Cronograma Programado de Muros

Post on 03-Oct-2015

33 views 10 download

description

muro de contencion cronograma

Transcript of Cronograma Programado de Muros

CRONOG PROGRAMADOCRONOGRAMA PROGRAMADO DE EJECUCION DE OBRAOBRA"CREACIN DE MURO DE CONTENCIN EN EL PASAJE 10 Y 4 (MZ. I-K) DE LA ASOC. DE VIVIENDA DE JARDN DE SANTA ROSA DE LIMA,DISTRITO DE ATE - LIMA- LIMA"DISTRITOATEMODALIDAD DE EJECUCIN:PROVINCIALIMAPRESUPUESTO TOTAL DE OBRA::258874.95:REGIONLIMAPLAZO DE EJECUCION:3 MESES

ITEMDESCRIPCIONPRESUPUESTO S/.1ER. MES 2DO. MES3ER. MES

30.0060.0090.0001.00.00MURO DE CONTENCIN - MAPOSTERA DE PIEDRA

01.01.00OBRAS PROVISIONALES0.01,069.501,069.5001.01.01CARTEL DE OBRA 4.80 m x 3.60 m SEGN DETALLE1,069.500.01,069.501,016.951,016.9501.02.01ALMACEN, OFICINA Y CASETA DE GUARDIANIA1,016.950.00.001.02.00TRABAJOS PRELIMINARES0.01,443.751,443.7501.02.01LIMPIEZA DEL TERRENO MANUAL1,443.750.01,443.75762.71762.71-762.7101.02.02MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS762.710.0530.25530.2501.02.03TRAZO NIVELACION Y REPLANTEO INICIAL530.250.0530.250.00.001.03.00MOVIMIENTO DE TIERRAS0.01,838.071,838.071,838.071,838.071,838.071,838.071,838.071,838.071,838.071,838.0718,380.7201.03.01CORTE EN TERRENO SEMIROCOSO MANUAL18,380.720.02,502.712,502.712,502.712,502.712,502.712,502.712,502.712,502.7120,021.6901.03.02RELLENO CON MATERIAL PROPIO COMPACTACION CON EQUIPO LIVIANO20,021.690.0633.63633.63633.63633.63633.63633.63633.63633.635,069.0701.03.03ACARREO MATERIAL EXCEDENTE DIST. PROM 30 M5,069.070.07,513.037,513.03-7,513.0301.03.04ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO VOLQ. 10M3,D=10KM7,513.030.00.00.001.04.00MUROS DE MAMPOSTERA0.03,121.123,121.123,121.123,121.123,121.123,121.123,121.123,121.1224,968.9401.04.01 CONCRETO CICLOPEO 1:8 + 40% PG - CIMIENTOS CORRIDOS PARA MURO DE CONTENCION24,968.940.01,895.281,895.281,895.281,895.281,895.281,895.281,895.281,895.2801.04.02 ENCOFRADO Y DESENCOFRADO DE MURO DE CONTENCION15,162.206,727.516,727.516,727.516,727.516,727.516,727.516,727.516,727.5115,162.2001.04.03MURO DE MAMPOSTERIA DE PIEDRA MEZCLA 1:6 + 70% PG53,820.100.0880.69880.69880.69880.69880.69880.69880.69880.697,045.5101.04.04DRENAJE EN MURO TUBERIA DE 2"7,045.510.0110.17110.17110.17110.17110.17110.17110.17771.2101.04.05JUNTA DE CONSTRUCCION CON TEKNOPORT E=1" PARA MUROS771.210.01,448.421,448.421,448.421,448.421,448.421,448.421,448.421,448.4211,587.3301.04.06BARANDAS METALICAS DE TUBO DE FIERRO GALVANIZADO DE 2"11,587.330.0167.04167.04167.04167.04668.1601.04.07COLOCACION PLATINA F.N 2"X3/16"X6M668.16411.38411.38411.38411.3801.04.08COLOCACION DE ANCLAJE QUIMICO DE 1/21,645.522,769.542,769.5401.04.09PINTURA BARANDAS METALICAS( INC. LIMPIEZA DE LA SUPERFICIE)5,539.080.00.001.05.00PLAN DE MANEJO AMBIENTAL0.00.001.05.01NORMATIVIDAD AMBIENTAL0.0296.61296.61296.61889.8301.05.01.01MONITOREO A LA APLICACION DE NORMAS DE COMPORTAMIENTO 889.830.0296.61296.61296.61889.8301.05.01.02SEGUIMIENTO Y CUMPLIMIENTO A LAS PAUTAS SOCIO AMBIENTALES 889.830.0

01.05.02SEALIZACION0.0550.05550.0501.05.02.01LETREROS DE SEALIZACION AMBIENTAL DE 1.00x0.50 M. 550.050.0338.20338.2001.05.02.02LETREROS DE SEALIZACIONES AMBIENTAL DE 0.50x0.30 M338.200.00.001.05.03MITIGACION AMBIENTAL0.0694.28694.2801.05.03.01CONTENEDORES DE BASURA METALICO TIPO BASCULANTE SEGN DISEO694.280.0535.46535.4601.05.03.02BOTIQUIN 535.460.0785.11785.11785.112,355.3301.05.03.02MITGACION POR LEVANTAMIENTO DE POLVO 2,355.330.0

01.05.04PROGRAMA DE CONTIGENCIA0.097.6701.05.04.01SUMINISTRO Y COLOCACION DE EXTINTOR CO2 DE 10 LB. 97.670.0321.56321.5601.05.04.02CINTAS DE SEGURIDAD 321.560.00.001.06.00VARIOS0.01,625.001,625.0001.06.01KIT DE IMPLEMENTOS DE SEGURIDAD1,625.001,016.7101.06.02PLACA RECORDATORIA1,016.710.01,575.001,575.0001.06.02LIMPIEZA FINAL DE OBRA1,575.000.0

PROGRAMADO8,097.133,953.183,256.8219,047.4320,329.2418,523.9719,887.5019,157.6020,329.2419,157.6030,803.705,361.25COSTO DIRECTO187,904.6434,354.5577,898.3075,651.79GASTOS GENERALES (10.75%)20,206.633,694.378,376.928,135.34UTILIDAD (6%)11,274.282,061.274,673.904,539.11--------------------------------------------------------------------------------SUB TOTAL219,385.5540,110.1990,949.1288,326.23I.GV. (18%)39,489.407,219.8316,370.8415,898.72===================================TOTAL PRESUPUESTO258,874.9547,330.03107,319.96104,224.96FACTOR DE RELACION1.00000047,330.03107,319.96104,224.96258,874.95AVANCE 18.28%41.46%40.26%AVANCE ACUMULADO18.28%59.74%100.00%