Calculo y Compensacion de Elevaciones Y VOLUMEN

16
NIVELACION SECCION LONGITUDINAL DEL EJE DE VIA - PARA CALCULO DE VOLUMENES DE EXCAVACION Y CALCULO PARA Punto Distancia LECTURA DE LA MIRA Elevacion o cota Desnivel Cota Excavacion excavacion SECCION TRAPECIO BM Parcial Acumulada BS FS Terreno Fondo canal h Area Volumen BM DE TERRENO, PARA CALCULO 1.012 2600.000 2 2598.000 2 6.00 295.03 1 20.000 20.000 1.663 1.891 2599.121 -0.400 2597.600 1.521 3.83 114.62 2 26.400 46.400 1.130 1.954 2598.830 -0.528 2597.072 1.758 4.85 128.97 3 26.500 72.900 1.164 1.652 2598.308 -0.530 2596.542 1.766 4.88 143.95 4 28.900 101.800 1.148 1.700 2597.772 -0.578 2595.964 1.808 5.08 160.68 5 30.300 132.100 1.180 1.658 2597.262 -0.606 2595.358 1.904 5.53 168.70 6 27.700 159.800 1.272 1.511 2596.931 -0.554 2594.804 2.127 6.65 203.67 7 27.520 187.320 1.187 1.551 2596.652 -0.550 2594.254 2.398 8.15 224.61 8 27.000 214.320 1.197 1.511 2596.328 -0.540 2593.714 2.614 9.45 - 9 23.000 237.320 1.675 2596.164 -0.460 2593.254 2.910 ### - ### Costo M3 G Bs Cotizacion -2 31.66 6.94 Costo Total Bs $b 45,597.59 Costo Total Sus $6,570.26

description

topografia

Transcript of Calculo y Compensacion de Elevaciones Y VOLUMEN

CORTE LONGITUDINAL NIVELACION SECCION LONGITUDINAL DEL EJE DE VIA - PARA CALCULO DE VOLUMENES DE EXCAVACION Y COSTOCALCULO PARACALCULO PARAPuntoDistanciaLECTURA DE LA MIRAElevacion o cotaDesnivelCota ExcavacionexcavacionSECCION TRAPECIOSECCION PARALELEPIPEDOBMParcialAcumuladaBSFSTerrenoFondo canalhAreaVolumenAREAVOLUMESBMEJE DE TERRENO, PARA CALCULO DE VOLUMENES1.0122600.00022598.00026.00295.032.000120.00020.0001.6631.8912599.121-0.4002597.6001.5213.83114.621.52150.420226.40046.4001.1301.9542598.830-0.5282597.0721.7584.85128.971.75866.488326.50072.9001.1641.6522598.308-0.5302596.5421.7664.88143.951.76670.092428.900101.8001.1481.7002597.772-0.5782595.9641.8085.08160.681.80877.770530.300132.1001.1801.6582597.262-0.6062595.3581.9045.53168.701.90485.082627.700159.8001.2721.5112596.931-0.5542594.8042.1276.65203.672.12785.288727.520187.3201.1871.5512596.652-0.5502594.2542.3988.15224.612.39895.271827.000214.3201.1971.5112596.328-0.5402593.7142.6149.45- 02.614102.967923.000237.3201.6752596.164-0.4602593.2542.91011.38- 02.91094.5211,440.23727.901Costo M3GBsCotizacion-231.666.94Costo Total Bs$b 45,597.59Costo Total Sus$6,570.26
CORTE LONGITUDINAL
EJE DE LA EXCAVACION
PERFIL DEL TERRENO
CANTIDAD DE DATOS
ELEVACION m
PERFIL LONGITUDINAL
Diagrama
BASE DE EXCAVACION
TERRENO NATURAL
COTA DE EXCAVACION
ISOMETRICO DE EXCAVACION
Hoja1
Hoja1260025982599.1212597.62598.832597.0722598.3082596.5422597.7722595.9642597.2622595.3582596.9312594.8042596.6522594.25362596.3282593.71362596.1642593.2536
COTA TERRENO
ALTURA DE EXCAVACION
NIVELACION
PuntoDISTANCIALECTURA DE LA MIRAElevacion terrenoBMParcialAcumuladaBSINTERMEDIOFS2600120201.0121.8912599.121226.446.41.6631.9542598.83326.572.91.131.6522598.308428.9101.81.1641.72597.772530.3132.11.1481.6582597.262627.7159.81.181.5112596.931728187.321.2721.5512596.652850237.321.1871.6752596.1649.75613.592