountered at the control site which was at a lower plain and closer to the river course.

b) Ferrisols/ferruginous tropical soils were encountered and these covered over half of the study area. These soils exhibited differentiated horizons and frequently had a leached A horizon and contained a textural or structural B-horizon. Free iron oxides were present within the profile in the form of mottles or concretions. The ferruginous soils were either developed on crystalline rocks, or were undifferentiated and developed from mixed rocks of basement complex. A summary of the characteristics (Particule sizes and profile ) of the ferrisols encountered within the study area is given in Table 4.10.

c) The lithosols are soils with weakly developed genetic horizons containing coarse elements and having solid rock within 30-60cm of the surface. They are of limited agricultural value as the profile is very shallow. The ferrisols have deep profile with varying amounts of iron concretions. The clay fraction usually consists entirely of Kaolinite (1:1 clay), free iron oxides and amorphous gels with small quantities of 2:1 clay.

REMARKS ON ANALYSIS

Page 47: NESTLE  ABAJI  EIA  PRESENTATION

Chemical Properties Chemical properties of the soil analysis by methods described in Appendix 4 showed that the

soil are all slightly acidic in nature with pH range of both control and site samples within (6.34 – 6.76). and (6.98 - 7.37) for both wet and dry season analysis. Organic Matter recorded ranged between (0.92 – 4.3) for wet season and (0.99 – 4.52) for the dry season.

Insoluble silica content was high (78.7 - 86.2) %, for wet and (72.9 - 83.7) %, for dry season. while Iron content was between (149.1 – 1570.16) mg/l wet season and (419.15 – 2253.70) (Graph 4.4) This shows the characteristic of the soil type which has earlier been described as mainly ferruginous and lithosols. The lower level recorded in the wet season may be connected with its being leached as a result of rain. The presence in the ground water confirm this.

As expected the amount of Ammoniacal Nitrogen and Nitrate were more in the wet season than the dry season. Ammoniacal Nitrogen concentration ranged between (2.03 – 11.17) wet and (0.63 – 1.02) dry season while Nitrate concentration ranged between (6.98 – 63.42) wet and (7.68 – 16.91) dry season. (Graph 4.1 & 4.2)

Similar trend is recorded for phosphorus. Concentration ranged between (41.77 – 43.71) Wet and (23.65 – 25.48) dry season (Graph 4.3). While Nitrates are essential plant nutrients, excess amount can cause significant water quality problem if run off occurs. Together with phosphorus, excess can accelerate eutrophication causing dramatic increase in aquatic plant growth and change in plant and animal that live in the stream. At the present concentration, they are not of any threat to the environment.

The content of basic cations like calcium Magnesium and Potassium also give the extent of leaching in the soil. Again the observed trend is that wet season values are lower than that of dry season. (Graph 4.5, 4.6 & 4.7)

Lead, Chromium and ( Heavy metals ) were not detected but Cadmium was found in very minute (trace) quantities in some point. Copper and Zinc value ranged between (3.89 – 6.69) mg/l wet season / (0.92 – 8.50) mg/l dry season, and (0.24 – 5.27) mg/l wet season / (3.06 – 29.37) mg/l dry season, respectively.

REMARKS CONT.

Page 48: NESTLE  ABAJI  EIA  PRESENTATION

Surface Water Profile / Analysis Water samples collected from the surface water body ( Yawuti river) was analysed and the

following characteristics were obtained. General Appearance The samples appeared brownish and with particulate. Turbidity Measured turbidity value ranged between (18.0 -39.6) wet Season and (7.5) dry season.

The value showed that the The high turbidity of 39.6NTU which is above the FMEnv limit of 5NTU occurred at the down stream in September. This may be attributed to anthropogenic intrusion at that point of the river course. Most of the settlers were found fetching water and carrying out domestic activities like washing at that point of the river. The values were generally lower in the dry season compared to the wet season.

Colour & Odour True colour measured were all below 5Hz (wet and dry) for all the stations sampled. All

the samples were of unobjectionable odour. The trend followed that observed for the turbidity. High colour recorded in the dry season depend on the dissolved organic matter and biological activity. The volume of the river which was lower at this period also contributed to the higher value. The value are however within the FMEnv limit of 10Hz

pH pH value recorded were all within a range of (6.3 – 6.5) wet , and (7.0 – 7.1) dry, which

still falls within the WHO limit of 6-9 for drinking water. The higher value were recorded for the upstream and lower for the down stream in both seasons. While slightly acidic value were recorded during the wet season, Neutral condition persist during the dry season.

Electrical Conductivity Electrical conductivity which is the ability of water to conduct an electric current ranged

between (52 and 54) us/cm. This was higher in the dry season. The value have a critical influence on aquatic biota and every kind of organism has typical level that it can tolerate. The values recorded were typical for fresh water bodies.

 

REMARKS CONT.

Page 49: NESTLE  ABAJI  EIA  PRESENTATION

Alkalinity (CaCo3) Alkalinity refers to the capacity of water to neutralize acid. The value for this study ranged from 21.8

to 23.6 mg/l with the dry season value highest. Total Dissolved Solid Total dissolved solid ranged between 50.4 – 52.8mg/l. the high value noted were for the down stream

station. Evidence of animal feaces around this area may be responsible for this. These values are however lower than the FMEnv limit of 500mg/l There were no trend variation noticed in the wet and dry season when compared.

Positive ions (Cations) The following cations ( Calcium, Magnesium and Manganese) etc) were all below the FMEnv limits a

possibility of absence of any major impact or pollution. As expected Calcium was most abundant ranging between (3.2 – 10.6) mg/l for both seasons. Magnsium

ranged between (0.86 – 2.1) mg/l. Both are indicators of the degree of hardness of the water. Negative ions (Anions) Chloride, Nitrate, Nitrite and sulphate were all detected but within the FMEnv limits. Although

anthropogenic influence on the stream was evident yet the value recorded must have been within the limit due to the flowing nature of the river.

Nitrate ranged between (0.25 – 0.75), Nitrite (0.01 – 0.04) and sulphate (2.5 – 4.4). Chloride as expected was most abundant among the Anions with values between (2.4 - 5.4).The higher

value recorded during the dry season may be due to evaporation. But all value were within the FMEnv limit of 200 mg/l. Phosphorus as phosphate ranged between (1.5 -2.3) mg/l wet and (0.77 – 1.50) mg/l dry season. This major component of agricultural fertilizer is a limiting nutrient in many river systems. The moderate level is an indication of its availability in the surrounding soil and not through application of fertilizers.

 

Remarks

Page 50: NESTLE  ABAJI  EIA  PRESENTATION

Heavy Metals Arsenic, cadmium, chromium and lead were not detected. Copper value ranged

between (0.059 - 0.125) for both wet and dry season. Manganese ranged from a low 0.012 m/l g to a high 0.209mg/l the higher value, was recorded for the downstream of the River Yawuti. This is also higher than the FMEnv limit. Iron ranged between (1.7 - 6.2) mg/l wet and (1.1 – 1.4) mg/l dry, depicting the ferruginous nature of the area. The high value resulted from the downstream sample. This value may be attributed to pronounced erosion along the way near the river bank.

Dissolved Oxygen (DO) DO value ranged between (4.0 – 5.0) wet and 6.4 dry season. All value were

above the limit of > 2.0 , The DO are considered adequate to support aquatic life.

Biochemical Oxygen Demand (BOD) The BOD ranged between (5.0 – 15.0) mg/l wet, and (2.0 – 3.0) mg/l for dry

season. Both values are lower than the limit of 50mg/l stated by the FMenv. It can be concluded that the water is not polluted for now.

Chemical Oxygen Demand (COD) Correspondingly, the COD ranged between (5.0 – 10.0) mg/l and within the

limit of FMEnv standard of 90 mg/l.  In conclusion, apart from the Iron content of the river, the water quality is within

the acceptable limits. However, in the light of some coliform count (6 -30) CFU /ml, and High Mesophillic Plate Count (TNTC), it is recommended that both the groundwater and surface water available to the community be subjected to some treatment before consumption.(i.e boiling & filtration)

REMARKS CONT.

Page 51: NESTLE  ABAJI  EIA  PRESENTATION

PATH THAT LEADS TO THE STREAM, SHOWING SIGN OF EROSION

Page 52: NESTLE  ABAJI  EIA  PRESENTATION

Plate 4.13: Cattle Egret (Ardeola ibis) sighted in the study area

Page 53: NESTLE  ABAJI  EIA  PRESENTATION

SOCIO – ECONOMICS Socio - Economics Introduction  Abaji is the headquarters of the Abaji Area Council which is one of the 6 Area Councils in the

Federal Capital Territory (FCT). A greater part of the Abaji Area Council was excised from the old Niger and present-day Kogi States. However, before its creation, it was one of the then 9 Development Area created at the inception of the FCT for ease of administration. It was later made local government area in 1987 following Federal Government directive that the 9 Development Areas be reconstituted into autonomous Local Government Areas in 1990. Another structural amendment resulted in merging of Abaji Local Government with Yaba Local Government to form the present Abaji Area Council.

  The Council is made up of executive and legislative arms and structured into the following

departments: Administration, Agriculture, Works, Education, Finance, Health and Environmental Sanitation  The town (Abaji) is located about 100km from Abuja on the Abuja-Lokoja road. It is at the

boundary of the FCT to the south-west. Abaji is occupied by many ethnic groups including the following: Hausa, Egbira, Gbagi, Bassa and Ganagana and a significant population of other ethnic groups from all over Nigeria. Hausa and Ganagana (a Nupe dialect) are the commonest native languages spoken. However, the predominant ethinic groups are the Ganagana and Egbira groups.

The population of Abaji was 46,600 as at the last National Census (2006) but with a national annual growth rate of 3 – 4 %, the present population is estimated to be about 58,000 which makes it one of the big towns in the Federal Capital Territory. Abaji has a land area of 1,100 square kilometres. It is structured into the following 10 wards for administrative purpose: Alu Mamagi, Central Abaji, Ebagi, Gawu, Gurdi, North-east, Nuku, Pandagi, South-east, and Yaba.

Page 54: NESTLE  ABAJI  EIA  PRESENTATION

Socio- economics interview

Page 55: NESTLE  ABAJI  EIA  PRESENTATION

SOCIO – ECONOMIC – Cont.

Page 56: NESTLE  ABAJI  EIA  PRESENTATION

SOCIO - ECONOMICS ISSUES THAT WERE INVESTIGATED INCLUDE:

OCCUPATION EDUCATION PUBLIC AMENITIES : ROAD, WATER, ELECTRICITY TRANSPORTATION ACCOMODATION LAND USE TRADITIONAL INSTITUTIONS INDUSTRIAL SERVICES

Page 57: NESTLE  ABAJI  EIA  PRESENTATION

CHAPTER FIVE In this Chapter, attention is directed towards the identification and

quantification of impacts that are associated with Project activities on the environment. These impacts are generally classified as primary or secondary. Primary impacts are those which are attributed directly and secondary impacts are those which are indirectly induced and typically include the associated transformations and changed patterns of social and economic activities by the proposed action. Some additional hidden impacts may also be predicted from the relevant components of the project.

  The impacts have been predicted for the proposed Nestle Abaji Greenfield

Water Factory (NNAGFWF) Project, assuming the baseline conditions covered during the EIA study remain the same till the commencement of the proposed Project.

Aspect of the proposed NNAGFWF that would create impact on the environment are in two distinct phases:

The Site preparation and construction phaseThe processing and operational phase

  The magnitude and significance of such impacts on the ecosystem, which

may be broadly classified into human, biological and physical elements have equally been assessed.

The chapter would be concluded by assessing the possible Project’s specific Risk and Hazards Assessment.

Page 58: NESTLE  ABAJI  EIA  PRESENTATION

Impact Adverse Beneficial ShortTerm

LongTerm

No effect Negativeeffect

Positiveeffect

Reversible Irreversible

Vegetation loss due to site clearing * * * *

Soil erosion due to pipe laying * * * *

Organic matter loss due to earth work * * * *

TSP due to construction activities * * * *

Noise Pollution due electricity generating set and vehicular movement

* * * *

Impairment of road human and road traffic * * * *

SOx, NOx, CO from generating sets and vehicles

* * * *

Landscape alteration due to site clearing and construction

* * * *

Employment * * * *

Influx of workers * * * *

Public and Health risk due to alteration of climatic condition

* * * *

Noise Pollution due to construction * *

Underground and surface water quality impairment due to the exploitation for production

* * *

Air emission effects to human health, agriculture and native wildlife and vegetation

* *

Habitat change and reduced population of wild life

* * *

Noise and Vibration due to heavy equipment * * *

Dislocation of farmers due to change in land use

* * * *

Community development * * *

Improved standard of living * *

Increase revenue to FCT , AAC * *

TABLE 5.4: RAU’ AD CHECKLISTOF POTENTIAL IMPACTS

Page 59: NESTLE  ABAJI  EIA  PRESENTATION

Project Activity Environmental Component

Potential Impacts Significance of Impact

Duration of Impacts

Magnitude of Impact

A Excavation Transportation EnergySupply Solid/Liquid

Waste Plant installation

Air / ClimateParticulate emission from construction Vehicles Emission from transportation to and from the project site.Particulate Emission from Generating set. Odour from undisposed solid / liquid waste. (from Waste Water Treatment Plant)Emission of toxic vapour from hazardous materials.

Adverse Adverse Adverse Adverse Adverse

Short termLong termPeriodic/ Short termPeriodic/ Short termMedium term

Moderate/ Negligible.Moderate/ NegligibleNegligible / Not important.Negligible / Medium.Moderate / Medium.

B Transportation Installation of

machinery and equipment

Possible Accidents/ equipment breakdown

Drilling of Borehole Well & Production Hall Construction

Noise/ Vibration Sound from transportation to and from the project site may lead to hearing

impairment.Sound/ Vibration from

drilling machine.Block setting & Iron

bending activitiesSound from welding, steel fabrication, pipe

laying.

Adverse Adverse Adverse

Short termShort term

Short termShort term

Moderate/ Negligible

Severe/ HighSevere/ HighSevere/High

1.ESTIMATION OF MAGNITUDE AND SIGNIFICANCE OF POTENTIAL PROJECT IMPACTS. Table 5.7

Page 60: NESTLE  ABAJI  EIA  PRESENTATION

Site / Land Clearing. (mostly grasses and flowers

Plant construction and Equipment installation

Vegetation/ Aesthetics

Elimination of terrestrial,

fauna/floral habitat.

Change in Land use/ Value.

Change in the landscape.

AdverseAdverseAdverse

Long termLong termLong term

Severe/High Moderate/ Medium

Moderate/ Medium.

Land Clearing

Construction of Storage / Warehouse building

Transportation

Handling of Hazardous material(s) – during well drilling

Treatment of water

Socio/ Economic

Increased job/working opportunities

locally.

Improved income opportunities.

Change in social structure/ services.

Possible effects on occupational health and safety

of the work

Increase economic

activities locally and nationally.

Beneficial

Beneficial

Beneficial

Adverse

Beneficial

Short term

Short term

Long term

Short term

Long term

Moderate/ Medium

Moderate/ Medium

Severe/ High

( + )

Severe/High

( - )

Moderate/ Medium

Page 61: NESTLE  ABAJI  EIA  PRESENTATION

CHAPTER SIX MITIGATION MEASURES 6.1 Introduction This chapter focuses on mitigation measures which have been developed in

consideration of the baseline conditions at the proposed NNAGFWF project site and study area.

Mitigation measures are used to eliminate if possible or reduce the risk(s) associated with the occurrence of potential impacts of the proposed project. These measures / controls have also taken into consideration projects activities and their envisaged impacts and concerns of stakeholders during the scoping and consultative forum as well as socio-economic / health status of the host community.

Based on the type / nature and characteristics of impacts, mitigation measures have been designed to address necessary areas by the following ways:

Prevention: Mitigation measures to address routine impacts have been included as part of the engineering design and process planning to ensure that significant potential impacts and risks do not occur.

Reduction and Control: Mitigation measures to ensure that the effects or consequences of impacts that could not be prevented are reduced to levels as low as reasonably practicable.

Monitoring: Mitigation measures to ensure that periodic checks are carried out on effects parameters to eliminate their impacts by ensuring compliance to statutorily permitted limits.

Summary of recommended mitigation measures to ameliorate all the significant associated and potential impacts identified for the proposed NNAGFWF project are highlighted in Table 6.1 However, brief explanatory highlights are provided below.

Page 62: NESTLE  ABAJI  EIA  PRESENTATION

MITIGATION MEASURES CONT. Acquisition and Land Use Land purchase and documentation have been done through the Abaji Local Council which has been vested with the

authority by the FCT Administration. Indigenous farmers shall be consulted and adequately compensated for the land cleared, economics crops and trees

through enumeration exercised supervised by the Abaji Area Council. Records of such consultations and compensations shall be well documented for future reference. (The NNAGFWF

Project has however concluded this aspect and documentation is attached as Appendix 8)

6.3 Site Preparation and Construction The proponent shall: use existing access routes / ways and ensure minimum clearing during site survey. Use equipment with low levels of noise and emissions that are within the acceptable national standards and

specifications Re – grass / flower the Project surrounding.

◦ Remove excess excavated soil for re – use (in other project – road repairs / remediation of erosion areas etc) Cement concrete / paving of un – grassed area. Ensure that water be sprinkled on open surface during excavation to reduce amount of soil particulates. Use Power sourced from the National grid where available to minimize burning of fossil fuel. Ensure movement of trucks and heavy duty vehicles are properly timed to ensure minimal interference with local

transportation as well as that of the major highway. Utilization of road worthy trucks to reduce emission of noxious gases and leakages of petroleum products in and

around the Project Site in particular and Factory in general. Ensure that all operators including third party contractors are trained on safety measures and site operational

procedures. Make provision for personal protection equipment for all categories of projects workers. Ears muffs, hard hat and

safety boots shall be made compulsory for site construction workers. Display, conspicuously, site safety requirements at the entrance of the site. Pictorial and dummy safety methods

shall be employed to cater for the level of education of the workers. Provide standard health and safety management on site in accordance with Nestle world-wide practice. Limit movement of unauthorized people to the Project site. Ensure land clearing and excavations are completed before wet season resumes to avoid run off that may

contaminate surface water. Ensure proper handling of oil and any other soil contaminant to avoid contamination of ground water. Lubricants shall

be disposed according to established good housekeeping practices. Provide adequate security at the site to prevent unwanted intruders. Ensure that solid wastes are disposed off by licensed and accredited waste contractors. Ensure storage of construction materials at designated area within the site and shall maintain good site

management and engineering practices during construction. Engage qualified local people as security, skilled and unskilled labour during construction activities.

Page 63: NESTLE  ABAJI  EIA  PRESENTATION

MITIGATION MEASURES CONT. Operation The proponent shall: Ensure that impacts indicating parameters for air quality, noise, water, soil environment are

monitored and within acceptable FMEnv standard limits and guidelines. Ensure the use of impacts reducing devices and incorporate appropriate contingency and emergency

response plan.

6.5 Decommissioning The proponent shall: Ensure decommissioning according to Nestle international standard and National guideline, if

available. Ensure the restoration of site by re-vegetation

6.6 Socio – economics Adequate compensation shall be paid to affected farmers for their cleared land, crops and economic

trees. Awareness campaign by means of consultative and stakeholders meeting shall be held at various

stages of the project. Proponent shall as part of agreed Memorandum of Understanding (MoU) undertake, identified

community development project(s) for the host community. Proponent shall support existing social infrastructure to reduce pressure on the limited ones as a

result of influx of people into the area. Use of local labour shall be given greater consideration in areas that are applicable / feasible. Nestle shared value initiative shall be encouraged for adoption by the relevant stakeholders.   6.7 Health The mitigation measures for health impacts shall include: Provision of mobile toilet on site during construction phase.

◦ Provision of site camp and mosquito nets for those that will be staying overnight.◦ Solid waste to be discarded by approved contractors◦ Provision of potable water for drinking (Packaged Nestle water will be provided).◦ Continous health education on easily transmitted diseases and communicable diseases will be conducted. ◦ Masking agents to be used for offensive odours from Waste Water Treatment Plant.

Page 64: NESTLE  ABAJI  EIA  PRESENTATION

Project Activity Environmental Component

Identified negative Impact

Mitigation Measure

Design / Land acquisition Soil Loss of land, loss of economic crops

Compensate communities for land take and farmlands.

Site Preparation / Clearing and ground excavation.

Soil, Terrestrial Fauna And Flora Migration of WildlifeVegetation removal exposes soil to adverse weather conditions. Increase in Particulate and Noxious emissions Surface water contamination

use existing access routes / ways and ensure minimum clearing during site survey.

Re – grassing / Flowering of Project surrounding.

Removal of excess excavated soil for re – use (in other project – road repairs / remediation of erosion areas etc)

Cement concrete / paving of un – grassed area.

Use equipment with low levels of noise and emissions that are within the acceptable national standards and specifications

Ensure that water be sprinkled on open surface during excavation to reduce amount of soil particulates

Use Power sourced from the National grid where available to minimize burning of fossil fuel.

Ensure movement of trucks and heavy duty vehicles are properly timed to ensure minimal interference with local transportation as well as that of the major highway.

Page 65: NESTLE  ABAJI  EIA  PRESENTATION

Construction / pipe laying, backfilling, machines installations

Soil, Water, Air Quality, Noise Health of the neighbouring residents / workers which may lead to hearing impairment.Atmospheric pollution. Injuries or accidents by machines Solid waste (domestic / industrial)

Use of appropriate PPE. Use of relevant safety

instruction and illustrations Site Safety Health Management

Procedures Limit Access to project Site. Clearing and Excavations to be

done in Dry Season Good housekeeping practices

and proper handling of oil. Solid wastes to be disposed

off by licensed/ accredited waste contractors.

Storage of construction materials at designated area within the site and enforcement of good site management and engineering practices.

Reduction at source, sorting and separation of materials for re-use and sale to third party users.

Operation / production, sales and marketing

Soil, Water, Air quality, Noise Movement of vehicles / Trucks in and out of the project site (i.e loading & off loading of packing materials and Finished Products & noise / emission generation).Occasional emission of unpleasant odours from Factory Waste Water Treatment Plant – to which the waste water from the Washer is discharged.

Packaging material; remnants of damaged pet, damaged pallets etc.

Use of vehicular packing, loading & off loading warehouse facility within Factory.

Utilisation of road worthy trucks to reduce emission of noxious gases and leakages of petroleum products in and around the Project Site in particular and Factory in general.

Need to introduce odour masking fumigant / deodorant agent to reduce emission of unpleasant odour(s) to the surrounding neighbourhood from Factory

Waste water Treatment plant Reduction at source, sorting

and separation of materials for re-use and sale to third party users.

Page 66: NESTLE  ABAJI  EIA  PRESENTATION

Decommissioning Ensure decommissioning according to Nestle international standard & existing National guidelines, if available.

Ensure the restoration of site by re-vegetation

Socio Economics Claims for compensation, conflict of ownership

Adequate compensation shall be

paid to affected farmers for

their farms, crops and economic

trees. Awareness campaign by means

of consultative and stakeholders

forum shall be held at various

stages of the project.

Pressure of available infrastructure Proponent shall as part of agreed Memorandum of Understanding undertake, identified community development project(s) for the host community.

Proponent shall support existing social infrastructure to reduce pressure on the limited ones as a result of influx of people into the area.

Page 67: NESTLE  ABAJI  EIA  PRESENTATION

ENVIRONMENTAL MANAGEMENT PLAN

NNAGFWF PROJECT ENVIRONMENTAL MANAGEMENT PLAN A Post EIA EMP which is different from the Factory EMP has been designed for the

NNAGFWF Project: This consist of three sections namely: Environmental Management Programme. Environmental Contigency Plan Waste Management Plan   7.3.1Environmnetal Management Programme   Scope of the Environmental Management Programme The EMP shall cover monitoring of compliance with mitigation measures during

construction activities and impacts monitoring during operation phase. This monitoring programme therefore establishes the specific environmental and socio – economic parameters for each of the environment that will be affected by the proposed project. The components includes:

Air quality Noise Water (Surface / ground) Vegetation and wild life Geology and hydrogeology Soil Waste Management Transportation Personnel Hygiene and safety Socio – economic and cultural impacts

CHAPTER SEVEN

Page 68: NESTLE  ABAJI  EIA  PRESENTATION

Project Activity / Potential Impacts

Action Required/Mitigation Measures

Impact Indicator

Regulatory Compliance Monitoring Party

Frequency / implementation time frame

Proponent’sAction Party

Land acquisition- Loss of land, loss of

economic crops and income

- conflict of ownership

Compensate farmers for land take and farmlands.

Proper identification of farmers by community / village head

Records of compensation, consultations and MOU shall be maintained

Abaji Area Council(AAC)

Prior to site preparation Nestle

Construction1.Vegetation Clearing and ground excavation. - Migration of Wildlife- Vegetation removal

exposes soil to adverse weather conditions.

- Increase in Particulate and Noxious emissions

- Surface water contamination

Restriction of pathway during site survey.

Re – grassing / Flowering of Project surrounding.

Removal of excess excavated soil for re – use (in other project – road repairs / remediation of erosion areas etc)

Use equipment with low levels of noise and emissions that are within the acceptable national standards and specifications

Ensure that water be sprinkled on open surface during excavation to reduce amount of soil particulates

Use Power sourced from the National grid where available to minimize burning of fossil fuel.

Periodic monitoring of air parameters

Species composition, abundance and identification of dominant species,Hunters catch, Availability and frequency of sightingNOx, CO2, CO, Sox, SPM and Noise levelBOD, COD, TSS TSP, DO, pH

FMEnv, NESREA Bi-annually. Bi-annually Quarterly / Monthly Monthly Daily during the

period of excavation Quarterly

Nestle / appointed Consultant“““

Table 7.1 Environmental Management Programme for NNAGFWF Project

Page 69: NESTLE  ABAJI  EIA  PRESENTATION

2. Socio-economics- Vehicular movement

and related transport activities

Transport of equipment and materials to site will be timed to coincide with period of low traffic in the area

Records of traffic situation around the site will be kept

Not Applicable Daily but during the period of transportation only

Nestle

Construction - pipe laying, backfilling,

machines installations- Health of the

neighbouring residents / workers which may lead to hearing impairment.

- Atmospheric pollution. - Injuries or accidents by

machines - Solid waste (domestic /

industrial)

Use of appropriate PPE.

Use of relevant safety instruction and illustrations

Site Safety Health Management Procedures

Limit Access to project Site.

Clearing and Excavations to be done in Dry Season

Good house keeping practices and proper handling of oil.

Solid wastes to be disposed off by licensed waste contractors.

Storage of construction materials at designated area within the site and enforcement of good site management and engineering practices.

Reduction at source, sorting and separation of materials for re-use and sale to third party users.

NOx, CO2, CO, Sox, SPM and Noise levelRecords of Injury free / Accidents & work down timeRecords all waste handling activities (log books) shall be kept

FMEnv, NESREAAAC““

Quarterly / MonthlyDailyDaily

Nestle / appointed Consultant

Nestle / Site safety office / supervisorNestle / SHE Unit in Nestle

Operation / production, sales and marketing.- Air Quality Pollution

Environmental and noise pollution control shall be incorporated into the power system

Monitoring of atmosphere/ surrounding air for major noxious gases and particulates.

NOx, CO2, CO, Sox, SPM and Noise level

FMEnv, NESREAAAC

. Quarterly / Monthly Quarterly / Monthly

Nestle staff (Laboratory)RNL Consultants

Page 70: NESTLE  ABAJI  EIA  PRESENTATION

- Water Quality / Contamination

Checking of effluent quality,

Ground / borehole water

Quality(Physico – chemical & Microbiological Analysis)

Oil and Grease, TDS, COD, TSS, BOD, Turbidity, pH, Temp, Heavy metals

FMEnv, NESREAAAC

Quarterly weekly

Nestle staff (Laboratory)RNL Consultants

- Soil Quality Degradation

Soil test ( around the Gas /Fuel pipeline route ) to verify project operational impact

pH, Heavy metals, Organic Matter.

FMEnv, NESREAAAC

Quarterly .

Nestle staff (Laboratory)

RNL

Consultants

- Environmental Awareness Programme

Safety, Health & Environmental (SHE) activities involving all workers, major suppliers / distributors / contractors – spanning 1week.

EMS FMEnv, NESREAAAC

Annually. Company Managers / Consultants.

- Documentation & Information Dissemination Programme.

Keeping records of all environmentally related compliances, Audit / monitoring Reports, log sheets, Accidents and recommendations.

EMS FMEnv, NESREAAAC

Routinely / Daily / Periodically

Factory Environmental Manager / Project SHE officer

Factory

- Accidental Occurrences

- Fire and explosions

Personnel to gather at muster points and emergency response plan to be followedPeriodic fire drill

EMS FMEnv, NESREA, AAC Fire Service

In case of

emergency

Nestle

Page 71: NESTLE  ABAJI  EIA  PRESENTATION

Specific Function

Action required Frequency Action by whom

Fire Prevention Provision of adequate fire protection and fire fighting facility

Inspection of fire – fighting equipment.

Certification of Fire – fighting equipment.

As need arisesMonthlyEvery 2 years

Factory Management / Project Manager

Certified contractors

Training Training of personnel on safety and loss / accident prevention activities.

Fire drills / Mock fire exercises

YearlyMonthly

Company Operative Staff

State Fire officials Factory fire team

Facility Inspection/ Maintenance

Machines / Equipment / Storage & Transportation System Inspection / Checking.

Daily Company

Engineering / Project Staff.

Table 7.2 Contingency Plan for NNAGFWF Project Operations

Page 72: NESTLE  ABAJI  EIA  PRESENTATION

Specific Function

Action required Frequency Action by whom

Drainage Management & House Keeping

Removal of debris from drains & repairs

General cleaning of site premises – internally & externally

Aesthetic maintenance

Cap house cleaning.

Daily Daily

Daily

Daily

Company operative staff (Nestle)

- ditto – - ditto – - ditto –

Disposal of Domestic / Solid waste

Safe handling, disposal / evacuation of solid waste from the NNAGFWF project site

Daily

Approved AAC waste contractor

Solid Waste Management PlanThe NNAGFWF project solid waste management plan as constituted and presented below in Table 7.3Table 7.3 Waste Management Plan for NNAGFWF Project Operation

Page 73: NESTLE  ABAJI  EIA  PRESENTATION

CONCLUSIONS AND RECOMMENDATIONS The Environmental Impact Assessment (EIA) of Nestle Nigeria Abaji Green Field

Water Factory Project was carried out in accordance with the Local, National and International Laws / Guidelines for EIA (Decree 86, 1992) adopted in 1994.

  A team of reputable environmental consultants were involved. Relevant recent

reports of other environmental experts were cited. Nestle Technical team, and other relevant stakeholders were consulted for their inputs. Consultations with the Host Community will continue while an MOU is being put in place for a cordial working relationship and for record purposes.

The general and specific concerns or impacts relating to the natural environment and socio – economic features have been identified, quantified and documented.

The magnitude / significance of the project environmental impacts has shown that the most important environmental parameters / components impacted upon are human health, physical surrounding (vegetation, land /soil quality, aesthetics) and socio economic issues, which are positive in nature. Those that are of negative impacts are short term and occurred mainly at the construction phase.

Based on the assessment of the results of available data and the existing Nestle Environmental Management System already in use in other Nestle factories, some additional mitigation and monitoring programmes have been recommended / suggested for this project.

The Nestle Environmental Management System (NEMS) would need to be upgraded to integrate the Plan / programmes highlighted in this report.

CHAPTER EIGHT – CONCLUSION

Page 74: NESTLE  ABAJI  EIA  PRESENTATION

We conclude, from the available data presented in the preceding chapters, that the overall benefit of the Nestle Nigeria Abaji Green Field Water Factory Project outweighs the few negative temporal and permanent effects.

Therefore, the construction, commissioning and operation of the Nestle Nigeria Abaji Green Field Water Factory Projects is recommended in view of its immense socio – economic and societal health improvement benefits to the citizens of Nigeria in general, to the neighbouring / host communities in particular and to the FCT and Federal Government of Nigeria, whose policy of Public / Private Sector partnership programme is being substantially enhanced.

CONCLUSION CONT.