PMM-RIEGO SUBCENTRAL LA HABANA.pdf

download PMM-RIEGO SUBCENTRAL LA HABANA.pdf

of 1

Transcript of PMM-RIEGO SUBCENTRAL LA HABANA.pdf

  • 7/24/2019 PMM-RIEGO SUBCENTRAL LA HABANA.pdf

    1/1

    Inversin 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    3940.45 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02

    3,940.45 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02 197.02

    Conclusin:

    Total

    AOS

    MONTOS EXPRESADOS EN DOLARES AMERICANOS

    IMPACTO AMBIENTAL

    PROYECTO: ESTUDIO TESA CONST. SISTEMA DE ADUCCION POR TUBERIA PARA RIEGO SUBCENTRAL LA HABANA

    COSTOS DE PREVENCIN, MITIGACIN Y CONTROL DURANTE LA CONSTRUCCIN Y LA OPERACIN

    Costo de los Estudios de Impacto

    Costo del Manejo del Impacto

    Debido a que el proyecto tendr una categora III, por su impacto socio-econmico del mismo; elpresupuesto a ser asignado para la Mitigacin de Impactos causados por la Ejecucin del Proyecto ysu posterior operacin son los establecidos en la tabla presentada: Etapa de Inversin (Construccin)$us 3,940.45 que es practicamente el 50% del presupuesto asignado para la mitigacin el otro 50%ser distribuido en partes iguales durante el resto de la vida til del Proyecto, es decir $us 197.02 porao., el mismo que cubrira la aplicacin de las medidas de mitigacin en la etapa de operacin ymantenimiento.