Transcript of Belzona Oil Presentation
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
1
Identifying the Hidden Threats in Austenitic Stainless Steels and Practical Repair
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
2
Hidden Threats in Austenitic Stainless Steel
SS AISI 321 was extensively used in Gasco
Buhasa NGL Extraction Plant intended to prevent internal CO2 corrosion and brittle fracture at :
• GAS Transmission Lines.• Equipment and Piping at Compression Section.• Cold BD Piping System and KO Vessel.
Key Words : 1. Chloride Stress Corrosion Cracking (CSCC) 2. Stainless Steel (SS)
3. Blow Down (BD)
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
3
Hidden Threats in Austenitic Stainless Steel
SS AISI 321 is vulnerable to Stress Corrosion Cracking in the presence of Chlorides depending on :
• Stress Levels,• Oxygen Content,• Temperature.
External CSCC phenomenon occurred at Welding Regions of the Reinforcing Pads, Wear Pads and Saddles resulting in Severe Cracking and Leakage.
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
4
Typical Reinforcing Pad and Wear Pad
BRANCH CON.
WEEP HOLE
MAIN PIPE
FULL ENCIRCLEMENT SLEEVE
WEEP HOLE
WEEP HOLE
RAINFORCING PAD
WEAR PAD
TACK WELD
SUPPORT
WEEP HOLE
WEAR PAD
SUPPORTBRANCH CON.
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
5
Reinforcing Pad Cross Section
WEEP HOLE
MAIN PIPE
REINFORCING PAD SECTION VIEW
CSCC AT WELD REGION
GAP BETWEEN MAIN PIPE AND REINFORCING PAD. (ANNULAR SPACE)
REINFORCING PAD
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
6
Wear Pad Cross Section & Metallographic Examination
MAIN PIPE
Metallographic Examinationof Typical CSCC Initated atthe Weld Region Annular Space.
WELDING
CSCC AT WELD REGION
GAP BETWEEN MAIN PIPE AND (ANNULAR SPACE)WEAR PAD.
WEAR PAD
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
7
Piping Reinforcing Pad – Cracks and Leaks
Leak at Reinforcing Pad Weep Hole
CSCC at Reinforcing Pad Weld
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
8
Vessel Reinforcing Pad & Saddle - Cracks
Cracks at Boot Reinforcing Pad
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
9
Cracks and Leaks at Wear Pads
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
10
Cracks and Leaks at Tack Weld Region after Wear Pad Removal
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
11
Action Taken
To restore the Integrity of the Plant, 8 SS Vessels had to be replaced and the Transmission Gas and Process Lines were also replaced at locations affected by CSCC. The Cold BD Piping System is fitted with 288 Wear Pads and operates at just positive Pressure and ambient Temperature. In spite of the Very Low Operating Pressure cracks and Leaks have been detected in some cases.
With the Objective of restoring the Integrity of the SS Cold BD Piping System, in a planned and cost effective manner a minimum risk with the Plant in Operation some options and non-standard repair methods were considered and evaluated.
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
12
Strategic Options
1. Replacement of the Cold BD Piping System.2. Do-nothing, Monitor Crack Propagation & Leaks. 3. Glass-Fiber Reinforced Protection Wrapping.4. Replace the Original Wear Pads with Cracks and Leaks by Larger Cold Bonded SS Wear Pads.
• Option-4 Was Chosen by Buhasa Plant and Endorsed by the 2003 Shareholders Integrity Review Team.
• The Repair Work was Implemented in accordance with the Gasco Plant Change Request procedure .
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
13
Test Piece
New Wear Pad
BelzonaPrimer
Top Coat
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
14
Practical Repair
Replacement of the 288 original Wear Pads with Cracks and
Leaks by “Larger Cold Bonded SS Wear Pads”.
1. Jack the Pipe Up.2. Removal of Wear Pads by Grinding.3. Assessment of Cracks with Regard to Fitness-For-Purpose
Criteria (Shell Study).4. SS Cold BD Line and Pads Anchor Profile >50 microns.5. Cold Bonding of Larger SS Wear Pads (Belzona 1121).6. Painting.
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
15
Steps to Bond Wear Pads to the Main Line
1 2
3 4
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
16
Cold BD Piping System Completion
Painting of New Wear pad Cold BD Partial View
ADNOC/ADCO/GASO Workshop, 11th Feb. ‘08
17
Thank you
Francisco Costa,
Buhasa Inspection Head, GASCO