E. Wiezorrek, O.H. Bauer MPE Garching
-
Upload
luke-jensen -
Category
Documents
-
view
21 -
download
0
description
Transcript of E. Wiezorrek, O.H. Bauer MPE Garching
![Page 1: E. Wiezorrek, O.H. Bauer MPE Garching](https://reader036.fdocuments.ec/reader036/viewer/2022082517/568137e9550346895d9f9b0d/html5/thumbnails/1.jpg)
EGSE/IEGSE 1
PACS IQR Kick-off ESTEC, 13 Jan 2005
E. Wiezorrek, O.H. BauerMPE Garching
EGSE/IEGSE and MIB
![Page 2: E. Wiezorrek, O.H. Bauer MPE Garching](https://reader036.fdocuments.ec/reader036/viewer/2022082517/568137e9550346895d9f9b0d/html5/thumbnails/2.jpg)
EGSE/IEGSE 2
PACS IQR Kick-off ESTEC, 13 Jan 2005
Starting Point: Routine Phase
![Page 3: E. Wiezorrek, O.H. Bauer MPE Garching](https://reader036.fdocuments.ec/reader036/viewer/2022082517/568137e9550346895d9f9b0d/html5/thumbnails/3.jpg)
EGSE/IEGSE 3
PACS IQR Kick-off ESTEC, 13 Jan 2005
Major Goal: Smooth Transition between Mission Phases
![Page 4: E. Wiezorrek, O.H. Bauer MPE Garching](https://reader036.fdocuments.ec/reader036/viewer/2022082517/568137e9550346895d9f9b0d/html5/thumbnails/4.jpg)
EGSE/IEGSE 4
PACS IQR Kick-off ESTEC, 13 Jan 2005
EGSE Working Group
• Started in Oktober 1999• Goal: Common development of EGSE for ILT and IST• Up to now 45 telecons or meetings• Participants:
– HIFI, PACS, SPIRE– Di/TOS– Project– HSCand – Alcatel– Astrium
![Page 5: E. Wiezorrek, O.H. Bauer MPE Garching](https://reader036.fdocuments.ec/reader036/viewer/2022082517/568137e9550346895d9f9b0d/html5/thumbnails/5.jpg)
EGSE/IEGSE 5
PACS IQR Kick-off ESTEC, 13 Jan 2005
EGSE/HCSS Set-up for ILT
![Page 6: E. Wiezorrek, O.H. Bauer MPE Garching](https://reader036.fdocuments.ec/reader036/viewer/2022082517/568137e9550346895d9f9b0d/html5/thumbnails/6.jpg)
EGSE/IEGSE 6
PACS IQR Kick-off ESTEC, 13 Jan 2005
EGSE for ILT
• Common development:– CDMS Simulator SPIRE– Test Equipment Interface concept HIFI– Router HIFI– SCOS 2000 support Di/TOS– MIB support Di/TOS, HSC First complete version: mid 2002
– Test Control PACS– TOPE Di/TOS, PACS– Out of Limit / Telecommand History ESOC,
SPIRE, HSC Available now
– On-board Software Management ESOC
![Page 7: E. Wiezorrek, O.H. Bauer MPE Garching](https://reader036.fdocuments.ec/reader036/viewer/2022082517/568137e9550346895d9f9b0d/html5/thumbnails/7.jpg)
EGSE/IEGSE 7
PACS IQR Kick-off ESTEC, 13 Jan 2005
IEGSE/CCS for IST
![Page 8: E. Wiezorrek, O.H. Bauer MPE Garching](https://reader036.fdocuments.ec/reader036/viewer/2022082517/568137e9550346895d9f9b0d/html5/thumbnails/8.jpg)
EGSE/IEGSE 8
PACS IQR Kick-off ESTEC, 13 Jan 2005
IEGSE Hardware
• The IEGSE is a common purchase by all three Herschel Instruments based on ILT-EGSE concept
• Hardware set-up can be reconfigured to replace any failed system
• The IEGSE has been pre-configured and tested at MPE on 20/22 Sep 04 by three instrument teams and HSC
• The IEGSE has been installed at Astrium, Ottobrunn, and acceptance tested together with CCS on 15/17 Nov 04
• CCS/IEGSE configuration has been used for first WE tests of SPIRE and PACS (mid Dec 04)
![Page 9: E. Wiezorrek, O.H. Bauer MPE Garching](https://reader036.fdocuments.ec/reader036/viewer/2022082517/568137e9550346895d9f9b0d/html5/thumbnails/9.jpg)
EGSE/IEGSE 9
PACS IQR Kick-off ESTEC, 13 Jan 2005
EGSE Hardware Overview
![Page 10: E. Wiezorrek, O.H. Bauer MPE Garching](https://reader036.fdocuments.ec/reader036/viewer/2022082517/568137e9550346895d9f9b0d/html5/thumbnails/10.jpg)
EGSE/IEGSE 10
PACS IQR Kick-off ESTEC, 13 Jan 2005
IEGSE Overview
![Page 11: E. Wiezorrek, O.H. Bauer MPE Garching](https://reader036.fdocuments.ec/reader036/viewer/2022082517/568137e9550346895d9f9b0d/html5/thumbnails/11.jpg)
EGSE/IEGSE 11
PACS IQR Kick-off ESTEC, 13 Jan 2005
Open Points• Bug in TOPE system of CCS SPR raised – When a test procedure read a TM parameter not always the
most recent value is read which seriously hampers CcsHandler
• When PACS/DPU and CCS/CDMU front end are started at the same time the first TC has to be sent twice NCR raised
• MIB – HPSDB bridge file conversion is not stable yet• MIB changes required due new naming conventions for HPSDB
• Set-up of CCS seems to be complex• Access to remote ICC sites not yet possible • OBS upload not yet possible: ESOC OBSM sytem will be used
Next EGSE WG meeting at Astrium, Ottobrunn, on 26 Jan 05 to discuss overall PLM EGSE situation