presentación 2014 Inglés.pdf

47
English

Transcript of presentación 2014 Inglés.pdf

Page 1: presentación 2014 Inglés.pdf

English

Page 2: presentación 2014 Inglés.pdf

ENGINEERING

CONSTRUCTION

CIVIL WORKS

MAINTENANCEMAINTENANCE

INVESTIGATION

2

Page 3: presentación 2014 Inglés.pdf

AREMA is a group of professionals who arestriving to improve the environment throughhigh quality well-executed projectshigh quality, well-executed projects.

Use of the latest technology, our ownresearch, environmental quality andmanagement systems, continual training,commitment to internationalization, dealingpersonally with our clients and respondingquickly to their needs all form part of ourquickly to their needs all form part of ourformula for success.

We hope that we will have an opportunity top pp ywork with you on the exciting challenge ofpreserving our surroundings.

3

Page 4: presentación 2014 Inglés.pdf

INDEX• The Company

INDEXp y

• Field of performance

• ProductsProducts

• Technology

• References• References

• Contact information and branch officesbranch offices

4

Page 5: presentación 2014 Inglés.pdf

THE COMPANYCompany specializing in designing,

THE COMPANYp y p g g g

constructing and running water treatment plants.

P f l l f d d ff

General Information

Professionals qualified in many different fields with extensive knowledge and solid experience.

Experience in producing urban and industrial water treatment plants, drinking-water installations, recycling g y gwater and desalinisation.

Founded in 1995, the company has d l d h 600 developed more than 600 projects in Spain, the rest of Europe, America and Africa.

Certified to be contracted for state projects.

5

Page 6: presentación 2014 Inglés.pdf

THE COMPANYCommitments

To use of the latest environmental technology.

To look for ways to save and to recycle, and for energyefficiency.

To find the best long-term solutions.

To guarantee the solutions proposed.

6

Page 7: presentación 2014 Inglés.pdf

THE COMPANYTHE COMPANYCategory awarded by the Spanish Ministry of Economics and TreasuryCategory awarded by the Spanish Ministry of Economics and Treasury

Group K: MiscellaneouspK-8 E: Design & Construction in Water Treatment Plants.

G O C ti d i t f tGroup O: Conservation and maintenance of property.O-4 D: Conservation an comprehensive maintenance of water installations.

Group E: HydraulicsE-1 E: Supply and plumbing.E 4 E Di h d d iE-4 E: Ditches and drainage.E-5 E: River banks and channelling defences.E-7 E: Non-specific hydraulic projects.

7

Page 8: presentación 2014 Inglés.pdf

THE COMPANYTHE COMPANYCategory awarded by the Spanish Ministry of Economics and TreasuryCategory awarded by the Spanish Ministry of Economics and Treasury

Group I: Electrical installationsI-1 B: Lighting and illumination.I-5 C: High voltage transformation and distribution centres.g gI-6 D: Low voltage distribution.I-8 C: Electronic installations.I-9 D: Non-specific electrical installationsI-9 D: Non-specific electrical installations.

G J M h i l i t ll tiGroup J: Mechanical installationsJ-5 D: Non-specific mechanical installations.

8

Page 9: presentación 2014 Inglés.pdf

THE COMPANYTHE COMPANYCertifications

EUROPEAN QUALITY ASSURANCE

Quality ManagementS t Q lifi ti

EUROPEAN QUALITY ASSURANCE

System QualificationUNE - EN - ISO 9001

7583 - E

Enviromental ManagementSystem QualificationSystem Qualification

UNE - EN - ISO 140017583 - E

Health & Safety ManagementS t Q lifi tiSystem Qualification

OHSAS 180017583 - E

9

Page 10: presentación 2014 Inglés.pdf

FIELD OF PERFORMANCEFIELD OF PERFORMANCEEEngineering

We offer our experience to organizations wanting to develop water-related projects.p j

We have thorough knowledge of the bl d h h d problems associated with the product,

with the market and with the latest trends in technology.

We are not connected to a manufacturer, ff i d d t d i i so we can offer independent advice in

our clients’ best interests.

10

Page 11: presentación 2014 Inglés.pdf

FIELD OF PERFORMANCEFIELD OF PERFORMANCEP MProject Management

Selection of equipments and management of purchasing.

Development of civil works.Development of civil works.

Production of control programmes.

Assembly and start-up.

Comprehensive management of projects, with extensive p g p j ,experience in international turn-key projects.

11

Page 12: presentación 2014 Inglés.pdf

FIELD OF PERFORMANCEFIELD OF PERFORMANCEC l kCivil works

Carrying out civil works

Our own fleet of machinery

Option for the clientto supervise the civilwork if they preferwork if they prefer

12

Page 13: presentación 2014 Inglés.pdf

FIELD OF PERFORMANCEFIELD OF PERFORMANCEMMaintenance

Maintenance of installations, including

those not built by AREMA

Ongoing advisory support.

Training programmes for operating personnel.

AREMA.

13

Page 14: presentación 2014 Inglés.pdf

FIELD OF PERFORMANCEFIELD OF PERFORMANCER hResearch

Development of our own products through: Research + Development + Innovation(R+D+i).

Participation in programmes organized by the “Centro para el Desarrollo Tecnológico Industrial”(Centre for Industrial Technological Development).

Incorporation of new technology and on-going staff training.

14

Page 15: presentación 2014 Inglés.pdf

PRODUCTSPRODUCTSRegeneration of urban water

Pioneer in EU to the Project for the Pioneer in EU to the Project for the Regeneration of Urban Waste Water to refill the water table and combat salt water intrusion in aquiferwater intrusion in aquifer.

Regeneration of 20.000 m3/day.g y

15

Page 16: presentación 2014 Inglés.pdf

PRODUCTSPRODUCTSRegeneration of industrial water

Carried out one of the biggest textile industrial water regeneration project i E in Europe. Regeneration of 12.500 m3/day.

I ll i hi h di Installation which treats dirty water so it can be reused, using a tertiary treatment which comprises sand f l l f l d filtration, ultra-filtration and reverse osmosis.

Re-use of industrial water to preserve the Tordera River.

16

Page 17: presentación 2014 Inglés.pdf

PRODUCTSPRODUCTSDesalinisation

Desalinisation Société Algerienne du Chlore (Soachlore) Algeria

17

Chlore (Soachlore) Algeria.Producing ultra-pure water.

Page 18: presentación 2014 Inglés.pdf

AgullanaLímits de la Jonquera

PRODUCTSWaste-water treatment plants for small towns

Castellar de N’Hug Tous 18

Page 19: presentación 2014 Inglés.pdf

VilalbaArtesa de Segre

PRODUCTSWaste-water treatment plants for medium-sized towns

Deltebre Ascó 19

Page 20: presentación 2014 Inglés.pdf

La UniónSanta Maria de Palautordera

PRODUCTSWaste-water treatment plants for large towns

La RodaPiedras Negras (Mexico) 20

Page 21: presentación 2014 Inglés.pdf

Meat industryFood industry

PRODUCTSIndustrial water treatment plants

Hydrocarbon recovery servicesSlaughter house y yg

21

Page 22: presentación 2014 Inglés.pdf

PRODUCTSPRODUCTSHydraulic projectsHydraulic projects

Construction of the new pump station for the waste-water treatment plant in Igualada(Barcelona)

Increase in capacity to 3.000 m3/hour (72.000 m3/day.)

22

Page 23: presentación 2014 Inglés.pdf

PRODUCTSPRODUCTSDrinking water supply and pipesDrinking water supply and pipes

Sector BarcelonaSector El Prat

Construction of the second phase of the hydraulic barrier to combat salt water intrusion in the Delta de Llobregat, production, transport and injection wells.

The treatment process comprises micro-filtration, ultra-filtration, reverse osmosis and ultra violet disinfection.

Th i ll i ’ i i 20 000 3/d

23

The installation’s treatment capacity is 20.000 m3/day.

Page 24: presentación 2014 Inglés.pdf

PRODUCTS Transportation of water from the waste-PRODUCTSDrinking water supply and pipes

Transportation of water from the waste-water treatment plant in Prat de Llobregat, regenerated by the tertiary treatment, to be injected into the Delta Drinking water supply and pipes , jde Llobregat water table.

Construction of 11 injection wells, each 72 metres deep.

Installation of 10 km of high-density l h l b 200 d 400 polyethylene piping, between 200 and 400

mm in diameter.

C t ti f 16 lti t i Construction of 16 multi-parametric control piezometres to transmit data immediately.

12 horizontal tunnels excavated by remote-control, measuring between 160 and 400 mm in diameter, totalling 2,153 and 400 mm in diameter, totalling 2,153 metres.

800 m long tunnel passed under the River

24

g pLlobregat.

Page 25: presentación 2014 Inglés.pdf

TECHNOLOGYTECHNOLOGYDesign criteriaDesign criteria

High efficiency systems using diffusersHigh efficiency systems using diffusers.

Reduction of hydraulic losses.

Elimination of nutrients in the biological tank, controlled with O2 and Rx probes.controlled with O2 and Rx probes.

Reduction in civil works through not using anoxyc chambersanoxyc chambers.

25

Page 26: presentación 2014 Inglés.pdf

TECHNOLOGYTECHNOLOGYC l SControl Systems

Complete control of the process through probes and PLC, and our own design of control gprogrammes.

System of alarm management, System of alarm management, sending text messages and pre-recorded messages.

System of graphic control, like Scada, and maintenance reports.

Telemetric systems to send information by GSM, integration with existing centralized systemswith existing centralized systems.

26

Page 27: presentación 2014 Inglés.pdf

TECHNOLOGYTECHNOLOGYWaste water treatment plants for small towns of less than 5 000 inhabitants

Construction of settling tanks using our own PRVF moulds with diameters between 2 30 m and

Waste-water treatment plants for small towns of less than 5,000 inhabitants

PRVF moulds with diameters between 2.30 m and 9.00 m, with a 56º slope and a polished finish inside, and the option of stainless steel cones.

Technology sufficient for installations in towns of up to 5,000 inhabitants, with the possibility to install two cones in the same tank.

Very compact installations which can be round, square or oval.

Elimination of nutrients in the tank, controlled by O2 and Rx probes.

Reduction in civil works which are only necessary Reduction in civil works, which are only necessary for the biological tank.

High energy efficiency and low consumption.

27

Totally automatic.

Page 28: presentación 2014 Inglés.pdf

TECHNOLOGYTECHNOLOGYTechnology to eliminate nitrates from drinking water suppliesTechnology to eliminate nitrates from drinking water supplies

We represent K-Nord ®, which produces the technology to eliminate nitrates p p gyfrom drinking water supplies.

Technology to eliminate nitrates through biological systems.

Low costs compared with other technology: 0,12 €/m3 (RO, EDR, EDI, etc.).

Quick supply.

Easy maintenance.y

Easy to transport.

Minimal civil works.

28

Page 29: presentación 2014 Inglés.pdf

TECHNOLOGYTECHNOLOGYBiological compact plant with mobile bed Biological compact plant with mobile bed

C i i 40 f hi i i f 1 000 i h biCapacity to treat water in a 40 feet shipping container for 1,000 inhabitants.

Technology based on the development of biofilms on plastic supports.

Operates on large quantities of biological contaminants.

Low energy consumption.Low energy consumption.

Easy maintenance.

Easy to transport.

Minimal civil works.

No odours.

Compact and modular

29

Compact and modular.

Page 30: presentación 2014 Inglés.pdf

REFERENCESREFERENCESFinished projects

Project Contracted by Developed in Starting date Completion date Observations

Riudarenes Construcciones Rubau Girona 09/1995 05/1996 WWTP with extended aeration

El Sosiego FCC Barcelona 11/1995 02/1996 WWTP with extended aeration

Procsa Zunfer Pontevedra 12/1995 04/1996 WWTP with extended aeration

Velilla del Rio Carrión Sato Palencia 01/1996 02/1997 WWTP with extended aeration

Consell Sato Balearic Islands 03/1996 02/1997 WWTP with extended aeration and sludge treatment

Ecoimsa Ecoimsa Barcelona 06/1996 08/1996WWTP with extended aeration and

physical-chemical treatmentp y

Enguera Egevasa Valencia 06/1996 03/1998 WWTP with extended aeration and sludge treatment

Slautherhouse in Barbastro Gines Navarro Construcciones

Huesca 07/1996 07/1996 WWTP with extended aerationConstrucciones

Dodro Corsan Pontevedra 09/1996 10/1996 WWTP with extended aeration

Els Muntells Elsan Tarragona 10/1996 02/1997 WWTP with extended aeration

30

Els Muntells Elsan Tarragona 10/1996 02/1997 WWTP with extended aeration

Page 31: presentación 2014 Inglés.pdf

REFERENCESREFERENCESFinished projects

Project Contracted by Developed in Starting date Completion date Observations

Enlargement of Telde Canaragua Las Palmas 02/1997 04/1997 WWTP with extended aeration

Pinofranqueado OCP Cáceres 02/1997 08/1997 Drinking water plant

La Goba Copcambra Girona 03/1997 09/1997 WWTP with extended aeration

Bussot Lubasa Alicante 04/1997 05/1997 WWTP with biological treatment, bio-cylinders and treatment of sludge

Ceramica Saloni Becsa Castellón 05/1997 08/1997 WWTP compact

Soriguerola Junta Plan Soriguerola Girona 06/1997 11/1997 WWTP with extended aeration

Congelados y Derivados, S.A.

Congelados y Derivados, S.A.

León 09/1997 04/1998 Reverse osmosis

Oliva Nova Construcciones Hispano Germanas

Alicante 09/1997 09/1998 WWTP with extended aerationGermanas

Negreira Covsa A Coruña 10/1997 08/1998WWTP for biogical treatment in carrousel

and sludge treatment

Belalcazar Diputación de Córdoba Córdoba 11/1997 12/1998 WWTP with extended aeration and li i i f i i

31

Belalcazar Diputación de Córdoba Córdoba 11/1997 12/1998elimination of nutritious

Page 32: presentación 2014 Inglés.pdf

REFERENCESREFERENCESFinished projects

Project Contracted by Developed in Starting date Completion date Observations

Temisas Canaragua Las Palmas 12/1997 05/1998 WWTP with extended aeration

Vielha Isolux Wat Lleida 01/1998 05/1998 WWTP with extended aeration

Carballeda de Avia Construcciones Alea Ourense 01/1998 08/1998 WWTP with extended aeration

Salinas Lubasa Alicante 01/1998 02/1999 WWTP with extended aeration and physical-chemical treatment

Esterri d'Aneu Agència Catalana de l'Aigua Lleida 02/1998 08/1998 WWTP with extended aeration

Catalana de Polimers Catalana de Polimers Barcelona 02/1998 11/1998WWTP with extended aeration and physical-

chemical treatment

Xunqueira de Ambia Elsan Ourense 03/1998 06/1998 WWTP with extended aeration

Santa Maria de Palautordera Agència Catalana de l'Aigua Barcelona 03/1998 08/1998 WWTP with extended aeration and elimination of nutrientselimination of nutrients

Santomera Obrascon Murcia 04/1998 04/1999 WWTP with extended aeration

Vallada Egevasa Valencia 05/1998 08/1998 WWTP with extended aerationVallada Egevasa Valencia 05/1998 08/1998 WWTP with extended aeration

32

Page 33: presentación 2014 Inglés.pdf

REFERENCESREFERENCESFinished projects

Project Contracted by Developed in Starting date Completion date Observations

Cuartel Colmenar Viejo Tremesa Madrid 06/1998 08/1998 WWTP with extended aeration

Tous Lubasa Valencia 06/1998 05/1999 WWTP with extended aeration

Sslautherhouse in Burriana Luis Batalla, S.A. Castellón 07/1998 11/1998 WWTP with extended aeration and physical-chemical treatment

Industrial estate Sant PereMolanta

Sugemesa Grupo Gallina Blanca

Barcelona 08/1998 12/1998 Industrial water with biological treatmet

Casinos Egevasa Valencia 08/1998 03/1999 WWTP with biological filter and sludge treatment

Begonte Construcciones Alea Lugo 08/1998 04/1999 WWTP with extended aeration

Castro Caldelas Construcciones Alea Ourense 08/1998 06/1999 WWTP with extended aeration

Viladrau -VidraFolgueroles La Guixa

Agència Catalana de l'Aigua Girona 08/1998 06/1999 WWTP with extended aerationFolgueroles - La Guixa

Enlargement ofRafelguaraf - L'Enova

Egevasa Valencia 08/1998 09/1999 WWTP with extended aeration

Carlet Obrascon Valencia 08/1998 10/1999 WWTP with extended aerationCarlet Obrascon Valencia 08/1998 10/1999 WWTP with extended aeration

33

Page 34: presentación 2014 Inglés.pdf

REFERENCESREFERENCESFinished projects

Project Contracted by Developed in Starting date Completion date Observations

WWTP Valparaiso Proinosa Tarragona 01/1999 02/1999 Pump station

Linyola Agència Catalana de l'Aigua Lleida 01/1999 07/2001 WWTP with extended aeration

WWTP Flix Edar Flix Ute Tarragona 03/1999 03/1999 Ferric chloride dosage

Slautherhouse in Mahón Ganados Pellicer Balearic Islands 06/1999 08/1999 WWTP with extended aeration

Llanos del Espinar Diputación de Córdoba Córdova 06/1999 12/1999 WWTP with extended aeration

Tales – Sueras Lubasa Castellón 06/1999 12/1999 WWTP with extended aeration

Cabanes Lubasa Castellón 06/1999 01/2000 WWTP with extended aeration

Piedras NegrasComisión Estatal de Aguas y

Saneamiento Estado de Mexico 07/1999 12/2000 WWTP with extended aeration. elimination Piedras Negras Saneamiento - Estado de Coahuila

Mexico 07/1999 12/2000of nutrients

La UniónRegión de Murcia

Consejería de Medio A b A l A

Murcia 07/1999 06/2001 WWTP with extended aerationAmbiente Agricultura y Agua

34

Page 35: presentación 2014 Inglés.pdf

REFERENCESREFERENCESFinished projects

Project Contracted by Developed in Starting date Completion date Observations

Bertamirans Isolux Wat A Coruña 08/1999 09/1999 WWTP with extended aeration

La Roda Junta de Castilla La Mancha Albacete 08/1999 11/1999 WWTP with extended aeration

Servitint Servitint Alicante 10/1999 06/2000 industrial water treatment plant with extended aeration

Dos Torres Diputación de Córdoba Córdoba 11/1999 05/1999 WWTP with extended aeration and elimination of nutrients

Intamasa Corviam Teruel 01/2000 04/2000 Industrial treatment plant

La Restinga Canaragua Sta. Cruz de Tenerife 03/2000 04/2000 WWTP with extended aeration

Enlargement of La Bisbald’Empordà

Agència Catalana de l'Aigua Girona 03/2000 04/2000 Pre-treatment

San Felipe A.C.S. Las Palmas 03/2000 09/2000 WWTP with extended aeration

Sardina A.C.S. Las Palmas 04/2000 10/2000 WWTP with extended aeration

Turbaco Instituto Colombiano de Bi t F ili

Colombia 09/2000 12/2000 WWTP with extended aerationBienestar Familiar

35

Page 36: presentación 2014 Inglés.pdf

REFERENCESREFERENCESFinished projects

Project Contracted by Developed in Starting date Completion date Observations

S iété Al é i d Soachlore Mostaganem

Société Algérienne du Chlore Algeria 09/2000 12/2000 Reverse osmosis and demineralisation

El Puente – Bogotá Instituto Colombiano de Bienestar Familiar

Colombia 01/2001 06/2001 WWTP with extended aeration

Enlargement ofCunit – Cubelles Agència Catalana de l'Aigua Tarragona 05/2001 12/2001 Improvements in WWTP

Méntrida, Torre de Esteban Hambrán Portillo de Toledo Junta de Comunidades Toledo 09/2001 01/2003 4 sewage-treatment plants with extended Hambrán, Portillo de Toledo and Santa Cruz de Retamar

Jde Castilla - La Mancha

Toledo 09/2001 01/2003 g paeration

WWTP Bahamonde Construcciones Alea Lugo 10/2001 11/2001 Construction of pumping stations

Cala GaldanaSorea - Antonio Gomila

Ute Balearic Islands 11/2001 07/2002WWTP with extended aeration and

elimination of nutrients

Deltebre Agència Catalana de l'Aigua Tarragona 02/2002 12/2002 WWTP with extended aeration and li i ti f t i t

g g gelimination of nutrients

Enlargement of Martorell Agència Catalana de l'Aigua Barcelona 03/2002 12/2003 WWTP by activated sludge

Gestión de Infraestructuras Sewage system and WWTP with extended Montoro Gestión de Infraestructuras de Andalucia (G.I.A.S.A.)

Córdoba 06/2002 01/2003 Sewage system and WWTP with extended aeration

36

Page 37: presentación 2014 Inglés.pdf

REFERENCESREFERENCESFinished projects

Project Contracted by Developed in Starting date Completion date Observations

Collectors at Viladrau and Collectors at Viladrau and Folgueroles

Agència Catalana de l'Aigua Girona 07/2002 11/2001 Sewage system

Terciary Treatment - La Unión

Región de Murcia-Consejería de Medio

Ambiente Agricultura y AguaMurcia 07/2002 12/2002 System of de filtration and re-use of water

for agricultural porpoisesAmbiente Agricultura y Agua

El Chaparral Eurodepuración Cadiz 09/2002 11/2002 WWTP with extended aeration

WWTP and general collector El M j l i N à

Agència Catalana de l'Aigua Barcelona 12/2002 03/2003 Decantation well and biologicalEl Mujal in Navàs

g g g

WWTP San Miguel Grupo Mahou - San Miguel Burgos 02/2003 04/2003 Pumping station

Castellar de N'Hug Agència Catalana de l'Aigua Barcelona 09/2003 10/2004 WWTP with extended aeration

Improvement work at WWTP in Villena

Generalitat Valenciana Epsar Alicante 09/2003 07/2005 Aerated lagoon

Artesa de Segre Agència Catalana de l'Aigua Lleida 11/2003 10/2004 WWTP with extended aeration

WWTP and collectors Al í

Junta de Andalucia -Consejería de Medio Málaga 03/2004 03/2005 Activated sludge

Alcaucín jAmbiente

g g

37

Page 38: presentación 2014 Inglés.pdf

REFERENCESREFERENCESFinished projects

Project Contracted by Developed in Starting date Completion date Observations

WWTP d ll f WWTP and collector of la Agullana

Agència Catalana de l'Aigua Girona 05/2004 10/2004 Green filter

Glaxo Smith KlineBoudouaou

Glaxo Smith Kline Algeria 09/2004 01/2005 WWTP with extended aeration

Improvements in the WWTP of Igualada, Òdena, Santa

Margarida de Montbui and Vilanova del Camí.

Agència Catalana de l'Aigua Barcelona 11/2004 12/2005 Construction of a new pre-treatment

Opuntia Rafael Jubindo Sta. Cruz de Tenerife 04/2005 08/2005 WWTP with extended aeration

WWTP and collector of Els Limits

Agència Catalana de l'Aigua Girona 06/2005 01/2006 Activated sludge

Connection work at Cerdanya neighborhood to

the general collector of Castellar de N'Hug

Agència Catalana de l'Aigua Barcelona 06/2006 06/2007 Collectors and pumping

g

WWTP and collector township high Ascó Agència Catalana de l'Aigua Tarragona 04/2007 04/2008

Activated sludge with elimination of nutrients

WWTP and collectors of Villalba Saserra

Agència Catalana de l'Aigua Barcelona 08/2007 08/2008 Activated sludge with elimination of nutrients

38

Page 39: presentación 2014 Inglés.pdf

REFERENCESREFERENCESFinished projects

Project Contracted by Developed in Starting date Completion date Observations

C t ti f Construction of a new pump station in the WWTP of Igualada, Òdena, Santa Margarita de Montbuiand Vilanova del Camí

Agència Catalana de l'Aigua Barcelona 10/2007 01/2008 Enlargement WWTP

Tertiary Treatment of the regeneration of the textil

industry of FibracolorAgència Catalana de l'Aigua Barcelona 11/2007 03/2008 Filtration, ultrafiltration, reverse osmosis,

de-carbonation

Llanos de Arinade Dbocan Sta. Cruz de Tenerife 02/2008 09/2008 WWTP with extended aeration

La Jaquita Hoteles Melià Sta. Cruz de Tenerife 02/2008 09/2008 WWTP with extended aeration

Urbanifisation Más Moregons Construcciones Caler Tarragona 04/2008 05/2008 WWTP with extended aeration

Rehabilitation of the WWTP Es Mercadal

Govern se les Illes Balears -Agència Balear de l'Aigua i d l Q li A bi l

Balearic Islands 04/2008 08/2008Refurbishment of aeration system. New

pre-treatment. Installation of sludged h d is Mercadal de la Qualitat Ambiental dehydratation

WWTP at Sant Cornelli de Cercs core

Agència Catalana de l'Aigua Barcelona 04/2008 09/2008 Activated Sludge with elimination of nutrients

Emptied of Lagoon of drainages in E T A P Abrera UTE Fangs Abrera Barcelona 06/2008 12/2008 Remodelation of drain lagoondrainages in E.T.A.P. Abrera g g

39

Page 40: presentación 2014 Inglés.pdf

REFERENCESREFERENCESFinished projects

Project Contracted by Developed in Starting date Completion date Observations

Palmeiro in Xove Xunta de Galicia Lugo 06/2008 06/2009 WWTP with extended aeration

Jina SC Prometal Romania 07/2008 06/2009 WWTP with extended aeration

Sura Mica SC Prometal Romania 07/2008 12/2009 WWTP with extended aeration

Installation of the reserve for the guarentee of the i i t ti f t d Ult filt ti i dsuministration of regenerated

water against the salineintrusion to the aquifer of

Baix Llobregat

Agència Catalana de l'Aigua Barcelona 10/2008 06/2010Ultrafiltration, reverse osmosi, deep

inyection wells

Collector net to supply pp ypurified water to the injection wells and

piezometres

Agència Catalana de l'Aigua Barcelona 10/2008 06/2010 Collectors D.450 to supply the wells forthe hydraulic barrier

Citromil Citromil Murcia 02/2009 05/2009 Anaerobic Digestorg

Rehabilitation of Lagoon UTE Potabilizadora Barcelona 03/2009 05/2009 Remodelation of drain lagoon

Camping Zmar Astramatic Portugal 04/2009 09/2009 WWTP with extended aerationCamping Zmar Astramatic Portugal 04/2009 09/2009 WWTP with extended aeration

40

Page 41: presentación 2014 Inglés.pdf

REFERENCESREFERENCESFinished projects

Project Contracted by Developed in Starting date Completion date Observations

Can Ram Copisa Barcelona 05/2009 12/2009 WWTP with extended aeration

WWTP and collectors at high Sant Pere Sacarrera

Agència Catalana del Agua Barcelona 05/2009 01/2011 Activated Sludge with elimination of nutrients

Renovation and extension of WWTP in Vacarisses

Agència Catalana del Agua Barcelona 11/2009 01/2011 Extension of WWTP by MBR System

Rosia SC Prometal Romania 11/2009 10/2012 WWTP with extended aeration

Sports center Bell-lloc Incasol Lleida 01/2012 12/2012 Sports center

Lyulyakovo Municipality of Ruen Bulgaria 06/2012 12/2012 WWTP with extended aeration

Taphco Ltd. Softal Algeria 10/2012 12/2012 Chemical line treatmentp g

Installations Idiada Energy Enginyeria Tarragona 12/2012 01/2013 Deposit Wet Handling

41

Page 42: presentación 2014 Inglés.pdf

REFERENCESREFERENCESFinished projects

Project Contracted by Developed in Starting date Completion date Observations

Beclean (Cluj-Napoca) Aquabis Romania 06/2012 12/2013DWTP Potable Water Treatment, 90.000

inhabitants

Glaxosmithkline - LPA Laboratoire PharmaceutiqueAlgerien

Algerie 06/2013 01/2014 Industrial Water treatment & Domestic Water Treatment

42

Page 43: presentación 2014 Inglés.pdf

REFERENCESREFERENCESCurrent projects

Project Contracted by Developed in Starting date Completion date Observations

Richis SC Prometal Romania 11/2009 -- WWTP with extended aeration

Biertan SC Prometal Romania 11/2009 -- WWTP with extended aeration

Arpas SC Prometal Romania 11/2009 -- WWTP with extended aeration

Feldru Aquabis Romania 10/2013 -- WWTP with extended aeration

Krichim Krichim Municipality Bulgaria 01/2014 --WWTP with extended aeration

Byala Slatina Municipality of Byala Slatina Bulgaria 10/2013 -- WWTP with extended aeration

Radenvo Municipality of Radenvo Bulgaria 02/2014 WWTP with extended aeration

43

Page 44: presentación 2014 Inglés.pdf

REFERENCESREFERENCESMaintenance

Water treatment plant of: Client Final contractor Type of treatment Starting date Completion

date

Velilla UTE Sato Arema Junta de Castilla y León extended aeration 03/1988 03/1999

Esterri d’Aneu UTE Comapa – Arema Junta de Sanejament extended Aeration and elimination of nutritious and phosphorus

03/1988 03/1999

Santa Maria de Palautordera

UTE Oshsa – Arema Junta de Sanejament extended Aeration and elimination of nutrients and phosphorus

01/1999 06/2000

NegreiraConstrucciones Obras y

Viales, S.A. Xunta de Galicia extended aeration 05/1999 02/2000,

Vidrà UTE Osona Agència Catalana de l'Aigua extended aeration 09/1999 10/2000

Folgueroles UTE Osona Agència Catalana de l'Aigua extended aeration 01/2000 12/2000

La Roda UTE La Roda Junta de Comunidades de Castilla - La Mancha

extended Aeration and elimination of nutrients

01/2000 12/2007

Comisión Estatal de aguas y Piedras Negras Aguas Depuradas, S.A.

(Adesa)

Comisión Estatal de aguas y saneamiento – CEAS Coahuila - Mexico

extended Aeration and elimination of nutrients

01/2000 12/2019

Viladrau UTE Osona Agència Catalana de l'Aigua extended aeration 05/2000 05/2001

44

Page 45: presentación 2014 Inglés.pdf

REFERENCESREFERENCESMaintenance

Water treatment plant of: Client Final contractor Type of treatment Starting date Completion

date

X t d G li iXunqueira Elsan Xunta de GaliciaCons. Medio Ambiente

extended aeration 07/2000 07/2001

Linyola Agència Catalana de l'Aigua Agència Catalana de l'Aigua extended aeration 01/2001 01/2002

La Guixa UTE Osona Agència Catalana de l'Aigua extended aeration 02/2001 01/2002

Martorell Agència Catalana de l'Aigua Agència Catalana de l'Aigua extended Aeration and elimination of nutrients

01/2002 12/2004

Deltebre Agència Catalana de l'Aigua Agència Catalana de l'Aigua extended Aeration and elimination of nutrients

12/2002 04/2004

La UniónEntidad Regional de

Saneamiento y Depuración Región de Murcia.

Consejería de Medio extended Aeration and elimination of

i 01/2003 05/2004y p(Esamur)

jAmbiente nutrients

El Mojal Agència Catalana de l'Aigua Agència Catalana de l'Aigua Primary tretament with clarifying welland biological filter

05/2003 05/2004

WWTP f Mé id WWTP of: Méntrida, Torre de Esteban

Hambrán, Portillo de Toledo and Santa Cruz

de Retamar

Junta de Comunidades de Castilla - La Mancha

Junta de Comunidades de Castilla - La Mancha

extended Aeration and elimination of nutrients

10/2003 03/2010

45

Page 46: presentación 2014 Inglés.pdf

REFERENCESREFERENCESMaintenance

Water treatment plant of: Client Final contractor Type of treatment Starting date Completion

date

t d d A ti d li i ti f Agullana Agència Catalana de l'Aigua Agència Catalana de l'Aigua extended Aeration and elimination of nutrients

12/2004 12/2006

Artesa de Segre Agència Catalana de l'Aigua Agència Catalana de l'Aigua extended Aeration and elimination of nutrients

01/2005 12/2006

Castellar de N'Hug Agència Catalana de l'Aigua Agència Catalana de l'Aiguaextended Aeration and elimination of

nutrients 05/2005 05/2006

Límits de La Jonquera Agència Catalana de l'Aigua Agència Catalana de l'Aigua extended Aeration and elimination of nutrients

02/2007 02/2008

Terciary treatment toregenerate industrial water

at FibracolorAgència Catalana de l'Aigua Agència Catalana de l'Aigua Filtration, ultrafiltration, reverse

osmosis, de-carbonatatión03/2008 06/2011

Barrier against the sea water intrusion. First phase

water table of BaixLlobregat

Agència Catalana de l'Aigua Agència Catalana de l'Aigua Ultrafiltration, reverse osmosi, deepinyection wells

08/2008 05/2010

Vilalba Sasserra Agència Catalana de l'Aigua Agència Catalana de l'Aigua extended Aeration and elimination of

11/2008 11/2009Vilalba Sasserra Agència Catalana de l Aigua Agència Catalana de l Aiguanutrients and phosphorus

11/2008 11/2009

WWTP at Sant Corneli de Cercs core

Agència Catalana de l'Aigua Agència Catalana de l'Aigua extended Aeration and elimination of nutrients and phosphorus

01/2012 12/2012

WWTP and collectors at A ència Catalana de l'Ai a A ència Catalana de l'Ai a

extended Aeration and elimination of 03/2012 03/2013high Sant Pere Sacarrera Agència Catalana de l Aigua Agència Catalana de l Aigua nutrients and phosphorus 03/2012 03/2013

4646

Page 47: presentación 2014 Inglés.pdf

CONTACT Avda Meridiana 350, 14 B CONTACTINFORMATION

Avda Meridiana 350, 14 B 08027 Barcelona, Spain Tel: (+34) 93 418 47 88Fax: (+34) 93 417 01 87INFORMATION

and branch [email protected]

http://www.arema.com

We are also represented in following countries:

Algeria

Bulgaria

ColombiaColombia

México

Romania