SVR Presentation

15
PEOPLE DEVELOPMENT WTAP _ 2015 SVR FINAL REPORT OUT

Transcript of SVR Presentation

Page 1: SVR Presentation

PEOPLE DEVELOPMENT

WTAP _ 2015 SVR FINAL REPORT OUT

Page 2: SVR Presentation

2

Introductio

n

s

Michael Lentz

Fun/Interesting Fact About You:

Current Assignment:• TCF Maintenance

1st Shift• Supervisor: Christopher Atkins

Education:• Lawrence Technological University

Electrical Engineering (May 2017)

ACTIVITY RESULTS

# CLOSED KAIZENS(SK, MK) 2

AMOUNT OF SAVINGS #1 Safety: JSRA reduction of 98#2 B/C ratio: 94.47

# OF SA POCKET CARDS 7

TOTAL RESULTS

I am a drone/quadcopter enthusiast

Page 3: SVR Presentation

3

The Kaizen

Page 4: SVR Presentation

4

The Tank Farm Storage Project

• Cleaned up the old abandoned pump room outside D-70.

• Applied paint to give it a fresh new look.

• Adding new shelving and cabinets to make the space usable as a storage

room for tank farm pumps, and a workshop to fix the pumps.

Page 5: SVR Presentation

5

The Mess of an Abandoned Pump Room

Page 6: SVR Presentation

6

The Tank Leaking Everywhere

Page 7: SVR Presentation

7

The Hard Part is Over…

Page 8: SVR Presentation

8

Final Look When Racking Arrives

Page 9: SVR Presentation

9

Other Projects

• MAHLE Leak Tester – QM Project

• Turnover NEW Lock Out Tag Out – To meet OSHA requirements

• Wrote a Kaizen for this Project

• F-22 Lubrication Mapping – Mapped for AM and PM specialists

• Seat Conveyor Roller Chain Analysis

• TCF Breakdown Map

Page 10: SVR Presentation

10

MAHLE Leak Tester – QM Project

• Since starting the project we have seen a major decrease in overall failures.

Page 11: SVR Presentation

11

Turnover LOTO To Meet OSHA Standards

Page 12: SVR Presentation

12

F-22 Lubrication Mapping

• Created a lubrication map for F-22 conveyor to better accommodate AM and PM maintenance.

Page 13: SVR Presentation

13

Seat Conveyor Roller Chain Analysis

• Created a PowerPoint to explain the benefits of O-ring roller chain over standard roller chain.

Page 14: SVR Presentation

14

TCF Breakdown Mapping

• Mapped breakdowns in TCF for a clearer analysis of issues throughout TCF.

Page 15: SVR Presentation

15

Other Responsibilities

• Filled in for supervisors when they needed time off.

• Inventory the TCF Maintenance storage area.