Informe_f...Doc Para Env

108
1 INDICE 1. INTRODUCCION.......................................2 2. RESULTADO DE INFORME DE PRÁCTICAS..................3 2.1 MEMORIA DESCRIPTIVA................................4 2.2 ESPECIFICACIONES TECNICAS:........................12 2.3 EVALUACION DE IMPACTO AMBIENTAL:..................18 2.4 ESTUDIO MECANICA DE SUELOS:.......................20 2.5 DISEÑO DE MEZCLA..................................28 2.6 MEMORIA DE CÁLCULO................................30 2.7 METRADOS..........................................38 2.8 PRESUPUESTO.......................................65 3. DISCUSION DE LOS RESULTADOS DEL INFORME DE PRÁCTICAS Y/O APORTE DEL PRACTICANTE..............................70 3.1 DESCRIPCION DE LAS ACTIVIDADES DEL PROYECTO......71 3.2 CRONOGRAMA VALORIZADO DE OBRA.....................71 3.3 PRECIOS Y CANTIDADES DE RECURSOS REQUERIDOS.......72 3.4 CRONOGRAMA DE ADQUISICION DE MATERIALES...........76 4. CONCLUSIONES......................................79 5. RECOMENDACIONES...................................80 6. BIBLIOGRAFIA......................................81

Transcript of Informe_f...Doc Para Env

Page 1: Informe_f...Doc Para Env

1

INDICE

1. INTRODUCCION.............................................................................................2

2. RESULTADO DE INFORME DE PRÁCTICAS...........................................3

2.1 MEMORIA DESCRIPTIVA..............................................................................4

2.2 ESPECIFICACIONES TECNICAS:.............................................................12

2.3 EVALUACION DE IMPACTO AMBIENTAL:..............................................18

2.4 ESTUDIO MECANICA DE SUELOS:.........................................................20

2.5 DISEÑO DE MEZCLA...................................................................................28

2.6 MEMORIA DE CÁLCULO.............................................................................30

2.7 METRADOS....................................................................................................38

2.8 PRESUPUESTO............................................................................................65

3. DISCUSION DE LOS RESULTADOS DEL INFORME DE PRÁCTICAS

Y/O APORTE DEL PRACTICANTE..........................................................................70

3.1 DESCRIPCION DE LAS ACTIVIDADES DEL PROYECTO..................71

3.2 CRONOGRAMA VALORIZADO DE OBRA...............................................71

3.3 PRECIOS Y CANTIDADES DE RECURSOS REQUERIDOS...............72

3.4 CRONOGRAMA DE ADQUISICION DE MATERIALES..........................76

4. CONCLUSIONES..........................................................................................79

5. RECOMENDACIONES.................................................................................80

6. BIBLIOGRAFIA...............................................................................................81

7. ANEXOS..........................................................................................................82

Page 2: Informe_f...Doc Para Env

2

1. INTRODUCCION

El presente informe final de prácticas pre profesionales se efectúa con la

finalidad de obtener el grado académico de bachiller en la carrera profesional

de Ingeniería Civil, es preciso informar que dichas prácticas fueron realizadas

en la Empresa CONSULTORA CONSTRUCTORA MONTALVAN K&M S.A.C.

por el lapso de tres meses, específicamente en la obra “CREACION DE

INFRAESTRUCTURA PUBLICA – CENTRO CIVICO DE LA COMUNIDAD DE

PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES –

HUANCAVELICA”, en el cual se desempeñó el cargo de Asistente de

Residente, realizando trabajos de control de ejecución de las partidas indicadas

en el expediente técnico, informes mensuales y elaboración de metrados

según avance de obra.

En el periodo de los tres meses de realización de prácticas pre profesionales,

se puso en práctica todos los conocimientos teóricos adquiridos en las aulas

universitarias de la Universidad Peruana Los Andes sucediendo así una serie

de inquietudes y actualizaciones, producto del desempeño en las labores

encomendadas, por el cual se superó las dificultades según la experiencia

acumulada en dicha obra.

Page 3: Informe_f...Doc Para Env

3

2. RESULTADO DE INFORME DE PRÁCTICAS

Se consideró como código básico para el diseño de las estructuras

existentes, el reglamento Nacional de Edificaciones donde se incluye las

consideraciones para la carga muerta, carga viva, carga de sismo,

métodos aceptados de análisis y diseño, factores de carga y coeficientes

de seguridad para cada uno de los elementos estructurales y materiales.

Se consideró algunas especificaciones de la estructura:

Resistencia del concreto: f´c = 210 kg/cm2

Resistencia del acero: f´y = 4200 kg / cm2

Presión admisible del suelo: Variable de acuerdo al terreno

Albañilería: f´m = 65 kg/cm2

E albañilería: E = 500 * f´m = 35000 kg / cm2

G Albañilería: G = 0.4 * E = 14000 kg / cm2

La estructura se realizó según la configuración estructural del Módulo de

la construcción de la vivienda Médico familiar, está definida por un

sistema de pórticos de concreto y muros de albañilería.

El análisis de la estructura se ha realizado mediante métodos elásticos y

lineales, realizando un análisis matricial efectuado por programas de

análisis estructural.

Se realizó un análisis sísmico para determinar los esfuerzo producidos

por un movimiento sísmico se realizó un análisis sísmico por el método

estático considerando que en la estructura actúa una fuerza horizontal

equivalente a una porción de las cargas permanentes, para ellos se

consideró los lineamientos de la Norma Peruana de Diseño Sismo

Resistente.

Page 4: Informe_f...Doc Para Env

4

2.1 MEMORIA DESCRIPTIVA

PROYECTO:

CREACION DE INFRAESTRUCTURA PUBLICA – CENTRO CIVICO DE

LA COMUNIDAD DE PIRCAPAHUANA, DISTRITO DE LIRCAY,

PROVINCIA DE ANGARAES – HUANCAVELICA”

UBICACIÓN POLÍTICA:

LUGAR : PIRCAPAHUANA

DISTRITO : LIRCAY

PROVINCIA : ANGARAES

DEPARTAMENTO : HUANCAVELICA

ALTITUD : 3390 m.s.n.m.

2.1.1 GENERALIDADES

2.1.1.1 ANTECEDENTES:

La Municipalidad Provincial de Angaraes - Lircay,

con la finalidad de cumplir, con los Proyectos programados

en el Presupuesto Participativo 2011, frente a la necesidad

de disponer de una mejor calidad de vida en atención al

sector público de la comunidad campesina de

Pircapahuana se determina realizar el proyecto

denominado “CREACION DE LA INFRAESTRUCTURA

PUBLICA CENTRO CIVICO DE LA COMUNIDAD

CAMPESINA DE PIRCAPAHUANA, DISTRITO DE

LIRCAY, PROVINCIA DE ANGARAES, HUANCAVELICA”

Page 5: Informe_f...Doc Para Env

5

, siendo importante prestar servicio de calidad con una

mejor infraestructura pública.

2.1.1.2 DESCRIPCION DE LA INFRAESTRUCTURA

EXISTENTE.

El local comunal existente tiene como tiempo de su

construcción hace más de veinte años y es de material

rustico, con muros de tapial o gaveras, a la fecha dicha

construcción presenta fisuras en sus muros así como el

techo de la cobertura de teja andina a punto de

desplomarse, las autoridades comunales atienden sus

despachos en otros ambientes improvisados carente de

infraestructura.

2.1.1.3 SÍNTESIS DEL PROYECTO

El Presente proyecto “CREACION DE LA INFRAESTRUCTURA

PUBLICA CENTRO CIVICO DE LA COMUNIDAD CAMPESINA

DE PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE

ANGARAES, HUANCAVELICA”, consta de realizar la ejecución

de la infraestructura pública de material noble de dos pisos y

azotea para el funcionamiento de ambientes de las autoridades

comunales y el planteamiento de una sala de usos múltiples que

servirá para las diferentes actividades socioculturales de la

comunidad campesina de Pircapahuana.

Page 6: Informe_f...Doc Para Env

6

2.1.1.4 JUSTIFICACIÓN:

El Centro Cívico la más relevante de la comunidad de

Pircapahuana requiere la construcción de una infraestructura

nueva, toda vez que el local comunal existente ha colapsado por

el tiempo de uso y por estar deteriorados los muros y techo, se

requiere renovar para brindar calidad de atención a la población

de Pircapahuana.

2.1.1.5 OBJETIVOS Y METAS DEL PROYECTO:

El Objetivo general del Proyecto es: “ADECUADA

PRESTACION DE SERVICIOS DE GESTION EN LA

COMUNIDAD CAMPESINA DE PIRCAPAHUANA”, que se

podrá apreciar en el desarrollo social de la zona.

El presente proyecto tiene como finalidad la disponibilidad de

infraestructura del local comunal para el servicio de gestión

administrativa de la población. Esto contribuirá a mejorar la

calidad de la asistencia social en la Comunidad Campesina y

mejorando los servicios a la colectividad en general.

2.1.1.6 METAS Y ACCIONES

Proyecto alternativo 2:

CONSTRUCCIÓN DEL CENTRO CÍVICO DE MATERIAL

NOBLE CON COBERTURA DE TECHO ALIGERADO DE 02

NIVELES Y CAPACITACION A AUTORIDADES LOCALES

Componentes:

Page 7: Informe_f...Doc Para Env

7

I. Construcción del Centro Cívico, con cobertura de

techo aligerado.

Construcción del Centro Cívico de 106.25 m2 dividido

en los siguientes ambientes: En el primer piso Salón

de usos Múltiples y SS.HH; en el segundo piso Sala

de Autoridades Comunales, Presidente Comunal,

Secretaria, Teniente Gobernador, Hall y SS.HH, de

Material noble con estructuras a porticadas de

concreto armado, albañilería de ladrillo corriente,

cobertura de techo aligerado de 02 niveles, 01 pozo

de percolador y tanque séptico.

II. Capacitación y Asistencia Técnica

Capacitación en organización y funciones de

autoridades

Capacitación en gestión

Capacitación en manejo administrativo

2.1.2 ANÁLISIS SITUACIONAL DEL PROYECTO:

UBICACIÓN DEL PROYECTO Y CARACTERISTICAS

GENERALES DE LA LOCALIDAD.

La Comunidad de Pircapahuana se ubica a una altura de 3390

msnm. margen derecha del rio Locclo (Pircapahuana), Distrito de

Lircay, Provincia de Angaraes, departamento de Huancavelica, a

10 Km al Sur-Oeste de la ciudad de Lircay. Limita por el Norte con

el Centro Poblado de Rumichaca, por el Este con los riachuelos

Page 8: Informe_f...Doc Para Env

8

Locclo y el centro Poblado de Ccollpampa por el sur con

Pircapahuana.

La temperatura varía de acuerdo a las estaciones del año, siendo

14ºC la máxima y -8ºC la mínima. Las precipitaciones varían de

590 mm a 830 mm anuales, con una Humedad Relativa de 62%.

Los vientos predominantes tienen dirección de Sur–Este a Nor-

Oeste, alcanzando la velocidad de 1.9 m/s. Su relieve es semi

accidentado, con muchos cambios de pendiente y pocas áreas

planas.

La población de lacomunidad de Pircapahuana, según el censo

de 2007 es de 332 habitantes; con una tasa de crecimiento para

el periodo 1993-2007 de 1.5%.

El uso predominante es el agro urbano rural.

El terreno se ubica en la plaza principal de la Comunidad

campesina de Pircapahuana en la Av. Tambraico como acceso

principal hacia el recinto de la construcción, así mismo por el Sur

colinda con la iglesia católica, por el Norte con propiedad

particular y por el Este fondo con propiedad particular.

2.1.3 MEDIDAS DEL PROYECTO

Page 9: Informe_f...Doc Para Env

9

2.1.4 VÍAS DE COMUNICACIÓN Y ACCESOS:

El acceso Principal a la comunidad principal es por una vía

afirmada con una distancia de 12 Km de la ciudad de lircay cuya

vía tiene acceso pasando las comunidades de Ccollpapampa,

Hatumpata, por el suroeste, a su vez tiene acceso por la vía de

la comunidad de Rumichaca por una vía afirmada hasta Pahuana

y de allí nos conduce por una trocha hacia el cerro tambraico.

ACCESOS A LA COMUNIDAD CAMPESINA DE

PIRCAPAHUANA

RECORRIDO

(KM)

TIEMPO

(horas)

TIPO DE

VÍA

Por el frente Este (Av. Tambraico) 20.00 ml

Derecha por Norte ( Con prop. De la

Comunidad de Pircapahuana8.00 ml

Izquierda por el Sur ( Con prop. De la

comunidad de Pircapahuan8.00 ml

Fondo por el Oeste ( Con prop.de la

Comunidad de Pircapahuana )20.00 ml

Page 10: Informe_f...Doc Para Env

10

HUANCAYO -

HUANCAVELICA

157.00 5.00 Asfaltada

HUANCAVELICA -

LIRCAY

76.00 2.50 Afirmada

LIRCAY -

PIRCAPAHUANA

12.00 0.20 Afirmada

2.1.5 CARACTERÍSTICAS DEL PROYECTO:

Es un sistema Arquitectónico, que servirá para mejorar la

infraestructura pública planteando el proyecto de la construcción

del Centro Cívico para la comunidad de Pircapahuana dos barrios

que requieren de un recinto moderno que se construirá de

material noble de dos pisos con ambientes en el primer nivel con

una sala de usos múltiples que cuenta con un escenario y sus

respectivos servicios higiénicos, así como una circulación vertical

por una caja de escalera hacia el segundo nivel, donde se plantea

ambientes para el funcionamiento administrativo de las

autoridades comunales que cuenta con una sala de autoridades

comunales, ambiente para el presidente comunal, teniente

gobernador, secretaria, hall de recepción y pasillo de circulación

que nos conduce a las diferentes oficinas, el servicio higiénico

publico indirectamente ubicado. Dicha construcción con columnas

rectangulares, muro de albañilería confinada en los dos niveles,

una losa aligerada en el primero, segundo nivel y techo de la caja

de escalera de losa maciza.

Page 11: Informe_f...Doc Para Env

11

2.1.6 CRONOGRAMA DE EJECUCIÓN

El tiempo de Ejecución del Proyecto “CREACION DE LA

INFRAESTRUCTURA PUBLICA CENTRO CIVICO DE LA

COMUNIDAD CAMPESINA DE PIRCAPAHUANA, DISTRITO DE

LIRCAY, PROVINCIA DE ANGARAES, HUANCAVELICA”, está

programado para un Plazo de 120 días calendarios (4 meses).

2.1.7 FUENTES DE FINANCIAMIENTO

El proyecto de “CREACION DE LA INFRAESTRUCTURA

PUBLICA CENTRO CIVICO DE LA COMUNIDAD CAMPESINA

DE PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE

ANGARAES, HUANCAVELICA” se efectuara con la fuente de

financiamiento de Foncomun.

2.1.8 MODALIDAD DE EJECUCIÓN

La modalidad de Ejecución, será por Contrata (suma alzada).

RESUMEN DE PRESUPUESTO

ALTERNATIVA 2

DESCRIPCION SUBTOTAL TOTALES

01. Construcción del Centro Cívico,

con cobertura de techo aligerado.301406.93 301406.93

02. Capacitación y Asistencia

Técnica7,000.00 7,000.00

03. Mitigación ambiental 5,000.00 5,000.00

Page 12: Informe_f...Doc Para Env

12

COSTO DIRECTO 313406.93

GASTOS GENERALES 9.84345% 30,850.05 30,850.05

TOTAL PRESUPUESTO 344,256.98

SON: Trecientos cuarenta y cuatro mil

doscientos cincuenta y seis con 98/100 Nuevos

Soles

2.2 ESPECIFICACIONES TECNICAS:

2.2.1 ALCANCES DE LAS ESPECIFICACIONES

Las presentes especificaciones describen el trabajo que

deberá realizarse para la ejecución de las Obras Civiles del

proyecto arriba indicado, estas tienen carácter general y

donde sus términos no lo precisen, será el SUPERVISOR

DE LA OBRA en la especialidad quien defina, para las

presentes especificaciones técnicas, en adelante para todo

los casos se le denominará “Supervisor” quien determine

respecto a la calidad de los materiales, procedimientos y

métodos de trabajo.

Todos los trabajos sin excepción se desenvolverán dentro

de las mejores prácticas constructivas y estarán sujetos a

la aprobación y plena satisfacción del Supervisor estable a

fin de asegurar su correcta ejecución.

2.2.2 VALIDEZ DE ESPECIFICACIONES, PLANOS Y METRADOS

Page 13: Informe_f...Doc Para Env

13

En caso de existir divergencia entre la validez de los

documentos del proyecto, los planos tienen supremacía

sobre las especificaciones técnicas. Los metrados son

referenciales y complementarios y la omisión parcial o total

de una partida no dispensará al Residente de Obra, de su

ejecución, si está prevista en los planos y/o

especificaciones técnicas.

2.2.3 GENERALIDADES

Este documento técnico ha sido elaborado teniendo en

consideración los siguientes criterios:

a) Consideraciones Generales

Conllevan a tomar y asumir criterios dirigidos al aspecto

netamente constructivo al nivel de indicación, materiales y

metodología de dosificación, procedimientos constructivos y

otros, los cuales por su carácter general capacita el documento

a constituirse como auxiliar técnico en el proceso de

construcción.

b) Consideraciones Particulares

Como su nombre lo indica, incluyen la gama de variaciones en

cuanto a tratamiento y aplicación de las partidas, por su

naturaleza son susceptibles a cambio debido que:

El nivel estratigráfico y las distintas variaciones del mismo,

de acuerdo a una localización geográfica determinada,

sugieren técnicas diversas en cuanto al tratamiento de la

Page 14: Informe_f...Doc Para Env

14

cimentación que el proyectista tendrá que definir de acuerdo

al estudio de suelos.

El clima y las variaciones atmosféricas inciden notablemente

en el comportamiento de los materiales encauzando a un

tratamiento especial en cuanto al proceso constructivo y

dosificaciones en sí.

2.2.4 ALCANCES DE LAS ESPECIFICACIONES

Las presentes especificaciones describen el trabajo que

deberán realizarse para las obras diseñadas con los

módulos de espacios educativos del Proyecto Rural –

Sierra. Estas tienen un carácter general y donde sus

términos no lo precisen, el Residente tiene autoridad en la

obra respecto a los procedimientos, calidad de los

materiales y método de trabajo.

Todos los trabajos sin excepción se desenvolverán dentro

de las mejores prácticas constructivas a fin de asegurar su

correcta ejecución y estarán sujetos a la aprobación y plena

satisfacción del Supervisor.

2.2.5 VALIDEZ DE ESPECIFICACIONES, PLANOS Y METRADOS

En caso de existir divergencia entre los documentos del

proyecto, los planos tienen primacía sobre las

Especificaciones Técnicas.

Los metrados son referenciales y complementarios y la

omisión parcial o total de una partida no dispensara al

Page 15: Informe_f...Doc Para Env

15

residente de su ejecución, si está prevista en los planos

y/o especificaciones técnicas.

2.2.6 CONSULTAS

Todas las consultas relativas a la construcción serán

efectuadas por el Residente al Supervisor, quien de

considerarlo necesario podrá solicitar el apoyo de los

proyectistas.

Cuando en los planos y/o especificaciones técnicas se

indique: “igual o similar”, solo el Residente y en consulta al

Supervisor decidirán sobre la igualdad o semejanza.

2.2.7 MATERIALES

Todos los materiales a usarse serán de reconocida calidad,

debiendo cumplir con todos los requerimientos indicados en

las presentes especificaciones técnicas. Se deberá

respetar todas las indicaciones en cuanto a la forma de

emplearse, almacenamiento y protección de los mismos.

Los materiales que vinieran envasados, deberán entrar en

la obra en sus recipientes originales, intactos y

debidamente sellados.

Además, el Residente tomara especial previsión en lo

referente al aprovisionamiento de materiales nacionales o

importados, sus dificultades no podrán excusarlo del

incumplimiento de su programación.

El almacenamiento de los materiales debe hacerse de tal

manera que este proceso no desmejore las propiedades de

Page 16: Informe_f...Doc Para Env

16

estos, ubicándolos en lugares adecuados, tanto para su

protección, como para su despacho.

El Supervisor está autorizado a rechazar el empleo de

materiales, pruebas, análisis o ensayos que no cumplan

con las normas mencionadas o con las especificaciones

técnicas.

Cuando exista duda sobre la calidad, características o

propiedades de algún material, el Supervisor podrá solicitar

muestras, análisis, pruebas o ensayos del material que

crea conveniente, el que previa aprobación podrá usarse

en la obra.

2.2.8 PROGRAMACION DE LOS TRABAJOS

El Residente, de acuerdo al estudio de los planos y

documentos del proyecto programará su trabajo de obra en

forma tal que su avance sea sistemático y pueda lograr su

terminación en forma ordenada, armónica y en el tiempo

previsto.

Si existiera incompatibilidad en los planos de las diferentes

especialidades, el Residente deberá hacer de conocimiento

por escrito al Supervisor, con la debida anticipación y quién

deberá resolver sobre el particular a la brevedad.

El Residente deberá hacer cumplir todas las Normas de

Seguridad en construcción vigentes, siendo este el

responsable de cualquier daño material o personal que

ocasione la ejecución de la obra.

Page 17: Informe_f...Doc Para Env

17

a) SUPERVISION DE OBRA

La Municipalidad, nombrará a un Ingeniero o Arquitecto de

amplia experiencia en obras de esta naturaleza y

profesionalmente calificado, quien lo representará en obra,

el cual velará por el cumplimiento de una buena práctica de

los procesos constructivos, reglamentos y correcta

aplicación de las normas establecidas.

b) EQUIPO DE OBRA

El equipo a utilizar en la obra, estará en proporción a la

magnitud de la obra y debe ser el suficiente para que la

obra no sufra retrasos en su ejecución. Comprende la

maquinaria necesaria para la obra, así como el equipo

auxiliar.

c) PROYECTO

En caso de discrepancias en dimensiones del proyecto,

deben respetarse las dimensiones dadas en el proyecto de

Arquitectura.

d) GUARDIANIA DE OBRA

La obra en ejecución contará con una guardianía durante

las 24 horas del día, siendo su responsabilidad el cuidado

de los materiales, equipos, herramientas y muebles que

están en obra.

e) LIMPIEZA FINAL

Al terminar los trabajos y antes de entregar la obra, el

Residente procederá a la demolición de las obras

Page 18: Informe_f...Doc Para Env

18

provisionales, eliminando cualquier área deteriorada por él,

dejándola limpia y conforme a los planos.

2.3 EVALUACION DE IMPACTO AMBIENTAL:

2.3.1 DESCRIPCION DEL PROBLEMA

a. Antecedentes del área de influencia

El Proyecto “Creación de Infraestructura Centro Cívico en la

comunidad campesina de Pircapahuana, Distrito de Lircay –

Provincia De Angaraes - Huancavelica” requería de

acciones de adecuación ambiental para compatibilizar los

efectos producidos durante su etapa constructiva y prever la

ocurrencia de potenciales impactos en la etapa operativa.

Dentro de éste contexto de demandas del Proyecto, se

establece la necesidad de contar con una Declaración de

Impacto Ambiental del Proyecto, a su vez el municipio, dentro

del marco de responsabilidad ambiental que le compete ratificó

este requerimiento.

Las Declaraciones de Impacto Ambiental constituyen un tipo

de análisis ambiental, destinado a permitir que un proyecto

dado se ejecute y que permiten demostrar antes de su

ejecución que sus impactos no tienen repercusiones negativas

relevantes o significativas, el análisis ambiental se reduce

en comparación a los Estudios de Impacto Ambiental de

Proyectos que tienen impactos manifiestamente adversos y

Page 19: Informe_f...Doc Para Env

19

que demandan un análisis detallado de cada componente

ambiental.

b. Finalidad

La finalidad del Proyecto es proporcionar mejores condiciones

de expendio de sus productos y/o animales, propósito que

coadyuva a mejorar el funcionamiento de manera ordena el

expendio de la ya mencionados.

c. Objetivos

General

Determinar el balancea ambiental de los impactos (positivos y

negativos) del Proyecto, con la construcción de las obras y

actividades del mismo.

Específicos

Conocer los impactos producto de las acciones del

proyecto en su fase de ejecución (construcción de obras

civiles) y de operación.

Proporcionar medidas de control ambiental (prevención,

mitigación y/o correctivas) que compatibilicen la operación

del Proyecto y el ambiente.

Proporcionar una propuesta de plan de manejo y monitoreo

ambiental

d. Resultados esperados

No causar ningún impacto ambiental en la zona:

Page 20: Informe_f...Doc Para Env

20

La protección de los componentes ambientales (abióticos, bióticos

y socioeconómicos) que podrían verse afectados por la

ejecución de la etapa deconstrucción del Proyecto.

Lograr la mínima afectación de los componentes ambientales

durante el desarrollo del proceso constructivo de las obras.

Las áreas intervenidas, donde se observen impactos

ambientales, tendrán que ser rehabilitadas y/o restauradas

para que estas vuelvan a ser como eran antes del inicio de las

obras.

e. Ubicación

Ubicación Política

Región : Huancavelica

Provincia : Angaraes

Distrito : Licay

Localidad : Pircapahuana

Región Natural : Sierra

Altitud de Suni : 3390 m.s.n.m

Accesos

El acceso Principal a la comunidad principal es por una vía

afirmada con una distancia de 12 Km de la ciudad de lircay cuya

vía tiene acceso pasando las comunidades de Ccollpapampa,

Jatumpata, por el suroeste, a su vez tiene acceso por la vía de la

comunidad de Rumichaca por una vía afirmada hasta

Pircapahuana – plaza principal donde se ubica el recinto.

Page 21: Informe_f...Doc Para Env

21

2.4 ESTUDIO MECANICA DE SUELOS:

2.4.1 GENERALIDADES

Todo estudio de Mecánica de Suelos, tiene un objetivo el mismo

que viene a representar los detalles de los tipos de suelo que

abarca la zona, como meta principal está en cubrir necesidades

de evaluación económica y técnica que inicialmente fueron

planteadas en las diferentes alternativas consideradas durante el

estudio del mismo.

Es necesario tener en claro que los estudios de mecánica de

suelos, se plantean a partir de trabajos que se desarrollan tanto

en campo como en gabinete, es decir trabajos de laboratorio y el

procesamiento de los resultados.

Esta cuantificación de las propiedades de los suelos ya sean

físicas o mecánicas, viene a representar puntos de interés para

nuestro proyecto por el mismo hecho de tener una idea clara del

tipo de material sobre la cual estará emplazado el Proyecto.

2.4.2 COMPORTAMIENTO DE LOS SUELOS

Del análisis del perfil estratigráfico de los suelos evaluados, nos

conducen a tener una idea clara de la formación superficial con

características adecuadas para poder soportar todo una

estructura que se planeta, el material que predomina dentro de

los grupos ML - CL, en el sistema de clasificación SUCS de

suelos y se nota que Limo inorgánico con ligante Arcillosa, según

los Limites de Atterberg tenemos el Limite Liquido de 27.00, Índice

Page 22: Informe_f...Doc Para Env

22

de Plasticidad de 6.8, Limite Plástico de 20.02 y una Humedad de

10.30%.

2.4.3 . ESTUDIO PARA EL PERFIL ESTRATIGRÁFICO.

Las perforaciones y muestreos para el perfil estratigráfico del estudio

del proyecto “ CREACION DE INFRAESTRUCTURA PUBLICA

CENTRO CIVICO DE LA COMUNIDAD CAMPESINA DE

PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE

ANGARAES - HUANCAVELICA “, se efectuaron hasta una

profundidad de 1.50 m., por debajo del nivel del terreno, se

efectuaron en la modalidad de pozos a cielo abierto o calicatas.

Page 23: Informe_f...Doc Para Env

23

Page 24: Informe_f...Doc Para Env

24

Page 25: Informe_f...Doc Para Env

25

Page 26: Informe_f...Doc Para Env

26

Page 27: Informe_f...Doc Para Env

27

Page 28: Informe_f...Doc Para Env

28

2.5 DISEÑO DE MEZCLA

Page 29: Informe_f...Doc Para Env

29

Page 30: Informe_f...Doc Para Env

30

2.6 MEMORIA DE CÁLCULO

METRADO DE CARGAS

PROYECTO  

ENTIDAD : MUNICIPALIDAD PROVINCIAL ANGARAES - LIRCAYLUGAR : PIRCAPAHUANADISTRITO : LIRCAYPROVINCIA : ANGARAESREGION : HUANCAVELICAFECHA : JUNIO DEL 2012

 Las cargas que se consideraron para el analisis y diseño de la estructura son las siguientes:                   1. CARGAS PERMANENTES O PESO MUERTO (CP)                         1.1. Losa aligerada de 20cm de espesor en camerinos : 300 Kg/m2    1.2. escaleras       : 350 Kg/m2  

 1.3. Albañileria con ladrillo artesanal inc. Acabado en muros   : 180 Kg/m2  

  1.4. Concreto         : 2400 Kg/m3                   2. CARGAS TEMPORALES O PESO VIVO (CT)                         2.1 Sala de Usos Multiples       : 350 Kg/m2    2.2 Oficinas         : 250 Kg/m2    3.2 Servicios Higienicos       : 280 kg/m2                   3. CARGAS SISMICAS (CS)                             3.1. Fuerzas horizontales              • Factor de zona          

     Departamento de Huancavelica (Zona 2)   : Z = 0.30  

    • Categoría de la edificación        

   Edificaciones comunes (Categoria A)   : U = 1.00  

   • Factor de ampliación sismica        

      Según lo establecido en el RNE   : C = 2.50      • Factor de suelo          

     Suelo Limo inorganico con ligante arcilloso (ML-CL) : S = 1.40  

    • Sistema estructural                Estructura de concreto armado   : R = 8.00      • Periodo de la estructura        

     Según analisis dinamico     : T = 0.03352 s  

    • Peso de la edificacion        

     Sala de Usos Multiples     27.2 Ton  

      Oficinas       10.23 Ton        Total       37.43    Con todos estos datos se determina la fuerza cortante en la    

Page 31: Informe_f...Doc Para Env

31

base    • Fuerza cortante en la base     : V = 3.16 Ton  

   • Distribucion de la fuerza sismica en la estructura      

     

sala de reuniones y auditorio     : F1 = 1.56 Ton  

      oficinas       : F2 = 0.98 Ton                     3.2. Momentos torsores          

     Sala de Usos Múltiples     : M1 = 1.75 Ton.m

      Oficinas       : M2 = 0.64 Ton.m4. COMBINACIONES DE CARGA                         

 4.1. La resistencia requeria se determinara según lo establecido por el RNE    

                     • 1.40CP + 1.70CT              • 1.25CP + 1.25CT ± 1.00CS            • 0.90CP ± 1.00CS                           

DISEÑO DE CIMIENTO AISLADO

CIMIENTO (ZAPATA CENTRICA)

             

EXP. TEC.

 

ENTIDAD

: MUNICIPALIDAD PROVINCIAL ANGARAES - LIRCAY

LUGAR

: PIRCAPAHUANA

DISTRITO

: LIRCAY

PROVINCIA

: ANGARAES

REGION

: HUANCAVELICA

FECHA

: JUNIO DEL 2012

             

Los datos necesarios para determinar las dimensiones del cimiento corrido son los siguientes

             

Resistencia del concreto

  f'c = 210.00 Kg/cm2  

Resistencia del acero

  f'y = 4200.00 Kg/cm2  

Carga axial CP   CP = 7.34 Ton  

Page 32: Informe_f...Doc Para Env

32

Carga axial CT   CT = 3.54 Ton  

Factor mayoracion CP

  φCP = 1.40    

Factor mayoracion CT

  φCT = 1.70    

Carga axial máxima   Pu = 16.29 Ton  

Cortante ultima   Vu = 696.87 kg  

Sobrecarga

    S/C = 250.00 Kg/m2  

Factor de seguridad por flexión

φ = 0.90    

Factor de seguridad por cortante

φ = 0.85    

Resistencia del suelo

  σt = 1.00 Kg/cm2  

Densidad del concreto armado

γc = 2500.00 Kg/m3  

Densidad del suelo   γs = 1800.00 Kg/m3  

Peralto asumido de la zapata

  h = 0.60 m  

Dimensión 1 de la columna

  d1 = 0.25 m  

Dimensión 2 de la columna

  d2 = 0.25 m  

Longitud libre de la columna

  Lc = 3.15 m  

Profundidad de cimentación

  hf = 0.90 m  

Módulo de reacción del suelo

  ks1 = 2.50    

Recubrimiento lateral e inferior de la zapata

r1 = 7.00 cm  

Recubrimiento de la columna

  r2 = 4.00 cm  

             

Se asumirá un peralto mínimo de 60cm, según el RNE, se determinara las dimensiones de la zapata, conel esfuerzo neto del terreno, como sigue:

       

    σn = 8.67 Ton/m2    

             

Por lo tanto, las dimensiones de la zapata son:

     

    Az = b(b) = 1.25 m2    

    b = 1.10 m    

             

Se trabajara con las siguientes dimensiones:

       

Page 33: Informe_f...Doc Para Env

33

    b = 1.50 m    

    T = 1.50 m    

    Lv = 0.63 m    

Se revisara la condición de puzonamiento de la zapata:      

             

    Vu/φ = 15.85      

    Vc =

254.01      

     Cumple por punzonamiento

     

1. Diseño longitudinal

         

             

    d = 0.51 m    

    Wnu = 7.24 Ton/m    

    Mu max = 2.12 Ton.m    

    a = 0.10 m    

    As = 1.22 cm2    

    As min = 13.80 cm2    

             

Utilizando acero de: 1/2 " con un área de: 1.27cm2

La cantidad de barras comerciales: 11.00 unidades    

Con un espaciamiento (@) de: 0.140 m    

             

2. Dirección transversal

         

             

    d = 0.51 m    

    wNU = 7.24 Ton/m    

    Mu max = 1.41 Ton.m    

    a = 0.10 m    

    As = 0.81 cm2    

Page 34: Informe_f...Doc Para Env

34

    As min = 13.80 cm2    

             

Utilizando acero de: 1/2 " con una area de: 1.27cm2

La cantidad de barras comerciales: 11.00 unidads    

Con un espaciamiento (@) de: 0.140 m    

             

             

3. Resistencia de aplastamiento sobre la columna      

             

    Pn = 25.07 Ton    

    Pnb = 111.56 Ton    

      Cumple      

             

4. Resistencia de aplastamiento sobre la cimentacion      

             

    Xo = 1.50 m    

    Pn = 25.07 Ton    

    Pnb = 223.125      

      Cumple      

             

    1.5m        

  

         

             

             

        11 φ 0.5 inch @ 0.14 m  

             

             

             

  1.5m

    11 φ 0.5 inch @ 0.14 m  

Page 35: Informe_f...Doc Para Env

35

             

             

             

 

DISEÑO DE CIMIENTO CORRIDO 

  MUROS INTERIORES

 EXP. TEC.  

 

  ENTIDAD : MUNICIPALIDAD PROVINCIAL ANGARAES - LIRCAY

  LUGAR : PIRCAPAHUANA

  DISTRITO : LIRCAY

  PROVINCIA : ANGARAES

  REGION : HUANCAVELICA

  FECHA : MAYO DEL 2012

                 

 Los datos necesarios para determinar las dimensiones del cimiento corrido son los siguientes

                 

  Resistencia del suelo   σt = 1.00Kg/cm2

   

  Altura del muro   h1 = 3.50 m    

  Altura de la columna   h2 = 3.50 m    

 Dim. 1 de la col. de confinamiento

b1 = 0.20 m    

 Dim. 2 de la col. de confinamiento

b2 = 0.15 m    

 Dim. 1 de la viga de confinamiento

c1 = 0.25 m    

 Dim. 2 de la viga de confinamiento

c2 = 0.15 m    

  Ancho del muro   d = 0.15 m    

  Espesor del tarrajeo   e = 1.50 cm    

 Peralto de la cimentacion corrida

h = 0.60 m    

 Altura del sobrecimiento

  a = 0.30 m    

 Densidad del muro de mamposteria

γa = 1800.00Kg/m3

   

Page 36: Informe_f...Doc Para Env

36

 Densidad del concreto ciclopeo

γc1 = 2200.00Kg/m3

   

 Densidad del concreto armado

γc2 = 2500.00Kg/m3

   

 Factor de mayoracion para las cargas

= 1.40      

                 

 Se determinara el peso del: muro, columna, tarrajeo y sobrecimiento:

   

                 

      P1 = 2.12 Ton      

                 

 La determinacion del peso del cimiento se obtiene en funcion del ancho del cimiento corrido:

 

                 

      P2 = 1.85 B Ton      

 Teniendo en cuenta los peso que se generan en el suelo, se llega a una ecuación de 1er grado de donde

  se obtiene el ancho del cimiento corrido:        

      B = 0.26 m      

               

 El ancho mínimo del cimiento corrido es dos veces el ancho del muro:

   

                 

      B ≥ 0.35M

     

DISEÑO ESTRUCTURAL VIGA TIPO VP - 101

 

  DISEÑO POR CORTANTE                    EXP.

TEC.

: "CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO DE LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES 

       HUANCAVELICA

       

 ENTIDAD

: MUNICIPALIDAD PROVINCIAL ANGARAES - LIRCAY

  LUGAR : PIRCAPAHUANA

 DISTRITO

: LIRCAY

  PROVIN : ANGARAES

Page 37: Informe_f...Doc Para Env

37

CIA  REGION : HUANCAVELICA  FECHA : MAYO DEL 2012                   Los datos de cortantes corresponden a la viga analizada      

                 

  Ancho de la viga   b= 0.25 m    

 Preralte de la viga

  h= 0.45 m    

  Peralte efectivo   d= 0.41 m    

  Recubrimiento   r= 0.04 m    

  Resistencia del concreto f'c= 21.00 MPa    

 Resistencia del acero

  f'y= 420.00 MPa    

  Cortante Carga temporal Vct= 12.25 kN.m    

  Cortante Carga permanente Vcp= 38.52 kN.m    

 Factor de amliacion para la CT

Øct= 1.70      

 Factor de amliacion para la CP

Øcp= 1.40      

  Cortante ultimo   Vu= 74.75 kN.m    

 Factor de reduccion de resistencia

Ø= 0.85      

 Longitud de la viga

  L= 2.520 m    

                 

 Para que el elemento cumpla con los requisitos de resistencia a la cortante se tiene la siguiente

 expresión:

             

      Vu ≤ ØVn  Exp. 10

                 

 Donde la Vu es la fuerza cortante amplificada en la seccion considerada y Vn es la resistencia nominal

 al cortante calculada según la Exp.

         

                 

        Vn=Vc+Vs    Exp. 11

                 

 La Vc es la resistencia a la cortante que aporta el concreto y la Vs es la resistencia que aporta el acero.

  El aporte del concreto a la resistencia por cortante se determina con la Exp. 12                   

      ØVc=Ø*0.17*b*d*√f'c  Exp. 12

                         ØVc= 67.87 kN    

Page 38: Informe_f...Doc Para Env

38

                 

 Alrededor de los apoyos se toma la cortante a una distancia b/2 + 3d/4

0.4325 m

 Por lo tanto, la cortante que se utilizara para realizar los calculos sera

49.09 kN

                 

 Es necesario el acero de refuerzo por calculo en la zona comprendida desde el apoyo de

 

 la viga hasta la longitud

    L1 = 0.12 m  

                   El acero de refuerzo no es necesario desde L2 = 0.69 m                   

 El cálculo del espaciamiento del acero de refuerzo para la cortante se determina mediante la Exp. 13

                 

      sx=Ø*Av*f'y*d/(Vx-ØVc)  Exp. 13

                   Utilizando acero de Ø 3/8" para el cerco se tiene un Av= 1.42 cm2                                                      

 Resolviendo la Exp. 13 se llega a la relacion que existe entre la cortante y el espaciamiento de los estribos

 que se refleja en la siguiente tabla

         

                     sx(m) 0.5 1 1.5 2    

   Vux(k

N)45.09 15.43 -14.24

-43.9

0   

    sx(m) 1.86 -1.12 -0.43-

0.27   

                   Según el RNE el espaciamiento maximo no debe de exceder los siguientes limites                       d/2 = 0.205 m        

   esp. Max

=0.20 m        

                 

 Teniendo en cuenta los datos obtenidos según la tabla y los limites maximos para el espaciamiento

 del acero de refuerzo por cortante se tiene el siguiente espaciamiento:

1 @ 0.05m, Rto. @ 0.20m

Page 39: Informe_f...Doc Para Env

39

2.7 METRADOS

Page 40: Informe_f...Doc Para Env

40

H O J A D E M E T R A D O S

PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA , DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”

COMPONENTE

01 CONSTRUCCION DE INFRAESTRUCTURA

FORMULA 01.01 OBRAS PROVISIONALES

UBICACIÓN PROVINCIA DE ANGARAES DISTRITO DE LIRCAY, COMUNIDAD CAMPESINA DE PIRCAPAHUANA FECHA

08/06/2012

PARTIDA DESCRIPCION

ELEMENTO DIMENSIONES METRADOS

UNDCANT

.LARGO ANCHO

ALTO

PARCIAL TOTAL

01CONSTRUCCION DEL CENTRO CIVICO CON

             

  COBERTURA DE TECHO ALIGERADO              

01.01 OBRAS PROVISIONALES              

01.01.01 ADECUACION DE ALMACEN Y OFICINA DE OBRA GLB        

 1.00

  AREA DE 50 M2   1.00       1.00  

                 

01.01.02 CARTEL DE IDENTIFICACION DE LA OBA DE 3.60x2.40M UND        

 1.00

      1.00       1.00  

                 

01.01.03 CERCO PERIMETRICO CON TELA ARPILLERA M

         56.00

 PERIMETRO DE LA CONSTRUCCION

  1      56.00

 

  

          

 

01.01.04 PAGO DE DERECHO DE CONEXIÓN DE ENERGIA ELECTRICA UND        

 1.00

      1.00       1.00  

  

          

 

01.01.05FLETE TERRESTRE GLB

         1.00

 TRANSPORTE DE MATERIALES DE CONSTRUCCION   1      

1.00 

              

 

01.01.06 PLACA RECORDATORIA SEGÚN DISEÑO UND

         1.00

      1      1.00

 

H O J A D E M E T R A D O S

PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA , DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”

Page 41: Informe_f...Doc Para Env

41

COMPONENTE 01 CONSTRUCCION DE INFRAESTRUCTURAFORMULA 01.02 ESTRUCTURAS

UBICACIÓN PROVINCIA DE ANGARAES DISTRITO DE LIRCAY, COMUNIDAD CAMPESINA DE PIRCAPAHUANA FECHA 08/06/2012

PART. DESCRIPCIONUND DIMENCIONES PARCIAL

    Largo Ancho Alto    

01.02 ESTRUCTURAS              01.02.01 TRABAJOS PRELIMINARES              01.02.01.01 LIMPIEZA DE TERRENO MANUAL m² 1 18.00 8.00   144.00 144.00

2.01.02TRAZO NIVELACION Y REPLANTEO PRELIMINAR m² 1 17.00 7.50   127.50 127.50

2.01.03TRAZO, NIVELACION Y REPLANTEO DURANTE EJECUCION DE OBRA m² 2 17.00 7.50   255.00 255.00

                 01.02.02 MOVIMIENTO DE TIERRA              02.02.01 EXCAVACION MASIVAS DE TERRENO m³ 1 17.00 7.50 0.20 25.50 25.50

02.02.02EXCAVACION ZANJAS PARA ZAPATAS DE 2.00 MT. DE PROFUNDIDAD m³           36.74

  Z - 1   10 1.50 1.50 1.30 29.25    Z - 2   4 1.20 1.20 1.30 7.49                   

02.02.03EXCAVACION PARA CIMIENTO CORRRIDO m³           7.33

  EJE 3-3' DE A a F   3 2.20 0.35 0.70 1.62        1 1.18 0.35 0.70 0.29        1 0.83 0.35 0.70 0.20    EJE 1-1' DE A a F   3 2.20 0.35 0.70 1.62        1 1.18 0.35 0.70 0.29        1 0.83 0.35 0.70 0.20    EJE A-A' DE 1 a 3   2 1.18 0.35 0.70 0.58    EJE F-F' DE 1 a 3   2 0.70 0.35 0.70 0.34    EJE E-E' DE 1 a 3   1 3.25 0.35 0.70 0.80    EJE E,F ENTRE 1,2   1 2.20 0.35 0.70 0.54        1 0.83 0.35 0.70 0.20    Base de Escalera m³ 1 1.20 0.60 0.90 0.65                                    

02.02.04RELLENO COMPACTADO CON MATERIAL AFIRMADO C-EQUIPO             9.94

  LIVIANO m³ 1 16.70 5.95 0.10 9.94                   

02.02.05

ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 1 KM m³ 1.25 vol= 62.24   77.80 77.80

                 02.03 OBRAS DE CONCRETO SIMPLE              

02.03.01SOLADO DE ZAPATAS DE E=4"MEZCLA 1:12 m2           28.26

  Z - 1   10 1.50 1.50   22.50    Z - 2   4 1.20 1.20   5.76                   

02.03.02CIMIENTOS CORRIDOS MEZCLA 1:10 C.H. +30% P.G. m³           7.33

  EJE 3-3' DE A a F   3 2.20 0.35 0.70 1.62        1 1.18 0.35 0.70 0.29        1 0.83 0.35 0.70 0.20    EJE 1-1' DE A a F   3 2.20 0.35 0.70 1.62        1 1.18 0.35 0.70 0.29        1 0.83 0.35 0.70 0.20    EJE A-A' DE 1 a 3   2 1.18 0.35 0.70 0.58    EJE F-F' DE 1 a 3   2 0.70 0.35 0.70 0.34    EJE E-E' DE 1 a 3   1 3.25 0.35 0.70 0.80    EJE E,F ENTRE 1,2   1 2.20 0.35 0.70 0.54        1 0.83 0.35 0.70 0.20    Base de Escalera m³ 1 1.20 0.60 0.90 0.65                   

02.03.03SOBRECIMIENTOS CONCRETO 1:8 + 25% P.M. m³           2.01

  EJE 3-3' DE A a F   2 3.45 0.15 0.30 0.31        1 1.39 0.15 0.30 0.06        1 2.75 0.15 0.30 0.12    EJE 1-1' DE A a E   3 3.45 0.15 0.30 0.47        1 2.40 0.15 0.30 0.11        1 2.75 0.15 0.30 0.12    EJE A-A' DE 1 a 3   2 2.53 0.15 0.30 0.23    EJE E-E' DE 1 a 3   2 2.53 0.15 0.30 0.23    EJE D-D' DE 1 a 3   1 2.55 0.15 0.30 0.11        1 0.40 0.15 0.30 0.02  

Page 42: Informe_f...Doc Para Env

42

  EJE D,E ENTRE 1,2   2 2.50 0.15 0.30 0.23                   

02.03.04ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS. m²           48.65

  EJE 3-3' DE A a E   2 1.75   0.75 2.63        2 9.92   0.30 5.95    menos columnas   -4 0.25   0.30 -0.30    EJE 1-1' DE A a E   2 1.75   0.75 2.63        2 13.77   0.30 8.26    menos columnas   6 0.25   0.30 0.45    EJE A-A' DE 1 a 3   2 3.23   0.75 4.85        2 3.22   0.75 4.83    EJE E-E' DE 1 a 3   2 3.23   0.30 1.94        2 3.22   0.30 1.93    EJE D-D' DE 1 a 3   2 3.22   0.30 1.93    menos columnas   2 1.43   0.30 0.86    EJE 1,3 ENTRE A,B   4 1.00   0.75 3.00        4 1.50   0.75 4.50    EJE C,D ENTRE 1,2   2 2.05   0.30 1.23        4 2.90   0.30 3.48        4 0.30   0.30 0.36        2 0.23   0.30 0.14                   

02.03.05FALSO PISO DE 4" DE CONCRETO 1:10. m²           92.56

 SALA DE USOS MULTIPLES, HALL, SS.HH. DAMAS Y VARONES   1 CAD = 92.56   92.56  

                 

02.03.06CONCRETO FC= 140 KG/CM2 EN VEREDA m²           50.40

  Parte frontal   1 17.00 1.20   20.40    Parte lateral dereco e izquierdo   2 6.50 1.00   13.00    Parte posterior   1 17.00 1.00   17.00                   

02.03.07ENCOFRADO Y DESENCOFRADO DE VEREDA m²           50.40

  Parte frontal   1 17.00 1.20   20.40    Parte lateral dereco e izquierdo   2 6.50 1.00   13.00    Parte posterior   1 17.00 1.00   17.00                   01.02.04 OBRAS DE CONCRETO ARMADO                               01.02.04.01 ZAPATAS              

02.04.01.01CONCRETO EN ZAPATAS F'C=210KG/CM2 m3           16.96

  Z - 1   10 1.50 1.50 0.60 13.50    Z - 2   4 1.20 1.20 0.60 3.46                   02.04.01.02 ACERO EN ZAPATAS FY=4200 KG/CM2 kg           284.33  (ver hoja de metrado de acero)              01.02.04.02 COLUMNAS              

02.04.02.01CONCRETO EN COLUMNAS F'C=210 KG/CM2 m³           15.83

  PRIMER PISO                C1   14 7.88 0.25 0.4 11.03                     AZOTEA   3 2.3 0.25 0.4 0.69    10% de concreto en Ladrillos     11.032     1.10                   

02.04.02.02ACERO EN COLUMNAS FY=4200 kg/cm2 kg         2177.39 2177.39

  (ver hoja de metrado de acero)                                                                                  

02.04.02.03ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNA m²           73.12

  PRIMER NIVEL                C1   14 1.00   2.43 34.02                                      SEGUNDO NIVEL                                 C1   14 1.00   2.30 32.20                     AZOTEA                C1   3 1.00   2.30 6.90                   02.04.03 VIGAS              

Page 43: Informe_f...Doc Para Env

43

02.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m³           17.85  PRIMER PISO                VA   6 3.45 0.25 0.20 1.04        2 2.40 0.25 0.20 0.24        2 2.75 0.25 0.20 0.28    VP   4 2.53 0.25 0.45 1.14        4 5.45 0.25 0.45 2.45    volado   1 0.90 0.25 0.20 0.05        3 1.20 0.25 0.20 0.18    VIGA ESCALERA   1 2.40 0.25 0.20 0.12    doble viguetas   1 2.40 0.15 0.20 0.07        3 3.45 0.15 0.2 0.31    SEGUNDO PISO                VA   6 3.45 0.25 0.20 1.04        2 2.40 0.25 0.20 0.24        2 2.75 0.25 0.20 0.28    VP   4 2.53 0.25 0.40 1.01        4 5.45 0.25 0.40 2.18    volado   2 1.50 0.25 0.20 0.15    doble viguetas   1 2.40 0.15 0.20 0.07        3 3.45 0.15 0.2 0.31                     AZOTEA                VA - 202 (0.20x0.25)   2 2.90 0.25 0.20 0.29    VA - 203 (0.20x0.25)   2 4.25 0.25 0.20 0.43                   02.04.03.02 ACERO EN VIGAS FY=4200 KG/CM2 kg         1476.61 1476.61  (ver hoja de metrado de acero)                               

02.04.03.03ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m²           126.85

  EJE A-A, F-F   2 6.25 1.00   12.50    EJE B, C,D y E   4 6.25 1.15   28.75    EJE 1, 3   2 17.00 0.65   22.10    menos   -1 12.55 0.15   -1.88        -1 1.85 0.15   -0.28                     SEGUNDO PISO                EJE 1-1                EJE A-A, F-F   2 6.25 0.95   11.88    EJE B, C,D y E   4 6.25 1.10   27.50    EJE 1, 3   2 17.00 0.65   22.10    menos   -1 12.55 0.15   -1.88        -1 3.05 0.15   -0.46    AZOTEA                EJE E-E, F-F   4 4.25 0.20   3.40    EJE 2-2,3-3   4 3.90 0.20   3.12                   01.02.04.04 ESCALERAS              

02.04.04.01CONCRETO EN ESCALERAS FC=210 KG/CM2 m³           4.12

  Cimiento   1 1.20 0.60 1.00 0.72    Losa   1 5.93 1.20 0.18 1.28    Gradas   16 1.20 0.25 0.18 0.43    Losa   1 5.93 1.20 0.18 1.28    Gradas   15 1.20 0.25 0.18 0.41                   

02.04.04.02ACERO EN ESCALERAS FY=4200 KG/CM2 kg         325.84 325.84

  (ver hoja de metrado de acero)                               

02.04.04.03ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m²           118.19

  EJE A-A, F-F   2 6.25 1.00   12.50    EJE B, C,D y E   8 6.25 1.15   57.50    EJE 1, 3   4 17.00 0.65   44.20                   01.02.04.05 LOSA ALIGERADA              

02.04.05.01CONCRETO EN LOSA ALIGERADA F'C=210 KG/CM2             45.00

  PRIMER NIVEL                Losa m³                  3 5.75 3.45 0.05 2.98        1 5.75 2.75 0.05 0.79        1 2.40 1.85 0.05 0.22        1 2.40 1.15 0.05 0.14    voladizo   2 3.45 0.75 0.05 0.26        1 3.45 1.05 0.05 0.18  

  VIGUETAS  45.0

0 3.45 0.10 0.15 2.33  

Page 44: Informe_f...Doc Para Env

44

      5.00 2.40 0.10 0.15 0.18        3 2.40 0.10 0.15 0.11        3 2.75 0.10 0.15 0.12    voladizo   15 3.45 0.10 0.15 0.78                     SEGUNDO NIVEL                    3 5.75 3.45 0.05 2.98        1 5.75 2.75 0.05 0.79        1 2.40 1.85 0.05 0.22        1 2.40 1.15 0.05 0.14    voladizo   2 3.45 0.75 0.05 0.26        1 3.45 1.05 0.05 0.18  

  VIGUETAS  45.0

0 3.45 0.10 0.15 2.33        5.00 2.40 0.10 0.15 0.18        3 2.40 0.10 0.15 0.11        3 2.75 0.10 0.15 0.12    voladizo   15 3.45 0.10 0.15 0.78                                                     

02.04.05.02ACERO EN LOSA ALIGERADA FY=4200 KG/CM2 kg         3110.71 3110.71

  (ver hoja de metrado de acero)                               

02.04.05.03ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA m²           216.36

  PRIMER NIVEL                Area 1   1 16.50 2.05   33.83        1 16.50 1.15   18.98    Area 2   1 13.85 2.75   38.09    Area 3   1 10.85 1.40   15.19                     SEGUNDO NIVEL                Area 1   1 16.50 2.05   33.83        1 16.50 1.15   18.98    Area 2   1 13.85 2.75   38.09        1 13.85 1.40   19.39                                    

02.04.05.04LADRILLO HUECO DE ARCILLA h = 15 CM PARA TECHO ALIGERADO

Und.           1604.96

  PRIMER NIVEL                Losa m³                  3 5.75 3.45   495.74        1 2.40 1.85   36.99        1 5.75 2.75   131.72        1 2.40 1.15   22.99    voladizo   1 3.45 0.75   21.55        2 3.45 1.20   68.97    SEGUNDO NIVEL                Losa m³                  3 5.75 3.45   495.74        1 2.40 1.85   36.99        1 5.75 2.75   131.72        1 2.40 1.15   22.99    voladizo   2 3.45 0.75   43.11        2 3.45 1.20   68.97        1 2.75 1.20   27.49                   01.02.04.06 LOSA MACIZA              

02.04.06.01CONCRETO EN LOSAS MACIZAS F'C=210 KG/CM2             1.23

  AZOTEA                TRAMO 01 m³                  1 4.25 2.90 0.10 1.23                   

02.04.06.02ACERO EN LOSA MACIZA FY=4200 KG/CM2 kg         135.33 135.33

  (ver hoja de metrado de acero)                               

02.04.06.03ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA MACIZA m²           12.33

                   Area 1   1 4.25 2.90   12.33                   01.02.05 CONTROL DE CALIDAD              02.05.01 DISEÑO DE MEZCLAS Und 1       1.00 1.0002.05.02 ROTURA DE PROBETAS Und 10       10.00 10.00                 

Page 45: Informe_f...Doc Para Env

45

                 

PLANILLA DE METRADOS ACERO

PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA , DISTRITO DE LIRCAY,

PROVINCIA DE ANGARAES - HUANCAVELICA”

COMPONENTE 01 CONSTRUCCION DE INFRAESTRUCTURA

FORMULA 01.02 ESTRUCTURAS

UBICACIÓN PROVINCIA DE ANGARAES DISTRITO DE LIRCAY LOCALIDAD DE PIRCAPAHUANA FECHA

Set. Del 2012

PART. DESCRIPCIONUND

ØCANT.

Nº DE PIEZAS

LONGUITUD

Kg/mlPARCIAL

TOTAL

  METRADO DE ACERO                                   01.02.04.01.02 Zapatas                

  Armadura de acero Kg            284.3

3

  Z-1   1/2 10 8 1.45 0.99 114.84        1/2 10 8 1.45 0.99 114.84    Z-2   1/2 4 6 1.15 0.99 27.32        1/2 4 6 1.15 0.99 27.32  01.02.04.02.02 Columnas                

  Armadura de acero Kg            1177.

39                     C-1   5/8 12 4 8.15 1.550 606.36        1/2 12 2 8.15 0.99 193.64        1/4 14 42 1.35 0.260 206.39        1/2 2 4 8.15 0.99 64.55        5/8 7 4 1.10 1.550 47.74        1/2 7 2 1.10 0.99 15.25        1/4 9 11 1.35 0.260 34.75        1/2 2 4 1.10 0.99 8.71  01.02.04.03.02 Vigas                

  Armadura de acero Kg            1476.

61

 PRIMER Y SEGUNDO NIVEL                

  VA   1/2 4 5 17.40 0.99 344.52    escalera   1/2 2 5 3.30 0.99 32.67        1/4 2 207 1.00 0.260 107.64    VP   5/8 10 5 6.65 1.550 515.38    positivo   5/8 12 1 4.65 1.550 86.49    negativo   5/8 26 1 2.00 1.550 80.60  

      1/4 1034.7

5 1.40 0.260 126.49    doble vigueta primer nivel   1/2 1 2 3.30 0.99 6.53        1/2 1 2 11.75 0.99 23.27    doble vigueta segundo nivel   1/2 1 2 17.40 0.99 34.45    volado primer nivel   5/8 2 5 1.30 1.550 20.15        5/8 2 5 1.60 1.550 24.80    volado segundo nivel   5/8 5 5 1.90 1.550 73.63    VA Azotea   1/2 2 4 4.25 0.99 33.66        1/2 2 4 3.90 0.99 30.89                     

01.02.04.04.02 Escalera              325.8

4

 Armadura de acero primer piso   1/2 1 8 10.00 0.99 79.20  

      1/2 1 9 9.00 0.99 80.19        3/8 1 30 1.20 0.560 20.16  

Page 46: Informe_f...Doc Para Env

46

      3/8 1 30 1.73 0.560 29.06  

 Armadura de acero segundo piso                

      1/2 1 8 9.00 0.99 71.28        3/8 1 28 1.20 0.560 18.82        3/8 1 28 1.73 0.560 27.13                     

H O J A D E M E T R A D O S

PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA , DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”

COMPONENTE 01 CONSTRUCCION DE INFRAESTRUCTURA

FORMULA 01.03 ARQUITECTURA

UBICACIÓN PROVINCIA DE ANGARAES, DISTRITO DE LIRCAY, COMUNIDAD CAMPESINA DE PIRCAPAHUANA

PARTIDA DESCRIPCIONELEMENTO DIMENSIONES METRADOS

UNDCANT

.LARGO ANCHO ALTO PARCIAL TOTAL

01.03 ARQUITECTURA              

01.03.01MUROS Y TABIQUES DE ALBAÑILERIA

             

01.03.01.01MURO DE SOGA LADRILLO DE ARCILLA C.A 1:4

m2           267.33

  PRIMER PISO              

  Eje A   2 2.525   2.43 12.27  

  Eje F   2 2.525   2.43 12.27  

  Eje E   1 2.73   2.43 6.63  

      1 0.40   2.43 0.97  

  Eje 1   3 3.45   1.78 18.42  

      1 2.75   1.78 4.90  

      1 2.40   1.78 4.27  

  Eje 3   2 3.45   1.78 12.28  

      2 0.73   1.78 2.58  

      1 2.75   1.78 4.90  

      1 1.40   1.78 2.49  

  Eje E,F entre 1,2   1 2.40   2.68 6.43  

      1 2.40   2.00 4.80  

      2 0.30   2.00 1.20  

  SEGUNDO PISO              

  Eje 1 m2 2 3.45   0.80 5.52  

      2 2.75   0.80 4.40  

      1 0.40   2.50 1.00  

      1.00 3.05   0.80 2.44  

      1.00 2.40   1.60 3.84  

  Eje E, F entre 1,2   1.00 2.52   1.80 4.54  

      1.00 2.52   2.50 6.30  

      2.00 0.30   1.80 1.08  

  Eje 2'   1.00 4.30   2.50 10.75  

    1.00 3.95   0.60 2.37  

Page 47: Informe_f...Doc Para Env

47

  Eje 3   1.00 2.40   0.80 1.92  

  Closet   3.00 0.65   2.50 4.88  

      1.00 0.88   1.00 0.88  

      1.00 2.75   2.50 6.88  

      1.00 1.45   2.50 3.63  

  Eje 3'   1 4.30   0.80 3.44  

      1.00 3.87   0.80 3.10  

      1.00 3.30   0.80 2.64  

      1.00 1.05   0.80 0.84  

  Eje A   2.00 2.53   2.10 10.61  

  Eje C   1.00 1.90   0.80 1.52  

      1.00 0.75   2.50 1.88  

  Closet   1.00 2.50   2.50 6.25  

      1.00 1.04   2.50 2.60  

  Eje D,E, entre 1,2   1.00 2.70   2.50 6.75  

  Eje E   1.00 0.40   2.20 0.88  

  Eje F   2.00 2.23   1.60 7.14  

  AZOTEA              

 Parapeto en perimetro de la azotea

m2 1.00 45.21   1.0045.21

 

 Muro de caja de escalera en azotea

  1.00 2.80   0.651.82

 

  AREA 01   2.00 AREA   7.24 14.48  

      1.00 2.40   1.40 3.36  

                 

01.03.01.02MAMPARA CON PERFILES DE ALUMINIO INC. VIDRIOS

m2           18.56

  SEGUNDO PISO              

  Eje C   1 1.90   1.50 2.85  

  Eje 1,2   1.00 4.32   1.90 8.21  

  Eje 2,3   1.00 3.95   1.90 7.51  

                 

01.03.02REVOQUES, ENLUCIDOS Y MOLDURAS

             

01.03.02.01TARRAJEO EN INTERIORES ACABADO CON CEMENTO - ARENA

m2           327.24

  PRIMER PISO              

  Eje A   2 2.525   2.43 12.27  

  Eje F   1 3.195   2.43 7.76  

      1 1.72   1.38 2.37  

  Eje E   2 2.73   2.43 13.27  

      2 0.40   2.43 1.94  

  Eje 1   3 3.45   1.78 18.42  

      1 2.40   1.78 4.27  

      1 2.75   1.78 4.90  

  Eje 3   2 3.45   1.78 12.28  

      2 0.73   1.78 2.58  

      1 2.75   1.78 4.90  

      1 1.40   1.78 2.49  

  Eje E,F entre 1,2   1 2.40   1.38 3.31  

      2 2.40   1.10 5.28  

      4 0.30   1.10 1.32  

  derrames   1 56.28 0.15   8.44  

  SEGUNDO PISO              

  Eje 1   2 3.45   0.80 5.52  

Page 48: Informe_f...Doc Para Env

48

      2 2.75   0.80 4.40  

      1 0.40   2.50 1.00  

      1.00 3.05   0.80 2.44  

      1.00 2.40   0.20 0.48  

  Eje E, F entre 1,2   1.00 2.52   0.50 1.26  

      1.00 2.52   1.20 3.02  

      4.00 0.30   0.50 0.60  

  Eje 2'   2.00 4.30   2.50 21.50  

    2.00 3.95   0.60 4.74  

  Eje 3   1.00 2.40   0.80 1.92  

  Closet   6.00 0.65   2.50 9.75  

      2.00 0.88   1.00 1.76  

      1.00 2.75   2.50 6.88  

      1.00 1.55   2.50 3.88  

  Eje 3'   1 4.30   0.80 3.44  

      1.00 3.87   0.80 3.10  

      1.00 3.30   0.80 2.64  

      1.00 1.05   0.80 0.84  

  Eje A   2.00 2.53   1.42 7.17  

  Eje C   2.00 1.90   0.80 3.04  

      2.00 0.75   2.50 3.75  

  Closet   2.00 2.50   2.50 12.50  

      2.00 1.04   2.50 5.20  

  Eje D,E, entre 1,2   2.00 2.70   2.50 13.50  

  Eje E   2.00 0.40   2.20 1.76  

      2.00 2.50   2.20 11.00  

  Eje F   2.00 2.23   1.60 7.14  

  derrames   1 79.05 0.15   11.86  

  AZOTEA              

 Parapeto en perimetro de la azotea

m2 1.00 45.21   1.0045.21  

 Muro de caja de escalera en azotea

  1.00 2.80   0.651.82  

  AREA 01   2.00 AREA   7.24 14.48  

      1.00 2.40   1.40 3.36  

  derrames   1.00 3.20 0.15   0.48  

                 

01.03.02.02TARRAJEO EN EXTERIORES ACABADOS CON CEMENTO ARENA

  m2         133.63

  PRIMER PISO              

  Eje 3   2 3.45   1.78 12.28  

      2 0.73   1.78 2.58  

      1 2.75   1.78 4.90  

      1 1.40   1.78 2.49  

  Eje A   2 2.525   2.43 12.27  

  Eje F   2 2.525   2.43 12.27  

  SEGUNDO PISO              

  Eje 3   1.00 2.40   0.80 1.92  

      1.00 2.75   2.50 6.88  

  Eje 3'   1 4.30   0.80 3.44  

      1.00 3.87   0.80 3.10  

      1.00 3.30   0.80 2.64  

      1.00 1.05   0.80 0.84  

Page 49: Informe_f...Doc Para Env

49

  Eje B   1.00 0.75   0.80 0.60  

  Eje B   1.00 0.45   0.80 0.36  

  Eje E   1.00 1.20   0.80 0.96  

  Eje D   1.00 0.95   0.80 0.76  

  AZOTEA              

 Parapeto en perimetro de la azotea

m2 1.00 45.21   1.0045.21  

 Muro de caja de escalera en azotea

  1.00 2.80   0.651.82  

  AREA 01   2.00 AREA   7.24 14.48  

      1.00 2.40   1.40 3.36  

  derrames   1.00 3.20 0.15   0.48  

                 

01.03.02.03TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5

m2           37.99

  PRIMER NIVEL              

  Eje F   1 1.60   1.30 2.08  

      1 0.35   1.30 0.46  

  Eje E   2 0.25   1.30 0.65  

  Eje 1   2 2.25   1.20 5.40  

  Eje E,F entre 1,2   1 2.25   1.20 2.70  

      1 2.40   1.20 2.88  

      1 2.40   1.20 2.88  

      4 0.30   1.30 1.56  

      2 0.15   1.30 0.39  

  SEGUNDO NIVEL              

  Eje F   1 1.60   1.30 2.08  

      1 0.35   1.30 0.46  

  Eje E   2 0.25   1.30 0.65  

  Eje 1   2 2.25   1.20 5.40  

  Eje E,F entre 1,2   1 2.25   1.20 2.70  

      1 2.40   1.20 2.88  

      1 2.40   1.20 2.88  

      4 0.30   1.30 1.56  

      2 0.15   1.30 0.39  

01.03.02.04TARRAJEO DE SUPERFICIE COLUMNAS CON CEMENTO ARENA

m2           56.96

  PRIMER NIVEL              

  Superficies              

  Interior              

  SUM   8 0.75   2.68 16.08  

      4 0.35   2.68 3.75  

      2 0.60   2.68 3.22  

  Exterior              

  SUM   12 0.25   2.68 8.04  

  SEGUNDO NIVEL              

  Superficies              

  Interior              

      3 0.75   2.30 5.18  

      5 0.35   2.30 4.03  

      1 4.85   2.30 11.16  

  AZOTEA              

  Interior   3 0.40   2.30 2.76  

Page 50: Informe_f...Doc Para Env

50

      3 0.40   2.30 2.76  

                 

01.03.02.05TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO ARENA

m2           63.71

  PRIMER NIVEL              

  Superficies              

  Eje 1, 3   6 3.45   0.10 2.07  

      2 2.40   0.10 0.48  

      2 2.75   0.10 0.55  

  Eje A, F   4 2.53 0.35   3.54  

  Eje B, D   3 5.45 0.75   12.26  

  Eje E   1 5.45 0.60   3.27  

  SEGUNDO NIVEL              

  Superficies              

  Eje 1   3 3.45   0.30 3.11  

      1 2.40   0.30 0.72  

      1 2.75   0.30 0.83  

  Eje 3   2 3.45   0.65 4.49  

      1 3.45   0.50 1.73  

      1 2.40   0.50 1.20  

      1 2.75   0.50 1.38  

  Eje A, E   4 2.53 0.70   7.07  

      1 0.90 0.50   0.45  

  Eje B, C, D, E   4 5.45 0.70   15.26  

      4 1.50 0.65   3.90  

  AZOTEA              

  Eje 2-2,3-3   1 2.90   0.20 0.58  

  Eje E-E, F-F   1 4.25   0.20 0.85  

                 

01.03.02.06VESTIDURA DE DERRAMES EN PUERTAS VENTANAS Y VANOS

m           70.00

  PUERTAS   1 18.00     18.00  

  VENTANAS   1 52.00     52.00  

                 

01.03.02.07TARRAJEO DE BRUÑAS DE 1 CM

m           128.00

 PRIMERO, SEGUNDO PISO Y AZOTEA   1 128.00     128.00  

                 

01.03.03 CIELORRASOS              

01.03.03.01CIELORRASOS CON MEZCLA CEMENTO - ARENA

m2           226.05

  PRIMER NIVEL              

  SUM   3 5.75 3.45   59.51  

      1 5.75 2.40   13.80  

      1 5.75 2.75   15.81  

  VOLADIZO   1 CAD = 17.80   17.80  

  SEGUNDO NIVEL              

  SUM   3 5.75 3.45   59.51  

      1 5.75 2.40   13.80  

      1 5.75 2.75   15.81  

  VOLADIZO   1 CAD = 21.00   21.00  

  AZOTEA              

      1 3.75 2.40   9.00  

                 

Page 51: Informe_f...Doc Para Env

51

01.03.04 PISOS Y PAVIMENTOS              

01.03.04.01 CONTRAPISO DE 25 mm. m2           9.32

  PRIMER NIVEL              

  SS.HH   1 CAD = 2.32   2.32  

      1 CAD = 2.34   2.34  

  SEGUNDO NIVEL              

  SS.HH   1 CAD = 2.32   2.32  

      1 CAD = 2.34   2.34  

                 

01.03.04.02PISO DE CERAMICO 30X30 CM, DE COLOR 1RA

m2           9.32

  PRIMER NIVEL              

  SS.HH   1 CAD = 2.32   2.32  

      1 CAD = 2.34   2.34  

  SEGUNDO NIVEL              

  SS.HH   1 CAD = 2.32   2.32  

      1 CAD = 2.34   2.34  

                 

01.03.04.03PISO DE CONCRETO COLOREADO ACABADO FROTACHADO E=1.5CM

m2           209.18

  PRIMER NIVEL              

      1 CAD = 93.93   93.93  

  SEGUNDO NIVEL              

      1 CAD = 111.60   111.60  

  AZOTEA              

      1 CAD = 3.65   3.65  

                 

01.03.05 CONTRAZOCALOS              

01.03.05.01ZOCALO DE LOSETA CORRIENTE DE 10X20

M           33.61

  PRIMER PISO              

  Eje A   2 2.53   0.30 1.52  

  Eje E   1 2.53   0.30 0.76  

      1 0.68   0.30 0.20  

  Eje D   1 0.40   0.30 0.12  

      1 2.55   0.30 0.77  

      1 2.40   0.30 0.72  

  Eje 1   3 3.45   0.30 3.11  

  Eje D,E entre 1,2   1 2.50   0.30 0.75  

  Eje 3   4 3.45   0.30 4.14  

      4 0.73   0.30 0.87  

  SEGUNDO PISO              

  Eje 1   2 3.45   0.30 2.07  

      1.00 3.05   0.30 0.92  

  Eje 2'   1.00 0.65   0.30 0.20  

      2.00 4.30   0.30 2.58  

      1.00 3.95   0.30 1.19  

      1.00 3.80   0.30 1.14  

  Eje 3   1 2.40   0.30 0.72  

  Eje 3'   1.00 3.55   0.30 1.07  

      1.00 7.35   0.30 2.21  

  Eje A   2.00 2.53   0.30 1.52  

      1.00 0.75   0.30 0.23  

  Eje B   1.00 1.90   0.30 0.57  

      1.00 1.75   0.30 0.53  

Page 52: Informe_f...Doc Para Env

52

      1.00 0.75   0.30 0.23  

      1.00 0.90   0.30 0.27  

      1.00 0.15   0.30 0.05  

  closet   1.00 1.17   0.30 0.35  

      1.00 1.44   0.30 0.43  

  Eje C closet   2.00 0.65   0.30 0.39  

      1.00 0.25   0.30 0.08  

      1.00 0.85   0.30 0.26  

  Eje C'   2.00 0.88   0.30 0.53  

      2.00 2.70   0.30 1.62  

  Eje D   1.00 0.40   0.30 0.12  

      1.00 2.50   0.30 0.75  

      1.00 1.05   0.30 0.32  

      1.00 1.25   0.30 0.38  

                 

01.03.06 ZOCALOS              

01.03.06.01ZOCALO DE CERAMICO 20X30 CM BLANCO DE 1RA

m2           40.30

  PRIMER NIVEL              

  Eje F   1 1.60   1.30 2.08  

      1 0.35   1.30 0.46  

  Eje E   2 0.25   1.30 0.65  

  Eje 1   2 2.25   1.30 5.85  

  Eje E,F entre 1,2   1 2.25   1.30 2.93  

      1 2.40   1.30 3.12  

      1 2.40   1.30 3.12  

      4 0.30   1.30 1.56  

      2 0.15   1.30 0.39  

  SEGUNDO NIVEL              

  Eje F   1 1.60   1.30 2.08  

      1 0.35   1.30 0.46  

  Eje E   2 0.25   1.30 0.65  

  Eje 1   2 2.25   1.30 5.85  

  Eje E,F entre 1,2   1 2.25   1.30 2.93  

      1 2.40   1.30 3.12  

      1 2.40   1.30 3.12  

      4 0.30   1.30 1.56  

      2 0.15   1.30 0.39  

                 

01.03.07 REVESTIMIENTOS              

01.03.07.01REVESTIMIENTO DE GRADERIA C/MORTERO 1:4x2CM + PULIDO 1:2x1CM

M2           39.85

  Eje E, F   4 3.20   1.10 14.08  

      4 1.50   1.10 6.60  

      2 2.52   1.10 5.54  

                 

01.03.08 CARPINTERIA DE MADERA              

01.03.08.01PUERTA DE MADERA APANELADA

m2           28.54

  PRIMER PISO              

      1 2.00   2.68 5.36  

      1 1.00   2.43 2.43  

      1 1.00   2.68 2.68  

      2 0.65   2.43 3.16  

  SEGUNDO PISO              

Page 53: Informe_f...Doc Para Env

53

      1 0.80   2.30 1.84  

      1 0.80   2.50 2.00  

      1 0.90   2.10 1.89  

      1 0.90   2.50 2.25  

      1 1.10   2.10 2.31  

      2 0.65   2.10 2.73  

  AZOTEA              

      1 0.90   2.10 1.89  

                 

01.03.09 CARPINTERIA METALICA              

01.03.09.01BARANDA METALICA DE FºNº PASAMANO Ø 2"

m           22.00

  Escalera   1 22.00     22.00  

                 

01.03.10 CERRAJERIA              

01.03.10.10BISAGRA ALUMINIZADA CAPUCHINA DE 4"x4"

pza           33.00

      1 33.00     33.00  

                 

01.03.10.02CERRADURA PESADA DE TRES GOLPES

pza           6.00

      1 6.00     6.00  

                 

01.03.10..03CHAPA PARA BAÑO CON SEGURO INTERIOR Y PERILLA O MANIJA

und           4.00

      1 4.00     4.00  

                 

01.03.11VIDRIOS, CRISTALES Y SIMILARES

             

01.03.11.01VENTANA CON EL SITEMA NOVA INCLUYE INSTALACION

m2           70.56

  PRIMER PISO              

      3 3.45   0.90 9.32  

      1 2.40   0.90 2.16  

      2 3.45   1.10 7.59  

      1 2.75   1.10 3.03  

      1 2.75   0.90 2.48  

      1 1.40   1.10 1.54  

      2 0.73   1.10 1.60  

  SEGUNDO PISO              

      2 3.45   1.40 9.66  

      1 3.05   1.40 4.27  

      1 2.40   0.60 1.44  

      1 2.40   1.70 4.08  

      1 4.35   1.70 7.40  

      1 3.85   1.70 6.55  

      1 4.30   1.70 7.31  

  AZOTEA              

      1 2.40   0.90 2.16  

                 

01.03.12 PINTURA              

01.03.12.01PINTURA LATEX EN MUROS INTERIORES

m2           330.67

  PRIMER PISO              

  Eje A   2 2.525   2.43 12.27  

  Eje F   1 3.195   2.43 7.76  

      1 1.72   1.38 2.37  

Page 54: Informe_f...Doc Para Env

54

  Eje E   2 2.73   2.43 13.27  

      2 0.40   2.43 1.94  

  Eje 1   3 3.45   1.78 18.42  

      1 2.40   1.78 4.27  

      1 2.75   1.78 4.90  

  Eje 3   2 3.45   1.78 12.28  

      2 0.73   1.78 2.58  

      1 2.75   1.78 4.90  

      1 1.40   1.78 2.49  

  Eje E,F entre 1,2   1 2.40   1.38 3.31  

      2 2.40   1.10 5.28  

      4 0.30   1.10 1.32  

  derrames   1 56.28 0.15   8.44  

  SEGUNDO PISO              

  Eje 1   2 3.45   0.80 5.52  

      2 2.75   0.80 4.40  

      1 0.40   2.50 1.00  

      1.00 3.05   0.80 2.44  

      1.00 2.40   0.20 0.48  

  Eje E, F entre 1,2   1.00 2.52   0.50 1.26  

      1.00 2.52   1.20 3.02  

      4.00 0.30   0.50 0.60  

  Eje 2'   2.00 4.30   2.50 21.50  

    2.00 3.95   0.60 4.74  

  Eje 3   1.00 2.40   0.80 1.92  

  Closet   6.00 0.65   2.50 9.75  

      2.00 0.88   1.00 1.76  

      1.00 2.75   2.50 6.88  

      1.00 1.55   2.50 3.88  

  Eje 3'   1 4.30   0.80 3.44  

      1.00 3.87   0.80 3.10  

      1.00 3.30   0.80 2.64  

      1.00 1.05   0.80 0.84  

  Eje A   2.00 2.53   2.10 10.61  

  Eje C   2.00 1.90   0.80 3.04  

      2.00 0.75   2.50 3.75  

  Closet   2.00 2.50   2.50 12.50  

      2.00 1.04   2.50 5.20  

  Eje D,E, entre 1,2   2.00 2.70   2.50 13.50  

  Eje E   2.00 0.40   2.20 1.76  

      2.00 2.50   2.20 11.00  

  Eje F   2.00 2.23   1.60 7.14  

  derrames   1 79.05 0.15   11.86  

  AZOTEA              

 Parapeto en perimetro de la azotea

m2 1.00 45.21   1.0045.21  

 Muro de caja de escalera en azotea

  1.00 2.80   0.651.82  

  AREA 01   2.00 AREA   7.24 14.48  

      1.00 2.40   1.40 3.36  

  derrames   1.00 3.20 0.15   0.48  

                 

                 

01.03.12.02PINTADURA AL OLEO MATE EN MURO EXTERIORES

m2           133.63

Page 55: Informe_f...Doc Para Env

55

  PRIMER PISO              

  Eje 3   2 3.45   1.78 12.28  

      2 0.73   1.78 2.58  

      1 2.75   1.78 4.90  

      1 1.40   1.78 2.49  

  Eje A   2 2.525   2.43 12.27  

  Eje F   2 2.525   2.43 12.27  

  SEGUNDO PISO              

  Eje 3   1.00 2.40   0.80 1.92  

      1.00 2.75   2.50 6.88  

  Eje 3'   1 4.30   0.80 3.44  

      1.00 3.87   0.80 3.10  

      1.00 3.30   0.80 2.64  

      1.00 1.05   0.80 0.84  

  Eje B   1.00 0.75   0.80 0.60  

  Eje B   1.00 0.45   0.80 0.36  

  Eje E   1.00 1.20   0.80 0.96  

  Eje D   1.00 0.95   0.80 0.76  

  AZOTEA              

 Parapeto en perimetro de la azotea

m2 1.00 45.21   1.0045.21  

 Muro de caja de escalera en azotea

  1.00 2.80   0.651.82  

  AREA 01   2.00 AREA   7.24 14.48  

      1.00 2.40   1.40 3.36  

  derrames   1.00 3.20 0.15   0.48  

                 

01.03.12.03PINTURA LATEX EN SUPERFICIE DE COLUMNAS

m2           56.96

  PRIMER NIVEL              

  Superficies              

  Interior              

  SUM   8 0.75   2.68 16.08  

      4 0.35   2.68 3.75  

      2 0.60   2.68 3.22  

  Exterior              

  SUM   12 0.25   2.68 8.04  

  SEGUNDO NIVEL              

  Superficies              

  Interior              

      3 0.75   2.30 5.18  

      5 0.35   2.30 4.03  

      1 4.85   2.30 11.16  

  AZOTEA              

  Interior   3 0.40   2.30 2.76  

      3 0.40   2.30 2.76  

                 

01.03.12.04PINTADO LATEX SUPERFICIE DE VIGAS

m2           63.71

  PRIMER NIVEL              

  Superficies              

  Eje 1, 3   6 3.45   0.10 2.07  

      2 2.40   0.10 0.48  

      2 2.75   0.10 0.55  

  Eje A, F   4 2.53 0.35   3.54  

  Eje B, D   3 5.45 0.75   12.26  

  Eje E   1 5.45 0.60   3.27  

Page 56: Informe_f...Doc Para Env

56

  SEGUNDO NIVEL              

  Superficies              

  Eje 1   3 3.45   0.30 3.11  

      1 2.40   0.30 0.72  

      1 2.75   0.30 0.83  

  Eje 3   2 3.45   0.65 4.49  

      1 3.45   0.50 1.73  

      1 2.40   0.50 1.20  

      1 2.75   0.50 1.38  

  Eje A, E   4 2.53 0.70   7.07  

      1 0.90 0.50   0.45  

  Eje B, C, D, E   4 5.45 0.70   15.26  

      4 1.50 0.65   3.90  

  AZOTEA              

  Eje 2-2,3-3   1 2.90   0.20 0.58  

  Eje E-E, F-F   1 4.25   0.20 0.85  

                 

01.03.12.05PINTURA LATEX EN CIELORRASO DE CEMENTO

m2           226.05

  PRIMER NIVEL              

  SUM   3 5.75 3.45   59.51  

      1 5.75 2.40   13.80  

      1 5.75 2.75   15.81  

  VOLADIZO   1 CAD = 17.80   17.80  

  SEGUNDO NIVEL              

  SUM   3 5.75 3.45   59.51  

      1 5.75 2.40   13.80  

      1 5.75 2.75   15.81  

  VOLADIZO   1 CAD = 21.00   21.00  

  AZOTEA              

      1 3.75 2.40   9.00  

                 

01.03.12.06PINTURA AL OLEO MATE EN ZOCALOS DE CEMENTO

m2           7.61

  PRIMER PISO              

  Eje 3-3   3 3.45   0.30 3.11  

      1 2.75   0.30 0.83  

      1 0.75   0.30 0.23  

      1 1.40   0.30 0.42  

  Eje F-F   2 2.53   0.30 1.52  

  Eje A-A   2 2.53   0.30 1.52  

                 

01.03.12.07 PINTADO DE BRUÑAS m2           128.00

      1 128.00     128.00  

                 

                 

H O J A D E M E T R A D O S

PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”

COMPONENTE 01 CONSTRUCCION DE INFRAESTRUCTURA

FORMULA 04 INSTALACIONES SANITARIAS

UBICACIÓN

PROVINCIA DE ANGARAES DISTRITO DE LIRCAY - COMUNIDAD DE PIRCAPAHUANA

FECHA

08/06/2012

Page 57: Informe_f...Doc Para Env

57

PARTIDA DESCRIPCIONELEMENTO DIMENSIONES METRADOS

UND CANT. LARGO ANCHO ALTO PARCIALTOTAL

                 

01.04 INSTALACIONES SANITARIAS              

                 

01.04.01 SISTEMA DE DESAGUE              

01.04.01.01 SALIDA DE DESAGUE              

01.04.01.0101 SALIDA DE DESAGUE EN PVC Ø 4" pto        

 4.00

  PRIMER PISO              

  S.S.H.H. VARONES   1.00       1.00  

  S.S.H.H. DAMAS   1.00       1.00  

                 

  SEGUNDO PISO              

  S.S.H.H. VARONES   1.00       1.00  

  S.S.H.H. DAMAS   1.00       1.00  

                 

01.04.01.01.02 SALIDA DE DESAGUE EN PVC Ø 2" pto        

 4.00

  PRIMER PISO              

  S.S.H.H. VARONES              

  LAVADERO   1.00       1.00  

  S.S.H.H. DAMAS              

  LAVADERO   1.00       1.00  

                 

  SEGUNDO PISO              

  S.S.H.H. VARONES              

  LAVADERO   1.00       1.00  

  S.S.H.H. DAMAS              

  LAVADERO   1.00       1.00  

                 

01.04.01.01.03 SALIDA DE VENTILACION PVC Ø 2" pto        

 1.00

  S.S.H.H. VARONES   1.00       1.00  

                 

01.04.01.02 REDES DISTRIBUCION              

01.04.01.02.01

RED DE DERIVACION PVC SAL PARA DESAGUE DE Ø4" m

          47.80

  PRIMER PISO              

  COLECTOR   1.00 5.00     5.00  

  RAMALES   1.00 2.00     2.00  

                 

  SEGUNDO PISO              

  S.S.H.H. VARONES   1.00 5.00     5.00  

  S.S.H.H. DAMAS   1.00 2.00     2.00  

                 

  BAJA A PRIMER NIVEL   1.00 3.80     3.80  

                 

 CAJA DE REGISTRO 01- TANQUE SEPTICO

  1.00 30.00     30.00  

                 

01.04.01.02.02

RED DE DERIVACION PVC SAL PARA DESAGUE DE Ø2" m

          39.40

  PRIMER PISO              

  S.S.H.H. VARONES   1.00 5.00     5.00  

  S.S.H.H. DAMAS   1.00 5.00     5.00  

  SUBE VENTILACION   2.00 7.20     14.40  

Page 58: Informe_f...Doc Para Env

58

                 

  SEGUNDO PISO              

  S.S.H.H. VARONES   1.00 5.00     5.00  

  BAJA A PRIMER NIVEL   1.00 5.00     5.00  

  HACIA CAJA DE REGISTRO   1.00 5.00     5.00  

                 

01.04.01.02.03 EXCAVACION DE ZANJAS m

          35.00

  DE BAJADA - CAJA DE REGISTRO 01   1.00 5.00     5.00  

 CAJA DE REGISDTRO 01- TANQUE SEPTICO

  1.00 30.00     30.00  

                 

01.04.01.02.04 RELLENO DE ZANJAS m

          35.00

  DE BAJADA - CAJA DE REGISTRO 01   1.00 5.00     5.00  

 CAJA DE REGISTRO 01- TANQUE SEPTICO

  1.00 30.00     30.00  

                 

01.04.01.03 ACCESORIOS DE REDES              

01.04.01.03.01 CODO PVC SAL 2"X45° pza        

 4.00

  PRIMER PISO              

  S.S.H.H. DAMAS, VARONES   2.00       2.00  

  SEGUNDO PISO              

  S.S.H.H. DAMAS, VARONES   2.00       2.00  

                 

                 

01.04.01.03.02 CODO PVC SAL 4"X45° pza        

 2.00

  PRIMER PISO              

  PARA BAJADA DE SEGUNDO NIVEL   2.00       2.00  

                 

01.04.01.03.03 CODO PVC SAL 2"X90° pza        

 13.00

  PRIMER PISO              

  PARA BAJADA DE SEGUNDO NIVEL   13.00       13.00  

                 

01.04.01.03.04 CODO PVC SAL 4"X90° pza        

 1.00

  PRIMER PISO              

  PARA BAJADA DE SEGUNDO NIVEL   1.00       1.00  

                 

01.04.01.03.05 YEE PVC SAL Ø2" pza        

 4.00

  PRIMER PISO              

  S.S.H.H. VARONES   1.00       1.00  

  S.S.H.H. DAMAS   1.00       1.00  

                 

  SEGUNDO PISO              

  S.S.H.H. VARONES   1.00       1.00  

  S.S.H.H. DAMAS   1.00       1.00  

                 

01.04.01.03.06 YEE PVC SAL 4" x 2" pza        

 4.00

  PRIMER PISO              

  S.S.H.H. VARONES   4.00       4.00  

                 

                 

01.04.01.03.07 REDUCCION DE PVC SAL DE 4"-2" und        

 4.00

  PRIMER PISO              

Page 59: Informe_f...Doc Para Env

59

  S.S.H.H. VARONES, DAMAS   2.00       2.00  

                 

  SEGUNDO PISO              

  S.S.H.H. DAMAS, DAMAS   2.00       2.00  

                 

01.04.01.03.08 TEE PVC SAL 4"X90° und        

 6.00

  PRIMER PISO              

  S.S.H.H. VARONES, DAMAS   3.00       3.00  

                 

  SEGUNDO PISO              

  S.S.H.H. DAMAS, DAMAS   3.00       3.00  

                 

                 

01.04.01.04 ADITAMIENTO VARIOS              

01.04.01.04.01

SUMIDEROS DE BRONCE DE 2", PROVISION Y COLOCACION und        

 4.00

  PRIMER PISO              

  S.S.H.H. VARONES   1.00       1.00  

  S.S.H.H. DAMAS   1.00       1.00  

                 

  SEGUNDO PISO              

  S.S.H.H. VARONES   1.00       1.00  

  S.S.H.H. DAMAS   1.00       1.00  

                 

01.04.01.04.02 REGISTRO DE BRONCE Ø 4" pza        

 2.00

  PRIMER PISO              

  S.S.H.H. VARONES   1.00       1.00  

                 

  SEGUNDO PISO              

  S.S.H.H. VARONES   1.00       1.00  

                 

01.04.01.04.03 REGISTRO DE BRONCE Ø 2" pza        

 4.00

  PRIMER PISO              

  S.S.H.H. VARONES   1.00       1.00  

  S.S.H.H. DAMAS   1.00       1.00  

                 

  SEGUNDO PISO              

  S.S.H.H. DAMAS   1.00       1.00  

  S.S.H.H. VARONES   1.00       1.00  

                 

01.04.01.04.04

SOMBRERO PARA VENTILACION PVC DE Ø 2" pza        

 1.00

  S.S.H.H. VARONES   1.00       1.00  

                 

01.04.01.05 CAMARAS DE INSPECCION              

01.04.01.05.01

CAJA DE REGISTRO DE DESAGUE 12" X 24" pza        

 1.00

  CAJA Nº 01   1.00       1.00  

                 

01.04.01.06APARATOS Y ACCESORIOS SANITARIOS

             

01.04.01.06.01 INODORO TANQUE BAJO BLANCO pza 4      

4.004.00

                 

                 

                 

Page 60: Informe_f...Doc Para Env

60

01.04.01.06.02 LAVATORIO DE PARED BLANCO 1 LLAVE pza 4      

4.004.00

                 

01.04.01.06.03

URINARIO DE LOZA DE PICO COLOR BLANCO pza 2      

2.002.00

                 

                 

                 

01.04.02 SISTEMA DE AGUA FRIA              

01.04.02.01 SALIDA DE AGUA FRIA              

01.04.02.01.01

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto        

 8.00

  PRIMER PISO              

  S.S.H.H. VARONES              

  INODORO   1.00       1.00  

  LAVADERO   1.00       1.00  

                 

  S.S.H.H. MUJERES              

  INODORO   1.00       1.00  

  LAVADERO   1.00       1.00  

                 

  SEGUNDO PISO              

  S.S.H.H. VARONES              

  INODORO   1.00       1.00  

  LAVADERO   1.00       1.00  

                 

  S.S.H.H. MUJERES              

  INODORO   1.00       1.00  

  LAVADERO   1.00       1.00  

                 

01.04.02.02 REDES DE DISTRIBUCION              

01.04.02.02.01 TUBERIA PVC SAP C - 10 SP DE 1/2" m        

 31.00

                 

  PRIMER PISO              

  S.S.H.H. VARONES              

  MEDIDOR - PRIMER NUDO   1.00 8.00     8.00  

  PRIMER NUDO SS.HH. VARONES   1.00 5.00     5.00  

                 

  S.S.H.H. MUJERES              

  PRIMER NUDO SS.HH. MUJERES   1.00 5.00     5.00  

                 

  SEGUNDO PISO              

  S.S.H.H. VARONES              

  LLEGADA A SS.HH. VARONES   1.00 5.00     5.00  

  S.S.H.H. DAMAS              

  LLEGADA A SS.HH. MUJERES   1.00 5.00     5.00  

                 

  DE PRIMER NIVEL A SEGUNDO NIVEL   1.00 3.00     3.00  

                 

01.04.02.02.02 EXCAVACION DE ZANJAS m

          15.00

  MEDIDOR - PRIMER NUDO   1.00 15.00     15.00  

                 

01.04.02.02.03 RELLENO DE ZANJAS m

          15.00

  MEDIDOR - PRIMER NUDO   1.00 15.00     15.00  

Page 61: Informe_f...Doc Para Env

61

                 

01.04.02.03 ACCESORIOS DE REDES              

01.04.02.03.01 CODO PVC SAP 1/2" *90° pza        

 13.00

  PRIMER PISO              

  S.S.H.H. VARONES   2.00       2.00  

  S.S.H.H. DAMAS   4.00       4.00  

                 

  SEGUNDO PISO              

  S.S.H.H. VARONES   3.00       3.00  

  S.S.H.H. DAMAS   4.00       4.00  

                 

01.04.02.03.02 TEE PVC-SAP 1/2" und        

 5.00

  PRIMER PISO              

  S.S.H.H. VARONES   1.00       1.00  

  S.S.H.H. DAMAS   1.00       1.00  

      1.00       1.00  

  SEGUNDO PISO              

  S.S.H.H. VARONES   1.00       1.00  

  S.S.H.H. DAMAS   1.00       1.00  

                 

                 

01.04.02.04 LLAVES VALVULAS              

01.04.02.04.01

VALVULA COMPUERTA DE BRONCE DE 1/2" pza        

 4.00

  PRIMER PISO              

  S.S.H.H. VARONES   2.00       2.00  

                 

  SEGUNDO PISO              

  S.S.H.H. VARONES   2.00       2.00  

                 

04.02.05 PIEZAS VARIAS              

04.02.05.01CAJAS PARA VALVULAS INC TAPAS 12" X 12" und        

 5.00

  PRIMER PISO              

  S.S.H.H. VARONES   2.00       2.00  

                 

  SEGUNDO PISO              

  S.S.H.H. VARONES   2.00       2.00  

                 

01.04.02.06 PRUEBA HIDRAULICA              

01.04.02.06.01

PRUEBA HIDRAULICA C/ EMPLEO DE EQ. DE BOMBEO PARA RELLENO und        

 1.00

      1.00       1.00  

falta                

04.03.00 SISTEMA DE DESAGUE PLUVIAL              

                 

04.03.01 SALIDA DE DESAGUE PLUVIAL PVC 3" Pto           2.00

      2.00       2.00  

                 

04.03.02RED DE DERIVACION PVC SAL PARA DESAGUE DE 3" M        

 38.50

  DESDE TECHO A PISO   38.50       38.50  

                 

04.03.03SOPORTE METALICA T/ABRAZADERA P/TUB. DE DIAM.DE 3" M        

 4.00

      4.00       4.00  

Page 62: Informe_f...Doc Para Env

62

                 

04.03.04 CANALETA GALVANIZADA DIAMETRO 4" M           35.00

      35.00       35.00  

                 

H O J A D E M E T R A D O S

PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA, DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”

COMPONENTE 01 CONSTRUCCION DE INFRAESTRUCTURA

FORMULA 05 INSTALACIONES ELECTRICAS

UBICACIÓN PROVINCIA DE ANGARAES DISTRITO DE LIRCAY - COMUNIDAD CAMPESINA DE PIRCAPAHUANA FECHA JUNIO DEL 2012

PARTIDA DESCRIPCION U.M. Nº VEC.DIMENSIONES METRADO

LARGO ANCHO ALTO PARCIAL TOTAL

01.05.01 INSTALACIONES ELECTRICAS              

01.05.01SALIDA PARA ELECTRICIDAD Y FUERZA              

01.05.01 SALIDA DE CENTROS DE LUZ pto           35.00

  1ER NIVEL              

  SALA DE USO MULTIPLE   10.00       10.00  

  SS.HH.   2.00       2.00  

  HALL   1.00       1.00  

  VOLADIZO   6.00       6.00  

  2DO NIVEL              

 SALA DE AUTORIDADES COMUNALES   5.00       5.00  

  TENIENTE GOBERNADOR   2.00       2.00  

  PRESIDENTE COMUNAL   1.00       1.00  

  SECRETARIA   1.00       1.00  

  SS.HH.   2.00       2.00  

  GRADERIAS   1.00       1.00  

  PASADIZO   4.00       4.00  

                 

05.01.02 SALIDA PARA BRAQUETS              

b   pto 1.00         1.00

                 

01.05.01.02SALIDA PARA INTERRUPTOR SIMPLE pto           12.00

Page 63: Informe_f...Doc Para Env

63

  1ER NIVEL              

  SALA DE USO MULTIPLE   2.00       2.00  

  SS.HH.   2.00       2.00  

  HALL   1.00       1.00  

  2DO NIVEL              

  ALCALDIA   1.00       1.00  

  SECRETARIA   1.00       1.00  

  SS.HH.   2.00       2.00  

  PASADIZO   2.00       2.00  

  SALA DE REGIDORES   1.00       1.00  

                 

01.05.01.03SALIDA PARA INTERRUPTOR DOBLE pto           6.00

  1ER NIVEL              

  SALA DE USO MULTIPLE   2.00       2.00  

  2DO NIVEL              

  SALA DE REGIDORES   1.00       1.00  

  ADMINISTRACION   2.00       2.00  

  HALL   1.00       1.00  

                 

01.05.01.04SALIDA PARA INTERRUPTOR DE CONMUTACION pto           2.00

  1ER NIVEL              

  CAJA DE ESCALERA   1.00       1.00  

  2DO NIVEL              

  CAJA DE ESCALERA   1.00       1.00  

                 

01.05.02.01SALIDA PARA TOMACORRIENTES              

01.05.03SALIDA PARA TOMACORRIENTE DOBLE pto           28.00

  1ER NIVEL              

  SALA DE USO MULTIPLE   10.00       10.00  

  2DO NIVEL              

  SALA DE REGIDORES   8.00       8.00  

  ADMINISTRACION   4.00       4.00  

  ALCALDIA   3.00       3.00  

  SECRETARIA   2.00       2.00  

Page 64: Informe_f...Doc Para Env

64

  PASADIZO   1.00       1.00  

                 

01.05.03CANALIZACIONES Y/O TUBERIAS              

01.05.03.01 TUBERIAS EMPOTRADAS              

01.05.03.01.TUBERIA PVC SAP D=1" (ELECTRICAS) m           25.00

      1.00 25.00     25.00  

                 

01.05.03.01.02TUBERIA PVC SAP D=3/4" (ELECTRICAS) m           550.00

      1.00 550.00     550.00  

                 

01.05.04 CONDUCTORES Y CABLES              

01.05.04.01CABLE ELECTRICO NYY 4x6 MM2 m           25.80

  1ER NIVEL   1.00 25.80     25.80  

                 

01.05.04.02CABLE ELECTRICO TW AWG N° 12 m           640.00

  1ER NIVEL   1.00 320.00     320.00  

  2DO NIVEL   1.00 320.00     320.00  

                 

01,05.04.03CABLE ELECTRICO TW AWG N° 14 m           460.00

  1ER NIVEL   1.00 220.00     220.00  

  2DO NIVEL   1.00 240.00     240.00  

                 

01.05.05TABLEROS Y CUCHILLAS (LLAVES)              

01.05.06.01

TABLERO ELECTRICO GAB. METALICO P/DISTRIBUCION DE 4 CIRCUITOS und 1.00       1.00 1.00

                 

05.05.02TABLERO DE DISTRIBUCION CAJA METALICA DE 12 POLOS und           2.00

  TD 01   1.00       1.00  

  TD 02   1.00       1.00  

                 

01.05.05,03

INTERRUPTOR THERMOMAGNETICO MONOFASICO DE 2x30 A und           1.00

      1.00       1.00  

                 

01.05.05.04

INTERRUPTOR THERMOMAGNETICO MONOFASICO DE 2x15 A und           2.00

Page 65: Informe_f...Doc Para Env

65

      1.00       1.00  

                 

01.05.05.05

POZO CONEXIÓN A TIERRA EN SISTEMA E/EQ ALUMBRADO, TOM und           1.00

      1.00       1.00  

                 

01.05.06 ARTEFACTOS ELECTRICOS              

01.05.06.02

FLUORESCENTE RECTO 2X40 W INCLUYE EQUIPO Y PANTALLA und           19.00

  1ER NIVEL              

  SALA DE USO MULTIPLE   10.00       10.00  

  2DO NIVEL              

  SALA DE REGIDORES   5.00       5.00  

  ADMINISTRACION   2.00       2.00  

  ALCALDIA   1.00       1.00  

  SECRETARIA   1.00       1.00  

                 

01.05.06.02

FLUORESCENTE CIRCULAR ISPE 1X36w INCLUYE EQUIPO Y PANTALLA und           16.00

  1ER NIVEL              

  SS.HH.   2.00       2.00  

  HALL   1.00       1.00  

  VOLADIZO   6.00       6.00  

  2DO NIVEL              

  SS.HH.   2.00       2.00  

  GRADERIAS   1.00       1.00  

  PASADIZO   4.00       4.00  

                 

01.05.06.03LAMPARA TIPO ANTORCHA BRAGUET und           6.00

  CAJA DE ESCALERA              

      6.00       6.00  

HOJA DE METRADOS

PROYECTO “CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO DE LA COMUNIDAD CAMPESINA DE

PIRCAPAHUANA , DISTRITO DE LIRCAY, PROVINCIA DE ANGARAES - HUANCAVELICA”

COMPONENTE 01 CONSTRUCCION DE INFRAESTRUCTURA

FORMUL 06 SISTEMA DE TRATAMIENTO DE AGUA

Page 66: Informe_f...Doc Para Env

66

A RESIDUALESUBICACIÓN

PROVINCIA DE ANGARAES DISTRITO DE LIRCAY, COMUNIDAD CAMPESINA DE PIRCAPAHUANA

ITEM DESCRIPCIÓN UNID CANT

MEDIDAS   PARCIAL TOTALLARG

O ANCHO ALTO

1.06SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES              

01.06.01 TANQUE SEPTICO              01.06.01.01 OBRAS PRELIMINARES              06.01.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m²           13.33

  PARA TANQUE SEPTICO     4.90 1.95   9.56  

  PARA POZO PERCOLADOR    AREA CAD 3.77   3.77  

                   01.06.01.02 MOVIMIENTO DE TIERRAS              01.06.01.02.01 EXCAVACION DE ESTRUCTURAS             20.54

  PARA TANQUE SEPTICO m³   4.90 1.95 2.15 20.54  

                   01.06.01.02.02

ELIMINACION DE MATERIAL EXCEDENTE + 25% DE ESPONJ.             25.68

  PRODUCTO DE ECAVACION m³ 1.25 20.54     25.68  

                   01.06.01.03 CONCRETO SIMPLE              01.06.01.03.01 SOLADO DE ZAPATAS E=4" MEZCLA 1:12 m2   4.00 1.55   6.20 6.20

                   01.06.01.04 CONCRETO ARMADO              01.05.01.04.01

CONCRETO EN MUROS REFORZADOS F'C= 175 KG/CM2 m³           5.64

  Paredes     2.00 4.65 0.15 1.80 2.51  

        3.00 1.15 0.15 1.80 1.53  

  Losa Superior   1.00 3.90 1.45 0.10 0.57  

  CORONA   2.00 2.45 0.05 0.05 0.01  

  TAPAS DE CONCRETO   2.00 0.90 0.90 0.05 0.08  

  UÑAS DE TAPA   2.00 3.20 0.10 0.05 0.03  

  DADOS DE CONCRETO   2.00 0.30 0.20 0.40 0.05  

  MENOS ABERTURA DE TAPA   -2.00 0.60 0.60 0.10 -0.07  

  Losa Inferior   1.00 4.00 1.55 0.15 0.93  

                   01.06.01.04.03

ENCOFRADO Y DESENCOF MUROS REFORZADOS m2           44.45

  MUROS INTERIORES   1.00 6.70   1.80 12.06  

        1.00 4.40   1.80 7.92  

  MUROS EXTERIORES   1.00 10.70   1.80 19.26  

                   

  Losa Superior   1.00 3.60   1.15 4.14  

        1.00 10.70   0.10 1.07  

                   01.06.01.04.03 ACERO FY=4200 kg/cm2 Kg           190.41

  PISO                

  Horizontal   9.00 4.25   0.58 22.19  

  Vertical     21.00 1.65   0.58 20.10  

                   

  MURO                

Page 67: Informe_f...Doc Para Env

67

  Horizontal   8.00 10.50   0.58 48.72  

  horizontal intermedio   8.00 1.65   0.58 7.66  

  Vertical     45.00 2.55   0.58 66.56  

  LOSA                

  Horizontal   2.00 3.70   0.58 4.29  

  horizontal intermedio   5.00 1.65   0.58 4.79  

  verticales     10.00 1.40   0.58 8.12  

  Tapas                

  Horizontal   8.00 0.75   0.58 3.48  

  Vertical     8.00 0.75   0.58 3.48  

  ganchos     4.00 0.45   0.58 1.04  

                   01.06.01.05 REVOQUES ENLUCIDOS Y MOLDURAS              01.06.01.05.02

TARRAJEO EN INTERIORES C/MORTERO 1:5X1.5 CM m2           24.12

  MUROS INTERIORES   1.00 6.70   1.80 12.06  

        1.00 4.40   1.80 7.92  

  PISO     1.00 3.60 1.15   4.14  

                   01.06.01.05.02

TARRAJEO EN EXTERIORES C/MORTERO 1:5X1.5 CM m2           4.00

  Losa Superior   1.00 3.60   1.00 3.60  

        1.00 1.00   0.40 0.40  01,05.01.06 INSTALACIONES SANITARIAS              01.06.01.06.01 SALIDA DE VENTILACION PVC 2" pto 1.00       1.00 1.00

                   

                   

ITEM DESCRIPCIÓNUNID

.CANT

.

MEDIDAS    

PARCIAL TOTALLARG

O ANCHO ALTO

01.06.02 POZO PERCOLADOR 01              01.06.02.01 OBRAS PRELIMINARES              01.06.02.01.01 TRAZO Y REPLANTEO PRELIMINAR m²           4.84

        1.00 2.20 2.20   4.84  

                   01.06.02.02 MOVIMIENTO DE TIERRAS              01.06.02.02.01 EXCAVACION DE ESTRUCTURAS m³           14.37

  PARA POZO PERCOLADOR    AREA CAD 3.77 3.55 13.38  

  PARA CIMIENTO CORRIDO     5.50 0.45 0.40 0.99  

                   01.06.02.02.02

ELIMINACION DE MATERIAL EXCEDENTE + 25% DE ESPONJ. m³ 1.00 0.78 1.25   0.97 0.97

                   01.06.02.02.03 FILTRO DE GRAVA O CASCAJO m³           0.94

  (Area Circular Diam.= 2.20 m.)   1.00 0.38   0.60 0.23  

  Longitud de circunferencia Diam. 2.20 m   1.00 1.06 0.25 2.70 0.72  

                   01.06.02.03 CONCRETO SIMPLE              01.06.02.03.01

CONCRETO F'C=175 KG/CM2 EN ANILLO DE CONCRETO m³ 1.00

VOL CAD=     0.57 0.57

                   01.06.02.04 CONCRETO ARMADO              

Page 68: Informe_f...Doc Para Env

68

01.06.02.04.02 Concreto en muros reforzados F`c 175 kg/cm2 m³           0.67

  (Area Circular Diam.= 2.20 m.)   1.00 4.44   0.15 0.67  

                   01.06.02.04.02 Encofrado y desencofrado muros reforzados m2 1.00 0.80     0.80 0.80

                   01.06.02.04.03 Acero FY=4200 Kg/cm2 Kg 1.00 20.00 2.00 0.58 23.20 23.20

                   

                   01.06.02.05 MUROS Y TABIQUES DE ALBAÑILERIA              01.06.02.05.01 Muro de ladrillo KK de arcilla de cabeza C:A 1:4 m2            

  Longitud de circunferencia Diam. 2.20 m)   1.00 2.20   3.85 8.47 8.47

                   01.06.02.06 REVOQUES ENLUCIDOS Y MOLDURAS              01.06.02.06.01

TARRAJEO MUROS EN INTERIORES C/MORTERO 1:5 X 1.5 CM m2 1.0 AREA 2.6   2.60 2.60

                   01.06.02.07 INSTALACIONES SANITARIAS              01.06.02.07.01 SALIDA DE DESAGUE PVC 4" pto 1.00       1.00 1.0001.06.02.07.02 CODO PVC SAL 4"X90° pza 1.00       1.00 1.00

                   

2.8 PRESUPUESTO

S10 Página 1

Presupuesto

Presupuesto 0302001 " CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUAN, DISTRITO DE LIRCAY, PROV. DE ANGARAES - HUANCAVELICA PIRCAPAHUANA "

Subpresupuesto 001 " CREACION DE INFRAESTRUCTURA PUBLICA CENTRO CIVICO EN LA COMUNIDAD CAMPESINA DE PIRCAPAHUANA, DISTRITO DE LIRCAY, PROV. DE ANGARAES - HUANCAVELICA"

Cliente MUNICIPALIDAD PROVINCIAL DE ANGARAES - LIRCAY Costo al 26/04/2012

Page 69: Informe_f...Doc Para Env

69

Lugar HUANCAVELICA - ANGARAES - LIRCAY

Item Descripción Und. Metrado Precio S/. Parcial S/.

01 CONSTRUCCION DEL CENTRO CIVICO CON COBERTURA DE TECHO ALIGERADO

301,406.93

01.01 OBRAS PROVISIONALES 8,247.16

01.01.01 ADECUACION DE ALMACEN Y OFICINA DE OBRA glb 1.00 300.00 300.00

01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m u 1.00 761.47 761.47

01.01.03 CERCO PERIMETRICO CON TELA ARPILLERA m 56.00 12.87 720.72

01.01.04 PAGO DE DERECHO DE CONEXION DE ENERGIA ELECTRICA glb 1.00 300.00 300.00

01.01.05 FLETE TERRESTRE glb 1.00 5,564.97 5,564.97

01.01.06 PLACA RECORDATORIA SEGUN DISEÑO u 1.00 600.00 600.00

01.02 ESTRUCTURAS 155,590.44

01.02.01 TRABAJOS PRELIMINARES 899.66

01.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 144.00 1.67 240.48

01.02.01.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 127.50 1.33 169.58

01.02.01.03 TRAZO, NIVELACION Y REPLANTEO DURANTE EJECUCION DE OBRA

m2 255.00 1.92 489.60

01.02.02 MOVIMIENTO DE TIERRAS 1,917.44

01.02.02.01 EXCAVACION MASIVA DE TERRENO m3 25.50 2.71 69.11

01.02.02.02 EXCAVACION ZANJAS PARA ZAPATAS 2M DE PROFUNDIDAD m3 36.74 17.82 654.71

01.02.02.03 EXCAVACION PARA CIMIENTO CORRIDO m3 7.33 17.82 130.62

01.02.02.04 RELLENOS COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO LIVIANO

m3 9.94 86.20 856.83

01.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 1 km

m3 77.80 2.65 206.17

01.02.03 OBRAS DE CONCRETO SIMPLE 13,663.50

01.02.03.01 SOLADO DE ZAPATAS, E=4" MEZCLA 1:12 m2 28.26 22.63 639.52

01.02.03.02 CIMIENTOS CORRIDOS MEZCLA 1:10 + 30% PG m3 7.33 253.97 1,861.60

01.02.03.03 SOBRECIMIENTOS CONCRETO 1:8 + 25% PM m3 2.01 286.32 575.50

01.02.03.04 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS m2 48.65 34.96 1,700.80

01.02.03.05 FALSO PISO DE 4" DE CONCRETO 1:10 m2 92.56 30.76 2,847.15

01.02.03.06 CONCRETO f'c=140 kg/cm2 EN VEREDA m2 50.40 88.14 4,442.26

01.02.03.07 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 50.40 31.68 1,596.67

Page 70: Informe_f...Doc Para Env

70

01.02.04 OBRAS DE CONCRETO ARMADO 138,559.84

01.02.04.01 ZAPATAS 9,175.91

01.02.04.01.01 CONCRETO EN ZAPATAS f'c= 210 kg/cm2 m3 16.96 412.95 7,003.63

01.02.04.01.02 ACERO fy=4200 kg/cm2 kg 284.33 7.64 2,172.28

01.02.04.02 COLUMNAS 20,641.12

01.02.04.02.01 CONCRETO EN COLUMNAS f'c= 210 kg/cm2 m3 15.83 423.73 6,707.65

01.02.04.02.02 ACERO EN COLUMNAS fy=4200 kg/cm2 kg 1,477.39 7.64 11,287.26

01.02.04.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 73.12 36.19 2,646.21

01.02.04.03 VIGAS 23,456.11

01.02.04.03.01 CONCRETO EN VIGAS f'c= 210 kg/cm2 m3 17.85 446.91 7,977.34

01.02.04.03.02 ACERO EN VIGAS fy=4200 kg/cm2 kg 1,476.61 7.64 11,281.30

01.02.04.03.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 126.85 33.09 4,197.47

01.02.04.04 ESCALERAS 11,090.82

01.02.04.04.01 CONCRETO EN ESCALERAS f'c= 210 kg/cm2 m3 4.12 425.60 1,753.47

01.02.04.04.02 ACERO EN ESCALERAS fy=4200 kg/cm2 kg 325.84 7.64 2,489.42

01.02.04.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 118.19 57.94 6,847.93

01.02.04.05 LOSA ALIGERADA 71,465.73

01.02.04.05.01 CONCRETO EN LOSA ALIGERADA f'c= 210 kg/cm2 m3 45.00 458.40 20,628.00

01.02.04.05.02 ACERO fy=4200 kg/cm2 kg 3,110.71 7.64 23,765.82

01.02.04.05.03 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS

m2 216.36 96.12 20,796.52

01.02.04.05.04 LADRILLO HUECO DE ARCILLA h=15 cm PARA TECHO ALIGERADO

u 1,604.96 3.91 6,275.39

01.02.04.06 LOSA MACIZA 2,730.15

01.02.04.06.01 CONCRETO EN LOSAS MACIZAS f'c=210 kg/cm2 m3 1.23 421.41 518.33

01.02.04.06.02 ACERO EN LOSA MACIZA fy=4200 kg/cm2 kg 105.33 7.64 804.72

01.02.04.06.03 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS m2 12.33 114.12 1,407.10

01.02.05 CONTROL DE CALIDAD 550.00

01.02.05.01 DISEÑO DE MEZCLAS u 1.00 300.00 300.00

01.02.05.02 ROTURA DE PROBETAS u 10.00 25.00 250.00

01.03 ARQUITECTURA 109,069.01

01.03.01 MUROS Y TABIQUES DE ALBAÑILERIA 29,888.87

Page 71: Informe_f...Doc Para Env

71

01.03.01.01 MURO DE SOGA LADRILLO DE ARCILLA C:A 1:4 m2 367.33 73.56 27,020.79

01.03.01.02 MAMPARA CON PERFILES DE ALUMINIO INC. VIDRIOS m2 18.56 154.53 2,868.08

01.03.02 REVOQUES ENLUCIDOS Y MOLDURAS 15,422.59

01.03.02.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO - ARENA m2 327.24 21.22 6,944.03

01.03.02.02 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO ARENA m2 133.63 25.91 3,462.35

01.03.02.03 TARRAJEO DEL TIPO RAYADO O PRIMARIO CON MORTERO 1:5 m2 37.99 18.33 696.36

01.03.02.04 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA

m2 56.96 24.47 1,393.81

01.03.02.05 TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO ARENA m2 63.71 24.76 1,577.46

01.03.02.06 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 70.00 13.03 912.10

01.03.02.07 TARRAJEO DE BRUÑAS DE 1 CM m 128.00 3.41 436.48

01.03.03 CIELORRASOS 8,431.67

01.03.03.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA m2 226.05 37.30 8,431.67

01.03.04 PISOS Y PAVIMENTOS 11,161.20

01.03.04.01 CONTRAPISO DE 25 mm m2 9.32 20.17 187.98

01.03.04.02 PISO DE CERAMICO 30X30 cm DE COLOR DE 1RA m2 9.32 149.44 1,392.78

01.03.04.03 PISO DE CONCRETO COLOREADO ACABADO FROTACHADO E=1.5CM

m2 209.18 45.80 9,580.44

01.03.05 CONTRAZOCALOS 893.02

01.03.05.01 CONTRAZOCALO DE LOSETA CORRIENTE CLARA DE 10X20 cm m 33.61 26.57 893.02

01.03.06 ZOCALOS 5,825.77

01.03.06.01 ZOCALO DE CERAMICO 20X30 cm BLANCA DE 1RA m2 40.30 144.56 5,825.77

01.03.07 REVESTIMIENTOS 842.03

01.03.07.01 REVESTIMIENTO DE GRADERIA C/MORTERO MEZCLA 1:4 X 2 cm PULIDO 1:2 X 1 cm

m2 39.85 21.13 842.03

01.03.08 CARPINTERIA DE MADERA 13,436.35

01.03.08.01 PUERTA DE MADERA APANELADA m2 28.54 470.79 13,436.35

01.03.09 CARPINTERIA METALICA 621.28

01.03.09.01 BARANDA DE METALICA DE FºNº PASAMANO Ø 2" m 22.00 28.24 621.28

01.03.10 CERRAJERIA 1,078.58

01.03.10.01 BISAGRA CAPUCHINA DE 4" X 4" pza 33.00 11.06 364.98

01.03.10.02 CERRADURA PESADA DE TRES GOLPES pza 6.00 84.18 505.08

Page 72: Informe_f...Doc Para Env

72

01.03.10.03 CHAPA PARA BAÑO CON SEGURO INTERIOR Y PERILLA O MANIJA

u 4.00 52.13 208.52

01.03.11 VIDRIOS, CRISTALES Y SIMILARES 16,473.64

01.03.11.01 VENTANA CON EL SISTEMA NOVA INCLUYE INSTALACION m2 70.56 233.47 16,473.64

01.03.12 PINTURA 4,994.01

01.03.12.01 PINTURA LATEX EN MUROS INTERIORES m2 330.67 5.34 1,765.78

01.03.12.02 PINTURA AL OLEO MATE EN MUROS EXTERIORES m2 133.63 7.14 954.12

01.03.12.03 PINTURA LATEX EN SUPERFICIE DE COLUMNAS m2 56.96 5.81 330.94

01.03.12.04 PINTURA LATEX EN SUPERFICIE DE VIGAS m2 63.71 5.81 370.16

01.03.12.05 PINTURA LATEX EN CIELORRASO DE CEMENTO m2 226.05 6.17 1,394.73

01.03.12.06 PINTURA AL OLEO MATE EN ZOCALO DE CEMENTO m2 7.61 7.28 55.40

01.03.12.07 PINTADO DE BRUÑAS m 128.00 0.96 122.88

01.04 INSTALACIONES SANITARIAS 7,646.34

01.04.01 SISTEMA DE DESAGUE 5,777.06

01.04.01.01 SALIDAS DE DESAGUE 358.03

01.04.01.01.01 SALIDA DE DESAGUE EN PVC 4" pto 4.00 51.21 204.84

01.04.01.01.02 SALIDA DE DESAGUE EN PVC 2" pto 4.00 30.96 123.84

01.04.01.01.03 SALIDA DE VENTILACION PVC 2" pto 1.00 29.35 29.35

01.04.01.02 REDES DE DISTRIBUCION 2,473.98

01.04.01.02.01 RED DE DERIVACION PVC SAL PARA DESAGUE DE 4" m 47.80 31.24 1,493.27

01.04.01.02.02 RED DE DERIVACION PVC SAL PARA DESAGUE DE 2" m 39.40 17.90 705.26

01.04.01.02.03 EXCAVACION DE ZANJAS m 35.00 5.24 183.40

01.04.01.02.04 RELLENO DE ZANJAS m 35.00 2.63 92.05

01.04.01.03 ACCESORIOS DE REDES 525.91

01.04.01.03.01 CODO PVC SAL 2"X45° pza 4.00 13.04 52.16

01.04.01.03.02 CODO PVC SAL 4"X45° pza 2.00 17.15 34.30

01.04.01.03.03 CODO PVC SAL 2"X90° pza 13.00 11.46 148.98

01.04.01.03.04 CODO PVC SAL 4"X90° pza 1.00 17.15 17.15

01.04.01.03.05 YEE PVC SAL 2" pza 4.00 11.99 47.96

01.04.01.03.06 YEE PVC SAL 4"x 2" pza 4.00 14.40 57.60

01.04.01.03.07 REDUCCION PVC SAL SP DE 4" A 2" u 4.00 14.16 56.64

Page 73: Informe_f...Doc Para Env

73

01.04.01.03.08 TEE PVC-SAL 4"*90° u 6.00 18.52 111.12

01.04.01.04 ADITAMIENTO VARIOS 277.12

01.04.01.04.01 SUMIDEROS DE BRONCE DE 2" PROVISION Y COLOCACION u 4.00 28.73 114.92

01.04.01.04.02 REGISTROS DE BRONCE DE 4" pza 2.00 31.20 62.40

01.04.01.04.03 REGISTROS DE BRONCE DE 2" pza 4.00 23.70 94.80

01.04.01.04.04 SOMBRERO PARA VENTILACION DE PVC DE 2" u 1.00 5.00 5.00

01.04.01.05 CAMARAS DE INSPECCION 658.02

01.04.01.05.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 1.00 658.02 658.02

01.04.01.06 APARATOS Y ACCESORIOS SANITARIOS 1,484.00

01.04.01.06.01 INODORO TANQUE BAJO BLANCO pza 4.00 173.50 694.00

01.04.01.06.02 LAVATORIO DE PARED BLANCO 1 LLAVE pza 4.00 60.00 240.00

01.04.01.06.03 URINARIOS DE LOZA DE PICO COLOR BLANCO pza 2.00 275.00 550.00

01.04.02 SISTEMA DE AGUA FRIA 1,869.28

01.04.02.01 SALIDA DE AGUA FRIA 305.84

01.04.02.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 8.00 38.23 305.84

01.04.02.02 REDES DE DISTRIBUCION 365.12

01.04.02.02.01 TUBERIA DE PVC SAP C-10 SP DE 1/2" m 31.00 7.97 247.07

01.04.02.02.02 EXCAVACION DE ZANJAS m 15.00 5.24 78.60

01.04.02.02.03 RELLENO DE ZANJAS m 15.00 2.63 39.45

01.04.02.03 ACCESORIOS DE REDES 183.03

01.04.02.03.01 CODO PVC SAP 1/2"x90° pza 13.00 10.36 134.68

01.04.02.03.02 TEE PVC-SAP 1/2" u 5.00 9.67 48.35

01.04.02.04 LLAVES Y VALVULAS 287.96

01.04.02.04.01 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" pza 4.00 71.99 287.96

01.04.02.05 PIEZAS VARIAS 200.20

01.04.02.05.01 CAJAS PARA VALVULAS INCLUIDOS TAPAS 12"X12" u 2.00 100.10 200.20

01.04.02.06 PRUEBA HIDRAULICA 527.13

01.04.02.06.01 PRUEBA HIDRAULICA glb 1.00 527.13 527.13

01.05 INSTALACIONES ELECTRICAS 12,117.10

Page 74: Informe_f...Doc Para Env

74

01.05.01 SALIDA PARA ELECTRICIDAD Y FUERZA 1,079.49

01.05.01.01 SALIDA DE CENTRO DE LUZ pto 35.00 20.04 701.40

01.05.01.02 SALIDA PARA INTERRUPTOR SIMPLE pto 12.00 17.37 208.44

01.05.01.03 SALIDA PARA INTERRUPTOR DOBLE pto 6.00 18.85 113.10

01.05.01.04 SALIDA PARA INTERRUPTOR CONMUTACION pto 3.00 18.85 56.55

01.05.02 SALIDA PARA TOMACORRIENTE 791.56

01.05.02.01 SALIDA PARA TOMACORRIENTE DOBLE pto 28.00 28.27 791.56

01.05.03 CANALIZACIONES Y/O TUBERIAS 2,437.75

01.05.03.01 TUBERIAS EMPOTRADAS 2,437.75

01.05.03.01.01 TUBERIA DE PVC SAP D= 1" (ELECTRICAS) m 25.00 7.97 199.25

01.05.03.01.02 TUBERIA DE PVC SAP D=3/4" (ELECTRICAS) m 550.00 4.07 2,238.50

01.05.04 CONDUCTORES Y CABLES 4,352.28

01.05.04.01 CABLE ELECTRICO NYY 4 X6 mm2 m 25.80 12.60 325.08

01.05.04.02 CABLE ELECTRICO THW # 12 m 640.00 3.59 2,297.60

01.05.04.03 CABLE ELECTRICO THW # 14 m 460.00 3.76 1,729.60

01.05.05 TABLEROS CUCHILLAS (LLAVES) 847.34

01.05.05.01 TABLERO ELECTRICO GABINETE METALICO PARA DISTRIBUCION DE 3 CIRCUITOS

u 1.00 38.36 38.36

01.05.05.02 TABLERO DE DISTRIBUCION CAJA METALICA DE 12 POLOS u 2.00 143.99 287.98

01.05.05.03 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A pza 1.00 18.00 18.00

01.05.05.04 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 20A pza 2.00 16.00 32.00

01.05.05.05 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 60A pza 1.00 21.00 21.00

01.05.05.06 POZO CONEXION A TIERRA EN SISTEMA CON EQUIPO BOMBEO ALUMBRAD0 TOMACORRIENTE

u 1.00 450.00 450.00

01.05.06 ARTEFACTOS ELECTRICOS 2,608.68

01.05.06.01 FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYE EQUIPO Y PANTALLA

u 19.00 84.60 1,607.40

01.05.06.02 FLUORESCENTE CIRCULAR 1x36w INCLUYE EQUIPO Y PANTALLA

u 16.00 59.88 958.08

01.05.06.03 LAMPARA TIPO ANTORCHA BRAQUET u 2.00 21.60 43.20

01.06 SISTEMA DE TRATAMIENTO DE AGUA RESIDUALES 8,736.88

01.06.01 TANQUE SEPTICO 6,623.44

01.06.01.01 OBRAS PRELIMINARES 11.60

Page 75: Informe_f...Doc Para Env

75

01.06.01.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 13.33 0.87 11.60

01.06.01.02 MOVIMIENTO DE TIERRAS 597.40

01.06.01.02.01 EXCAVACION DE ESTRUCTURAS m3 20.54 17.82 366.02

01.06.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE + 25% DE ESPONJAMIENTO

m3 25.68 9.01 231.38

01.06.01.03 CONCRETO SIMPLE 140.31

01.06.01.03.01 SOLADO DE ZAPATAS, E=4" MEZCLA 1:12 m2 6.20 22.63 140.31

01.06.01.04 CONCRETO ARMADO 5,229.31

01.06.01.04.01 CONCRETO EN MUROS REFORZADOS f'c= 175 kg/cm2 m3 5.64 384.03 2,165.93

01.06.01.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 44.45 36.19 1,608.65

01.06.01.04.03 ACERO fy=4200 kg/cm2 kg 190.41 7.64 1,454.73

01.06.01.05 REVOQUES ENLUCIDOS Y MOLDURAS 615.47

01.06.01.05.01 TARRAJEO EN INTERIORES C/MORTERO 1:5X1.5CM m2 24.12 21.22 511.83

01.06.01.05.02 TARRAJEO EN EXTERIORES C/MORTERO 1:5 1.5CM m2 4.00 25.91 103.64

01.06.01.06 INSTALACIONES SANITARIAS 29.35

01.06.01.06.01 SALIDA DE VENTILACION PVC 2" pto 1.00 29.35 29.35

01.06.02 POZO PERCOLADOR 2,113.44

01.06.02.01 OBRAS PRELIMINARES 4.21

01.06.02.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 4.84 0.87 4.21

01.06.02.02 MOVIMIENTO DE TIERRAS 354.97

01.06.02.02.01 EXCAVACION DE ESTRUCTURAS m3 14.37 17.82 256.07

01.06.02.02.02 ELIMINACION DE MATERIAL EXCEDENTE + 25% DE ESPONJAMIENTO

m3 0.97 9.01 8.74

01.06.02.02.03 FILTRO DE GRAVA O CASCAJO m3 0.94 95.92 90.16

01.06.02.03 CONCRETO SIMPLE 202.67

01.06.02.03.01 CONCRETO f'c=175 kg/cm2 m3 0.57 355.56 202.67

01.06.02.04 CONCRETO ARMADO 463.50

01.06.02.04.01 CONCRETO EN MUROS REFORZADOS f'c= 175 kg/cm2 m3 0.67 384.03 257.30

01.06.02.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 0.80 36.19 28.95

01.06.02.04.03 ACERO fy=4200 kg/cm2 kg 23.20 7.64 177.25

01.06.02.05 MUROS Y TABIQUES DE ALBAÑILERIA 964.56

01.06.02.05.01 MURO DE LADRILLO DE ARCILLA DE CABEZA C:A 1:4 m2 8.47 113.88 964.56

Page 76: Informe_f...Doc Para Env

76

01.06.02.06 REVOQUES ENLUCIDOS Y MOLDURAS 55.17

01.06.02.06.01 TARRAJEO EN INTERIORES C/MORTERO 1:5X1.5CM m2 2.60 21.22 55.17

01.06.02.07 INSTALACIONES SANITARIAS 68.36

01.06.02.07.01 SALIDA DE DESAGUE EN PVC 4" pto 1.00 51.21 51.21

01.06.02.07.02 CODO PVC SAL 4"X90° pza 1.00 17.15 17.15

02 CAPACITACION Y ASISTENCIA TECNICA 7,000.00

02.01 CAPACITACION A AUTORIDADES Y COMUNEROS glb 1.00 7,000.00 7,000.00

03 MITIGACION AMBIENTAL 5,000.00

03.01 MITIGACION AMBIENTAL glb 1.00 5,000.00 5,000.00

Costo Directo 313,406.93

GASTOS GENERALES (9.84345)% 30,850.05

--------------------------

TOTAL PRESUPUESTO 344,256.98

SON : TRESCIENTOS CUARENTICUATRO MIL DOSCIENTOS CINCUENTISEIS Y 98/100 NUEVOS SOLES

3. DISCUSION DE LOS RESULTADOS DEL INFORME DE

PRÁCTICAS Y/O APORTE DEL PRACTICANTE

Durante el desarrollo de las prácticas pre profesionales, se me designo

responsable de la ejecución de la construcción de la“CREACION DE

INFRAESTRUCTURA PUBLICA – CENTRO CIVICO DE LA

COMUNIDAD DE PIRCAPAHUANA, DISTRITO DE LIRCAY,

PROVINCIA DE ANGARAES – HUANCAVELICA”, donde se me encargo

las siguientes actividades:

Control de calidad de los materiales

Supervisión de Obra

Control de seguridad

Page 77: Informe_f...Doc Para Env

77

3.1 DESCRIPCION DE LAS ACTIVIDADES DEL PROYECTO

Se realizaron los aportes necesarios para la ejecución de obra

basados en el expediente técnico y planos generados del expediente

Se hizo los metrados de acuerdo al avance de obra con ayuda de las

herramientas manuales realizadas in situ.

Se elaboró las valorizaciones mensuales

La experiencia fue real, efectiva y activa en los trabajos tanto en

campo como en gabinete, siendo capaz de poder enfrentar con

seriedad casos similares en mi futura vida profesional.

3.2 CRONOGRAMA VALORIZADO DE OBRA

3.3 PRECIOS Y CANTIDADES DE RECURSOS REQUERIDOS

PRESUPUESTO

Código

Descripción Und. Cantidad Precio S/.

Parcial

MANO DE OBRA

0147010002

OPERARIO hh4,587.2099 8.91 40,872.04

0147010003

OFICIAL hh1,246.2333 7.03 8,761.02

0147010004

PEON hh4,874.2523 5.47 26,662.16

Page 78: Informe_f...Doc Para Env

78

MATERIALES0202000007

ALAMBRE NEGRO RECOCIDO # 16 kg483.9383 6.00 2,903.63

0202000008

ALAMBRE NEGRO RECOCIDO # 8 kg140.5181 6.00 843.11

0202010003

CLAVOS PARA MADERA CON CABEZA DE 2" kg1.8560 6.00 11.14

0202010005

CLAVOS PARA MADERA CON CABEZA DE 3" kg152.3883 6.00 914.33

0202010022

CLAVOS C/CABEZA P/CONSTRUCCION D/PROMEDIO kg5.6000 6.00 33.60

0202100010

PERNO HEXAGONAL DE 3/4" X 3 1/2" pza9.0000 7.00 63.00

0202620002

PLACA RECORDATORIA SEGUN DISEÑO u1.0000 600.00 600.00

0203020003

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg7,833.0784 6.00 46,998.47

0204000000

ARENA FINA m322.9107 90.00 2,061.96

0205000003

PIEDRA CHANCADA DE 1/2" m31.0455 90.00 94.10

0205000009

PIEDRA GRANDE DE 8" m34.5093 75.00 338.20

0205010000

AFIRMADO m311.9280 30.00 357.84

0205010004

ARENA GRUESA m318.8109 85.00 1,598.93

0205510001

GRAVA GRUESA PARA DRENAJE m31.0340 75.00 77.55

0207030000

CABLE THW # 14 AWG m640.0000 1.40 896.00

0207030001

CABLE THW # 12 AWG m659.2000 1.60 1,054.72

0210020011

INODORO TANQUE BAJO NORMAL BLANCO INCLUYE ACCESORIOS

u4.0000 173.50 694.00

0210040088

LAVATORIO 23"X17" PARA GRIFERIA 4" BLANCO CON ACCESORIOS

u4.0000 60.00 240.00

0210050008

URINARIO PICO BLANCO u2.0000 275.00 550.00

0210230001

REGISTRO DE BRONCE DE 2" u4.0000 4.50 18.00

0210230003

REGISTRO DE BRONCE DE 4" u2.0000 12.00 24.00

0211000024

LAMPARA TIPO ANTORCHA BRAQUET u2.0000 12.00 24.00

0211800002

POZO CONEXION A TIERRA INCLUYE MATERIAL E INSTALACION

glb1.0000 450.00 450.00

0212000024

TABLERO ELECTRICO METAL - 3 CIRCUITOS u1.0000 38.00 38.00

0212010022

TOMACORRIENTE DOBLE pza28.0000 3.50 98.00

0212020088

INTERRUPTOR TERMOMAGNETICO DE 2 X 30A u1.0000 12.00 12.00

0212020100

INTERRUPTOR TERMOMAGNETICO DE 2 X 20A u2.0000 10.00 20.00

0212030038

INTERRUPTOR SIMPLE pza12.0000 3.50 42.00

0212030039

INTERRUPTOR DOBLE pza6.0000 4.80 28.80

0212030045

INTERRUPTOR CONMUTACION pza3.0000 4.80 14.40

0212090034

CAJA RECTANGULAR DE 58 mm X 93 mm u49.0000 2.00 98.00

0212090046

CAJA OCTOGONAL GALVANIZADA LIVIANA 100 mm X 40 mm u35.0000 2.20 77.00

0212140043

FLUORESCENTE RECTO ISPE 2X40 W C/EQ + PANTALLA u19.0000 75.00 1,425.00

0212140044

FLUORESCENTE RECTO ISPE 1X40 W C/EQ + PANTALLA u16.0000 48.00 768.00

0212400081

INTERRUPTOR TERMOMAGNETICO 2 X 60 A pza1.0000 15.00 15.00

0212700025

TABLERO DE DISTRIBUCION T-5 u2.0000 65.00 130.00

02170 LADRILLO DE ARCILLA PARA TECHO h=15 cm u 1,685.2080 3.50 5,898.23

Page 79: Informe_f...Doc Para Env

79

100040217070003

LADRILLO CORRIENTE 6 X 12 X 24 cm u17,156.630

00.95 16,298.80

0219010031

CABLE ELECTRICO NYY 4 X 4 mm2 m27.0900 12.00 325.08

0221000001

CEMENTO PORTLAND TIPO I (42.5 kg) bls1,532.3008 25.00 38,307.52

0226070010

CERRADURA DE TRES GOLPES u6.0000 75.00 450.00

0226160017

BISAGRA CAPUCHINA 4" u33.0000 8.00 264.00

0226310057

CHAPA PARA BAÑO CON SEGURO INTERIOR Y PERILLA u4.0000 45.00 180.00

0229040001

CINTA AISLANTE rll16.4500 3.50 57.58

0229050001

CINTA TEFLON rll6.4000 1.00 6.40

0229060001

YESO kg200.3350 0.50 100.17

0229120051

YUTE kg56.0000 3.00 168.00

0229150009

OCRE kg107.1400 12.00 1,285.68

0229180002

FRAGUA GRIS CLARO kg26.2986 8.00 210.39

0229200010

THINNER CORRIENTE gal7.0620 18.00 127.12

0229720002

ACCESORIOS DIVERSOS ( INCLUYE ALUMINIO ) u18.5600 50.00 928.00

0230460010

PEGAMENTO DE MAYOLICA gal396.9600 10.50 4,168.08

0230460011

PEGAMENTO PARA PVC AGUA FORDUIT gal1.9546 60.00 117.28

0230460019

PEGAMENTO PLASTICO PARA PVC CCP gal0.1860 60.00 11.16

0230460035

PEGAMENTO PARA PVC 1/4 gl u1.1616 20.00 23.23

0230480032

CINTA TEFLON pza0.4000 1.00 0.40

0230990104

DISEÑO DE MEZCLAS u1.0000 300.00 300.00

0230990105

ROTURA DE PROBETAS u10.0000 25.00 250.00

0231700002

CURVAS PVC SEL 3/4" pza105.0000 0.80 84.00

0232000053

FLETE TERRESTRE glb1.0000 5,564.9

75,564.97

0232040002

PAGO DE DERECHO DE CONEXION DE ENRGIA ELECTRICA glb1.0000 300.00 300.00

0238000000

HORMIGON (PUESTO EN OBRA) m313.4366 75.00 1,007.75

0238000002

HORMIGON DE RIO m3133.4538 85.00 11,343.57

0239020027

LIJA DE FIERRO # 80 pza193.3600 2.50 483.40

0239050000

AGUA m330.0000 0.01 0.30

0239900100

VENTANA EN SISTEMA NOVA S/DISEÑO CON VIDRIO 6 MM, PERFIL DE ALUMINIO

m274.0880 200.00 14,817.60

0239990052

PUERTA DE MADERA APANELADA EN MADERA TORNILLO INC. BISAGRAS, CHAPA FORTE 2 GOLPES, JALADOR, ENTRE OTROS

m228.5400 350.00 9,989.00

0240020008

CONTRAZOCALO DE LOSETA CORRIENTE CLARO 10 X 20 cm

m35.2905 20.00 705.81

0240130051

CERAMICO ANTIDESLIZANTE 30X30 CM, COLOR BLANCO m29.7860 35.00 342.51

0240130052

CERAMICO 20X30 CM, COLOR BLANCO m242.3150 35.00 1,481.03

0243040000

MADERA TORNILLO p2606.1000 4.50 2,727.45

0243920002

MADERA NACIONAL P/ENCOFRADO p23,142.4605 3.80 11,941.35

0243920004

ROLLIZO DE EUCALIPTO DE 3"x2.80 m. pza698.4000 18.00 12,571.20

Page 80: Informe_f...Doc Para Env

80

0244030024

TRIPLAY DE 8 mm m28.6400 8.00 69.12

0245010001

MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO p2864.0106 4.80 4,147.25

0250010000

TAPA PARA CAJA DE DESAGUE DE FIERRO FUNDIDO DE 12" X 24"

u1.0000 240.00 240.00

0250010005

TAPA CON MARCO FIERRO FUNDIDO DE DESAGUE 12" X 24" pza1.0000 240.00 240.00

0254010001

PINTURA ESMALTE SINTETICO gal1.7120 38.00 65.06

0254030000

PINTURA LATEX gal37.2603 25.00 931.51

0254120002

PINTURA AL OLEO MATE gal8.5125 28.00 238.35

0254130001

PINTURA IMPRIMANTE PARA MUROS gal25.6892 22.00 565.16

0254190003

PINTURA ESMALTE gal0.7650 38.00 29.07

0265020110

BARANDA METALICA DE FIERRO NEGRO Ø 2" m24.2000 15.00 363.00

0265050011

UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1/2" u8.0000 6.00 48.00

0265130064

NIPLE DE FIERRO GALVANIZADO DE 1/2" X 1 1/2" u8.0000 10.00 80.00

0268030012

ADECUACION DE ALMACEN Y OFICINA DE OBRA glb1.0000 300.00 300.00

0268040000

SUMIDERO DE BRONCE DE 2" u4.0000 4.50 18.00

0272000104

TUBERIA PVC SAP A-10 DE 1/2" m76.1600 1.80 137.09

0272130009

TUBERIA PVC SAL PARA DESAGUE DE 2" m42.4420 12.00 509.30

0272130011

TUBERIA PVC SAL PARA DESAGUE DE 4" m51.7340 22.00 1,138.15

0272210001

SOMBRERO DE VENTILACION PVC SAL DE 2" u1.0000 5.00 5.00

0272320002

YEE PVC SAL 2" u4.2000 2.50 10.50

0273110002

CODO PVC SAL 2" X 90° pza19.6500 2.00 39.30

0273110004

CODO PVC SAL 4" X 90° pza7.1022 4.50 31.96

0273110052

CODO PVC SAL 2" X 45° pza4.2000 3.50 14.70

0273110054

CODO PVC SAL 4" X 45° pza2.1000 4.50 9.45

0273110057

CODO PVC SAP 1/2" pza29.0000 1.00 29.00

0273130021

TEE PVC SAP 1/2" pza5.0000 1.50 7.50

0273130022

TEE PVC SAL 4" X90° u6.0000 8.00 48.00

0273160005

YEE PVC SAL DE 4" X 2" pza4.2000 4.80 20.16

0273180003

REDUCCION PVC SAL 4" X 2" pza4.0000 4.80 19.20

0273230001

SOMBRERO DE VENTILACION PVC SAL 2" pza2.0000 6.50 13.00

0274010032

TUBO PVC SAP 3/4" ELECTRICA m566.5000 2.00 1,133.00

0274020027

CURVA PVC SEL 3/4" pza49.0000 0.80 39.20

0277000002

VALVULA COMPUERTA DE BRONCE DE 1/2" u4.0000 18.00 72.00

0279000053

VIDRIO DOBLE p2213.4400 2.90 618.98

0298010184

MITIGACION AMBIENTAL glb1.0000 5,000.0

05,000.00

0298010185

CAPACITACION A AUTORIDADES Y COMUNEROS glb1.0000 7,000.0

07,000.00

0337020043

BALDE PRUEBA TAPON ABRAZADERA Y ACCESORIOS hm8.0000 25.00 200.00

MAQUINARIA

03480 MEZCLADORA DE CONCRETO DE 9 -11p3 hm 105.9065 20.00 2,118.13

Page 81: Informe_f...Doc Para Env

81

100110348040027

CAMION VOLQUETE 6 X 4 330 HP 10 m3 hm2.4896 30.00 74.69

0348090002

ANDAMIO METAL TABLAS ALQUILER est10.2400 5.00 51.20

0349030001

COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP hm19.8800 10.00 198.80

0349040008

CARGADOR SOBRE LLANTAS 100-115 HP 2-2.25 yd3 hm0.7469 140.00 104.57

0349070001

VIBRADOR DE CONCRETO 4 HP 1.35" hm47.1950 10.00 471.95

0349070004

VIBRADOR DE CONCRETO 4 HP 2.40" hm0.6560 10.00 6.56

0349100007

MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3 hm31.6456 20.00 632.91

0349190003

NIVEL TOPOGRAFICO CON TRIPODE he0.2295 6.00 1.38

0349880003

TEODOLITO hm0.3180 10.00 3.18

TOTALS/.

309,838.44

3.4 CRONOGRAMA DE ADQUISICION DE MATERIALES

N° DESCRIPCION DE MATERIALES UND.

MES 1 MES2 MES 3 Total

              ALAMBRE NEGRO RECOCIDO # 16 kg 2,903.6300 2,903.63 ALAMBRE NEGRO RECOCIDO # 8 kg 843.1100 843.11

Page 82: Informe_f...Doc Para Env

82

CLAVOS PARA MADERA CON CABEZA DE 2" kg 11.1400 11.14 CLAVOS PARA MADERA CON CABEZA DE 3" kg 914.3400 914.34 CLAVOS C/CABEZA P/CONSTRUCCION D/PROMEDIO kg 33.6000 33.60 PERNO HEXAGONAL DE 3/4" X 3 1/2" pza 63.0000 63.00 PLACA RECORDATORIA SEGUN DISEÑO u 600.00 600.00 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 46,998.4700 46,998.47 ARENA FINA m3 2,061.95 2,061.95 PIEDRA CHANCADA DE 1/2" m3 94.1000 94.10 PIEDRA GRANDE DE 8" m3 338.2000 338.20 AFIRMADO m3 357.84 357.84 ARENA GRUESA m3 1,598.9300 1,598.93 GRAVA GRUESA PARA DRENAJE m3 77.55 77.55 CABLE THW # 14 AWG m 896.00 896.00 CABLE THW # 12 AWG m 1,054.72 1,054.72 INODORO TANQUE BAJO NORMAL BLANCO INCLUYE

ACCES u 694.00 694.00

LAVATORIO 23"X17" PARA GRIFERIA 4" BLANCO CON ACCES u 240.00 240.00

URINARIO PICO BLANCO u 550.00 550.00 REGISTRO DE BRONCE DE 2" u 18.00 18.00 REGISTRO DE BRONCE DE 4" u 24.00 24.00 LAMPARA TIPO ANTORCHA BRAQUET u 24.00 24.00

  POZO CONEXION A TIERRA INCLUYE MATERIAL E INSTALACI glb     450.00 450.00

TABLERO ELECTRICO METAL - 3 CIRCUITOS u 38.00 38.00 TOMACORRIENTE DOBLE pza 98.00 98.00 INTERRUPTOR TERMOMAGNETICO DE 2 X 30A u 12.00 12.00 INTERRUPTOR TERMOMAGNETICO DE 2 X 20A u 20.00 20.00

  INTERRUPTOR SIMPLE pza     42.00 42.00 INTERRUPTOR DOBLE pza 28.80 28.80

  INTERRUPTOR CONMUTACION pza     14.40 14.40 CAJA RECTANGULAR DE 58 mm X 93 mm u 98.00 98.00 CAJA OCTOGONAL GALVANIZADA LIVIANA 100 mm X 40 mm u 77.00 77.00 FLUORESCENTE RECTO ISPE 2X40 W C/EQ + PANTALLA u 1,425.00 1,425.00 FLUORESCENTE RECTO ISPE 1X40 W C/EQ + PANTALLA u 768.00 768.00 INTERRUPTOR TERMOMAGNETICO 2 X 60 A pza 15.00 15.00 TABLERO DE DISTRIBUCION T-5 u 130.00 130.00 LADRILLO DE ARCILLA PARA TECHO h=15 cm u 5,898.23 5,898.23 LADRILLO CORRIENTE 6 X 12 X 24 cm u 16,298.8000 16,298.80 CABLE ELECTRICO NYY 4 X 4 mm2 m 325.08 325.08 CEMENTO PORTLAND TIPO I (42.5 kg) bls 38,307.5200 38,307.52 CERRADURA DE TRES GOLPES u 450.00 450.00 BISAGRA CAPUCHINA 4" u 264.00 264.00 CHAPA PARA BAÑO CON SEGURO INTERIOR Y PERILLA u 180.00 180.00 CINTA AISLANTE rll 57.58 57.58 CINTA TEFLON rll 6.40 6.40 YESO kg 100.1700 100.17 YUTE kg 168.0000 168.00 OCRE kg 1,285.68 1,285.68 FRAGUA GRIS CLARO kg 210.39 210.39 THINNER CORRIENTE gal 127.12 127.12 ACCESORIOS DIVERSOS ( INCLUYE ALUMINIO ) u 928.00 928.00 PEGAMENTO DE MAYOLICA gal 4,168.08 4,168.08 PEGAMENTO PARA PVC AGUA FORDUIT gal 117.28 117.28 PEGAMENTO PLASTICO PARA PVC CCP gal 11.16 11.16 PEGAMENTO PARA PVC 1/4 gl u 23.23 23.23 CINTA TEFLON pza 0.40 0.40 DISEÑO DE MEZCLAS u 300.0000 300.00 ROTURA DE PROBETAS u 250.00 250.00 CURVAS PVC SEL 3/4" pza 84.00 84.00 FLETE TERRESTRE glb 5,564.9700 5,564.97 PAGO DE DERECHO DE CONEXION DE ENRGIA ELECTRICA glb 300.0000 300.00

Page 83: Informe_f...Doc Para Env

83

DESCRIPCION DE MATERIALES UND.

MES 1

  MES 3 Total

HORMIGON (PUESTO EN OBRA) m3 1,007.7500 1,007.75 HORMIGON DE RIO m3 11,343.5600 11,343.56 LIJA DE FIERRO # 80 pza 483.40 483.40 AGUA m3 0.31 0.31 VENTANA EN SISTEMA NOVA S/DISEÑO CON VIDRIO 6 MM, PERFIL m2

14,817.80

14,817.80

PUERTA DE MADERA APANELADA EN MADERA TORNILLO INC. BISAG m2 9,989.00 9,989.00

CONTRAZOCALO DE LOSETA CORRIENTE CLARO 10 X 20 cm m

705.81 705.81

CERAMICO ANTIDESLIZANTE 30X30 CM, COLOR BLANCO m2 342.51 342.51 CERAMICO 20X30 CM, COLOR BLANCO m2 1,481.03 1,481.03 MADERA TORNILLO p2 2,727.4500 2,727.45 MADERA NACIONAL P/ENCOFRADO p2 11,941.3500 11,941.35 ROLLIZO DE EUCALIPTO DE 3"x2.80 m. pza

12,571.20

12,571.20

TRIPLAY DE 8 mm m2 69.12 69.12 MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO p2 4,147.25 4,147.25 TAPA PARA CAJA DE DESAGUE DE FIERRO FUNDIDO DE 12" X 24" u 240.00 240.00 TAPA CON MARCO FIERRO FUNDIDO DE DESAGUE 12" X

24" pza 240.00 240.00

PINTURA ESMALTE SINTETICO gal 65.06 65.06

  PINTURA LATEX gal     931.51 931.51 PINTURA AL OLEO MATE gal 238.35 238.35 PINTURA IMPRIMANTE PARA MUROS gal 565.16 565.16 PINTURA ESMALTE gal 29.07 29.07 BARANDA METALICA DE FIERRO NEGRO Ø 2" m 363.00 363.00 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1/2" u 48.00 48.00 NIPLE DE FIERRO GALVANIZADO DE 1/2" X 1 1/2" u 80.00 80.00 ADECUACION DE ALMACEN Y OFICINA DE OBRA glb 100.0000 100.00 100.00 300.00 SUMIDERO DE BRONCE DE 2" u 18.00 18.00 TUBERIA PVC SAP A-10 DE 1/2" m 137.09 137.09 TUBERIA PVC SAL PARA DESAGUE DE 2" m 509.30 509.30 TUBERIA PVC SAL PARA DESAGUE DE 4" m 1,138.15 1,138.15 SOMBRERO DE VENTILACION PVC SAL DE 2" u 5.00 5.00 YEE PVC SAL 2" u 10.50 10.50 CODO PVC SAL 2" X 90° pza 39.30 39.30 CODO PVC SAL 4" X 90° pza 31.95 31.95 CODO PVC SAL 2" X 45° pza 14.70 14.70 CODO PVC SAL 4" X 45° pza 9.45 9.45 CODO PVC SAP 1/2" pza 29.00 29.00 TEE PVC SAP 1/2" pza 7.50 7.50 TEE PVC SAL 4" X90° u 48.00 48.00 YEE PVC SAL DE 4" X 2" pza 20.16 20.16 REDUCCION PVC SAL 4" X 2" pza 19.20 19.20 SOMBRERO DE VENTILACION PVC SAL 2" pza 13.00 13.00 TUBO PVC SAP 3/4" ELECTRICA m 1,133.00 1,133.00 CURVA PVC SEL 3/4" pza 39.20 39.20 VALVULA COMPUERTA DE BRONCE DE 1/2" u 72.00 72.00 VIDRIO DOBLE P2 618.98 618.98

                     11,628.1

1217,680.0

4

Page 84: Informe_f...Doc Para Env

84

4. CONCLUSIONES

Se debe informar que no siempre podemos encontrar los metrados del

expediente técnico en la obra, definitivamente existen diferencias que

tenemos que asumirlas con el menor gasto posible así como problemas

que nos conllevaran a un retraso pero para esas malas eventualidades

estamos nosotros quienes somos los encargados de resolverlos sin

tardar mucho tiempo.

Page 85: Informe_f...Doc Para Env

85

Se logró aplicar los conocimientos en estructuras, concreto armado,

cimentaciones y diseño sismo resistente adquiridos en la Universidad

Peruana los Andes

Se verifico el cumplimiento de los requisitos de control de calidad

durante el proceso constructivo, respetando los planos, especificaciones

técnicas del expediente técnico basados en las normativas y

reglamentos de construcción vigentes

En las practicas pre profesionales en la obra: “CREACION DE

INFRAESTRUCTURA PUBLICA – CENTRO CIVICO DE LA

COMUNIDAD DE PIRCAPAHUANA, DISTRITO DE LIRCAY,

PROVINCIA DE ANGARAES – HUANCAVELICA”, adquirí una

experiencia real y efectiva enfrentado en campo y en gabinete,

permitiéndome conocer, manejar y controlar con ética profesional al

personal de campo, aportar y sugerir al personal profesional existente.

5. RECOMENDACIONES

Es indispensable que se conozcan cada uno de los materiales a usarse

como, el cemento, fierros, etc. Ya que si estas se encuentran en mal

estado las partidas que se ejecuten con éstos materiales serán

defectuosas.

Se recomienda ejecutar la obra según los planos especificados en el

expediente técnico y hacer uso de los equipos y herramientas

necesarios durante el proceso constructivo

Page 86: Informe_f...Doc Para Env

86

Es necesario hacer uso de los instrumentos de seguridad durante las

horas de trabajo.

Es de vital necesidad cumplir todas las especificaciones técnicas del

Expediente Técnico pues de no seguir éstas nos podemos encontrar con

muchos inconvenientes que pueden ocasionar el aumento de

presupuesto y del plazo de ejecución de la obra.

La “UNIVERSIDAD PERUANA LOS ANDES”, facultad de Ingeniería,

carrera profesional de Ingeniería Civil, a través de la coordinación de

Practicas Pre profesionales y del docente Asesor, espero revise y

apruebe favorablemente el presente informe

6. BIBLIOGRAFIA

REGLAMENTO NACIONAL DE EDIFICACIONES

DISEÑO DE ESTRUCTURAS DE CONCRETO ARMADO – Ing. Jorge

Alva Jurado

REGLAMENTO NACIONAL DE CONSTRUCCIONES – CAPECO

CIMENTACIONES – ZavenDavidian

REGLAMENTO DE METRADOS PARA OBRAS DE EDIFICACION

SUPERVISION DE OBRAS DE CONCRETO – American Concrete

Institute

Page 87: Informe_f...Doc Para Env

87

TECNOLOGIA DEL CONCRETO – Ing Jorge Alva Jurado

ESTRUCTURACION Y DISEÑO DE EDIFICACIONES DE CONCRETO

ARMADO – Blasco Blasco Antonio

COSTOS Y PRESUPUESTOS EN EDIFICACIONES – CAPECO

ESTRUCTURA DE CONCRETO – Gaylord y Robinson

COSTO Y TIEMPO EN EDIFICACION – Ing. Carlos Suarez Salazar

7. ANEXOS