¤ Item Descripción Und. Falso 01 COMPONENTE PAVIMENTACION DE VIAS Falso 01.01 TRABAJOS PRELIMINARES Falso 01.01.01 ALQUILER DE LOCAL PARA ALAMACEN Y OFICINA mes Falso 01.01.02 CARTEL DE OBRA und Falso 01.01.03 TRAZO, NIVELACION Y REPLANTEO M.L Falso 01.01.04 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO M.L Falso 01.02 DEMOLISION DE PAVIMENTOS Falso 01.02.01 DEMOLISION DE PAVIMENTOS ANTIGUOS CON EQUIPO m3 Falso 01.03 EXPLANACIONES Falso 01.03.01 CORTE EN MATERIAL SUELTO m3 Falso 01.04 SUB BASES Y BASES Falso 01.04.01 SUB - BASE GRANULAR m3 Falso 01.05 PAVIMENTO HIDRAULICO Falso 01.05.01 ENCOFRADO Y DESENCOFRADO DE LOSAS m2 Falso 01.05.02 CONCRETO FC=210 KG/CM2 EN LOSA H=0.20 MTS m3 Falso 01.05.03 ACERO DE REFUERZO TRANSVERSAL DE Ø 1/2" kg Falso 01.05.04 ACABADO Y FROTACHADO DE LOSAS m2 Falso 01.05.05 JUNTA DE DILATACIÓN m Falso 01.06 SARDINEL Y CUNETA DE CONCRETO Falso 01.06.01 SARDINELES TIPO I, H=0.20 m Falso 01.06.02 CUNETAS DE CONCRETO TIPO I m Falso 01.06.03 RAMPAS DE CONCRETO F'C=175 KG/CM2 m2 Falso 01.07 TRANSPORTE Falso 01.07.01 TRANSPORTE DE ELIMINACION DE MATERIAL A DME para d<=1 km m3 Falso 01.07.02 TRANSPORTE DE ELIMINACION DE MATERIAL A DME para d> 1 km m3 Falso 01.08 SEÑALIZACION Falso 01.08.01 SEÑALIZACION VERTICAL und Falso 01.08.02 PINTURA EN SARDINEL m2 Falso 01.09 ENSAYOS DE CONTROL DE CALIDAD Falso 01.09.01 DISEÑO DE MEZCLA und Falso 01.09.02 ENSAYO DE COMPACTACION DE BASE Y SUB BASE und Falso 01.09.03 ROTURA DE PROBETAS CILINDRICAS DE CONCRETO und Falso 01.09.04 ENSAYO DE PROCTOR MODIFICADO und Falso 01.10 VARIOS Falso 01.10.01 REPARACION DE SISTEMAS DE RED DE DESAGUE GLB Falso 01.10.02 REPARACION DE SISTEMAS DE RED DE AGUA POTABLE GLB Falso 01.10.03 LIMPIEZA GENERAL DE LA OBRA GLB Falso 01.10.04 PLACA RECORDATORIA und Falso 02 DRENAJE PLUVIAL Falso 02.01 TRABAJOS PRELIMINARES Falso 02.01.01 TRAZO Y REPLANTEO PRELIMINAR m Falso 02.01.02 TRAZO Y REPLANTEO DURANTE PROCESO DE CONSTRUCCION m Falso 02.01.03 DEMOLICION DE ELEMENTOS DE CONCRETO SIMPLE m3 Falso 02.02 MOVIMIENTO DE TIERRAS Falso 02.02.01 EXCAVACION DE ZANJA EN TERRENO NORMAL m3 Falso 02.02.02 EXCAVACION DE ZANJA MANUAL EN TERRENO COMPACTO PARA TUBERIA m3 Falso 02.02.03 REFINE Y PERFILADO EN TERRENO NORMAL m2

Transcript of CRONOGRAMA VALORIZADO.xls

H PItemDescripcinUnd.MetradoPrecio (S/.)Parcial (S/.)Falso01COMPONENTE PAVIMENTACION DE VIAS84,727.58Falso01.01TRABAJOS PRELIMINARES2,062.16Falso01.01.01ALQUILER DE LOCAL PARA ALAMACEN Y OFICINAmes4.00200.00800.00Falso01.01.02CARTEL DE OBRAund1.00500.00500.00Falso01.01.03TRAZO, NIVELACION Y REPLANTEOM.L148.281.84274.32Falso01.01.04TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESOM.L296.561.65501.19Falso01.02DEMOLISION DE PAVIMENTOSFalso01.02.01DEMOLISION DE PAVIMENTOS ANTIGUOS CON EQUIPOm3197.6912.852,562.06Falso01.03EXPLANACIONESFalso01.03.01CORTE EN MATERIAL SUELTOm3274.996.171,702.19Falso01.04SUB BASES Y BASESFalso01.04.01SUB - BASE GRANULARm3246.7036.018,883.67Falso01.05PAVIMENTO HIDRAULICOFalso01.05.01ENCOFRADO Y DESENCOFRADO DE LOSASm223.2226.98636.23Falso01.05.02CONCRETO FC=210 KG/CM2 EN LOSA H=0.20 MTSm3107.26338.2836,644.31Falso01.05.03ACERO DE REFUERZO TRANSVERSAL DE 1/2"kg293.766.751,988.76Falso01.05.04ACABADO Y FROTACHADO DE LOSASm2531.975.502,984.35Falso01.05.05JUNTA DE DILATACINm142.634.90713.15Falso01.06SARDINEL Y CUNETA DE CONCRETOFalso01.06.01SARDINELES TIPO I, H=0.20m293.1326.997,911.58Falso01.06.02CUNETAS DE CONCRETO TIPO Im144.5245.756,611.79Falso01.06.03RAMPAS DE CONCRETO F'C=175 KG/CM2m215.9147.65769.09Falso01.07TRANSPORTEFalso01.07.01TRANSPORTE DE ELIMINACION DE MATERIAL A DME para d 1 kmm31,931.921.893,651.33Falso01.08SEALIZACIONFalso01.08.01SEALIZACION VERTICALund7.00304.622,146.76Falso01.08.02PINTURA EN SARDINELm287.947.44669.22Falso01.09ENSAYOS DE CONTROL DE CALIDADFalso01.09.01DISEO DE MEZCLAund3.00250.00750.00Falso01.09.02ENSAYO DE COMPACTACION DE BASE Y SUB BASEund8.0036.02288.16Falso01.09.03ROTURA DE PROBETAS CILINDRICAS DE CONCRETOund37.0015.00555.00Falso01.09.04ENSAYO DE PROCTOR MODIFICADOund2.0075.12150.24Falso01.10VARIOSFalso01.10.01REPARACION DE SISTEMAS DE RED DE DESAGUEGLB1.00800.00800.00Falso01.10.02REPARACION DE SISTEMAS DE RED DE AGUA POTABLEGLB1.00400.00400.00Falso01.10.03LIMPIEZA GENERAL DE LA OBRAGLB1.00545.60625.60Falso01.10.04PLACA RECORDATORIAund1.00359.38359.38Falso02DRENAJE PLUVIALFalso02.01TRABAJOS PRELIMINARESFalso02.01.01TRAZO Y REPLANTEO PRELIMINARm38.641.2147.91Falso02.01.02TRAZO Y REPLANTEO DURANTE PROCESO DE CONSTRUCCIONm77.291.57124.44Falso02.01.03DEMOLICION DE ELEMENTOS DE CONCRETO SIMPLEm38.1058.27476.12Falso02.02MOVIMIENTO DE TIERRASFalso02.02.01EXCAVACION DE ZANJA EN TERRENO NORMALm367.1911.34856.67Falso02.02.02EXCAVACION DE ZANJA MANUAL EN TERRENO COMPACTO PARA TUBERIAm39.615.8363.62Falso02.02.03REFINE Y PERFILADO EN TERRENO NORMALm2200.380.50114.22Falso02.02.04RIEGO Y COMPACTACION DE TERRENOm25.243.0016.61Falso02.02.05CAMA DE ARENA MANUALP/ZANJA TUBO DN 400 MMm38.6414.99584.24Falso02.02.06RELLENO COMPACTADO FINAL DE ZANJAS TUB. 15" H= VARIABLEm357.6516.09988.12Falso02.02.07ELIMINACION DE MATERIAL EXCED. +25% DE ESPONJ.m323.956.13166.93Falso02.02.08TABLESCADO DE ZANJA EN TERRENOS INESTABLESm280.0021.511,775.20Falso02.03OBRAS DE CONCRETO SIMPLEFalso02.03.01SOLADO DE BASE E= 3"m23.9717.2769.79Falso02.03.02CONCRETO F'C= 140 KG/CM2m31.54285.11443.29Falso02.04OBRAS DE CONCRETO ARMADOFalso02.04.01ENCOFRADO Y DESENCOFRADO DE MUROSm210.3927.65295.80Falso02.04.02CONCRETO FC=210 KG/CM2m30.99361.67361.3802.04.03ACERO F'Y=4200 KG/CM2kg58.934.66275.2002.04.04BUZON TIPO I (DI=1.20)/TN/H=2.50und1.002,107.362,140.9602.05INSTALACION DE TUBERAS02.05.01SUMINISTRO E INSTALACION TUBERIA PERFILADA DE PVC DN 250 mmm38.6459.272,290.9702.05.02SUMINISTRO E INSTALACION DE TAPAS METALICAS S/DISEOund1.00170.21171.2403VEREDAS PEATONALES03.01TRABAJOS PRELIMINARES03.01.01TRAZO, NIVELACION Y REPLANTEOm2382.121.09424.1503.01.02TRAZO, NIVELACION Y REPLANTEO DURANTE EJECUCION DE PROYECTOm2764.230.87687.8103.02MOVIMIENTO DE TIERRAS03.02.01EXCAVACION A NIVEL DE SUB RAZANTEm376.4211.12955.2503.02.02ELIMINACION DE MATERIAL EXCEDENTE EXCED. +25%, MANUAL L=40Mm395.536.13665.8403.03BASE GRANULAR03.03.01BASE GRANULAR EN VEREDASm395.5319.551,867.6103.04VEREDAS PEATONALES03.04.01ENCOFRADO Y DESENCOFRADO DE VEREDAS H=.10Mm210.8917.34192.3203.04.02CONCRETO F'C=175 KG/CM2m322.09321.527,164.0103.04.03ENCHAPADO DE PIEDRA LAJA NATURAL Emax=2"m2353.5164.9223,529.6303.04.04TUBERIA DE PVC SAL EN VEREDAS 2"pto33.0010.72359.0403.04.05JUNTAS DE DILATACIN EN VEREDASm108.903.04339.7704RED DE DISTRIBUCION DE AGUA POTABLE (SUSTITUCION) UF04.01TRABAJOS PRELIMINARES04.01.01TRAZO Y REPLANTEO INICIALm229.061.63380.2404.01.02CINTA PLSTICA SEALIZADOTA P/LIMITE SEGURIDAD DE OBRAML351.322.19783.4404.01.03PUENTE DE MADERA PASE PEATONAL SOBRE ZANJA PROVISIONALund4.0032.16128.6404.02MOVIMIENTO DE TIERRAS04.02.01EXCAVACION DE ZANJA EN TERRENO NORMALm3208.8411.342,662.7104.02.02REFINE Y NIVELACION ZANJA TUB. 3-4"m229.060.57146.6004.02.03CAMA DE APOYO PARA TUBERIAS 3-4"ML229.0610.432,428.0404.02.04RELLENO COMP. INICIAL C/MAT. ZARANDEADO TUB. 3-4"ML229.062.74657.4004.02.05RELLENO CON MATERIAL PROPIOm3162.2210.051,714.6704.02.06ELIMINACION DE MATERIAL EXCED. +25% DE ESPONJ.m358.276.13406.1404.03OBRAS DE CONCRETO SIMPLE04.03.01CONCRETO F'C= 140 KG/CM2, PARA ANCLAJES Y/O DADOSm30.45285.11129.5304.04INSTALACION Y PROVISION DE TUBERIAS04.04.01INST. Y PROV. TUBERIA PVC UF PN 10 DN 110 MMML58.2222.271,297.1404.04.02INST. Y PROV. TUBERIA PVC UF PN 7.5 DN 90 MM 3"ML135.0016.232,192.4004.05INSTALACION Y PROVISION DE ACCESORIOS04.05.01INST. Y PROV. DE TEE PVC SAP UF DN 110 MM(4")und2.0073.75147.9004.05.02INST. Y PROV. DE REDUCCION HM PVC SAP UF DN 110-90 MM (4-3")und2.0039.8380.0004.05.03INST. Y PROV. DE VALVULA MAZZA ISO DN 110 MM (4")und1.00391.37392.4004.05.04INST. Y PROV. DE VALVULA MAZZA ISO DN 90 (3")und1.00368.37369.4004.05.05INST. Y PROV. DE CODO 22.50 PVC SAP UF DN 110 MM(4")und1.0034.8335.0004.05.06INST. Y PROV. DE TAPON PVC SAP UF DN 90 MM(3")und2.0024.1248.6404.05.07INST. Y PROV. DE VALVULA DE PURGAund1.002,262.762,271.4004.06CONEXIONES DOMICILIARIAS04.06.01INSTALACION DOMICILIARIA DE AGUA POTABLE RED MATRIZ 110 MMund6.00172.911,037.4604.06.02INSTALACION DOMICILIARIA DE AGUA POTABLE RED MATRIZ 90 MMund16.00164.412,630.5604.06.03RED DE DISTRIBUCION TUBERIA DE 1/2" PVC SAP PARA CONEXIONES DOMICILIARIASm53.409.44512.6404.07PRUEBAS Y ENSAYOS04.07.01PRUEBA HIDRAULICA Y DESINFECCION EN RED TUB. 4-6" ZANJA TAPADAML351.321.30470.7704.08VARIOS04.08.01DESMONTAJE Y RETIRO DE TUBERIA DE FFM.L58.221.0065.7904.08.02DESMONTAJE Y RETIRO DE CONEXIONES DOMICILIARIAS DE AGUA POTABLEund20.007.40159.2005RED DE DESAGUE 200mm (CONSTRUCCION)05.01OBRAS PROVISIONALES05.01.01TRAZO, NIVELACION Y REPLANTEOM.L275.541.84509.7505.01.02CINTA SEALIZADORA P/LIMITE SEGURIDAD DE OBRAm429.361.21523.8205.01.03TRANQUERA MADERA 2.40 X 1.20 ML PARA SEALIZACINund2.0099.83208.0605.01.04TRAZO, NIVELACION Y REPLANTEO PARA ALCANTARILLADOM.L429.871.01442.7705.02MOVIMIENTO DE TIERRAS05.02.01EXCAVACION DE ZANJA MANUAL EN TERRENO COMPACTO PARA TUBERIAm3356.435.832,359.5705.02.02EXCAVACION DE ZANJAS PARA BUZONESm324.7210.00281.8105.02.03REFINE Y NIVELACION DE FONDO DE ZANJA P/TUBO DN 200 MMM.L266.500.35106.6005.02.04REFINE Y PERFILADO DE BUZONESm272.000.4738.8805.02.05CAMA DE ARENA MANUALP/ZANJA TUBO DN 200 MMM.L266.5013.243,563.1105.02.06RELLENO COMPACTADO FINAL DE ZANJAS TUB. 8-10" H= VARIABLEm3292.3010.053,089.6105.02.07ELIMINACION DE MATERIAL EXCED. +25% DE ESPONJ.m380.166.13558.7205.02.08TABLESCADO DE ZANJA EN TERRENOS INESTABLESm240.0021.51887.6005.03TUBERIAS05.03.01TUBERIA UPVC 200 mmM.L204.9034.357,050.6105.04OBRAS DE CONCRETO SIMPLE05.04.01CONCRETO F'C= 140 KG/CM2m31.69285.11486.4705.05BUZONES DE CONCRETO05.05.01BUZON TIPO I (DI=1.20)/TN/H=2.00und6.001,696.4310,279.3805.05.02BUZON TIPO I (DI=1.20)/TN/H=4.00und1.002,869.572,903.1705.06ENSAYOS DE CONTROL DE CALIDAD05.06.01PRUEBAS DE COMPACTACION DE BASEund6.0045.24271.4405.06.02PRUEBA HIDRAULICA + ESCORRENTIA TUBERIA DN 200 MM ZANJA TAPADAM.L204.902.44499.9605.07CONEXION DOMICILIARIA - DESAGUE05.07.01INSTALACION DOMICILIARIA DE ALCANTARILLADOund24.00159.863,902.4005.07.02SUMINISTRO E INSTALACION TUBERIA DESAGUE S20 U.F. DN 160 MMM.L61.6025.021,543.08

Cronograma valorizadoFORMATO 10 - CRONOGRAMA DE AVANCE DE OBRA VALORIZADOPROYECTOMEJORAMIENTO JR. AYACUCHO DE PUEBLO VIEJO - LIRCAY, PROVINCIA DE ANGARAES HUANCAVELICACOMPONENTE01 DEFENSA RIBEREACONSULTORING. HOOVER HUERTA DEXTREUBICACINLUGAR : PUEBLO VIEJO DISTRITO: LIRCAY PROVINCIA: ANGARAES DEPARTAMENTO DE HUANCAVELICAFECHA6/22/10ItemP A R T I D A SUnidadMetradoCUPrecioP E R I O D O DE E J E C U C I O NTOTALJUNIOJULIOAGOSTO1ERA SEM2DA SEM3ra SEM4ta SEM5ta SEM6ta SEM7ma SEM8va SEM9na SEM10ma SEM11ma SEM12ma SEM13ra SEM14ta SEM01COMPONENTE PAVIMENTACION DE VIAS001.01TRABAJOS PRELIMINARES01.01.01ALQUILER DE LOCAL PARA ALAMACEN Y OFICINAmes4.00200.00800.0073.4791.8491.8491.8491.8491.8491.8491.8483.65800800.00001.01.02CARTEL DE OBRAund1.00500.00500.00500500500.00001.01.03TRAZO, NIVELACION Y REPLANTEOM.L148.281.84274.32274.32274.32274.32001.01.04TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESOM.L296.561.65501.19469.8731.32501.19501.19001.02DEMOLISION DE PAVIMENTOS00.00001.02.01DEMOLISION DE PAVIMENTOS ANTIGUOS CON EQUIPOm3197.6912.852,562.06427.012,135.052562.062562.06001.03EXPLANACIONES00.00001.03.01CORTE EN MATERIAL SUELTOm3274.996.171,702.19904.29797.91702.191702.19001.04SUB BASES Y BASES00.000.000.000.00001.04.01SUB - BASE GRANULARm3246.7036.018,883.671,110.464,997.062,776.158883.678883.67001.05PAVIMENTO HIDRAULICO00.00001.05.01ENCOFRADO Y DESENCOFRADO DE LOSASm223.2226.98636.23636.23636.23636.23001.05.02CONCRETO FC=210 KG/CM2 EN LOSA H=0.20 MTSm3107.26338.2836,644.3118,322.1618,322.1536644.3136644.31001.05.03ACERO DE REFUERZO TRANSVERSAL DE 1/2"kg293.766.751,988.761,988.761988.761988.76001.05.04ACABADO Y FROTACHADO DE LOSASm2531.975.502,984.351,492.181,492.172984.352984.35001.05.05JUNTA DE DILATACINm142.634.90713.15178.29534.86713.15713.15001.06SARDINEL Y CUNETA DE CONCRETO00.00001.06.01SARDINELES TIPO I, H=0.20m293.1326.997,911.58847.673,178.763,178.76706.397911.587911.58001.06.02CUNETAS DE CONCRETO TIPO Im144.5245.756,611.793,305.903,305.896611.796611.79001.06.03RAMPAS DE CONCRETO F'C=175 KG/CM2m215.9147.65769.09769.09769.09769.09001.07TRANSPORTE00.00001.07.01TRANSPORTE DE ELIMINACION DE MATERIAL A DME para d 1 kmm31931.921.893,651.333,651.333651.333651.33001.08SEALIZACION00.00001.08.01SEALIZACION VERTICALund7.00304.622,146.762,146.762146.762146.76001.08.02PINTURA EN SARDINELm287.947.44669.22501.92167.3669.22669.22001.09ENSAYOS DE CONTROL DE CALIDAD00.00001.09.01DISEO DE MEZCLAund3.00250.00750.00750750750.00001.09.02ENSAYO DE COMPACTACION DE BASE Y SUB BASEund8.0036.02288.16288.16288.16288.16001.09.03ROTURA DE PROBETAS CILINDRICAS DE CONCRETOund37.0015.00555.00312.19242.81555555.00001.09.04ENSAYO DE PROCTOR MODIFICADOund2.0075.12150.24150.24150.24150.24001.10VARIOS00.00001.10.01REPARACION DE SISTEMAS DE RED DE DESAGUEGLB1.00800.00800.00800800800.00001.10.02REPARACION DE SISTEMAS DE RED DE AGUA POTABLEGLB1.00400.00400.00400400400.00001.10.03LIMPIEZA GENERAL DE LA OBRAGLB1.00545.60625.60469.2156.40625.6625.60001.10.04PLACA RECORDATORIAund1.00359.38359.38359.38359.38359.38002DRENAJE PLUVIAL00.00002.01TRABAJOS PRELIMINARES00.00002.01.01TRAZO Y REPLANTEO PRELIMINARm38.641.2147.9147.9147.9147.91002.01.02TRAZO Y REPLANTEO DURANTE PROCESO DE CONSTRUCCIONm77.291.57124.44124.44124.44124.44002.01.03DEMOLICION DE ELEMENTOS DE CONCRETO SIMPLEm38.1058.27476.12476.12476.12476.12002.02MOVIMIENTO DE TIERRAS00.00002.02.01EXCAVACION DE ZANJA EN TERRENO NORMALm367.1911.34856.67455.11401.56856.67856.67002.02.02EXCAVACION DE ZANJA MANUAL EN TERRENO COMPACTO PARA TUBERIAm39.615.8363.6263.6263.6263.62002.02.03REFINE Y PERFILADO EN TERRENO NORMALm2200.380.50114.22114.22114.22114.22002.02.04RIEGO Y COMPACTACION DE TERRENOm25.243.0016.6116.6116.6116.61002.02.05CAMA DE ARENA MANUALP/ZANJA TUBO DN 400 MMm38.6414.99584.24584.24584.24584.24002.02.06RELLENO COMPACTADO FINAL DE ZANJAS TUB. 15" H= VARIABLEm357.6516.09988.12988.12988.12988.12002.02.07ELIMINACION DE MATERIAL EXCED. +25% DE ESPONJ.m323.956.13166.93125.241.73166.93166.93002.02.08TABLESCADO DE ZANJA EN TERRENOS INESTABLESm280.0021.511,775.201,775.201775.21775.20002.03OBRAS DE CONCRETO SIMPLE00.00002.03.01SOLADO DE BASE E= 3"m23.9717.2769.7969.7969.7969.79002.03.02CONCRETO F'C= 140 KG/CM2m31.54285.11443.29443.29443.29443.29002.04OBRAS DE CONCRETO ARMADO00.00002.04.01ENCOFRADO Y DESENCOFRADO DE MUROSm210.3927.65295.80295.8295.8295.80002.04.02CONCRETO FC=210 KG/CM2m30.99361.67361.38361.38361.38361.38002.04.03ACERO F'Y=4200 KG/CM2kg58.934.66275.20275.2275.2275.20002.04.04BUZON TIPO I (DI=1.20)/TN/H=2.50und1.002107.362,140.96802.861,338.102140.962140.96002.05INSTALACION DE TUBERAS00.00002.05.01SUMINISTRO E INSTALACION TUBERIA PERFILADA DE PVC DN 250 mmm38.6459.272,290.972,290.972290.972290.97002.05.02SUMINISTRO E INSTALACION DE TAPAS METALICAS S/DISEOund1.00170.21171.24171.24171.24171.24003VEREDAS PEATONALES0.00003.01TRABAJOS PRELIMINARES0.00003.01.01TRAZO, NIVELACION Y REPLANTEOm2382.121.09424.15424.15424.15424.15003.01.02TRAZO, NIVELACION Y REPLANTEO DURANTE EJECUCION DE PROYECTOm2764.230.87687.81573.18114.63687.81687.81003.02MOVIMIENTO DE TIERRAS0.00003.02.01EXCAVACION A NIVEL DE SUB RAZANTEm376.4211.12955.25358.22597.03955.25955.25003.02.02ELIMINACION DE MATERIAL EXCEDENTE EXCED. +25%, MANUAL L=40Mm395.536.13665.84332.92332.92665.84665.84003.03BASE GRANULAR0.00003.03.01BASE GRANULAR EN VEREDASm395.5319.551,867.611,867.611867.611867.61003.04VEREDAS PEATONALES0.00003.04.01ENCOFRADO Y DESENCOFRADO DE VEREDAS H=.10Mm210.8917.34192.32144.2448.08192.32192.32003.04.02CONCRETO F'C=175 KG/CM2m322.09321.527,164.017,164.017164.017164.01003.04.03ENCHAPADO DE PIEDRA LAJA NATURAL Emax=2"m2353.5164.9223,529.631,604.2912,032.209,893.1423529.6323529.63003.04.04TUBERIA DE PVC SAL EN VEREDAS 2"pto33.0010.72359.04359.04359.04359.04003.04.05JUNTAS DE DILATACIN EN VEREDASm108.903.04339.77339.77339.77339.77004RED DE DISTRIBUCION DE AGUA POTABLE (SUSTITUCION) UF0.00004.01TRABAJOS PRELIMINARES0.00004.01.01TRAZO Y REPLANTEO INICIALm229.061.63380.24380.24380.24380.24004.01.02CINTA PLSTICA SEALIZADOTA P/LIMITE SEGURIDAD DE OBRAML351.322.19783.44734.4848.96783.44783.44004.01.03PUENTE DE MADERA PASE PEATONAL SOBRE ZANJA PROVISIONALund4.0032.16128.64128.64128.64128.64004.02MOVIMIENTO DE TIERRAS0.00004.02.01EXCAVACION DE ZANJA EN TERRENO NORMALm3208.8411.342,662.711,248.151,414.562662.712662.71004.02.02REFINE Y NIVELACION ZANJA TUB. 3-4"m229.060.57146.6091.6354.97146.6146.60004.02.03CAMA DE APOYO PARA TUBERIAS 3-4"ML229.0610.432,428.042,428.042428.042428.04004.02.04RELLENO COMP. INICIAL C/MAT. ZARANDEADO TUB. 3-4"ML229.062.74657.40575.2282.18657.4657.40004.02.05RELLENO CON MATERIAL PROPIOm3162.2210.051,714.671,500.34214.331714.671714.67004.02.06ELIMINACION DE MATERIAL EXCED. +25% DE ESPONJ.m358.276.13406.14406.14406.14406.14004.03OBRAS DE CONCRETO SIMPLE0.00004.03.01CONCRETO F'C= 140 KG/CM2, PARA ANCLAJES Y/O DADOSm30.45285.11129.53129.53129.53129.53004.04INSTALACION Y PROVISION DE TUBERIAS0.00004.04.01INST. Y PROV. TUBERIA PVC UF PN 10 DN 110 MMML58.2222.271,297.14324.29972.851297.141297.14004.04.02INST. Y PROV. TUBERIA PVC UF PN 7.5 DN 90 MM 3"ML135.0016.232,192.402,192.402192.42192.40004.05INSTALACION Y PROVISION DE ACCESORIOS0.00004.05.01INST. Y PROV. DE TEE PVC SAP UF DN 110 MM(4")und2.0073.75147.90147.9147.9147.90004.05.02INST. Y PROV. DE REDUCCION HM PVC SAP UF DN 110-90 MM (4-3")und2.0039.8380.00808080.00004.05.03INST. Y PROV. DE VALVULA MAZZA ISO DN 110 MM (4")und1.00391.37392.40392.4392.4392.40004.05.04INST. Y PROV. DE VALVULA MAZZA ISO DN 90 (3")und1.00368.37369.40369.4369.4369.40004.05.05INST. Y PROV. DE CODO 22.50 PVC SAP UF DN 110 MM(4")und1.0034.8335.00353535.00004.05.06INST. Y PROV. DE TAPON PVC SAP UF DN 90 MM(3")und2.0024.1248.6448.6448.6448.64004.05.07INST. Y PROV. DE VALVULA DE PURGAund1.002262.762,271.402,271.402271.42271.40004.06CONEXIONES DOMICILIARIAS0.00004.06.01INSTALACION DOMICILIARIA DE AGUA POTABLE RED MATRIZ 110 MMund6.00172.911,037.461,037.461037.461037.46004.06.02INSTALACION DOMICILIARIA DE AGUA POTABLE RED MATRIZ 90 MMund16.00164.412,630.562,630.562630.562630.56004.06.03RED DE DISTRIBUCION TUBERIA DE 1/2" PVC SAP PARA CONEXIONES DOMICILIARIASm53.409.44512.64512.64512.64512.64004.07PRUEBAS Y ENSAYOS0.00004.07.01PRUEBA HIDRAULICA Y DESINFECCION EN RED TUB. 4-6" ZANJA TAPADAML351.321.30470.77470.77470.77470.77004.08VARIOS0.00004.08.01DESMONTAJE Y RETIRO DE TUBERIA DE FFM.L58.221.0065.7965.7965.7965.79004.08.02DESMONTAJE Y RETIRO DE CONEXIONES DOMICILIARIAS DE AGUA POTABLEund20.007.40159.20159.2159.2159.20005RED DE DESAGUE 200mm (CONSTRUCCION)0.00005.01OBRAS PROVISIONALES0.00005.01.01TRAZO, NIVELACION Y REPLANTEOM.L275.541.84509.75509.75509.75509.75005.01.02CINTA SEALIZADORA P/LIMITE SEGURIDAD DE OBRAm429.361.21523.82523.82523.82523.82005.01.03TRANQUERA MADERA 2.40 X 1.20 ML PARA SEALIZACINund2.0099.83208.06208.06208.06208.06005.01.04TRAZO, NIVELACION Y REPLANTEO PARA ALCANTARILLADOM.L429.871.01442.77442.77442.77442.77005.02MOVIMIENTO DE TIERRAS0.00005.02.01EXCAVACION DE ZANJA MANUAL EN TERRENO COMPACTO PARA TUBERIAm3356.435.832,359.57516.161,659.07184.342359.572359.57005.02.02EXCAVACION DE ZANJAS PARA BUZONESm324.7210.00281.81140.91140.9281.81281.81005.02.03REFINE Y NIVELACION DE FONDO DE ZANJA P/TUBO DN 200 MMM.L266.500.35106.6039.9866.62106.6106.60005.02.04REFINE Y PERFILADO DE BUZONESm272.000.4738.8838.8838.8838.88005.02.05CAMA DE ARENA MANUALP/ZANJA TUBO DN 200 MMM.L266.5013.243,563.112,850.49712.623563.113563.11005.02.06RELLENO COMPACTADO FINAL DE ZANJAS TUB. 8-10" H= VARIABLEm3292.3010.053,089.613,089.613089.613089.61005.02.07ELIMINACION DE MATERIAL EXCED. +25% DE ESPONJ.m380.166.13558.72558.72558.72558.72005.02.08TABLESCADO DE ZANJA EN TERRENOS INESTABLESm240.0021.51887.60665.7221.9887.6887.60005.03TUBERIAS0.00005.03.01TUBERIA UPVC 200 mmM.L204.9034.357,050.617,050.617050.617050.61005.04OBRAS DE CONCRETO SIMPLE00.000.000.000.00005.04.01CONCRETO F'C= 140 KG/CM2m31.69285.11486.47486.47486.47486.47005.05BUZONES DE CONCRETO00.00005.05.01BUZON TIPO I (DI=1.20)/TN/H=2.00und6.001696.4310,279.38513.975,782.153,983.2610279.3810279.38005.05.02BUZON TIPO I (DI=1.20)/TN/H=4.00und1.002869.572,903.172,177.38725.792903.172903.17005.06ENSAYOS DE CONTROL DE CALIDAD0.00005.06.01PRUEBAS DE COMPACTACION DE BASEund6.0045.24271.44271.44271.44271.44005.06.02PRUEBA HIDRAULICA + ESCORRENTIA TUBERIA DN 200 MM ZANJA TAPADAM.L204.902.44499.96499.96499.96499.96005.07CONEXION DOMICILIARIA - DESAGUE0.00005.07.01INSTALACION DOMICILIARIA DE ALCANTARILLADOund24.00159.863,902.403,902.403902.43902.40005.07.02SUMINISTRO E INSTALACION TUBERIA DESAGUE S20 U.F. DN 160 MMM.L61.6025.021,543.081,543.081543.081543.080COSTO DIRECTO193,452.581,274.808,820.7617,694.8614,998.2222,519.4415,883.525,170.908,267.6613,302.6129,750.8528,630.7012,210.4914,264.30663.47193452.58193452.580GASTOS GENERALES12.88%24,924.00164.241,136.452,279.771,932.342,901.352,046.40666.211,065.191,713.883,833.033,688.721,573.171,837.7885.482492424924.0000.000COSTO TOTAL218,376.581,439.049,957.2119,974.6316,930.5625,420.7917,929.925,837.119,332.8515,016.4933,583.8832,319.4213,783.6616,102.08748.95218376.58218376.580COSTO EXPEDIENTE TECNICOPROCENTAJE DE AVANCE FISICO FINANCIERO SEMANAL100.000%0.659%4.560%9.147%7.753%11.641%8.211%2.673%4.274%6.876%15.379%14.800%6.312%7.374%0.343%PROCENTAJE DE AVANCE FISICO FINANCIERO ACUMULADO100.000%0.659%5.219%14.365%22.118%33.759%41.970%44.643%48.916%55.793%71.172%85.972%92.283%99.657%100.000%