TPij MIN/UNIDADE1 E2 E3 E4

A 25 20 45 30B 40 25 0 45C 30 50 60 25

TPC ijE1 E2 E3 E4

A 600 600 600 600B 720 720 0 720C 840 840 840 840

TNTOTALE1 E2 E3 E4

A 250000 200000 450000 300000B 480000 300000 0 540000C 420000 700000 840000 350000

1150000 1200000 1290000 11900000.24 0.25 0.27 0.25

CALCULO DE MAQUINARIAH/AÑO M/AÑO

1 TFM 2178 130680

NUMERO DE MAQUINAS 36.96

E1 E2 E3 E48.80 9.18 9.87 9.11

CALCULO DE OPERARIOSH/AÑO M/AÑO

1 TFPO 2068.94 124136

NUMERO DE OPERARIOS 38.91

E1 E2 E3 E49.26 9.67 10.39 9.59

TURNO(HORAS) 7.75Dj DIAS/SEMANA 6

10000 MANTENIMIENTO (HORAS*MAQUINA) 12012000 TIEMPO (H)PREPARACION *1000 UNIDADES 114000 LIMPIEZA ESTACIONES E3 Y E4 (MINS) 15 ?

TIEMPO DE AUSENTISMO Y ENFERMEDAD 6%NUMERO DE MAQUINAS NUMERO DE OPERARIOS

TOTAL120000013200002310000

4830000 min/año

h/añoE1 tfm_E1 2081 124860E2 TFM_E2 2081 124860E3 TFM_E3 2010 120600E4 TFM_E4 2010 120600

VACACIONES(DIAS) 15

N° maquinas9.219.61

10.709.87

INDICES SUMARIOS $ 200,000,000.00 EN ARTICULOS TOTAL INDICE

1000 JEAN $ 30,000.00 $ 30,000,000.00 0.22200 LINO $ 20,000.00 $ 4,000,000.00 0.03

3000 SEDA $ 35,000.00 $ 105,000,000.00 0.76

TOTAL $ 139,000,000.00

q' $ 3,861,111.11

Q 51.80PRODUCCION POR TIPO DE PRODUCTO

OPERARIOS OPERACIÓN TIPO VALOR8.63 TRAZO Y CORTE JEAN $ 43,165,467.63

14.39 FILETEADO LINO $ 5,755,395.68 21.58 COSTURA SEDA $ 151,079,136.69

7.19 TERMINADOS

OPERARIOS OPERACIÓN INDICE 290 DIAS/AÑO6 TRAZO Y CORTE 0.17

10 FILETEADO 0.2815 COSTURA 0.42

5 TERMINADOS 0.14TOTAL 36

UNIDADES1438.852158.271233.30

MIN/UNIDADT.OP

PROD E1 E2 E3 E4 Dj1 10 14 13 12 150002 20 16 8 10 250003 10 22 15 17 25000

T.AUXPROD E1 E2 E3 E4

1 3.5 4.9 4.55 4.22 7 5.6 2.8 3.53 3.5 7.7 5.25 5.95

T.SER.ORGPROD E1 E2 E3 E4

1 17.55 24.57 22.815 21.062 35.1 28.08 14.04 17.553 17.55 38.61 26.325 29.835

T.SER.CALPROD E1 E2 E3 E4

1 20.25 28.35 26.325 24.32 40.5 32.4 16.2 20.253 20.25 44.55 30.375 34.425

T.SER.TECPROD E1 E2 E3 E4

1 5.25 7.35 6.825 6.32 10.5 8.4 4.2 5.253 5.25 11.55 7.875 8.925

TnijPROD E1 E2 E3 E4

1 62.2 87.1 80.9 74.62 124.4 99.5 49.8 62.23 62.2 136.9 93.3 105.7

TNTOTALPROD E1 E2 E3 E4 POR PRODUCTO

1 933075.0 1306305.0 1212997.5 1119690.0 4572067.52 3110250.0 2488200.0 1244100.0 1555125.0 8397675.03 1555125.0 3421275.0 2332687.5 2643712.5 9952800.0

POR ETAPA DE PROCESO 5598450.0 7215780.0 4789785.0 5318527.5

TOTAL 22922542.5382042.375

T.PRIN PROD E1 E2 E3 E41 13.5 18.9 17.55 16.22 27 21.6 10.8 13.53 13.5 29.7 20.25 22.95

T.UNIT PROD E1 E2 E3 E41 56.55 79.17 73.515 67.862 113.1 90.48 45.24 56.553 56.55 124.41 84.825 96.135

TPC PROD E1 E2 E3 E41 5.655 7.917 7.3515 6.7862 11.31 9.048 4.524 5.6553 5.655 12.441 8.4825 9.6135

POR PRODUCTO

MIN/AÑOH/AÑO

D E1 E2 E3 E4A 800 2 0.5 1.5 0B 440 0.5 0.6 0 0.9C 100 0.4 0.5 0.5 1.6D 200 2 0 1 1E 600 2 2 1 0

2140

F* 2 0.6 1.5 1.6

E9
UEC: CUANDO NO HAY UN PRODUCTO QUE PASE POR TODAS LAS ESTACIONES, SE TOMA EL MAYOR TIEMPO

TOTAL Ki DEMANDA TIPO4 1.333 1066.672 0.667 293.333 1.000 100.004 1.333 266.675 1.667 1000.00

2726.67

5.7 0.702 561.400.351 154.390.526 52.630.702 140.350.877 526.32

1435.09

Toij TIEMPO DE OPERACIÓN MIN/UDE1 E2 E3 D

A 10 25 35 1000B 45 30 35 2400C 60 0 40 1800

TAij E1 E2 E3A 1 2.5 3.5B 4.5 3 3.5C 6 0 4

TSOij E1 E2 E3A 1 2.5 3.5B 4.5 3 3.5C 6 0 4

TSCij E1 E2 E3A 2 5 7B 9 6 7C 12 0 8

Tiij E1 E2 E3A 1 2.5 3.5B 4.5 3 3.5C 6 0 4

TuijE1 E2 E3

A 15 37.5 52.5B 67.5 45 52.5C 90 0 60

TPC E1 E2 E3A 1.5 1.5 1.5B 3.6 3.6 3.6C 2.7 2.7

Tnij E1 E2 E3A 15001.5 37501.5 52501.5B 162003.6 108003.6 126003.6C 162002.7 0 108002.7

Ttotal capoacidadE1 E2 E3 Cap. Req. Por Prod

A 15001.5 37501.5 52501.5 105004.5B 162003.6 108003.6 126003.6 396010.8

C 162002.7 0 108002.7 270005.4

339007.8 145505.1 286507.8 771020.7

Num de Máqunas Aprox h/añoZE1 1.3037959203 2 tfm1 4333.6ZE2 0.559600563 1 tfm2 4333.6ZE3 1.1392141426 1 tfm3 4191.6ZE4

Num de Máqunas Aprox h/añoZE1 2.6364728258 3 tfo1 2143.064ZE2 1.1315970965 1ZE3 2.2281789065 2ZE4

Cap. Req. Por estacion

TIEMPO AUX 10% DE T.OPER 2 TURNOST.SER.ORG 10% DE T.OPER 8 HORAST.SER.CAL 20% DE T.OPER 6 DIAST.INTER 50% DE T.SER.CAL 20 MINUTOS DE DESCANSO

15 DIAS DE VACACIONES40 HORAS POR MANTENIMIENTO POR MAQUINA

0.3 HORAS DE PREP POR LOTE DE 200 PRODE3 0.25 HORAS AL DIA POR LIMPIEZA

2% TIEMPO DE ENFERMEDADCAL.OPERCAL.MAQ

min/año260016260016251496

min/año128583.84

HORAS POR MANTENIMIENTO POR MAQUINAHORAS DE PREP POR LOTE DE 200 PROD