OMEGA NPDES Paseo Lineal Fase 3 y 4

download OMEGA NPDES Paseo Lineal Fase 3 y 4

of 3

Transcript of OMEGA NPDES Paseo Lineal Fase 3 y 4

  • 8/19/2019 OMEGA NPDES Paseo Lineal Fase 3 y 4

    1/3

    9/10/15, 2:2012 Construction General Permit

    Page ttp://ofmpub.epa.gov/apex/aps/f?p=119:4:10625819686541::NO::P4_PERMIT_ID,P4_PERMIT_TYPE:19903,NOI

     You are here: Permits Landing Page 2012 CGP 2012 CGP Details

    Quick Jump to Other

    Permits

    2012 Construction General Permit eNOI

    Detail

    Details for PRR12A724

    General Information

    Project / Site Name: Construccion Fase 3 y 4 - Paseo Lineal Puerta de Tierra

    Current Status:  Active

    Tracking Number: PRR12A724

    Permit Type: NOI

    Interview Page Answers

    Is your project/site located in Indian Country Lands? No

    Are you requesting coverage under this NOI as a 'federal operator' as defined

    in Appendix A?No

    Operator Information

    Operator's Name: Omega Engineering Corp.

    Street: PO Box 363823

    City: San Juan

    State: Puerto Rico

    Zip Code: 00936

    Point of Contact Name: Noel Robles

    Phone Number: 787-793-6100

    Operator Email: [email protected]

    Fax: 787-782-7305

    IRS Employer Identification Number (EIN): 660455637

    Project / Facility Information

    Project / Site Name: Construccion Fase 3 y 4 - Paseo Lineal Puerta de Tierra

    Street:  Avenica Luis Muñoz RiveraCity: San Juan

    State: Puerto Rico

    Zip Code: 00926

    Project / Facility on Indian Land? No

    Reservation Name: N/A 

     Additional Project Information

    http://ofmpub.epa.gov/apex/aps/f?p=CGP_2012:HOME:10625819686541:::::http://ofmpub.epa.gov/apex/aps/f?p=LANDING:HOME:10625819686541:::::

  • 8/19/2019 OMEGA NPDES Paseo Lineal Fase 3 y 4

    2/3

    9/10/15, 2:2012 Construction General Permit

    Page ttp://ofmpub.epa.gov/apex/aps/f?p=119:4:10625819686541::NO::P4_PERMIT_ID,P4_PERMIT_TYPE:19903,NOI

    Is your project an 'emergency-related project' as defined in Appendix A? No

    Have stormwater discharges from your project/site been covered previously

    under an NPDES permit?No

    Estimated Project Start Date: 12/15/2014

    Estimated Project End Date 06/30/2016

    Have earth-disturbing activities commenced on your project/site? No

    County or Similar government subdivision: San Juan

    Latitude and Longitude Information

    Longitude: 66,06,04

    Longitude Unit: (degrees, minutes, seconds)

    Latitude: 18,27,59

    Latitude Unit: (degrees, minutes, seconds)

    Latitude / Longitude Data Source: Google Earth

    Horizontal Reference Datum NAD 83 or WGS 84

    Estimated Area to be Disturbed (to the nearest quarter acre): 8.53

    Chemical Treatment Information

    Will you use polymers, flocculants, or other treatment chemicals at yourconstruction site?

    No

    ESA 

    Under which criterion listed in Appendix D are you eligible for coverage under

    this permit?

     A. No federally-listed threatened or endangered species or their

    designated critical habitat(s) are likely to occur in your site’s “action

    area” as defined in Appendix A  of this permit

    Provide the basis for criterion selection selected: Environmental Impact Studies Conducted by Owner

    1) Any federal listed species and/or designated habitat located in your area: N/A 

    2) The distance between your site and the listed species or designated critical

    habitat (in miles):N/A 

    SWPPP Point of Contact

    Name: Noel Robles

    Organization Name: Omega Engineering Corp.

    Phone: 787-793-6100

    Fax: 787-782-7305

    Email: [email protected]

    Discharge Information

    Does your project/site discharge stormwater into a Municipal Separate Storm

    Sewer System (MS4)?Yes

    Are there any surface waters within 50 feet of your project's earth

    disturbances?Yes

    If a TMDL has been approved or established, identify the title or reference of

    the TMDL document:N/A 

    Impaired Surface Waters to Which you Discharge

    Surface water(s) to which you discharge Impaired Water Listed Water Pollutant(s) Tier 2, 2.5 or 3 Source TMDL Name and Pollutant

     Atlantic Ocean No No N/A 

    http://www.epa.gov/npdes/pubs/cgp2012_appendixa.pdf

  • 8/19/2019 OMEGA NPDES Paseo Lineal Fase 3 y 4

    3/3

    9/10/15, 2:2012 Construction General Permit

    Page ttp://ofmpub.epa.gov/apex/aps/f?p=119:4:10625819686541::NO::P4_PERMIT_ID,P4_PERMIT_TYPE:19903,NOI

    Historic Preservation

    Is your project/site located on a property of religious or cultural significance to

    an Indian tribe? Are you installing any stormwater controls as described in

    Appendix E that require? (Appendix E, Step 1):

    No

    If yes, have prior surveys or evaluations conducted on the site have already

    determined historic properties do not exist, or that prior disturbances have

    precluded the existence of historic properties? (Appendix E, Step 2):

    N/A 

    If no, have you determined that your installation of subsurface earth-disturbing

    stormwater controls will have no effect on historic properties? (Appendix E,

    Step 3):

    N/A 

    If no, did the SHPO, THPO, or other tribal representative (whichever applies)

    respond to you within the 15 calendar days to indicate whether the subsurface

    earth disturbances caused by the installation of stormwater controls affect

    historic properties? (Appendix E, Step 4)

    N/A 

    If yes, describe the nature of their response: N/A 

    Certifier Information

    Name: Noel RoblesTitle: Project Manager

    Email: [email protected]

    Certified Date: 12/10/2014

    Preparer Information

    Name: Roberto Lopez-Esquerra

    Phone: (787) 748-6060

    Fax: N/A 

    Organization: ENTECH

    Email: [email protected]

    Corresponding Documents

    No data found.

    Back to Search Results

    release 1.0

    http://apex.navigation.redirect%28%27f/?p=119:4:10625819686541::NO::::YES%27);