MET presentation -2015

Post on 11-Apr-2017

49 views 0 download

Transcript of MET presentation -2015

MET, salMajdalani Engineering & Trading 

Mission Statement:

To provide electro mechanical engineering solutions that are efficient, reliable, easy to maintain and cost effective. 

History….

• UNECO, The United Engineering Co. was founded in 1956 as one of the first Air conditioning companies in the region.

• UNECO was the exclusive TRANE distributor in Lebanon Since 1956.

HISTORY CONT……

In 2008 M.E.T. sal, was established to take over the Mechanical Engineering and service business from UNECO.

LEBANON RECONSTRUCTION

We  took ownership of Beirut Central district renovation projects since 1994

We were there from the beginning..

• Beirut Central district had the majority of construction activity aside from the Beirut International Airport and Casino 

du Liban. 

BCD –Unitary success..• We Owned the 

Beirut Central district small and medium size residential projects by introducing the high rise unitary application using USA made outdoor units ( Solidere Lot 671).

BCD – Applied success…• Thru a design/build 

agreement with Beirut Central district development team, we managed to install more than 60  air cooled heat pump screw chillers.

• Currently there are more than 75 of these chillers installed in Downtown Beirut

Central Plants…• From 1969 to 2012 We have 

installed more than 80 % of the water cooled central plants in the country.

– Phoenicia Intercontinental Hotel 1969

– AUB Medical School 1969– UNESCO bldg 1971– St. George Hotel 1971– Gefinor Commercial Center 1972– Summerland Hotel and resort 

1978.– American University Hospital 

1994.– Casino Du Liban 1996.– Mount Lebanon hospital 1998.– AUB district cooling plant 2008

AUB Central Plants…1969 till 2008

HEALTHCAREAmerican University of Beirut

American University of Beirut – Medical Center – OR chiller replacement with BMS system to monitor chiller operation from the OR suite. Project was won based on life cycle cost analysis between repair and replace

Lifting of New Chillers to AUB Medical Center Roof On March 11th ,2013

The next step.. Piping...BMS 

Geitaoui Hospital New addition800 tons of cooling using All priamry variable pumping system

COMMERCIALLes Dunes Commercial Center and Holiday Inn Hotel

Les Dunes commercial Center and Holiday Inn hotel:  Scheduled replacement of Qty=6, 160 tons air cooled chillers. Contract was signed directly with owner. Project was won based on long standing relationship with the owner and based on excellent service record that started in 1997.

VRV INSTALLATIONS

The Square Office Bldg. – BachouraSupply and installation of  17 Fujiair – Inverter type VRF systems .

Private  Residence. – DowntownSupply and installation of  TRANE– digital  type VRF systems .

Khoury Home Dept. StoresSupply and Installation of Fujiair Inverter type VRF systems

RESIDENTIALThe Platinum Tower

The Platinum Tower

‐ Provided design/build solutions for Mechanical works related to many apartments in the bldg.

‐ Provided and installed the mechanical system for the bldg. health club, including humidity control system for the indoor semi Olympic  size 

swimming pool.

Saifi Residential Bldg.Supply and installation of TRANE VRF digital systems

HOUSE OF WORSHIPMaronite Headquarters 

• Maronite church headquarters in Lebanon: Supply and installation of Qty=2 , air cooled heat pump chillers and supply of various air side equipment, that are being installed by a mechanical contractor under our supervision. Contract was signed directly with the Cardinal, based on our experience in the HVAC applications for worship houses.

LONGER TERM BUSINESS….American University of Beirut

American University of Beirut – School of MedicineCentral plant Replacement 

Project is currently under bid, with provision for value engineering . Consultant AME and Associates. Original plant was executed by UNECO 1969

$400 Million New Hospital at AUB including Three new central plants

WE ARE PART OF THE DESIGN‐BUILD TEAM

Award winning project with international recognition ‐ 2009

American University of Beirut – New Central Plant • 3,000 tons of cooling with absorption and centrifugal chillers, using marine cooling 

• A design/build effort at the highest level • Saved the university $1million • Record execution time of 11 month. 

Our efforts were recognized by the University administration and by the American Institute of Architects as one of the top 10 green projects in 2009.

Lowering the 1500 ton Abs. Chiller into the underground central plant

The Second Centrifugal Chiller being lowered to place

Completed Central plant

TUMO CENTERYEREVAN ‐ AREMENIA

• Lead Design/Build EM Team. 

• Implementation of the state of the art HVAC system.

• Training of local personnel on systems operation and maintenance.

• Design and installation of a total BMS System, with remote monitoring and trouble shooting capabilities from Beirut.

Stretching the limits in providing outdoor Air Conditioning for Music Hall‐ Biel

CONTINUING THE APPLIED BUSINESS WITH CLIMAVENETA, ITALY, 2014

MAK Palace hotel, Beirut

Sin El Fil MunicipalitySupply and installation of CLIMAVENTA SCROLL heat pump chillers and air handling  units

Gems Hotel – Ras BeirutSupply and installation of CLIMAVENTA SCREW heat pump chillers and fan coil units

Gemshotel‐Ras BeirutSupply and installation of CLIMAVENTA SCREW heat pump chillers and fan coil units

Cedim Medical Imaging CenterProviding cooling 24/7 to MRI and other medical imaging machines

Geitawoui General Hospital, Beirut