CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO F.C.E. PERIODO 0 1 2 3 INGRESOS 98248.92 112284.48 126320.04 % DE PRODUCCION 0.7 0.8 0.9 PRECIO UNITARIO(S/.) 31 31 31 Capacidad de planta 4527.6 4527.6 4527.6 PRODUCCION ANUAL 3169.32 3622.08 4074.84 COSTO DE INVERSION -59393.805 TERRENO -10500 EDIFICIO -33192.5 MAQUINARIA -2925 EQUIPO -4458 PLANEACION -1700 INGENIERIA -2553.775 SUPERVISION -2553.775 ADMINISTRACION -510.755 CAMBIO CAPITAL TRABAJO -1000 -1000 -1000 -1000 TASA DE DEPRECIACION 0.1 0.1 0.1 EDIFICIO 33192.5 3319.25 3319.25 3319.25 MAQUINARIA 2925 292.5 292.5 292.5 EQUIPO 4458 445.8 445.8 445.8 PLANEACION 1700 170 170 170 INGENIERIA 2553.755 255.3755 255.3755 255.3755 SUPERVISION 2553.755 255.3755 255.3755 255.3755 ADMINISTRACION 510.755 51.0755 51.0755 51.0755 DEPRECIACION 4789.3765 4789.3765 4789.3765 C.F.P.V. -38241.88 -40153.974 -42161.6727 MANO DE OBRA -30000 MATERIA PRIMA -4490.8 GASTOS IND. FAB. -3751.08 COSTO DE OPERACION -60600 -63630 -66811.5 ADMINISTRACION -24600 VENTAS -36000 IMPUESTOS(25%) -1345.584125 927.782375 3139.3727 -5382.3365 3711.1295 12557.4908 F.C.E -59393.805 -2938.544125 8428.288375 19486.24 COK 0.18 0.18 0.18 1.18 1.18 1.18 1.18 1.3924 1.643032 FLUJOS -59393.805 -2490.2916313559 6053.06548 11859.92726 VANE = -620.88262805912

description

esto es una información a serca de la evaluación económica de una empresa

Transcript of Evaluacion-economica

Page 1: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

F.C.E.PERIODO 0 1 2 3

INGRESOS 98248.92 112284.48 126320.04

% DE PRODUCCION 0.7 0.8 0.9

PRECIO UNITARIO(S/.) 31 31 31

Capacidad de planta 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84

COSTO DE INVERSION -59393.805

TERRENO -10500

EDIFICIO -33192.5

MAQUINARIA -2925

EQUIPO -4458

PLANEACION -1700

INGENIERIA -2553.775

SUPERVISION -2553.775

ADMINISTRACION -510.755

CAMBIO CAPITAL TRABAJO -1000 -1000 -1000 -1000

TASA DE DEPRECIACION 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25

MAQUINARIA 2925 292.5 292.5 292.5

EQUIPO 4458 445.8 445.8 445.8

PLANEACION 1700 170 170 170

INGENIERIA 2553.755 255.3755 255.3755 255.3755

SUPERVISION 2553.755 255.3755 255.3755 255.3755

ADMINISTRACION 510.755 51.0755 51.0755 51.0755

DEPRECIACION 4789.3765 4789.3765 4789.3765

C.F.P.V. -38241.88 -40153.974 -42161.6727

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(25%) -1345.584125 927.782375 3139.3727

-5382.3365 3711.1295 12557.4908

F.C.E -59393.805 -2938.544125 8428.288375 19486.24

COK 0.18 0.18 0.18

1.18 1.18 1.18

1.18 1.3924 1.643032

FLUJOS -59393.805 -2490.29163135593 6053.06548 11859.92726

VANE = -620.882628059123

Page 2: Evaluacion-economica

FLUJO DE FINANCIAMIENTO

MODO DE PAGO CUOTAS IGUALES

Nº DE CUOTAS 3

INTERÉS(10%) 0.1

AÑOS DE GRACI 1

PERIODO 0 1 2 3

PRESTAMO 23757.522

CAPITAL 16580.13703 8685.01356

INTERES 2375.7522 1658.013703

AMORTIZACION 7177.384971 7895.123469

A 9553.137171 9553.137171

FACTOR (A/P,10%,3) 0.40211 0.40211

PERIODO 0 1 2 3

PRESTAMO 23757.522

AMORTIZACION -7177.384971 -7895.123469

INTERESES -2375.7522 -1658.013703

ESCUDO FISCAL 593.93805 414.5034257

F. NETO 23757.522 0 -8959.199121 -9138.633746

COK 0.18 0.18 0.18

1.18 1.18 1.18

1.18 1.3924 1.643032

FLUJO 23757.522 0 -6434.357312 -5562.054632

VANF : 6945.69901466864

FLUJO FINANCIERO

PERIODO 0 1 2 3

F.C.E. -59393.805 -2938.544125 8428.288375 19486.24

F. FINANCIAMIENTO 23757.522 0 -8959.199121 -9138.633746

FLUJO FINANCIERO -35636.283 -2938.544125 -530.9107464 10347.60625

VAN = VANE + VANF

VAN = 6324.82

Page 3: Evaluacion-economica

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.122336 -35636.283 -35636.283

-2938.544125

1.122336

-2618.239213

-530.9107464

1.259638097

-421.4787944

10347.60625

1.413737183

7319.328074

20883.85487

1.586688135

13161.91532

63515.36225

1.780797215

35666.81356

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : 17472.05595

TIR PROY = 0.122336 12.2336

INFL. 1.05%

TIR REAL = 0.1106739238001 11.06739238

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23757.522 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN:

Page 4: Evaluacion-economica

4 5 LIQUIDACION

140355.6 140355.6

1 1

31 31

4527.6 4527.6

4527.6 4527.6

40446.86

10500

16596.25

1462.5

2229

850

1276.87

1276.87

255.37

-1000 -1000 6000

0.1 0.1

3319.25 3319.25 16596.25

292.5 292.5 1462.5

445.8 445.8 2229

170 170 850

255.3755 255.3755 1276.8775

255.3755 255.3755 1276.8775

51.0755 51.0755 255.3775

4789.3765 4789.3765

-44269.75634 -46483.24415

-70152.075 -73659.67875

5286.098041 3855.82515

21144.39217 15423.3006

30219.86671 23068.50225 40446.86

0.18 0.18

1.18 1.18

1.93877776 2.287757757

15587.07106 27763.15021

Page 5: Evaluacion-economica

4 5 LIQUIDACION

868.501356

8684.635815

9553.137171

0.40211

4 5 LIQUIDACION

-8684.635815

-868.501356

217.125339

-9336.011832 0

0.18 0.18

1.18 1.18

1.93877776 2.287757757

-4815.411041 0

4 5 LIQUIDACION

30219.86671 23068.50225 40446.86

-9336.011832 0 0

20883.85487 23068.50225 40446.86

63515.36225

Page 6: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

F.C.E.PERIODO 0 1 2 3 4

INGRESOS 108073.812 123512.928 138952.044 154391.16

% DE PRODUCCION 0.7 0.8 0.9 1

PRECIO UNITARIO(S/.) 34.1 34.1 34.1 34.1

Capacidad de planta 4527.6 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84 4527.6

COSTO DE INVERSION -59393.805

TERRENO -10500

EDIFICIO -33192.5

MAQUINARIA -2925

EQUIPO -4458

PLANEACIO -1700

INGENIERIA -2553.775

SUPERVISIO -2553.775

ADMINISTRA -510.755

CAMBIO CAPITAL TRABA -1000 -1000 -1000 -1000 -1000

TASA DE DEPRECIACION 0.1 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25 3319.25

MAQUINARIA 2925 292.5 292.5 292.5 292.5

EQUIPO 4458 445.8 445.8 445.8 445.8

PLANEACIO 1700 170 170 170 170

INGENIERIA 2553.755 255.3755 255.3755 255.3755 255.3755

SUPERVISIO 2553.755 255.3755 255.3755 255.3755 255.3755

ADMINISTRA 510.755 51.0755 51.0755 51.0755 51.0755

DEPRECIACION 4789.3765 4789.3765 4789.3765 4789.3765

C.F.P.V. -38241.88 -40153.974 -42161.6727 -44269.75634

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5 -70152.075

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(25%) 1110.638875 3734.894375 6297.3737 8794.988041

4442.5555 14939.5775 25189.4948 35179.95217

F.C.E -59393.805 9342.570875 22463.84838 35276.245 47764.31671

COK 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776

FLUJOS -59393.805 7917.43294491526 16133.18614 21470.21178 24636.30319

VANE = 46195.3200453106

Page 7: Evaluacion-economica

FLUJO DE FINANCIAMIENTO

MODO DE PAAS IGUALES

Nº DE CUOT 3

INTERÉS(10 0.1

AÑOS DE GR 1

PERIODO 0 1 2 3 4

PRESTAMO 23757.522

CAPITAL 16580.13703 8685.01356

INTERES 2375.7522 1658.013703 868.501356

AMORTIZACION 7177.384971 7895.123469 8684.635815

A 9553.137171 9553.137171 9553.137171

FACTOR (A/P,10%,3) 0.40211 0.40211 0.40211

PERIODO 0 1 2 3 4

PRESTAMO 23757.522

AMORTIZACION -7177.384971 -7895.123469 -8684.635815

INTERESES -2375.7522 -1658.013703 -868.501356

ESCUDO FISCAL 593.93805 414.5034257 217.125339

F. NETO 23757.522 0 -8959.199121 -9138.633746 -9336.011832

COK 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776

FLUJO 23757.522 0 -6434.357312 -5562.054632 -4815.411041

VANF : 6945.69901466864

FLUJO FINANCIERO

PERIODO 0 1 2 3 4

F.C.E. -59393.805 9342.570875 22463.84838 35276.245 47764.31671

F. FINANCIAMIENTO 23757.522 0 -8959.199121 -9138.633746 -9336.011832

FLUJO FINANCIERO -35636.283 9342.570875 13504.64925 26137.61125 38428.30487

VAN = VANE + VANF

VAN = 53141.01906

Page 8: Evaluacion-economica

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.533 -35636.283 -35636.283

9342.570875

1.533

6094.305855

13504.64925

2.350089

5746.441626

26137.61125

3.602686437

7255.033629

38428.30487

5.522918308

6957.970901

81059.81225

8.466633766

9574.030776

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : -8.500213988

TIR PROY = 0.533 53.3

INFL. 1.05%

TIR REAL = 0.517070757050965 51.70707571

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23757.522 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN:

Page 9: Evaluacion-economica

5 LIQUIDACION

154391.16

1

34.1

4527.6

4527.6

40446.86

10500

16596.25

1462.5

2229

850

1276.87

1276.87

255.37

-1000 6000

0.1

3319.25 16596.25

292.5 1462.5

445.8 2229

170 850

255.3755 1276.8775

255.3755 1276.8775

51.0755 255.3775

4789.3765

-46483.24415

-73659.67875

7364.71515

29458.8606

40612.95225 40446.86

0.18

1.18

2.287757757

35431.991

Page 10: Evaluacion-economica

5 LIQUIDACION

5 LIQUIDACION

0

0.18

1.18

2.287757757

0

5 LIQUIDACION

40612.95225 40446.86

0 0

40612.95225 40446.86

81059.81225

Page 11: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

F.C.E.PERIODO 0 1 2 3 4 5

INGRESOS 78599.136 89827.584 101056.032 112284.48 112284.48

% DE PRODUCCION 0.7 0.8 0.9 1 1

PRECIO UNITARIO(S/.) 24.8 24.8 24.8 24.8 24.8

Capacidad de planta 4527.6 4527.6 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84 4527.6 4527.6

COSTO DE INVERSION -59393.805

TERRENO -10500

EDIFICIO -33192.5

MAQUINARIA -2925

EQUIPO -4458

PLANEACIO -1700

INGENIERIA -2553.775

SUPERVISIO -2553.775

ADMINISTRA -510.755

CAMBIO CAPITAL TRABA -1000 -1000 -1000 -1000 -1000 -1000

TASA DE DEPRECIACION 0.1 0.1 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25 3319.25 3319.25

MAQUINARIA 2925 292.5 292.5 292.5 292.5 292.5

EQUIPO 4458 445.8 445.8 445.8 445.8 445.8

PLANEACIO 1700 170 170 170 170 170

INGENIERIA 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

SUPERVISIO 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

ADMINISTRA 510.755 51.0755 51.0755 51.0755 51.0755 51.0755

DEPRECIACION 4789.3765 4789.3765 4789.3765 4789.3765 4789.3765

C.F.P.V. -38241.88 -40153.974 -42161.6727 -44269.7563 -46483.2442

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5 -70152.075 -73659.6787

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(25%) -6258.030125 -4686.44162 -3176.6293 -1731.68196 -3161.95485

-25032.1205 -18745.7665 -12706.5172 -6926.72783 -12647.8194

F.C.E -59393.805 -27500.774125 -19642.8316 -12093.77 -4869.03329 -12020.3978

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJOS -59393.805 -23305.7407839 -14107.1758 -7360.64179 -2511.39321 12425.46863

VANE = -94253.2879748

FLUJO DE FINANCIAMIENTO

MODO DE PAAS IGUALES

Nº DE CUOT 3

INTERÉS(10 0.1

AÑOS DE GR 1

Page 12: Evaluacion-economica

PERIODO 0 1 2 3 4 5

PRESTAMO 23757.522

CAPITAL 16580.13703 8685.01356

INTERES 2375.7522 1658.013703 868.501356

AMORTIZACION 7177.384971 7895.123469 8684.635815

A 9553.137171 9553.137171 9553.137171

FACTOR (A/P,10%,3) 0.40211 0.40211 0.40211

PERIODO 0 1 2 3 4 5

PRESTAMO 23757.522

AMORTIZACION -7177.38497 -7895.12347 -8684.63582

INTERESES -2375.7522 -1658.0137 -868.501356

ESCUDO FISCAL 593.93805 414.5034257 217.125339

F. NETO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJO 23757.522 0 -6434.35731 -5562.05463 -4815.41104 0

VANF : 6945.69901467

FLUJO FINANCIERO

PERIODO 0 1 2 3 4 5

F.C.E. -59393.805 -27500.774125 -19642.8316 -12093.77 -4869.03329 -12020.3978

F. FINANCIAMIENTO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

FLUJO FINANCIERO -35636.283 -27500.774125 -28602.0307 -21232.4037 -14205.0451 -12020.3978

28426.46225

VAN = VANE + VANF

VAN =-87308

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.122336 -35636.283 -35636.283

-27500.7741

1.122336

-24503.156

-28602.0307

1.259638097

-22706.5463

-21232.4037

1.413737183

-15018.6357

-14205.0451

1.586688135

-8952.6384

Page 13: Evaluacion-economica

28426.46225

1.780797215

15962.77331

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : -90854.4861

TIR PROY 0.122336 12.2336

INFL. 1.05%

TIR REAL = 0.1106739238 11.06739238

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23757.522 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN:

Page 14: Evaluacion-economica

LIQUIDACION

40446.86

10500

16596.25

1462.5

2229

850

1276.87

1276.87

255.37

6000

16596.25

1462.5

2229

850

1276.8775

1276.8775

255.3775

40446.86

Page 15: Evaluacion-economica

LIQUIDACION

LIQUIDACION

LIQUIDACION

40446.86

0

40446.86

Page 16: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

F.C.E.PERIODO 0 1 2 3 4 5 LIQUIDACION

INGRESOS 68774.244 78599.136 88424.028 98248.92 98248.92

% DE PRODUCCION 0.7 0.8 0.9 1 1

PRECIO UNITARIO(S/.) 21.7 21.7 21.7 21.7 21.7

Capacidad de planta 4527.6 4527.6 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84 4527.6 4527.6

COSTO DE INVERSION -59393.805 40446.86

TERRENO -10500 10500

EDIFICIO -33192.5 16596.25

MAQUINARIA -2925 1462.5

EQUIPO -4458 2229

PLANEACIO -1700 850

INGENIERIA -2553.775 1276.87

SUPERVISIO -2553.775 1276.87

ADMINISTRA -510.755 255.37

CAMBIO CAPITAL TRABA -1000 -1000 -1000 -1000 -1000 -1000 6000

TASA DE DEPRECIACION 0.1 0.1 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25 3319.25 3319.25 16596.25

MAQUINARIA 2925 292.5 292.5 292.5 292.5 292.5 1462.5

EQUIPO 4458 445.8 445.8 445.8 445.8 445.8 2229

PLANEACIO 1700 170 170 170 170 170 850

INGENIERIA 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755 1276.8775

SUPERVISIO 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755 1276.8775

ADMINISTRA 510.755 51.0755 51.0755 51.0755 51.0755 51.0755 255.3775

DEPRECIACION 4789.3765 4789.3765 4789.3765 4789.3765 4789.3765

C.F.P.V. -38241.88 -40153.974 -42161.6727 -44269.7563 -46483.2442

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5 -70152.075 -73659.6787

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(25%) -8714.25312 -7493.55362 -6334.6303 -5240.57196 -6670.84485

-34857.0125 -29974.2145 -25338.5212 -20962.2878 -26683.3794

F.C.E -59393.805 -39781.8891 -33678.3916 -27883.775 -22413.4833 -29564.8478 40446.86

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJOS -59393.805 -33713.4654 -24187.2965 -16970.9263 -11560.6253 4756.627845

VANE = -141069.491

FLUJO DE FINANCIAMIENTO

Page 17: Evaluacion-economica

MODO DE PAAS IGUALES

Nº DE CUOT 3

INTERÉS(10 0.1

AÑOS DE GR 1

PERIODO 0 1 2 3 4 5 LIQUIDACION

PRESTAMO 23757.522

CAPITAL 16580.13703 8685.01356

INTERES 2375.7522 1658.013703 868.501356

AMORTIZACION 7177.384971 7895.123469 8684.635815

A 9553.137171 9553.137171 9553.137171

FACTOR (A/P,10%,3) 0.40211 0.40211 0.40211

PERIODO 0 1 2 3 4 5 LIQUIDACION

PRESTAMO 23757.522

AMORTIZACION -7177.38497 -7895.12347 -8684.63582

INTERESES -2375.7522 -1658.0137 -868.501356

ESCUDO FISCAL 593.93805 414.5034257 217.125339

F. NETO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJO 23757.522 0 -6434.35731 -5562.05463 -4815.41104 0

VANF : 6945.699015

FLUJO FINANCIERO

PERIODO 0 1 2 3 4 5 LIQUIDACION

F.C.E. -59393.805 -39781.8891 -33678.3916 -27883.775 -22413.4833 -29564.8478 40446.86

F. FINANCIAMIENTO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0 0

FLUJO FINANCIERO -35636.283 -39781.8891 -42637.5907 -37022.4087 -31749.4951 -29564.8478 40446.86

10882.01225

VAN = VANE + VANF

VAN = -134124

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.122336 -35636.283 -35636.283

-39781.8891

1.122336

-35445.6144

-42637.5907

Page 18: Evaluacion-economica

1.259638097

-33849.08

-37022.4087

1.413737183

-26187.6176

-31749.4951

1.586688135

-20009.9153

10882.01225

1.780797215

6110.753182

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : -145017.757

TIR PROY 0.122336 12.2336

INFL. 1.05%

TIR REAL = 0.110673924 11.06739238

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23757.522 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN:

Page 19: Evaluacion-economica

LIQUIDACION

Page 20: Evaluacion-economica

LIQUIDACION

LIQUIDACION

LIQUIDACION

Page 21: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTROS"*TODOS LOS VALORES ECONOMICOS EN U.M.

FLUJO DE CAJA ECONOMICO

PERIODO 0 1 2 3 4 5

INGRESOS 108073.812 123512.928 138952.044 154391.16 154391.16

% DE PRODUCCION 0.7 0.8 0.9 1 1

PRECIO UNITARIO(S/.) 34.1 34.1 34.1 34.1 34.1

Capacidad de planta 4527.6 4527.6 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84 4527.6 4527.6

COSTO DE INVERSION -59353.765

TERRENO -10500

EDIFICIO -33192.5

MAQUINARIA -2925

EQUIPO -4458

PLANEACIO -1700

INGENIERIA -2533.755

SUPERVISIO -2533.755

ADMINISTRA -510.755

Cap. Trab.+c -1000 -1000 -1000 -1000 -1000 -1000

TABLA DE DEPRECIACIONACTIVO VALOR INIC 0.1 0.1 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25 3319.25 3319.25

MAQUINARIA 2925 292.5 292.5 292.5 292.5 292.5

EQUIPO 4458 445.8 445.8 445.8 445.8 445.8

PLANEACIO 1700 0 0 0 0 0

INGENIERIA 2553.755 0 0 0 0 0

SUPERVISIO 2553.755 0 0 0 0 0

ADMINISTRA 510.755 0 0 0 0 0

DEPRECIACION 4057.55 4057.55 4057.55 4057.55 4057.55

C.F.P.V. -38241.88 -40153.974 -42161.6727 -44269.7563 -46483.2442

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5 -70152.075 -73659.6787

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(30%) 1552.3146 4701.4212 7776.39639 10773.5336 9057.206129

5174.382 15671.404 25921.3213 35911.77867 30190.6871

F.C.E -59353.765 6679.6174 14027.5328 21202.47491 28195.79507 24191.03097

-59353.765 6679.6174 14027.5328 21202.47491 28195.79507 60978.78

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJOS -59353.765 5660.6927119 10074.35564 12904.48081 14543.07742 26654.38716

VANE = 10483.229 TIRE 23%

S/. 10,483.23

Page 22: Evaluacion-economica

FLUJO DE FINANCIAMIENTO

MODO DE PAGO: CUOTAS IGUALES

Nº DE CUOT 3

INTERÉS(10 0.1

AÑOS DE GR 1

PERIODO 0 1 2 3 4

PRESTAMO 23717.482

CAPITAL 16552.19351 8670.376177

INTERES 2371.7482 2371.7482 1655.219351 867.0376177

AMORTIZACION 0 7165.288487 7881.817336 8669.999069

A 9537.036687 9537.036687 9537.036687

FACTOR (A/P,10%,3) 0.40211 0.40211 0.40211

FLUJO DE FINANCIAMIENTOPERIODO 0 1 2 3 4

PRESTAMO 23717.482

AMORTIZACION 0 -7165.28849 -7881.81734 -8669.99907

INTERESES -2371.7482 -2371.7482 -1655.21935 -867.037618

ESCUDO FISCAL 711.52446 711.52446 496.5658054 260.1112853

F.F. 23717.482 -1660.22374 -8825.51223 -9040.47088 -9276.9254

TASA DE INTERES 0.1 0.1 0.1 0.1

1.1 1.1 1.1 1.1

1.1 1.21 1.331 1.4641

FLUJO 23717.482 -1509.294309 -7293.81176 -6792.23958 -6336.26487

VANF : 1785.8715 TIRF 7%

FLUJO FINANCIERO

PERIODO 0 1 2 3 4 5

F.C.E. -59353.765 6679.6174 14027.5328 21202.47491 28195.79507 24191.03097

F. FINANCIAMIENTO 23717.482 -1660.22374 -8825.51223 -9040.47088 -9276.9254 0

FLUJO FINANCIERO -35636.283 5019.39366 5202.020573 12162.00403 18918.86966 24191.03097

-35636.283 5019.39366 5202.020573 12162.00403 18918.86966 60978.78

COK PONDERADO 0.148 0.148 0.148 0.148 0.148

1.148 1.148 1.148 1.148 1.148

1.148 1.317904 1.512953792 1.736870953 1.993927854

FLUJO -35636.283 4372.2941289 3947.192339 8038.582601 10892.50162 30582.24039

CAPITAL PROPIO 35636.283 60.04047595 0.18 10.80728567

FINANCIAMIENTO 23717.482 39.95952405 0.1 3.995952405

TOTAL INVERSION 59353.765 14.80323808

Page 23: Evaluacion-economica

VAN= 22196.528 TIR 30%

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23717.482 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN:

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.122336 0 0

0

1.122336

0

0

1.259638097

0

0

1.413737183

0

0

1.586688135

0

0

1.780797215

0

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : 0

Page 24: Evaluacion-economica

TIR PROY 0.122336 12.2336

INFL. 1.05%

TIR REAL = 0.1106739238 11.06739238

Page 25: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTROS"

LIQUIDACION

36787.75

10500

16596.25

1462.5

2229

0

0

0

0

6000

16596.25

1462.5

2229

0

0

0

0

36787.75

Page 26: Evaluacion-economica

LIQUIDACION

36787.75

0

36787.75

Page 27: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

F.C.E.PERIODO 0 1 2 3 4 5

INGRESOS 117898.704 134741.376 151584.048 168426.72 168426.72

% DE PRODUCCION 0.7 0.8 0.9 1 1

PRECIO UNITARIO(S/.) 37.2 37.2 37.2 37.2 37.2

Capacidad de planta 4527.6 4527.6 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84 4527.6 4527.6

COSTO DE INVERSION -59393.805

TERRENO -10500

EDIFICIO -33192.5

MAQUINARIA -2925

EQUIPO -4458

PLANEACIO -1700

INGENIERIA -2553.775

SUPERVISIO -2553.775

ADMINISTRA -510.755

CAMBIO CAPITAL TRABA -1000 -1000 -1000 -1000 -1000 -1000

TASA DE DEPRECIACION 0.1 0.1 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25 3319.25 3319.25

MAQUINARIA 2925 292.5 292.5 292.5 292.5 292.5

EQUIPO 4458 445.8 445.8 445.8 445.8 445.8

PLANEACIO 1700 170 170 170 170 170

INGENIERIA 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

SUPERVISIO 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

ADMINISTRA 510.755 51.0755 51.0755 51.0755 51.0755 51.0755

DEPRECIACION 4789.3765 4789.3765 4789.3765 4789.3765 4789.3765

C.F.P.V. -38241.88 -40153.974 -42161.6727 -44269.7563 -46483.2442

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5 -70152.075 -73659.6787

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(25%) 3566.861875 6542.006375 9455.3747 12303.87804 10873.60515

14267.4475 26168.0255 37821.4988 49215.51217 43494.4206

F.C.E -59393.805 21623.68588 36499.40838 51066.25 65308.76671 58157.40225

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJOS -59393.805 18325.15752 26213.30679 31080.4963 33685.53532 43100.83179

VANE = 93011.52272

FLUJO DE FINANCIAMIENTO

MODO DE PAAS IGUALES

Nº DE CUOT 3

INTERÉS(10 0.1

AÑOS DE GR 1

Page 28: Evaluacion-economica

PERIODO 0 1 2 3 4 5

PRESTAMO 23757.522

CAPITAL 16580.13703 8685.01356

INTERES 2375.7522 1658.013703 868.501356

AMORTIZACION 7177.384971 7895.123469 8684.635815

A 9553.137171 9553.137171 9553.137171

FACTOR (A/P,10%,3) 0.40211 0.40211 0.40211

PERIODO 0 1 2 3 4 5

PRESTAMO 23757.522

AMORTIZACION -7177.38497 -7895.12347 -8684.63582

INTERESES -2375.7522 -1658.0137 -868.501356

ESCUDO FISCAL 593.93805 414.5034257 217.125339

F. NETO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJO 23757.522 0 -6434.35731 -5562.05463 -4815.41104 0

VANF : 6945.699015

FLUJO FINANCIERO

PERIODO 0 1 2 3 4 5

F.C.E. -59393.805 21623.68588 36499.40838 51066.25 65308.76671 58157.40225

F. FINANCIAMIENTO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

FLUJO FINANCIERO -35636.283 21623.68588 27540.20925 41927.61625 55972.75487 58157.40225

98604.26225

VAN = VANE + VANF

VAN = 99957

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.122336 -35636.283 -35636.283

21623.68588

1.122336

19266.6776

27540.20925

1.259638097

21863.58869

41927.61625

1.413737183

29657.29186

55972.75487

1.586688135

35276.46904

98604.26225

Page 29: Evaluacion-economica

1.780797215

55370.85381

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : 125798.598

TIR PROY 0.122336 12.2336

INFL. 1.05%

TIR REAL = 0.110673924 11.06739238

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23757.522 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN:

Page 30: Evaluacion-economica

LIQUIDACION

40446.86

10500

16596.25

1462.5

2229

850

1276.87

1276.87

255.37

6000

16596.25

1462.5

2229

850

1276.8775

1276.8775

255.3775

40446.86

Page 31: Evaluacion-economica

LIQUIDACION

LIQUIDACION

LIQUIDACION

40446.86

0

40446.86

Page 32: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

F.C.E.PERIODO 0 1 2 3 4

INGRESOS 127723.596 145969.824 164216.052 182462.28

% DE PRODUCCION 0.7 0.8 0.9 1

PRECIO UNITARIO(S/.) 40.3 40.3 40.3 40.3

Capacidad de planta 4527.6 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84 4527.6

COSTO DE INVERSION -59393.805

TERRENO -10500

EDIFICIO -33192.5

MAQUINARIA -2925

EQUIPO -4458

PLANEACIO -1700

INGENIERIA -2553.775

SUPERVISIO -2553.775

ADMINISTRA -510.755

CAMBIO CAPITAL TRABA -1000 -1000 -1000 -1000 -1000

TASA DE DEPRECIACION 0.1 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25 3319.25

MAQUINARIA 2925 292.5 292.5 292.5 292.5

EQUIPO 4458 445.8 445.8 445.8 445.8

PLANEACIO 1700 170 170 170 170

INGENIERIA 2553.755 255.3755 255.3755 255.3755 255.3755

SUPERVISIO 2553.755 255.3755 255.3755 255.3755 255.3755

ADMINISTRA 510.755 51.0755 51.0755 51.0755 51.0755

DEPRECIACION 4789.3765 4789.3765 4789.3765 4789.3765

C.F.P.V. -38241.88 -40153.974 -42161.6727 -44269.75634

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5 -70152.075

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(25%) 6023.084875 9349.118375 12613.3757 15812.768041

24092.3395 37396.4735 50453.5028 63251.072165

F.C.E -59393.805 33904.800875 50534.968375 66856.255 82853.216706

COK 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776

FLUJOS -59393.805 28732.882097 36293.427445 40690.780825 42734.767448

VANE = 139827.72539

FLUJO DE FINANCIAMIENTO

MODO DE PAAS IGUALES

Nº DE CUOT 3

INTERÉS(10 0.1

AÑOS DE GR 1

Page 33: Evaluacion-economica

PERIODO 0 1 2 3 4

PRESTAMO 23757.522

CAPITAL 16580.137029 8685.01356

INTERES 2375.7522 1658.0137029 868.501356

AMORTIZACION 7177.3849714 7895.1234686 8684.6358154

A 9553.1371714 9553.1371714 9553.1371714

FACTOR (A/P,10%,3) 0.40211 0.40211 0.40211

PERIODO 0 1 2 3 4

PRESTAMO 23757.522

AMORTIZACION -7177.384971 -7895.123469 -8684.635815

INTERESES -2375.7522 -1658.013703 -868.501356

ESCUDO FISCAL 593.93805 414.50342571 217.125339

F. NETO 23757.522 0 -8959.199121 -9138.633746 -9336.011832

COK 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776

FLUJO 23757.522 0 -6434.357312 -5562.054632 -4815.411041

VANF : 6945.6990147

FLUJO FINANCIERO

PERIODO 0 1 2 3 4

F.C.E. -59393.805 33904.800875 50534.968375 66856.255 82853.216706

F. FINANCIAMIENTO 23757.522 0 -8959.199121 -9138.633746 -9336.011832

FLUJO FINANCIERO -35636.283 33904.800875 41575.769254 57717.621254 73517.204874

VAN = VANE + VANF

VAN = 146773

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.122336 -35636.283 -35636.283

33904.800875

1.122336

30209.136012

41575.769254

1.2596380969

33006.122438

57717.621254

1.4137371831

40826.273754

73517.204874

1.5866881352

46333.745898

Page 34: Evaluacion-economica

116148.71225

1.7807972149

65222.873935

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : 179961.86904

TIR PROY = 0.122336 12.2336

INFL. 1.05%

TIR REAL = 0.1106739238 11.06739238

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23757.522 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN:

Page 35: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

5 LIQUIDACION

182462.28

1

40.3

4527.6

4527.6

40446.86

10500

16596.25

1462.5

2229

850

1276.87

1276.87

255.37

-1000 6000

0.1

3319.25 16596.25

292.5 1462.5

445.8 2229

170 850

255.3755 1276.8775

255.3755 1276.8775

51.0755 255.3775

4789.3765

-46483.24415

-73659.67875

14382.49515

57529.980598

75701.852248 40446.86

0.18

1.18

2.2877577568

50769.672577

Page 36: Evaluacion-economica

5 LIQUIDACION

5 LIQUIDACION

0

0.18

1.18

2.2877577568

0

5 LIQUIDACION

75701.852248 40446.86

0 0

75701.852248 40446.86

116148.71225

Page 37: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

F.C.E.PERIODO 0 1 2 3 4 5

INGRESOS 127723.596 145969.824 164216.052 182462.28 182462.28

% DE PRODUCCION 0.7 0.8 0.9 1 1

PRECIO UNITARIO(S/.) 40.3 40.3 40.3 40.3 40.3

Capacidad de planta 4527.6 4527.6 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84 4527.6 4527.6

COSTO DE INVERSION -59393.805

TERRENO -10500

EDIFICIO -33192.5

MAQUINARIA -2925

EQUIPO -4458

PLANEACIO -1700

INGENIERIA -2553.775

SUPERVISIO -2553.775

ADMINISTRA -510.755

CAMBIO CAPITAL TRABA -1000 -1000 -1000 -1000 -1000 -1000

TASA DE DEPRECIACION 0.1 0.1 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25 3319.25 3319.25

MAQUINARIA 2925 292.5 292.5 292.5 292.5 292.5

EQUIPO 4458 445.8 445.8 445.8 445.8 445.8

PLANEACIO 1700 170 170 170 170 170

INGENIERIA 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

SUPERVISIO 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

ADMINISTRA 510.755 51.0755 51.0755 51.0755 51.0755 51.0755

DEPRECIACION 4789.3765 4789.3765 4789.3765 4789.3765 4789.3765

C.F.P.V. -38241.88 -40153.974 -42161.6727 -44269.7563 -46483.2442

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5 -70152.075 -73659.6787

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(25%) 6023.084875 9349.118375 12613.3757 15812.76804 14382.49515

24092.3395 37396.4735 50453.5028 63251.07216 57529.9806

F.C.E -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJOS -59393.805 28732.8821 36293.42745 40690.78082 42734.76745 33089.9773

VANE = 122148.0301

FLUJO DE FINANCIAMIENTO

MODO DE PAAS IGUALES

Nº DE CUOT 3

INTERÉS(10 0.1

AÑOS DE GR 1

PERIODO 0 1 2 3 4 5

Page 38: Evaluacion-economica

PRESTAMO 23757.522

CAPITAL 16580.13703 8685.01356

INTERES 2375.7522 1658.013703 868.501356

AMORTIZACION 7177.384971 7895.123469 8684.635815

A 9553.137171 9553.137171 9553.137171

FACTOR (A/P,10%,3) 0.40211 0.40211 0.40211

PERIODO 0 1 2 3 4 5

PRESTAMO 23757.522

AMORTIZACION -7177.38497 -7895.12347 -8684.63582

INTERESES -2375.7522 -1658.0137 -868.501356

ESCUDO FISCAL 593.93805 414.5034257 217.125339

F. NETO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJO 23757.522 0 -6434.35731 -5562.05463 -4815.41104 0

VANF : 6945.699015

FLUJO FINANCIERO

PERIODO 0 1 2 3 4 5

F.C.E. -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

F. FINANCIAMIENTO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

FLUJO FINANCIERO -35636.283 33904.80087 41575.76925 57717.62125 73517.20487 75701.85225

75701.85225

VAN = VANE + VANF

VAN =1E+05

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.122336 -35636.283 -35636.283

33904.80087

1.122336

30209.13601

41575.76925

1.259638097

33006.12244

57717.62125

1.413737183

40826.27375

73517.20487

1.586688135

46333.7459

75701.85225

Page 39: Evaluacion-economica

1.780797215

42510.09133

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : 157249.0864

TIR PROY 0.122336 12.2336

INFL. 1.05%

TIR REAL = 0.110673924 11.06739238

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23757.522 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN:

Page 40: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

F.C.E.PERIODO 0 1 2 3 4 5

INGRESOS 127723.596 145969.824 164216.052 182462.28 182462.28

% DE PRODUCCION 0.7 0.8 0.9 1 1

PRECIO UNITARIO(S/.) 40.3 40.3 40.3 40.3 40.3

Capacidad de planta 4527.6 4527.6 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84 4527.6 4527.6

COSTO DE INVERSION -59393.805

TERRENO -10500

EDIFICIO -33192.5

MAQUINARIA -2925

EQUIPO -4458

PLANEACIO -1700

INGENIERIA -2553.775

SUPERVISIO -2553.775

ADMINISTRA -510.755

CAMBIO CAPITAL TRABA -1000 -1000 -1000 -1000 -1000 -1000

TASA DE DEPRECIACION 0.1 0.1 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25 3319.25 3319.25

MAQUINARIA 2925 292.5 292.5 292.5 292.5 292.5

EQUIPO 4458 445.8 445.8 445.8 445.8 445.8

PLANEACIO 1700 170 170 170 170 170

INGENIERIA 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

SUPERVISIO 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

ADMINISTRA 510.755 51.0755 51.0755 51.0755 51.0755 51.0755

DEPRECIACION 4789.3765 4789.3765 4789.3765 4789.3765 4789.3765

C.F.P.V. -38241.88 -40153.974 -42161.6727 -44269.7563 -46483.2442

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5 -70152.075 -73659.6787

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(25%) 6023.084875 9349.118375 12613.3757 15812.76804 14382.49515

24092.3395 37396.4735 50453.5028 63251.07216 57529.9806

F.C.E -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJOS -59393.805 28732.8821 36293.42745 40690.78082 42734.76745 33089.9773

VANE = 122148.0301

FLUJO DE FINANCIAMIENTO

MODO DE PAAS IGUALES

Nº DE CUOT 3

INTERÉS(10 0.1

AÑOS DE GR 1

PERIODO 0 1 2 3 4 5

Page 41: Evaluacion-economica

PRESTAMO 23757.522

CAPITAL 16580.13703 8685.01356

INTERES 2375.7522 1658.013703 868.501356

AMORTIZACION 7177.384971 7895.123469 8684.635815

A 9553.137171 9553.137171 9553.137171

FACTOR (A/P,10%,3) 0.40211 0.40211 0.40211

PERIODO 0 1 2 3 4 5

PRESTAMO 23757.522

AMORTIZACION -7177.38497 -7895.12347 -8684.63582

INTERESES -2375.7522 -1658.0137 -868.501356

ESCUDO FISCAL 593.93805 414.5034257 217.125339

F. NETO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJO 23757.522 0 -6434.35731 -5562.05463 -4815.41104 0

VANF : 6945.699015

FLUJO FINANCIERO

PERIODO 0 1 2 3 4 5

F.C.E. -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

F. FINANCIAMIENTO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

FLUJO FINANCIERO -35636.283 33904.80087 41575.76925 57717.62125 73517.20487 75701.85225

75701.85225

VAN = VANE + VANF

VAN =1E+05

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.122336 -35636.283 -35636.283

33904.80087

1.122336

30209.13601

41575.76925

1.259638097

33006.12244

57717.62125

1.413737183

40826.27375

73517.20487

1.586688135

46333.7459

75701.85225

Page 42: Evaluacion-economica

1.780797215

42510.09133

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : 157249.0864

TIR PROY 0.122336 12.2336

INFL. 1.05%

TIR REAL = 0.110673924 11.06739238

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23757.522 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN:

Page 43: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

F.C.E.PERIODO 0 1 2 3 4 5

INGRESOS 127723.596 145969.824 164216.052 182462.28 182462.28

% DE PRODUCCION 0.7 0.8 0.9 1 1

PRECIO UNITARIO(S/.) 40.3 40.3 40.3 40.3 40.3

Capacidad de planta 4527.6 4527.6 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84 4527.6 4527.6

COSTO DE INVERSION -59393.805

TERRENO -10500

EDIFICIO -33192.5

MAQUINARIA -2925

EQUIPO -4458

PLANEACIO -1700

INGENIERIA -2553.775

SUPERVISIO -2553.775

ADMINISTRA -510.755

CAMBIO CAPITAL TRABA -1000 -1000 -1000 -1000 -1000 -1000

TASA DE DEPRECIACION 0.1 0.1 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25 3319.25 3319.25

MAQUINARIA 2925 292.5 292.5 292.5 292.5 292.5

EQUIPO 4458 445.8 445.8 445.8 445.8 445.8

PLANEACIO 1700 170 170 170 170 170

INGENIERIA 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

SUPERVISIO 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

ADMINISTRA 510.755 51.0755 51.0755 51.0755 51.0755 51.0755

DEPRECIACION 4789.3765 4789.3765 4789.3765 4789.3765 4789.3765

C.F.P.V. -38241.88 -40153.974 -42161.6727 -44269.7563 -46483.2442

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5 -70152.075 -73659.6787

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(25%) 6023.084875 9349.118375 12613.3757 15812.76804 14382.49515

24092.3395 37396.4735 50453.5028 63251.07216 57529.9806

F.C.E -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJOS -59393.805 28732.8821 36293.42745 40690.78082 42734.76745 33089.9773

VANE = 122148.0301

FLUJO DE FINANCIAMIENTO

MODO DE PAAS IGUALES

Nº DE CUOT 3

INTERÉS(10 0.1

AÑOS DE GR 1

PERIODO 0 1 2 3 4 5

Page 44: Evaluacion-economica

PRESTAMO 23757.522

CAPITAL 16580.13703 8685.01356

INTERES 2375.7522 1658.013703 868.501356

AMORTIZACION 7177.384971 7895.123469 8684.635815

A 9553.137171 9553.137171 9553.137171

FACTOR (A/P,10%,3) 0.40211 0.40211 0.40211

PERIODO 0 1 2 3 4 5

PRESTAMO 23757.522

AMORTIZACION -7177.38497 -7895.12347 -8684.63582

INTERESES -2375.7522 -1658.0137 -868.501356

ESCUDO FISCAL 593.93805 414.5034257 217.125339

F. NETO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJO 23757.522 0 -6434.35731 -5562.05463 -4815.41104 0

VANF : 6945.699015

FLUJO FINANCIERO

PERIODO 0 1 2 3 4 5

F.C.E. -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

F. FINANCIAMIENTO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

FLUJO FINANCIERO -35636.283 33904.80087 41575.76925 57717.62125 73517.20487 75701.85225

75701.85225

VAN = VANE + VANF

VAN =1E+05

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.122336 -35636.283 -35636.283

33904.80087

1.122336

30209.13601

41575.76925

1.259638097

33006.12244

57717.62125

1.413737183

40826.27375

73517.20487

1.586688135

46333.7459

75701.85225

Page 45: Evaluacion-economica

1.780797215

42510.09133

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : 157249.0864

TIR PROY 0.122336 12.2336

INFL. 1.05%

TIR REAL = 0.110673924 11.06739238

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23757.522 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN:

Page 46: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

F.C.E.PERIODO 0 1 2 3 4 5

INGRESOS 127723.596 145969.824 164216.052 182462.28 182462.28

% DE PRODUCCION 0.7 0.8 0.9 1 1

PRECIO UNITARIO(S/.) 40.3 40.3 40.3 40.3 40.3

Capacidad de planta 4527.6 4527.6 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84 4527.6 4527.6

COSTO DE INVERSION -59393.805

TERRENO -10500

EDIFICIO -33192.5

MAQUINARIA -2925

EQUIPO -4458

PLANEACIO -1700

INGENIERIA -2553.775

SUPERVISIO -2553.775

ADMINISTRA -510.755

CAMBIO CAPITAL TRABA -1000 -1000 -1000 -1000 -1000 -1000

TASA DE DEPRECIACION 0.1 0.1 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25 3319.25 3319.25

MAQUINARIA 2925 292.5 292.5 292.5 292.5 292.5

EQUIPO 4458 445.8 445.8 445.8 445.8 445.8

PLANEACIO 1700 170 170 170 170 170

INGENIERIA 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

SUPERVISIO 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

ADMINISTRA 510.755 51.0755 51.0755 51.0755 51.0755 51.0755

DEPRECIACION 4789.3765 4789.3765 4789.3765 4789.3765 4789.3765

C.F.P.V. -38241.88 -40153.974 -42161.6727 -44269.7563 -46483.2442

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5 -70152.075 -73659.6787

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(25%) 6023.084875 9349.118375 12613.3757 15812.76804 14382.49515

24092.3395 37396.4735 50453.5028 63251.07216 57529.9806

F.C.E -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJOS -59393.805 28732.8821 36293.42745 40690.78082 42734.76745 33089.9773

VANE = 122148.0301

FLUJO DE FINANCIAMIENTO

MODO DE PAAS IGUALES

Nº DE CUOT 3

INTERÉS(10 0.1

AÑOS DE GR 1

PERIODO 0 1 2 3 4 5

Page 47: Evaluacion-economica

PRESTAMO 23757.522

CAPITAL 16580.13703 8685.01356

INTERES 2375.7522 1658.013703 868.501356

AMORTIZACION 7177.384971 7895.123469 8684.635815

A 9553.137171 9553.137171 9553.137171

FACTOR (A/P,10%,3) 0.40211 0.40211 0.40211

PERIODO 0 1 2 3 4 5

PRESTAMO 23757.522

AMORTIZACION -7177.38497 -7895.12347 -8684.63582

INTERESES -2375.7522 -1658.0137 -868.501356

ESCUDO FISCAL 593.93805 414.5034257 217.125339

F. NETO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJO 23757.522 0 -6434.35731 -5562.05463 -4815.41104 0

VANF : 6945.699015

FLUJO FINANCIERO

PERIODO 0 1 2 3 4 5

F.C.E. -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

F. FINANCIAMIENTO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

FLUJO FINANCIERO -35636.283 33904.80087 41575.76925 57717.62125 73517.20487 75701.85225

75701.85225

VAN = VANE + VANF

VAN =1E+05

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.122336 -35636.283 -35636.283

33904.80087

1.122336

30209.13601

41575.76925

1.259638097

33006.12244

57717.62125

1.413737183

40826.27375

73517.20487

1.586688135

46333.7459

75701.85225

Page 48: Evaluacion-economica

1.780797215

42510.09133

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : 157249.0864

TIR PROY 0.122336 12.2336

INFL. 1.05%

TIR REAL = 0.110673924 11.06739238

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23757.522 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN:

Page 49: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

F.C.E.PERIODO 0 1 2 3 4 5

INGRESOS 127723.596 145969.824 164216.052 182462.28 182462.28

% DE PRODUCCION 0.7 0.8 0.9 1 1

PRECIO UNITARIO(S/.) 40.3 40.3 40.3 40.3 40.3

Capacidad de planta 4527.6 4527.6 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84 4527.6 4527.6

COSTO DE INVERSION -59393.805

TERRENO -10500

EDIFICIO -33192.5

MAQUINARIA -2925

EQUIPO -4458

PLANEACIO -1700

INGENIERIA -2553.775

SUPERVISIO -2553.775

ADMINISTRA -510.755

CAMBIO CAPITAL TRABA -1000 -1000 -1000 -1000 -1000 -1000

TASA DE DEPRECIACION 0.1 0.1 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25 3319.25 3319.25

MAQUINARIA 2925 292.5 292.5 292.5 292.5 292.5

EQUIPO 4458 445.8 445.8 445.8 445.8 445.8

PLANEACIO 1700 170 170 170 170 170

INGENIERIA 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

SUPERVISIO 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

ADMINISTRA 510.755 51.0755 51.0755 51.0755 51.0755 51.0755

DEPRECIACION 4789.3765 4789.3765 4789.3765 4789.3765 4789.3765

C.F.P.V. -38241.88 -40153.974 -42161.6727 -44269.7563 -46483.2442

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5 -70152.075 -73659.6787

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(25%) 6023.084875 9349.118375 12613.3757 15812.76804 14382.49515

24092.3395 37396.4735 50453.5028 63251.07216 57529.9806

F.C.E -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJOS -59393.805 28732.8821 36293.42745 40690.78082 42734.76745 33089.9773

VANE = 122148.0301

FLUJO DE FINANCIAMIENTO

MODO DE PAAS IGUALES

Nº DE CUOT 3

INTERÉS(10 0.1

AÑOS DE GR 1

PERIODO 0 1 2 3 4 5

Page 50: Evaluacion-economica

PRESTAMO 23757.522

CAPITAL 16580.13703 8685.01356

INTERES 2375.7522 1658.013703 868.501356

AMORTIZACION 7177.384971 7895.123469 8684.635815

A 9553.137171 9553.137171 9553.137171

FACTOR (A/P,10%,3) 0.40211 0.40211 0.40211

PERIODO 0 1 2 3 4 5

PRESTAMO 23757.522

AMORTIZACION -7177.38497 -7895.12347 -8684.63582

INTERESES -2375.7522 -1658.0137 -868.501356

ESCUDO FISCAL 593.93805 414.5034257 217.125339

F. NETO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJO 23757.522 0 -6434.35731 -5562.05463 -4815.41104 0

VANF : 6945.699015

FLUJO FINANCIERO

PERIODO 0 1 2 3 4 5

F.C.E. -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

F. FINANCIAMIENTO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

FLUJO FINANCIERO -35636.283 33904.80087 41575.76925 57717.62125 73517.20487 75701.85225

75701.85225

VAN = VANE + VANF

VAN =1E+05

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.122336 -35636.283 -35636.283

33904.80087

1.122336

30209.13601

41575.76925

1.259638097

33006.12244

57717.62125

1.413737183

40826.27375

73517.20487

1.586688135

46333.7459

75701.85225

Page 51: Evaluacion-economica

1.780797215

42510.09133

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : 157249.0864

TIR PROY 0.122336 12.2336

INFL. 1.05%

TIR REAL = 0.110673924 11.06739238

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23757.522 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN:

Page 52: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

F.C.E.PERIODO 0 1 2 3 4 5

INGRESOS 127723.596 145969.824 164216.052 182462.28 182462.28

% DE PRODUCCION 0.7 0.8 0.9 1 1

PRECIO UNITARIO(S/.) 40.3 40.3 40.3 40.3 40.3

Capacidad de planta 4527.6 4527.6 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84 4527.6 4527.6

COSTO DE INVERSION -59393.805

TERRENO -10500

EDIFICIO -33192.5

MAQUINARIA -2925

EQUIPO -4458

PLANEACIO -1700

INGENIERIA -2553.775

SUPERVISIO -2553.775

ADMINISTRA -510.755

CAMBIO CAPITAL TRABA -1000 -1000 -1000 -1000 -1000 -1000

TASA DE DEPRECIACION 0.1 0.1 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25 3319.25 3319.25

MAQUINARIA 2925 292.5 292.5 292.5 292.5 292.5

EQUIPO 4458 445.8 445.8 445.8 445.8 445.8

PLANEACIO 1700 170 170 170 170 170

INGENIERIA 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

SUPERVISIO 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

ADMINISTRA 510.755 51.0755 51.0755 51.0755 51.0755 51.0755

DEPRECIACION 4789.3765 4789.3765 4789.3765 4789.3765 4789.3765

C.F.P.V. -38241.88 -40153.974 -42161.6727 -44269.7563 -46483.2442

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5 -70152.075 -73659.6787

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(25%) 6023.084875 9349.118375 12613.3757 15812.76804 14382.49515

24092.3395 37396.4735 50453.5028 63251.07216 57529.9806

F.C.E -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJOS -59393.805 28732.8821 36293.42745 40690.78082 42734.76745 33089.9773

VANE = 122148.0301

FLUJO DE FINANCIAMIENTO

MODO DE PAAS IGUALES

Nº DE CUOT 3

INTERÉS(10 0.1

AÑOS DE GR 1

PERIODO 0 1 2 3 4 5

Page 53: Evaluacion-economica

PRESTAMO 23757.522

CAPITAL 16580.13703 8685.01356

INTERES 2375.7522 1658.013703 868.501356

AMORTIZACION 7177.384971 7895.123469 8684.635815

A 9553.137171 9553.137171 9553.137171

FACTOR (A/P,10%,3) 0.40211 0.40211 0.40211

PERIODO 0 1 2 3 4 5

PRESTAMO 23757.522

AMORTIZACION -7177.38497 -7895.12347 -8684.63582

INTERESES -2375.7522 -1658.0137 -868.501356

ESCUDO FISCAL 593.93805 414.5034257 217.125339

F. NETO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJO 23757.522 0 -6434.35731 -5562.05463 -4815.41104 0

VANF : 6945.699015

FLUJO FINANCIERO

PERIODO 0 1 2 3 4 5

F.C.E. -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

F. FINANCIAMIENTO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

FLUJO FINANCIERO -35636.283 33904.80087 41575.76925 57717.62125 73517.20487 75701.85225

75701.85225

VAN = VANE + VANF

VAN =1E+05

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.122336 -35636.283 -35636.283

33904.80087

1.122336

30209.13601

41575.76925

1.259638097

33006.12244

57717.62125

1.413737183

40826.27375

73517.20487

1.586688135

46333.7459

75701.85225

Page 54: Evaluacion-economica

1.780797215

42510.09133

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : 157249.0864

TIR PROY 0.122336 12.2336

INFL. 1.05%

TIR REAL = 0.110673924 11.06739238

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23757.522 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN:

Page 55: Evaluacion-economica

CALCULO DEL VAN Y LA TIR DEL PROYECTO "FABRICACIÓN DE LLAVES EXTRACTORAS DE FILTRO

F.C.E.PERIODO 0 1 2 3 4 5

INGRESOS 127723.596 145969.824 164216.052 182462.28 182462.28

% DE PRODUCCION 0.7 0.8 0.9 1 1

PRECIO UNITARIO(S/.) 40.3 40.3 40.3 40.3 40.3

Capacidad de planta 4527.6 4527.6 4527.6 4527.6 4527.6

PRODUCCION ANUAL 3169.32 3622.08 4074.84 4527.6 4527.6

COSTO DE INVERSION -59393.805

TERRENO -10500

EDIFICIO -33192.5

MAQUINARIA -2925

EQUIPO -4458

PLANEACIO -1700

INGENIERIA -2553.775

SUPERVISIO -2553.775

ADMINISTRA -510.755

CAMBIO CAPITAL TRABA -1000 -1000 -1000 -1000 -1000 -1000

TASA DE DEPRECIACION 0.1 0.1 0.1 0.1 0.1

EDIFICIO 33192.5 3319.25 3319.25 3319.25 3319.25 3319.25

MAQUINARIA 2925 292.5 292.5 292.5 292.5 292.5

EQUIPO 4458 445.8 445.8 445.8 445.8 445.8

PLANEACIO 1700 170 170 170 170 170

INGENIERIA 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

SUPERVISIO 2553.755 255.3755 255.3755 255.3755 255.3755 255.3755

ADMINISTRA 510.755 51.0755 51.0755 51.0755 51.0755 51.0755

DEPRECIACION 4789.3765 4789.3765 4789.3765 4789.3765 4789.3765

C.F.P.V. -38241.88 -40153.974 -42161.6727 -44269.7563 -46483.2442

MANO DE OBRA -30000

MATERIA PRIMA -4490.8

GASTOS IND. FAB. -3751.08

COSTO DE OPERACION -60600 -63630 -66811.5 -70152.075 -73659.6787

ADMINISTRACION -24600

VENTAS -36000

IMPUESTOS(25%) 6023.084875 9349.118375 12613.3757 15812.76804 14382.49515

24092.3395 37396.4735 50453.5028 63251.07216 57529.9806

F.C.E -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJOS -59393.805 28732.8821 36293.42745 40690.78082 42734.76745 33089.9773

VANE = 122148.0301

FLUJO DE FINANCIAMIENTO

MODO DE PAAS IGUALES

Nº DE CUOT 3

INTERÉS(10 0.1

AÑOS DE GR 1

PERIODO 0 1 2 3 4 5

Page 56: Evaluacion-economica

PRESTAMO 23757.522

CAPITAL 16580.13703 8685.01356

INTERES 2375.7522 1658.013703 868.501356

AMORTIZACION 7177.384971 7895.123469 8684.635815

A 9553.137171 9553.137171 9553.137171

FACTOR (A/P,10%,3) 0.40211 0.40211 0.40211

PERIODO 0 1 2 3 4 5

PRESTAMO 23757.522

AMORTIZACION -7177.38497 -7895.12347 -8684.63582

INTERESES -2375.7522 -1658.0137 -868.501356

ESCUDO FISCAL 593.93805 414.5034257 217.125339

F. NETO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

COK 0.18 0.18 0.18 0.18 0.18

1.18 1.18 1.18 1.18 1.18

1.18 1.3924 1.643032 1.93877776 2.287757757

FLUJO 23757.522 0 -6434.35731 -5562.05463 -4815.41104 0

VANF : 6945.699015

FLUJO FINANCIERO

PERIODO 0 1 2 3 4 5

F.C.E. -59393.805 33904.80087 50534.96838 66856.255 82853.21671 75701.85225

F. FINANCIAMIENTO 23757.522 0 -8959.19912 -9138.63375 -9336.01183 0

FLUJO FINANCIERO -35636.283 33904.80087 41575.76925 57717.62125 73517.20487 75701.85225

75701.85225

VAN = VANE + VANF

VAN =1E+05

TIR DEL PROYECTO:

1 + TIR = X

X = 0

1.122336 -35636.283 -35636.283

33904.80087

1.122336

30209.13601

41575.76925

1.259638097

33006.12244

57717.62125

1.413737183

40826.27375

73517.20487

1.586688135

46333.7459

75701.85225

Page 57: Evaluacion-economica

1.780797215

42510.09133

APROX.: X= 1; 1,1 ;1.2;1.3

SUMA = 0 : 157249.0864

TIR PROY 0.122336 12.2336

INFL. 1.05%

TIR REAL = 0.110673924 11.06739238

COK PONDERADO = 0.16 16

COK

FINANCIAMIENTO: 40% 23757.522 0.12

CAPITAL PROPIO: 60% 35636.283 0.04

INTERES = 10%

CONCLUSIÓN: