WELCOME

Jabatan Penilaian dan Perkhidmatan Harta

Daerah Gombak (JPPH Gombak),

Kementerian Kewangan Malaysia.

Visit To IBS Factory

IBS Superstructure In Malaysia 3 in 1

- 11 Jan 2017 -

Page 7: Presentation . _ JPPH (MOF) factory visit

Macro Economy & Green

1. One of the way to improve the Outflow of Currency is the utilization of

Industrial Building System ( IBS ).

“ IBS is a system which suit all architectural demands & not a machine or component “

2. If we talk about lowering house prices, what is the best way to do it? The best way is to build

houses faster and cheaper. One of the ways is by using Industrial Building Systems ( IBS ).

3. The low usage of IBS in Malaysia is due to the lack of enforcement besides other

shortcoming of IBS adoption. If independent enforcement is based on the contracts awards,

the usage of IBS will higher.

4. Industrialised Building System is a system not a machine or component. Responsibility of the

building should not have many different mix system and manufacture products.

5. Q-Lassic or Conquas should be carried-out upon the completion of the superstructure

works (frame & wall) instead of upon of completion finishing work.

6. System provider and manufacturer should provided installer of the building precast

element. Same concept applies when we buy computer and hardware.

7. IBS Superstructure In Malaysia 3 in 1: HC PRECAST SYSTEM.

- Load Bearing Wall + Modular Shear Keys Wet Joint + Box System.

- Speed, Quality & Environment.- Precast Element ( off site ) 80%

- Wet Work ( on site ) 20%

Page 8: Presentation . _ JPPH (MOF) factory visit

PROPOSE TO GOVERNMENT & PRIVATE DEVELOPER

Invite industrialized building system provider with manufacturing facility ( flexibility to suit all

architectural demands ) to participate to built the show unit with work below and superstructure

without finishing for the Government & Private Developer to identify the system in terms of quality,

speed and environment for supply in its development.

--------------------------------------------------------------------------------------------------------------------------------

1. Architect

• Appointed by the Government & Private Developer.

• Design of single storey bungalow of 1,000 ft2 ( affordable home ), up to superstructure without

finishing.

• With M&E requirement.

• Wall finishing with plaster or skim coat only.

• Door and window frame included except door leaf.

• Ground floor without tiling.

2. Industrialized building system manufacturer have formed their BQ for superstructure ( in terms of

wall area ) and to submit work program with sequence of work for record purposes.

3. Proper record by the Government & Private representative during construction, in terms of labour

and machinery involved per day up to completion ( superstructure only ).

4. Conquas or QLassic consultant ( 2 ) engaged by the Government & Private Developer.

5. Cost Comparison for each Industrialized Building System Manufacturer by the Government &

Private Developer ( for superstructure only ). Cost will be fixed for the selected manufacturer and

supply to its development.

Page 9: Presentation . _ JPPH (MOF) factory visit
Page 10: Presentation . _ JPPH (MOF) factory visit
Page 11: Presentation . _ JPPH (MOF) factory visit
Page 12: Presentation . _ JPPH (MOF) factory visit

Presentation at Show Unit : IBS Sequence of Work

Page 13: Presentation . _ JPPH (MOF) factory visit

Presentation at Show Unit : IBS Sequence of Work

Page 14: Presentation . _ JPPH (MOF) factory visit

Production Sequence

Page 15: Presentation . _ JPPH (MOF) factory visit

Production Sequence

Page 16: Presentation . _ JPPH (MOF) factory visit

Production Sequence

Page 17: Presentation . _ JPPH (MOF) factory visit

In-house Engineering & Accessories Fabrication

Page 18: Presentation . _ JPPH (MOF) factory visit

In-house Engineering & Accessories Fabrication

Page 19: Presentation . _ JPPH (MOF) factory visit

Precast Staircase Mould Installation & Dismantle Demo : 5 Minutes

Page 20: Presentation . _ JPPH (MOF) factory visit

Precast Staircase Mould Installation & Dismantle Demo : 5 Minutes

Page 21: Presentation . _ JPPH (MOF) factory visit

Training Unit Inspection ( Without Waterproofing , Roof Covering & Finishing – 9 Years)

Page 22: Presentation . _ JPPH (MOF) factory visit

Training Unit Inspection ( Without Waterproofing , Roof Covering & Finishing – 9 Years)

Page 23: Presentation . _ JPPH (MOF) factory visit

Question & Answer after Visiting Production, Engineering, Fabrication & Training Unit

Page 24: Presentation . _ JPPH (MOF) factory visit
Page 25: Presentation . _ JPPH (MOF) factory visit

Industrial Building Systems is cheaper then Conventional.

Open system or proprietary system is a technology.

- If we talk about lowering house prices, what is the best way to do it ?

- The best way is to build houses faster.

- One of the ways is by using Industrial Building Systems ( IBS ).

Conventional vs HC Precast System Sdn Bhd

Schedule of Rate - Single Storey Semi - D House

Fast & Easy Cost Comparison ( .xls format )

Notes :

Rate to be fill by you

Rate that has been key in is automatically links to page 2 & page 3

- 800 ft2 : RM 23,688.00 ( ex-factory )

- Precast Element : 88% ( off site )

- Wet Work : 12% ( on site )

Page 26: Presentation . _ JPPH (MOF) factory visit

- 800 ft2 : RM 23,688.00 ( ex-factory )

- Precast Element : 88% ( off site )

- Wet Work : 12% ( on site )

Page 27: Presentation . _ JPPH (MOF) factory visit

- 800 ft2 : RM 23,688.00 ( ex-factory )

- Precast Element : 88% ( off site )

- Wet Work : 12% ( on site )

Page 28: Presentation . _ JPPH (MOF) factory visit
Page 29: Presentation . _ JPPH (MOF) factory visit
Page 30: Presentation . _ JPPH (MOF) factory visit
Page 31: Presentation . _ JPPH (MOF) factory visit
Page 32: Presentation . _ JPPH (MOF) factory visit
Page 33: Presentation . _ JPPH (MOF) factory visit

Double Storey HC Precast System Drawing - 3D

Superstructure ( Frame & Wall ) :

- By HC Precast System

77 %

23 %

Sub- Structure By Other :

- Appointed By Client

Page 34: Presentation . _ JPPH (MOF) factory visit

Double Storey Terrance

Page 35: Presentation . _ JPPH (MOF) factory visit

RM 66,100.00 / 1,650 ft2

Double Storey Terrance

Page 36: Presentation . _ JPPH (MOF) factory visit

RM 63,400.00 / 1,600 ft2

Double Storey Terrance

Page 37: Presentation . _ JPPH (MOF) factory visit

RM 59,800.00 / 1,600 ft2

Double Storey Terrance

Page 38: Presentation . _ JPPH (MOF) factory visit

RM 59,800.00 / 1,600 ft2

Double Storey Terrance

Page 39: Presentation . _ JPPH (MOF) factory visit

INDUSTRIALISED BUILDING SYSTEM ( IBS )

is a system not a machine or component

IMPORTANTELEMENTS REQUIRED TO COMPLETE A BUILDING

SEQUENCE OF WORK : 5 Steps & No Variation Order

Step 1 Step 2 Step 3 Step 4 Step 5

Drawing Mould Production Delivery Installation

Conversion Fabrication Numbering

( 2D to 3D ) ( Decide by Client )

Speed, Quality & Environment

Page 40: Presentation . _ JPPH (MOF) factory visit

Step 1 : Drawing Conversion 2D To 3D - 1 Month

Original 2D To System 3D

Page 41: Presentation . _ JPPH (MOF) factory visit

Step 1 : Drawing Conversion 2D To 3D - 1 Month

Original 2D To System 3D

Page 42: Presentation . _ JPPH (MOF) factory visit

Original Drawing To System Shop Drawing - 1

Step 1a : M & E Conversion original to system shop drawing 1

Page 43: Presentation . _ JPPH (MOF) factory visit

Original Drawing To System Shop Drawing - 1

Step 1a : M & E Conversion original to system shop drawing 2

Page 44: Presentation . _ JPPH (MOF) factory visit

Step 2 : Mould Fabrication - 1 Month

1. Designed by You 2. Coping 1 Cast 3. Chequer Plate ( Tiling )

4. L shape Panel 5. Door Frame 1 Cast 6. Half Slab

Page 45: Presentation . _ JPPH (MOF) factory visit

Existing production 8 acres : 1,800 to 2,500 units

of single storey ( 1000 ft2 ) per year

Future development 13 acres : 2,500 to 3,500 units

of single storey ( 1000 ft2 ) per year

SPEED ( step 3 to 5 ) : Decide by Client : Production , Delivery & Installation

Page 46: Presentation . _ JPPH (MOF) factory visit

SPEED ( step 3 to 5 ) : Decide by Client : Production , Delivery & Installation

Page 47: Presentation . _ JPPH (MOF) factory visit

SPEED ( step 3 to 5 ) : Decide by Client : Production , Delivery & Installation

Page 48: Presentation . _ JPPH (MOF) factory visit

SPEED ( step 3 to 5 ) : Decide by Client : Production , Delivery & Installation

Page 49: Presentation . _ JPPH (MOF) factory visit

Every Truck Every 20m3 Casting & Leveling Mould Dismantling

Rebound Hammer Test Panel Lifting Vertical Curing 7days Proper Storage Yards

Step 3 : Production ( Decide by Client ) - 7 to 9 units / day

Page 50: Presentation . _ JPPH (MOF) factory visit

External transport to project

Step 3a : Quality Control & Assurance

Bay yard storage 7 daysPanel 18 hrs hoistG30 design mixed 14 hrs hoist

Page 51: Presentation . _ JPPH (MOF) factory visit

Step 3b : Decide by Client - 7 to 9 units / day

Page 52: Presentation . _ JPPH (MOF) factory visit

Step 4 : Delivery ( 4 Options ) - Decide by Client

Page 53: Presentation . _ JPPH (MOF) factory visit

Step 4a : Delivery ( 4 Options ) - Decide by Client

1. Bay Yard to Block Yard 2. Bay Yard to Site yard (project) – Advance Casting

3. Storage Yard (factory) to Block Yard – Advance Casting 4. Storage Yard (factory) to Site Yard (project) – Advance Casting

Page 54: Presentation . _ JPPH (MOF) factory visit

Step 5 : Installation - Decide By Client

Sequence Block by Block One Time Adjustment

Page 55: Presentation . _ JPPH (MOF) factory visit

Step 5a : Installation - Numbering

Page 56: Presentation . _ JPPH (MOF) factory visit

1. Panel Guide 2. Panel Installation 3. Wall Prop installation

4. Vertical Adjust 5. Expending Cement 6. Rebar Installation

Step 5b : Installation

Page 57: Presentation . _ JPPH (MOF) factory visit

Step 5b1 : Expanding Cement Motar

Page 58: Presentation . _ JPPH (MOF) factory visit

7. Mould Installation 8. Wet joint Casting 9. Mould Dismantling

10. Half Slab installation 11. Rebar Install 12. RC Flat Roof Casting

Step 5c : Installation

Page 59: Presentation . _ JPPH (MOF) factory visit

Step 5d : Over View

Page 60: Presentation . _ JPPH (MOF) factory visit

No Variation Order

Absolutely no Variation Order (V.O) due to :-

- No material wastage (minimal concreting at site)

- Accurate estimation by 3D drawing of building precast elements

-(wall, beam, staircase & partition ) compared to bricks,

-reinforcement work and concreting at site.

Page 61: Presentation . _ JPPH (MOF) factory visit

THANK YOU

DESIGN BY YOU

PRODUCE BY HC