VAL. FECHA N° FACT.
MONTO
DIRECTO IGV 19% MONTO C.PAGO
PAGO DE
DETRACCION
N° C.
PAGO
MONTO
ORIGINAL CONT.
1 OCT. 2013 00051 139,716.91 26,546.21 166,263.12 149,472.59 0.00 167,905.32
2 NOV. 2013 00054 1,380.00 262.20 1,642.20 1,642.20 0.00
141,096.91 26,808.41 167,905.32 151,114.79 0.00
49304.88
217,210.20
VAL. FECHA N° FACT.
MONTO
DIRECTO IGV 18% MONTO C.PAGO
PAGO DE
DETRACCION
N° C.
PAGO
MONTO
ORIGINAL CONT
1 8/31/2013 00076 0.00 0.00 0.00 0.00 0.00 6459 0.00
0.00 0.00 0.00 0.00 0.00
49,304.88
106308.26
83123.644 151148.29
TOTAL
TOTAL
8/10/2019 resumen LIQUIDACION DE OBRA
http://slidepdf.com/reader/full/resumen-liquidacion-de-obra 2/7
10% R.F.G
MONTO
PAGADO
16,790.53 167,905.32 151,114.79 14229.2644
0
16,790.53 167,905.32 167,905.32
167,905.32
10% R.F.G
MONTO
PAGADO
0.00 0.00
0.00 0.00
480640.6
0 167,905.33 567155.908
170,938.55 MONTO TOTAL DE OBRA
8/10/2019 resumen LIQUIDACION DE OBRA
http://slidepdf.com/reader/full/resumen-liquidacion-de-obra 3/7
TOTAL 16,790.53
TOTAL 0.00
RETENCION POR GARANTIA DE FIEL CUMPLIMIENTO
RETENCION POR GARANTIA DE FIEL CUMPLIMIENTO ADICIONAL
8/10/2019 resumen LIQUIDACION DE OBRA
http://slidepdf.com/reader/full/resumen-liquidacion-de-obra 4/7
CONTRATO ORIGINAL
MONTO CONTRACTUAL 167,905.32
MONTO PAGADO CONTRACTUAL 151,114.79
REAJUSTES 3,033.23
FONDO DE GARANTIA 16,790.53
SUB TOTAL 16,790.53ADICIONAL
MONTO CONTRATUAL 0.00
MONTO PAGADO CONTRACTUAL 0.00
DETRACCION 0.00
FONDO DE GARANTIA 0.00
SUBTOTAL 0.00
MONTO TOTAL A DEVOLVER AL CONTRATISTA 16,790.53
8/10/2019 resumen LIQUIDACION DE OBRA
http://slidepdf.com/reader/full/resumen-liquidacion-de-obra 5/7
A
VAL. PERIODO DE
VALORIZACION
REAJUSTE
CALCULO SIN
IGV
IGV 19 % PARCIAL
18%
1 NOV 2,364.01 449.16 2,813.16 425.52
2 DIC 184.92 35.13 220.05 33.29
3,033.23
B
VAL. PERIODO DE
VALORIZACION
REAJUSTE
CALCULO SIN
IGV
IGV 18 % PARCIAL
1 SETIEMBRE 0.00 0.00 0.00
0.00
C TOTAL 2,548.93 484.30 3,033.23
TOTAL A
TOTAL B
CONTRATO ORIGINAL
ADICIONAL
8/10/2019 resumen LIQUIDACION DE OBRA
http://slidepdf.com/reader/full/resumen-liquidacion-de-obra 6/7
23.64
1.85
8/10/2019 resumen LIQUIDACION DE OBRA
http://slidepdf.com/reader/full/resumen-liquidacion-de-obra 7/7
ITEM RESUMEN TOTAL MONTO
1 DEVOL. RETENCION DE GARANTIA 10% 16,790.53 167,905.32
2 REAJUSTE FORM. POLINOMICA 3,033.23
4 REGULARIZACION IGV DE REAJUSTES -25.48
19,798.29TOTAL A PAGAR AL CONTRATISTA