In-Flight Test Plan
PAZ Mission CALVAL Centre
Juan Manuel Cuerda Muñoz, Beatriz Gómez Miguel, Javier del Castillo Mena, Adolfo López Pescador, Nuria Gimeno Martínez, Nuria Casal Vázquez, Patricia Cifuentes Revenga, Marcos García
Rodríguez, María José González Bonilla.
PAZ Mission
Contents
Introduction CALVAL In-Flight Test Plan Objectives and Scope Approach Areas Data takes planning Conclusion
10/30/2015 Pag.: 2
PAZ Mission 3
INTRODUCTION
PNOTS SPANISH NATIONAL PLAN FOR EARTH OBSERVATION
Responsible for coordinated development of both systems Ground Segment location at INTA Torrejón headquarters PAZ Ground Segment Developer PAZ Calibration and Validation Centre
INGENIO OPTICAL
SATELLITE
PAZ RADAR SATELLITE
4
PAZ PROGRAM
INTA Ground Segment
INTA - Acceptation
DLR PSP
CalVal Tools IO
HISDESAT Space Segment
INSA G/S
Spanish Companies
INDRA - GMV - DEIMOS - INSA
PAZ
INTA CalVal Centre
5
FOS Flight Operation Segment PDGS Payload Data Ground Segment
G/S Ground Station
ARF Acquisition
Routing Facility M&C
Monitoring and Control
SMC Secure Management
Centre
FOCC Filght Operations Control
Centre MPF
Mission Planning Facility MCS
Mission Control System
FDS Flight Dynamics
System
SSIM Spacecraft Simulator
PDS Payload Data
System
MAC Mission Archive and Catalogue
MUS Master User
Services
CALVAL Calibration and
Validation Centre
PM Performance Monitoring
PAZ Satellite Front-End
Request
PAZ Product delivery
DT Orders
DT Files
Mission Plan
S-Band TC/TM
X-Band TM
Instrument Electronics GROUND SEGMENT
6
Internal External Antenna
SAR SYSTEM CALIBRATION & CHARACTERIZATION
SAR SYSTEM VERIFICATION AND MONITORING
CalVal Centre
EXPERIMENTAL
OPERATION
SCIENTIFIC EXPLOITATION OF
PAZ
Data take Quality
Monitoring
Data take Verification
Unit
Long Term System
Monitoring
CALVAL CENTRE
PAZ Mission
CALVAL IN-FLIGHT TEST PLAN
30/10/2015 Pag.: 7
Task TypesSAR System Operation
Signal Conditioning
Attitude and Antenna Pointing
Internal Calibration
Geometric Calibration
Antenna Radiometirc Calibration
Interferometry
Polarimetry
Image Quality and Product
Definition
System StabilitySystem Residual
Errors
The test plan deals with characterization, calibration, configuration and validation of a complete E2E SAR system. At the end of the tests system shall be ready to provide products according to the product tree for all the nominal modes and to determine if specified performances are met. Groups of tasks have been identified and broken down to derivate required processes, tested/no tested features and data requirements at different levels. Software developments and test procedures have been tested with SVT1B and TDX-PAZGS test data sets
PAZ Mission 10/30/2015 Pag.: 8
Pre - launch checkpoint
Launch In - Flight Tests First System
Validation Product Definition Plan development
APPROACH
PAZ Mission 30/10/2015 Pag.: 9
The main plan is the source of a group of plans intended to cover all the tasks to be accomplished.
Plan development Plan development
Data Takes Plan
Deployment Plan
Reflector Orientation
Plan
Test Procedures
Tests Plan
PLAN DEVELOPMENT
PAZ Mission 10/30/2015 Pag.: 10
Launch In - Flight Tests First System
Validation Product Definition Plan development
Pre - launch checkpoint
E 2 E Configuration
Characterization Calibration Status
Performance Assessment
Product Definition
Risks Analysis
SAR System Operation
Internal Calibration
External Calibration
Requirements Verification
Conditioning and
Product Specification
APPROACH
PAZ Mission 10/30/2015 Pag.: 11
To check the status of the system and analyse key points to define the approach for next steps.
E2E system configuration:
Systematic Item identification
Data and coherence review
List of possible updates over CALVAL plan execution and possible side effects
Characterization, calibration report
List of characterization analysis: tested / no tested features
List of calibration parameters: tested / no tested
Performance assessment / product definition / validation report
Instrument performance assessment (IRF, amplitude and phase drifts, NESZ, ambiguities, TX/Rx Gain, internal calibration processes, stability)
Product tree and beam / mode parameters per product establishment
Requirement Validation matrix
Risk identification
Pre - launch checkpoint
E 2 E Configuration
Characterization Calibration Status
Performance Assessment
Product Definition
Risks Analysis
PRE-LAUNCH CHECKPOINT
PAZ Mission 10/30/2015 Pag.: 12
Pre - launch checkpoint
Launch First System
Validation Product Definition Plan development
Requirements Verification
In - Flight Tests
SAR System Operation
Internal Calibration
External Calibration
Conditioning and Characterization
Product Specification
APPROACH
PAZ Mission 10/30/2015 Pag.: 13
In - Flight Tests
SAR System Operation
Internal Calibration
External Calibration
Conditioning and Characterization
SAR System Operation focuses on processes that shall be carried out in PAZ operation phase:
Provide requested products to users Monitoring the status of the system Generation and distribution of a new system configuration Provide data for characterization, calibration and validation to CALVAL users.
These shall be considered under different scenarios:
Commercial Operation Operation from data take request to product delivery including verification tasks.
CALVAL Centre operation. Operation from campaign definition to data analysis considered.
Configuration of the E2E system.
APPROACH
PAZ Mission
SAR System Operation
Features Under Test
Approach Refinements
Design of Test Cases
Verif. Nominal Operation
Monitor Imaging DTMonitor Health Check
E2E System Config Verification
Long term System Monitor
CALVAL Op. Nominal DT
CALVAL Op. Experim. DT
E2E System Config Release
CALVAL Op. Calibration DT
E2E System Config Generation
CALVAL Product Generation
First Level Features
Second Level Features
Operation All modes. All Variables. All Performances.
Verification Loop
CVC Campaing Design
CVC Commanding
CVC L0 and L1B Product Generation
CVC LTDBs Processing And Storage Chains
Configuration Dissemination
Configuration Acknowledge
Product Management Environment Definition
Test Procedures
Campaing Design
Data Take Commanding
MUS Request Generation
CVC Data Management
CVC Product GenerationExperimental Modes Product Generation
Verification Loop
Configuration Generation
Configuration Release
Nominal System Operation
Calval System Operation
E2E Configuration Update
Configuration Verification
30/10/2015 Pag.: 14
SAR SYSTEM OPERATION
PAZ Mission
APPROACH
10/30/2015 Pag.: 15
In - Flight Tests
SAR System Operation
Internal Calibration
External Calibration
Conditioning and Characterization
Signal conditioning and characterization shall assure that the signal is good enough to be used in subsequent stages or may drive to an optimizations, establishes expected operation limits and define the actual behavior of the complete system.
PAZ Mission
SIGNAL CONDITIONING AND CHARACTERIZATION
30/10/2015 Pag.: 16
Signal Conditioning and Characterization
Features Under Test
Approach Refinements
Design of Test Cases
Calibration Network Signals
Raw Data
Image
Limits Establishment
Nadir Detection and Characterization
SNR
Dynamic Range
ADC Saturation
SNR
Dynamic Range
IQ parameters
SNR
Dynamic Range
Test Procedures
Block Raw Data Analysis
ADC saturation monitoring
CN signal and noise analysis
Energy Stats. over calibration areas
Block Image Analysis
Nadir Detection and Charact.
Signal Level Verification
SNR, Dynamic Range and Overflow Margins definition
Nadir Response Analysis
Orbit Verification
Attitude and Azimuth Pointing
Doppler Characterization
Orbit Tube
Orbit Shift Verification
Doppler Limits Monitoring
Quality Limits Definition
Geometric vs. Raw Doppler
Antenna Pointing
Doppler Centroid
Doppler Analysis
Interferometry Measurements
Phase Preservation Offset
Baseline Determination Errors
Interferometric Offset
Sub-Block Test
Inter-Burst Point Target
Inter-Swath Point Target
Baseline Error Budget
Orbital Offset Induced
PAZ Mission
INTERNAL CALIBRATION
10/30/2015 Pag.: 17
In - Flight Tests
SAR System Operation
Internal Calibration
External Calibration
Conditioning and Characterization
Intended to correct instrument effects on image products, excluding antenna pattern.
TRM analysis to control the effect of antenna feed. Gains (amplitude and phase) in signal paths: RxGain validation System noise Calibration strategy Chirp reference and azimuth drifts Internal calibration processes
PAZ Mission 30/10/2015 Pag.: 18
Internal Calibration
Features to be Tested
Approach Refinements
Design of Test Cases
Procedures
Status of Antenna TRM
TRM shift w.r.t. TRM Reference Status
RX Gain Actual Values
System Noise Power
Warm up Effects over CN Signals
Prolog TX Behavior
Chirp Reference
Replica IRF Degradation Performances
Internal Delays
Internal Calibration Accuracy
TRM Reference Generation
PN_Gating Accuracy Evaluation
TRM Monitoring
RX Gain Calibration Validation
Temperature Analysis
Cal. Network Signal and Noise Analysis
Drift in Azimuth
System NESZ
Internal Calibraton Accuracy
TRM Reference Generation
PN_Gating Accuracy Evaluation
Temp. Limits Verification
Temp. Drifts Verification
CAL Pulses Analysis
Cal Strategy Analysis
Replica Analysis
Absolute Azimuth Drift Extraction
Residual Drift Calculation
NESZ Estimation
INTERNAL CALIBRATION
PAZ Mission
EXTERNAL CALIBRATION
10/30/2015 Pag.: 19
In - Flight Tests
SAR System Operation
Internal Calibration
External Calibration
Conditioning and Characterization
Intended to estimate and compensate error contributions to the complete SAR System. Activities shall analyze antenna pattern effects on the images, transform digital numbers into physical units and assure the location accuracy of the generated products
PAZ Mission
EXTERNAL CALIBRATION
30/10/2015 Pag.: 20
External Calibration
Radiometric Calibration
Antenna PointingAntenna Pattern
Verification
Geometric Calibration
Features to be Tested
Design of Test Cases
Geometric Calibration
Elevation Pointing via Rain Forest DTs
Azimuth Pointing via Transponder
Elevation Pattern verification
Azimuth Pattern verification
Absolute Calibration Factor
Absolute Radiometric Accuracy
Relative Radioimetric Accuracy
Radiometric Stability
Polarimetric Calibration
Antenna Pattern Estimation
Antenna Pattern Verification
Antenna Beam to Beam gain Verification
Antenna Elevation Pointing
Antenna Phase Pattern Validation
DT Start Time Characterization
Systematic Azimuth Shift
Internal Delay Calibration
Abs. and Relative Radiometric Accuracy
Radiometric Stability
Abs. Cal. Factor
Channel Imbalance
Channel Cross Talk
Polarimetry
Test Procedures
PAZ Mission
DATA TAKE PLANNING
A 10 cycles plan is defined: 3 cycles for nominal chain, 2 cycles for redundant chain and 2 cycles main chain mainly intended to system validation based on stripmap mode. 3 cycles main chain intended to system validation and product definition for SL, HS and SC modes.
30/10/2015 Pag.: 21
Two point target deployments have been designed. The first one for stripmap analysis, and the second one for spotlight and scansar modes.
21 CR with 2 deployments with reorientations Max 60DT per day / 33 up to L1b 10 Orbit cycles 2-4 system configuration changes RX Transponder
PAZ Mission
ORBIT CYCLES AND STAGES
Orbit Cycles #1 #2 #3
Stages Conditioning Main ICU Characterization, Internal and Geometric Cal.
Orbit Cycles #4 #5
Stages Redundant ICU Characterization
Orbit Cycles # 6 # 7
Stages External Cal. System Validation
SM Product Definition
Orbit Cycles #8 #9 #10
Stages SL, HS, SC Product Definition
30/10/2015 Pag.: 22
SL, SC Deployment
Config Change
Config Change
PAZ Mission
SUMMARY
The objective of this plan is to identify, define and carry out the activities required to the first E2E validation of the complete PAZ SAR system and the initial product definition for all imaging modes.
Software developments and test procedures mostly completed Software tested with TDS from SBT1B and TDX-PAZGS campaigns Data take plan completed for cycles 1, 3, 4, 5, 6, 7, 8, 9 and 10 Data take plan for cycle 2 (hot/cold) on progress Calibration Sites defined. Contractual agreements to be signed. 21 Ground corner reflectors defined: 6 ready 15 on progress 1 transponder on development