1.- INGENIERIA, SUMINISTRO, PROYECTOS LLAVE EN MANO, ASISTENCIA EN MONTAJE, PRUEBAS, COMISIONAMIENTO, CAPACITACION EN LA ESPECIALIDAD DE VENTILACION INDUSTRIAL, POLVOS Y DESCONTAMINACION DE GASES.

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

Puerto Coloso- MEL, Chile Sistema colector de polvo, tipo insertable sobre correa 2008 800 20.000

Expansión Los Pelambres – Takraf, Chile Sistema colector de polvo, para presurización de salas de Chancador

2008 1000 100.000

Codelco Andina – PDA Fase 1 Bechtel, Chile

Sistemas colectores de polvo, Ttransporte y chancado PDA Fase 1

2008 2000 400.000

SEPON – KDG, Laos Sistema de abatimiento de neblinas acidas, planta de EW

2008 15000 5.000.000

ANGLOPLATINUM / HATCH, Sudafrica

Sistema de abatimiento de neblinas ácidas 2008 15000 5.000.000

Proyecto Yanacocha - Perú FLUOR 22.500 cfm

Engineering and Supply of 3 Dust and Gases Scrubber Systems + a tunnel ventilation system

2006-2007 380 365.000

MINERA SIERRA MIRANDA, Chile 18.000 cfm

Engineering, Supply and Site Assistance of an Acid Mist Control System. Nueva Planta de EW

2006-2007 350 655.000

S2W9 Escondida Project Minera Escondida (BHP Billiton), Chile Man Takraf (52.000 cfm)

Engineering and Supply of 6 New Dust Collector Systems, including additional parts and pieces to relocate 3 existing Dust control systems.

2006-2007 2500 1.325.900

San Francisco Copper EW Plant Expansion Project MINERA SUR ANDES – Anglo American Chile 3.500 cfm

Engineering, Supply, Erection and Start-up of the upgraded existing extraction and abatement acid mist control system. 2006 400 223.000.-

RBMR Expansion Project ANGLO PLATINUM – Sudáfrica 3.500 cfm

Engineering, Supply, Site assistance, evaluation and result discussion of a testing pilot configuration, for nickel cell ventilation system in 3 alternatives at the existing EW Plant in RBMR.

2006 1190 220.900.-

Emission control in belt skip area – Area 200 CERRO MATOSO – BHP Billiton, Coliombia 400 acfm

Details / basic engineering for the development of a control and provision solution of details for the fabrication of supports, services and supply of equipment for emission control.

2004-2005 1.600 242.000.-

Emission control in area 200 – Alim. Alterna, mineral deposit CERRO MATOSO – BHP Billiton, Colombia 40.000 acfm

Details / basic engineering for the development of a control and provision solution of details for the fabrication of supports, services, existent areas modifications and supply of equipment for emission control, lodes tank and ventilator.

2004-2005 2.646 446.000.-

Page 3: 1. Experiencia SAME 2008

EXPERIENCIA SAME

CALIDAD DE AIRE – CALIDAD DE VIDA

3

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

Pilot development for emissions control in FC150 stack CERRO MATOSO – BHP Billiton, Colombia 1.700 acfm

Details / basic engineering for development of a pilot system of emissions control in the chimney FC150.

2005-2006 3.236 99.500.-

Oxides project Tintaya Peru BHP BILLITON TINTAYA S.A., Perú 23.500 acfm

Engineering and supply of components for actualization of coupling high energy hoods of extraction and abatement acid mist.

2005 600 88,300.-

ILO project – Peru MINERA Southern Copper Peru 11.200 acfm

Engineering and supply of collector dust filter. Two units of 3200 cfm e/o and two units of 2400 cfm e/o. Contract by Fluor.

2005 750 173.750.-

Spence project – Exhauster dust system COMPAÑÍA MINERA SPENCE S.A., Chile 16.100 acfm

Engineering and supply of collect filters in 30 and 35 areas, on conveyor belt and on storing silo. Contract by Aker Kvaerner.

2004-2005 1.000 220.000.-

“Hydromet Demonstration Plant” Project, Argentiina 200 cfm HATCH - INCO

Engineering and Supply of a System of Extraction and Abatement of Acid Mist – 200 cfm – Voisey’s Bay –Pilot Plant – Argentia - Canada.

2005 120 19.000.-

Escondida Norte Project MINERA ESCONDIDA LIMITADA, Chile 52.000 acfm

Engineering, Supply, Assembling Assistance, Commissioning, Starting and Training of 5 systems collector’s dust in transference of belt, 3 independents systems of 12.000 acfm c/u y 2 systems of 8.000 acfm

2004 at date

2.000 970.000.-

Spence Project– Acid Mist Control System COMPAÑÍA MINERA RIOCHILEX S.A. 286.000 acfm

Engineering, Supply, Assembling Assistance, Commissioning, Starting and Training of 6 Acid Mist Control System for the Electro-obtention building. Include Secondary Ventilation System design.

2004 2005

15.400 5.938.900.-

Lixiviación de Súlfuros – Close Capture Acid Mist Control System Project MINERA ESCONDIDA LIMITADA, Chile 330.000 acfm

Engineering, Supply, Assembling Assistance, Commissioning, Starting and Training of 6 Acid Mist Control System for the Electro-obtention building. Include Secondary Ventilation System design

2004 2005

17.500 8.578.000.-

Project Extrusora Nº3 – Fine dusty Control in mixer PugMill CERRO MATOSO , BHPBilliton – Colombia 600 acfm

Supply, Assembling and starting advice of a collecting system of fines from PugMill mixer, through washer chimney. 2004 150 18.300.-

System Aspiration of Dusty for Coloso Port Project MINERA ESCONDIDA LIMITADA, MEL 500 acfm

Engineering, Supply, Assembling Assistance, Commissioning, Starting and Training of a System of Dust Exhaust for copper concentrated.

2003-2004 1.000 114.200.-

E3 of Minera Escondida Limitada Project MANTAKRAF - MINERA ESCONDIDA LIMITADA, Chile 48.000 acfm

Engineering, Supply, Assembling Assistance, commissioning, Starting and Training of 6 Collecting Systems of dusty in transference of belts. Capacity 8.000 acfm c/u

2003-2004 2.300 350.000.-

Page 4: 1. Experiencia SAME 2008

EXPERIENCIA SAME

CALIDAD DE AIRE – CALIDAD DE VIDA

4

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

Installation of collecting hoods of acid mist in en EW of oxide Project MINERA ESCONDIDA LIMITADA, Chile 282.000 acfm

Engineering, Supply, Assembling and Starting of a Acid Mist control system in a EW de Oxides – Phase I& Phase II

2003-2004 52.400 6.250.000.-

Enlargement stock pile de CMIC - Puerto Patache Project BDS – CMDIC, Chile 82.000 acfm

Engineering, Supply, Assembling Assistance, Commissioning, Starting and Training of a equipment of dust control for the enlargement of the stock-pile of Patache Port.

2003-2004 350 266.500.-

Third plant of flow solids dried – Codelco Teniente Project, Chile METSO 500 cfm

Engineering, Supply and Starting of vacuum suction net.

2003 100 22.000.-

Fosfina Fume Control Project DEGESCH DE CHILE 10.000 cfm

Engineering and supply, assembling and starting of a captation system of fosfine fumes, through use of cabin absorber explosion, washer and drier filter. 10.000 cfm.

2003 900 100.000.-

Air Conditioned Control Area Project Technologic Change Potrerillos Foundry CODELCO - SALVADOR DIVISION, Chile

Engineering, Supply, Assembling and Starting of a Pressurization System of Conditioned Air 15.000 cfm

2002 1.200 260.000.-

Tintaya Oxides Project BHP BILLITON TINTAYA S.A., Peru

Supply of a strongback equipment semi-automatic for harvest and hoods.

2002 150 41.900.-

“EW Fume Exhaust System” Project 4.000 cfm STILLWATER MINING COMPANY, USA

Engineering and Supply of a Acid Mist Control System – 4.000 cfm – Base Metals Refinery – Columbus – Montana – EE.UU.

2002 540 156.000.-

Project “Dust Exhaust System of Concentrated” for Codelco Division Salvador, Chile METSO MINERALS

Engineering and Supply of equipment for vacuum net for dust exhaust for copper concentrated.

2002 200 41.000.-

Project “Prototype Useful of Reaping and Positioned travelling crane”, Chile ESCONDIDA LIMITADA MINING, Chile

Turnkey project for the supply of a cathodes and of a positioned automatic of crane bridge for the tankhouse EW. Oxides plant

2002 2.500 205.000.-

Project Pressurization of electric Areas – Mill SAG 1 y 2 DOÑA INES DE COLLAHUASI COMPANY MINING, Chile

Turnkey Project for the supply of 2 Dust Exhaust System of 3.500 cfm c/u

2001 650 180.000.-

Silo Dust Control of Cement MELÓN CEMENT, Chile

Supply of hose filter and ventilating of 10.000 cfm

2001 120 36.000.-

Project Copper Recuperation in low grade mineral– Los Bronces, Chile COMPAÑÍA MINERA DISPUTADA DE LAS CONDES

Supply of a Acid Mist Control System for the EW San Francisco Plant - 2.800 m.a.s.l.

2000/2001 1.000 580.000.-

Tintaya Oxide Project, Peru Electrowinning Cell Ventilation System 59.000 cfm KVAERNER METALS SAN FRANCISCO

Supply of a Acid Mist Control System for the EW area in the Tintaya Mining of BHP 4.100 m.a.s.l.

2000/2001 1.200 781.500

Page 5: 1. Experiencia SAME 2008

EXPERIENCIA SAME

CALIDAD DE AIRE – CALIDAD DE VIDA

5

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

Optimization Project for Radomiro Tomic – Codelco, Chile KVERNER METALS

System of cleaning for exhauster dust through net vacuum.

2000 800 352.000

El Tesoro Project, Chile SVEDALA

Supply of a Exhauster Dust System 10.000 cfm Primary Crusher Plant

2000

120 74.800

Captation in transfer belt System Escondida Fase IV MAN TAKRAF

Engineering, fabrication and supply of a 1 filter of 12000 cfm and 8 filters of 8000 cfm e/o., for belt transfer in dry area

2000 1500 402.000

Equipment and Services , Chile COMSA

Supply of a system of smell control in grill room. Treatment plat of sewage Tocopilla

2000 150 36.000

Turnkey project Mix Area., Chile ETERSOL

Supply Exhaust dust floor plat, mix area. 1999 250 40.000

Turnkey project Ventilation System Oxychloride Plant., Chile QUIMETAL

Supply Acid Gas Control. 1999 300 120.000

Improvement System of Exhauster Gas Chemistry Laboratory - F.H.V.L. ENAMI

Engineering, supply of washer equipment, hoods reconditioning, ducts supply and auxiliary equipment for chemistry laboratory of the Hernán Videla Lira Foundry.

1999 180 43.500

Supply of cabin for galvanized., Chile CINTAC

Supply of cabin for galvanized of piping in crucible furnace.

1999 150 16.900

Engineering and supply for the services of industrial ventilation for emission control. COMSA

Supply of smell control system in grill room. Treatment plant of sewage Tal-Tal.

1999 150 38.700

Exhauster dust System and calcinations furnace in Cal Plant., Chile 60.000 ACFM COMPAÑÍA SIDERÚRGICA HUACHIPATO

Engineering of details of the specialty civil and electric of the system. Supply of hose filter, ventilating and support equipment (Screw conveyor, dampers, etc.)

1999 2.500 400.000

Ampliation of the system of capture of acid mist - Lixiviation Phase I – Los Bronces 12.000 ACFM COMPAÑÍA MINERA DISPUTADA DE LAS CONDES

Engineering, hoods supply and FRP ducts for coupling being systems. To add rinse washer system for hoods.

1999 600 96.500

Fumes control system in roast of coffee. 3.500 ACFM, Chile CAFÉ HAITÍ

Supply of hose filter, ventilator, ducts. Assembling and Starting.

1999 90 16.500

Exhauster dust system and gas’s de-sulphuration for emission coming to the boiler with Fuel 5 8.000 ACFM DUEIK – AGRÍCOLA SUPERPOLLO

Turnkey project, included: engineering, supply of hose filter, cooler and proportioner of cal, centrifugal ventilator, electro mechanic assembling, test assistance, starting and Training.

1998 600 75.000

Exhauster dust system – Thermic Hardening Area– Pellets Plant– Phase 1 2.000 ACFM CIA. MINERA DEL PACÍFICO

Supply of hose filter type jet-pulse, high efficiency cyclone and double flap valve – Special design high precision (28” Hg)

1998 100 15.000

Page 6: 1. Experiencia SAME 2008

EXPERIENCIA SAME

CALIDAD DE AIRE – CALIDAD DE VIDA

6

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

Fumes filtrated system and Concentrated of foundry gas’s furnace – Foundry area, Argentina 10.000 ACFM CERRO VANGUARDIA – ARGENTINA

Engineering and supply of hose filter, Cooler system, Assistance in test, starting and Training.

1998 1.700 170.000.-

Dust filter system –Spray drier 6.000 ACFM LICAN ALIMENTOS S.A.

Engineering, Supply of special hose filter, Assembling assistance, Training, Test and Starting.

1998 400 42.000.-

Exhauster dust system in storing and dispatch in finishing plaster.– Plaster Plant, Chile 5.000 ACFM – 1.400 a.s.l. SOCIEDAD INDUSTRIAL ROMERAL

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1998 260 30.000.-

Exhauster dust system – Hardener thermic Area - Pellets Plant.– Phase 2 2.000 ACFM CIA. MINERA DEL PACÍFICO

Supply of jet pulse sleeve filters, high efficiency cyclone and double flap valve. Special design high precision (28” Hg)

1998 350 42.000.-

Acid mist washer system – Plant SX-EW 15.000 AFCM – 3.400 a.s.l., Chile CIA. MIN. DISPUTADA DE LAS CONDES

Washer supply, Multiventuri, Assembling assistance, test, starting and training.

1997-98 650 65.000.-

Dust control system in rotators furnace – Plaster Plant 14.000 ACFM – 1.400 a.s.l., Chile SOCIEDAD INDUSTRIAL ROMERAL

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1997 880 110.000.-

Dust control system – Crusher Plan Secondary / Tertiary 50.000 ACFM – 4.500 a.s.l., Chile CIA. MINERA MARICUNGA

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1997 3.400 420.000.-

Ventilation system, Food handling – 7.000 ACFM, Chile TROUW CHILE S.A.

Engineering, sleeve filter supply, test assistance, starting and training.

1997 200 30.000.-

Dust control system – Lime Plant – Los Lirios, Chile 12.500 ACFM CODELCO-CHILE, El Teniente Division

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1997 2.600 260.000.-

Exhausted dust system and smell reducer from induction furnace and blaster machines – Foundry Area 12.500 ACFM MEDIDORES LAUTARO

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1996-97 1.100 97.000.-

Dust control system – Sampling, Chile 9.000 ACFM CIA. MINERA CANDELARIA

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1996 240 30.000.-

Page 7: 1. Experiencia SAME 2008

EXPERIENCIA SAME

CALIDAD DE AIRE – CALIDAD DE VIDA

7

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

Exhausted dust system and smell reducer from induction furnace and blaster machines – Foundry Area 7.000 ACFM – 4.000 a.s.l. FLUOR DANIEL ARGENTINA – PROYECTO ALUMBRERA

Engineering, washer supply Multiventuri, test assistance, starting and training.

1996 1.200 110.000.-

Emergency system of exhauster dust system – Crusher Plant, Chile CIA. MINERA MARICUNGA

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1996 1.300 90.000.-

Pressurization system of electrics rooms – Lime Plant 6.000 CFM, Chile SOPROCAL CALERIAS

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1996 400 40.000.-

Modernizations sleeves filtres 2.000 ACFM – Aggregate Plant, Chile READY MIX

Engineering, Sleeves filter transformation, Assembling assistance, test, starting and training.

1995 300 15.000.-

Corrosives and dust control system – Chemistry laboratory, Chile 15.000 ACFM CIA. MINERA CANDELARIA

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1995 1.400 135.000.-

Dust control system – Crusher Plant – El Navío Mining 22.000 ACFM CEMENTO MELÓN

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1995-96 1.200 98.000.-

Dust control system in roller grinder, stucco papers, load of a firewood boiler. 8.000 ACFM C.M.P.C. PAPELES S.A.

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1995 720 60.000.-

Fumes system and combustion of gases in sawdust boiler 4.000 ACFM MADERAS FERNANDO MAYER

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1995 840 70.000.-

Dust control system – Mix and formulation area 4.500 ACFM INDURA S.A.

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1995 500 51.000.-

Exhauster dust system and gas desulphurization from combustion of fuel 5 emissions 6.500 ACFM AGRICOLA SUPERPOLLO S.A.

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1995 1.400 120.000.-

Page 8: 1. Experiencia SAME 2008

EXPERIENCIA SAME

CALIDAD DE AIRE – CALIDAD DE VIDA

8

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

Fumes and dust control system in induction furnace, cooler area and blaster machines – Foundry building, 9.000 ACFM CIA. CHILENA DE MEDIDORES SCHLUMBERGER

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1994 1.000 81.000.-

Exhauster dust system and starch handling 8.000 ACFM INDUSTRIAS MAIZ Y ALIMENTOS S.A.

Engineering and sleeve filer supply, assembling assistance, test, starting and training.

1994 500 35.000.-

Fumes and dust control system in induction furnace, cooler area and blaster machines – Foundry building 6.000 ACFM MEDIDORES LAUTARO S.A.

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic erecting, test assistance and training.

1994 700 50.000.-

Sleeve filter mechanic to jet – pulse recondition 3.000 ACFM MADERAS SINTÉTICAS MASISA S.A.

Engineering and reconditioning of sleeve filter, assembling assistance, test, starting and training.

1994 280 23.000.-

Exhaust dust system in packing machine of dust juice of different flavour. 30.000 ACFM CORPORA TRES MONTES S.A.

Engineering, supply of sleeve filters, assistance, erecting, starting and training.

1994 700 70.000.-

Recondition existent system of dust and gas control in different furnaces. 5.000 ACFM MADECO S.A.

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic erecting, test assistance and training.

1994 300 23.000.-

Exhauster dust system and gas desulphurization from glass furnace, combustion of fuel 5 20.500 ACFM CRISTALERÍAS TORO S.A.

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1993 4.600 390.000.-

Exhauster dust system from process equipment (screens, pulley, etc.), 20.000 ACFM SOPROCAL CALERÍAS E INDUSTRIAS

Engineering, supply of sleeve filters, assistance assembling, starting and training.

1992-93 1.600 175.000.-

Exhauster dust system – Sampling area – Mining laboratory,6.000 ACFM UNIVERSIDAD DE CHILE

Turnkey Project that include: Engineering, supply of sleeve filters, centrifugal fans, telescopic sleeve for tracks, ventilation system, electro mechanic assembling, test assistance and training.

1992 300 30.000.-

Dust and gases control system in chemistry laboratory,15.000 ACFM CIA. MINERA OJOS DEL SALADO

Engineering and washer gases supply, assembling assistance, starting and training.

1991-92 600 50.000.-

Dust control system - El Lince crusher plant – Cathodes Plant I Phase. 90.000 ACFM - 1.000 a.s.l. CIA. MINERA CAROLINA DE MICHILLA

Engineering and multi cyclones washers supply, (different models), assembling assistance, test, starting and training.

1991-92 7.000 550.000.-

Gas washer system in digester plant 10.000 ACFM 4.200 a.s.l. CIA. MINERA TRES CRUCES

Engineering and Venturi scrubber washer and cyclonic separator, assembling assistance, test, starting and training.

1990-91 650 63.000.-

Page 9: 1. Experiencia SAME 2008

EXPERIENCIA SAME

CALIDAD DE AIRE – CALIDAD DE VIDA

9

2.- INGENIERÍA, ASESORIA Y CONSULTORIA EN LA ESPECIALIDAD DE VENTILACIÓN INDUSTRIAL, POLVO Y DESCONTAMINACION DE GASES

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

RBMR Expansion Project ANGLO PLATINUM – South Africa

Detail Engineering to implement Ventilation Systems on Cu and Ni EW Tankhouses, and emissions control in nickelic cells.

2007 3.500 154.100

Aconcagua Foods, Chile Ingeniería Básica-Detalle. Sistma de control de Mat. Particulado. Caldera Industriales y Lavador de Gases

2007 1700 17.000

Minera Santa Bárbara, Chile

Servicio de ingeniería conceptual definición de sistema de ventilación y control de polvo proveniente de proceso de chancado de mineral planta cerro Imán.

2006 768 5.000

Compañía Minera del Pacifico S.A., Chile

Suministro de pulverizador Aire-Agua. Aplicación en chimenea lavadora.

2006 700 5.500

RBMR Expansion Project ANGLO PLATINUM – South Africa

Feasibility Study to implement Ventilation Systems on Cu and Ni EW Tankhouses, and emissions control in nickelic cells.

2006 12.000 490.000

Dalkia. S.A. Planta Fábrica, Chile

Servicio de ingeniería básica. Definir y diseñar sistema de control de material particulado proveniente de caldera industrial, alimentada con petroleo pesado Nº5. Planta Ariztií Fabrica. Melipilla. Servicio de Ingeniería de Detalle referencia ingeniería anterior.

2006 1.400 14.000

Improvement in Emissions Control System in stack Nº 2A COMPAÑÍA MINERA DEL PACÍFICO (CMP), Chile

Basic Engineering for designing requiered modifications in 1º stage for stack Nº 2A discharge emissions Control System Improvement Plan .

2006 800 35.600

RBMR Expansion Project ANGLO PLATINUM – South Africa

Pre-Feasibility Study to implement Ventilation System on Cu and Ni EW Tankhouses.

2006 3.650 149.800

Proyecto Control de Emisiones en Chimenea del Horno 2 CERRO MATOSO (BHPBilliton – Colombia)

Ingeniería Básica para el diseño de una solución de control de emisiones de finos en la descarga de gases de horno.

2005 2006 250 99.500

Proyecto Mejoramiento de Sistema de Control de emisiones en la chimenea 2A., Chile COMPAÑÍA MINERA DEL PACÍFICO (CMP)

Ingeniería conceptual para el diseño de las modificaciones requeridas para el mejoramiento del sistema de control de emisiones de la descarga de la chimenea 2A.

2005 50 3.900

Page 10: 1. Experiencia SAME 2008

EXPERIENCIA SAME

CALIDAD DE AIRE – CALIDAD DE VIDA

10

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

Ferronickel Plant CERRO MATOSO (BHPBilliton), Colombia Colombia

Conceptual Engineering Emissions control of particles from chimney in electric furnace 2.

2004 1170 63.000

Ferronickel Plant CERRO MATOSO (BHPBilliton), Colombia Colombia

Profile Engineering Emissions control of particles and gases to the atmosphere. Area 200 Mineral preparation and Area 400 calciner and foundry furnace.

2004 550 30.000

Fines treatment project – Extruder Nº3 BECHTEL for CERRO MATOSO Colombia

Conceptual – basic Engineering Dust control in process of mix. 2004 170 6.000

Control of gases system, Chile PAPELES INDUSTRIALES S.A. (PISA)

Conceptual – basic Engineering Control of gases system in carbon boiler.

2003 70 2.400

Aggregate Plant, Chile ARENEX – READY MIX

Conceptual Engineering Dust control in Aggregate plant 2003 180 4.000

Tracks shop – Los Bronces COMPAÑÍA MINERA DISPUTADA DE LAS CONDES

Advice and revision of ventilation engineering 2002 90 3.700

Lixiviation project phase II – Los Bronces COMPAÑÍA MINERA DISPUTADA DE LAS CONDES

Technical assistance for the starting of the ventilations system of the lixiviation plant

2002 250 19.700

Coffee plant CORPORA TRES MONTES

Basic engineering – Dust control of coffee plant 2002 100 5.000

Patache Port COMPAÑÍA MINERA DOÑA INÉS DE COLLAHUASI

Engineering Collector dust Overhaul 2001 150 7.000

Patache Port COMPAÑÍA MINERA DOÑA INÉS DE COLLAHUASI

Conceptual engineering - stock pile dust control system and ship load 2001 200 10.000

Technical management - Oxides Area COMPAÑÍA MINERA ESCONDIDA LTDA.

Basic and details engineering – EW acid mist control system 2001 3.100 142.000

Pesticides DEGESCH DE CHILE

Basic engineering for gases capitation system – Fabrication fosfine Project 2001 120 5.000

Technical management - Oxides Area COMPAÑÍA MINERA ESCONDIDA LTDA.

Conceptual Engineering – Electro – Winning tankhouse acid mist control system

2000 1.175 41.600

Grinding, flotation and filter ventilation system COMPAÑÍA MINERA CANDELARIA

Conceptual Engineering and preparation of bidding bases for grinding, flotation and filter ventilations system.

2000 800 24.000

Exhauster dust system Optimization of Radomiro Tomic KVAERNER METALS

Basic engineering – details exhauster dust system in primary, secondary and tertiary crusher.

2000 1.900 40.000

Founder Profo ASIMET clearing production treatment AMBAR

Details engineering in control emission from ferrous foundries. 2000 1.200 46.000

Engineering dust control service primary crusher COMPAÑÍA MINERA DISPUTADA DE LAS CONDES

Basic & detail engineering for general system of dust control. Los Bronces primary crusher.

2000 750 22.700

Page 11: 1. Experiencia SAME 2008

EXPERIENCIA SAME

CALIDAD DE AIRE – CALIDAD DE VIDA

11

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

Exhauster dust system Optimization of Radomiro Tomic KVAERNER METALS

Basic engineering – details exhauster dust system in primary, secondary and tertiary crusher.

1999 750 20.500

Conceptual engineering Oxychloride Plant QUIMETAL

Conceptual engineering capitation gases system in oxychloride plant.

1999 150 3.400

Conceptual/Basic engineering Mix/Process Area ETERSOL

Basic engineering dust control system in mix/process area.

1999 200 12.300

Reconditioning study of dust control system CMP

Optimization engineering sleeve filter. 1999 160 4.500

Acid mist control system EW room – Lixiviation CODELCO CHILE, Div. Salvador

Conceptual engineering 1999 700 27.000.-

Dust captation system – Concentrator’s tertiary crusher WOLNITZKY ING. – CODELCO CHILE, Div. Chuquicamata

Assembly technical assistance, training, test and starting of the dust captation system. Included jet – pulse sleeve filters.

1999 150 7.000.-

Electrostatic precipitator and optimization – Roasted Plant PROMINA – CODELCO CHILE, Div. Chuquicamata

Conceptual engineering –Process discipline

1999 140 5.000.-

Dust off in 22 mill , Chile CEMENTO MELÓN

Technical advice 1999 90 3.000.-

Fumes captation system – Piping galvanised furnace CINTAC S.A.

Conceptual / Basic engineering 1998 260 9.200.-

Optimization fumes captation system , Chile MADECO S.A.

Conceptual / Basic engineering 1998 275 9.500.-

To capsule gross hopper – Primary crusher – Concentrator PROMINA – CODELCO CHILE – Div. Chuquicamata

Conceptual engineering –Process discipline

1998 110 4.000.-

Control dust contamination and aspiration system COPRIM S.A. – CODELCO CHILE, Div. Salvador

Conceptual engineering –Process discipline

1998 420 12.500.-

Exhauster dust system for carbon transportation and clinker discharge POLPAICO S.A.

Conceptual / Basic engineering 1998 520 15.500.-

Fumes captation system – Crucible furnace of galvanized MORGAN Y FUENZALIDA

Basic engineering 1998 210 8.000.-

Fumes captation system in foundries room – Induction furnace FUNDICIÓN LAS ROSAS

Conceptual / Basic engineering 1998 240 8.500.-

Modification washer chimney 2B CIA. MINERA DEL PACÍFICO

Details engineering, fabrication assistance, assembly, training and ventilator-washer starting.

1998 620 28.000.-

Fumes treatment system Furnace door and slag handling – Aluminium Foundry MADECO S.A.

Conceptual engineering 1998 200 7.300.-

Page 12: 1. Experiencia SAME 2008

EXPERIENCIA SAME

CALIDAD DE AIRE – CALIDAD DE VIDA

12

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

Dust aspiration system – Thermic hardener area – Pellets plant CIA. MINERA DEL PACÍFICO

Details engineering, assembling assistance, tests, starting and system training.

1998 1.200 35.000.-

Balling ventilation areas and cal dust control in Pekay mixers –Pellets plant CIA. MINERA DEL PACÍFICO

Design, basic and details engineering 1998 1.900 47.000.-

Dust control system in silo and process equipment –Cal plant PUGA&MUJICA – SOPROCAL

Conceptual engineering 1998 250 8.200.-

Ventilation system in tunnel of thickener – Crusher area CODELCO CHILE, Div. Chuquicamata

Conceptual engineering 1998 90 3.000.-

Gas and dust captation system –Carbon plant CEMENTO MELÓN

Conceptual engineering 1998 380 12.000.-

Industrial ventilation plant SX-EW and acid mist control FLUOR DANIEL – MINMETAL – C.M.D.

Basic and detail engineering, assembling assistance, test, starting and system training – Process discipline.

1997-98 3.500 135.000.-

Dust control system – Trébol plant READY MIX

Conceptual / Basic engineering 1997 250 10.000.-

Caption dust system – Tertiary crusher of concentrator WOLNITZKY ING – CODELCO CHILE, Div. Chuquicamata

Details engineering –Process discipline 1997 1.000 36.000.-

Captation dust system and fugitives fumes from copper foundry, chile MADECO

Conceptual engineering 1997 230 8.300.-

Dust control system from aggregate plant CALAMA, chile READY MIX

Technical advice included the generation of profile engineering.

1997 160 5.500.-

Dust control system Tripper transfer, Primary crusher concentrator CODELCO CHILE, Div. Chuquicamata

Technical advice included the generation of profile engineering.

1997 90 3.000.-

Discharge truck dust control, Chile CEMENTO MELÓN

Technical advice, engineering 1997 200 8.000.-

Dust control system in Aggregate plant WOLNITZKY ING – CODELCO CHILE, Div. Chuquicamata

Details engineering –Process discipline 1997 180 7.000.-

Dust recuperation and control system – Crusher plant CIA. MINERA AMAX GUANACO

Conceptual engineering 1996 250 9.500.-

Dust control system – Aggregate plant – El Trébol PUGA&MUJICA – READY MIX

Conceptual / Basic engineering 1996 500 18.000.-

Captation dust system in concentrator plant A0, A1, A2 WOLNITZKY ING – CODELCO CHILE, Div. Chuquicamata

Details engineering –Process discipline 1996 600 20.000.-

Page 13: 1. Experiencia SAME 2008

EXPERIENCIA SAME

CALIDAD DE AIRE – CALIDAD DE VIDA

13

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

Aspiration dust system – Hardener thermic area –Pellets plant CIA. MINERA DEL PACÍFICO

Conceptual engineering 1996 450 15.000.-

Dust contrl system – Crusher plant – Punta del Cobre DAVY INTERNATIONAL

Conceptual engineering 1996 300 10.200.-

Dust and gases captation system of Selenium in nobles metal plant WOLNITZKY ING – CODELCO CHILE, Div. Chuquicamata

Details engineering –Process discipline 1996 550 18.000.-

Dust control system – Limestone plant SOPROCAL CALERÍAS E INDUSTRIAS

Conceptual / Basic engineering 1996 650 20.000.-

Dust captation system in molybdenum plant – Area 600 WOLNITZKY ING – CODELCO CHILE, Div. Chuquicamata

Details engineering –Process discipline 1996 400 14.000.-

Ventilation system diluter local – Juices plant CORPORA TRES MONTES

Conceptual engineering 1995-96 1.500 45.000.-

Dust control system in Prills tower Ammonium nitrate plant ENAEX

Conceptual engineering 1995 600 19.000.-

Gases and dust control syste - Refinery area. CIA. MINERA MANTOS DE ORO

Conceptual engineering 1995 800 25.000.-

Forced air feeder system to corn drier INDUSTRIAZ DE MAIZ Y ALIMENTOS S.A.

Conceptual engineering 1994 250 7.300.-

Fumes control system – Aluminium foundry MADECO S.A.

Details engineering –Process discipline 1994 450 14.000.-

Ventilation system Pellets plant CIA. MINERA DEL PACÍFICO

Details engineering –Process discipline 1993-94 400 13.000.-

Dust control system of cal dust – Crusher plant CEMENTO MELÓN

Conceptual engineering 1993 600 18.000.-

Dust control system – Crusher plant CIA. MINERA OJOS DEL SALADO

Conceptual engineering 1993-94 300 9.000.-

Dust control system – Crusher plant – Cathodes plant II phase. CIA. MINERA CAROLINA DE MICHILLA

Conceptual / Basic engineering 1993 3.400 101.000.-

Fumes and dust control system – Calcinations area – Cal plant CIA. SIDERÚRGICA HUACHIPATO

Conceptual engineering 1993 400 12.000.-

Control and recuperation dust system – Crusher plant ANGLOAMÉRICAN MANTOVERDE

Conceptual engineering 1992 300 9.500.-

Sistema Control de Gases – Área de Fundición ELECTROMETALÚRGICA ELECMETAL

Basic engineering 1992 850 25.000.-

Page 14: 1. Experiencia SAME 2008

EXPERIENCIA SAME

CALIDAD DE AIRE – CALIDAD DE VIDA

14

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

Dust control system in Limestone plant and recuperation of sleeve filters CELULOSA ARAUCO S.A.

Basic engineering 1992 320 9.800.-

Dust control system – Tertiary crusher plant – Sulphides INCA – CODELCO CHILE, Div. Chuquicamanta

Survey of existent installation of dust areas

1992 450 14.000.-

Dust control system – Crusher plant CIA. MINERA TRES CRUCES

Conceptual engineering 1990-91 800 22.200.-

Dust control system – Sand plant ELECTROMETALÚRGICA ELECMETAL

Conceptual engineering 1990-91 400 13.500.-

Page 15: 1. Experiencia SAME 2008

EXPERIENCIA SAME

CALIDAD DE AIRE – CALIDAD DE VIDA

15

3.- ASISTENCIA, MANTENIMIENTO Y SERVICIOS.

PROYECTO / CLIENTE ESPECIALIDAD DE TRABAJO FECHA HORAS HOMBRE VALOR EN U$

Atacama Kozan, Chile

Servicio de Mantención Sistema Colector de Polvo. Minera Subterránea 2007 1000 91.400

Maintenance Assistance to SAME’s Systems Minera Spence (BHP Billiton)

SAME’s Dust Control and Acid Mist Control Systems Maintenance-Operation assistance

2006-2007 500 60.000

Maintenance Assistance /MEL, Chile

SAME’s Dust Control Systems Maintenance-Operation assistance (two year). Evaluation Diagnosis - EW acid mist control system – Oxidos MEL.

2006-2008 1040 125.000