HEV INTERN PROJECT SUMMARYPresentation to: Management
Presented by: Rogelio Fonseca
Date: August 16, 2016
![Page 2: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/2.jpg)
22
Overview• Introduction• Problem statement• Project 1• Project 2• Project 3• What I learned• Questions
![Page 3: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/3.jpg)
33
Rogelio Fonseca
• University of Houston
• Industrial Engineering/ Computer Science
• Graduating May 2017
Introduction
![Page 4: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/4.jpg)
44
Problem Statement
A lot of very useful data can be collected on the manufacturing floor. • Measurements• Cycle times• Defect problemsHow can this data be collected quickly and accurately? How can it be quickly used to create improvements to reduce rework, scrap and another elements that might increase costs?
![Page 5: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/5.jpg)
5
Project 1: Daily Check Sheet Database
Old System (paper check sheets)• Out-of-tolerance values are usually caught by SV or QC during review
• SV and QC may not catch the out of spec values among the dozens of check sheets reviewed daily, and could be caught days or weeks after measurement
![Page 6: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/6.jpg)
6
Daily CS Database - Menu
Check sheet menu shows GLs what check sheets remain, and what periodic check sheets are due soon or overdue.
Decreases chances of a forgotten checkLets other GLs know that a check has been completed by someone else
![Page 7: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/7.jpg)
7
Daily CS Database - Usage
Out-of-tolerance values are highlighted in red to alert at the point of measurement to improve recognition time
![Page 8: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/8.jpg)
8
Daily CS Database - Signatures
Entire check sheet is flagged to eliminate accidental misses by GL, QC, or SV.Will only sign bad value check sheets reducing check sheet burden by 96% (from 46 daily to only and average of 2 daily).
New recognition time: instant (10 min max to finish and report it)Old recognition time (best case): 1 shift (630 min) 98.4% improvementOld recognition time (worst case): 2 months (20160 min) 99.95%
![Page 9: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/9.jpg)
9
Daily CS Database - Review
Group leaders can add a note for each date, instead of one field for an entire month.Easier to trace problem descriptions.
![Page 10: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/10.jpg)
10
Daily CS Database - Review
Check sheet data in a database allows easy retrieval, review, and analysis instead of just record control
Recently used to check a week of varnish weights at beginning of shift
![Page 11: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/11.jpg)
11
Daily CS Database - Summary
99% reduction in bad value recognition time96% reduction in SV and QC check sheet burden40 pounds of paperwork saved per yearTo-Do list for check sheets makes objectives clearEach check sheet now has its own notesQuick retrieval of past dataDatabase data can be analyzed in Excel or MinitabGreatly increased compliance with our proceduresSupervisors and QC/Maintenance can log notes upon signing
3.5 lb of paper replaced by only 200 kb of data
One month worth of check sheets
![Page 12: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/12.jpg)
12
Project 2: Live Production Graphs
Enable quick data analysis, for daily review or improvement projects
![Page 13: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/13.jpg)
13
Example data project: GS Bottom Height Rework
History of Rework (from 81332 GS produced)Tester limit set at 32mm, spec limit is 33mm8466 (10.4%) were over 32 mm (47 hours rework)774 (0.95%) were over 32.5 mm (4.3 hours rework)
TrialBased on data, checking 32.5mm (yellow area) is acceptable
BenefitUp to 42.7 hours/year saved (91% reduction)No expense or training required
![Page 14: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/14.jpg)
14
30 Day Trial
Proposed Benefit91% reduction in rework
Last 30 Days - 7974 GS produced875 (11%) were over 32 mm 77 (0.96%) were over 32.5 mm
Actual 30 day Benefit4.5 hours saved (91.2% reduction) = 150 extra GS producedEquals 1423 extra GS at last year’s rate
Setting: 32 mm Setting: 32.5 mm0
50100150200250300350
Rework Minutes
Rework Minutes
![Page 15: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/15.jpg)
15
Bottom Height Gauge Failures
Concern:Relaxing test standard may cause more line outs after varnish
Last 4 months of line out data:7.25 gauge line outs/month average
During 30 day trial:4 line outs
No significant increase in gauge line outs during trial
![Page 16: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/16.jpg)
16
Project 3: Line Out Database
?
![Page 17: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/17.jpg)
17
Line Out Database - Interface and functionality
![Page 18: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/18.jpg)
18
Line Out Database – Sorting and Usage
Line Out and scrap being recorded in databaseAllows for live graph display of line outs and scrapAllows for automation of OEE calculation and more accurate first-time-thru
![Page 19: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/19.jpg)
19
What I LearnedTechnical• Use of SQL server.• Got a chance to observe the processes and tests required
to build a stator or rotor.• How to use some tools that I had never worked with before
while setting up the touchscreens and other line improvements.
• The importance of designing things that are user-friendly and intuitive.
• Thorough debugging of code is important to prevent interruptions to a project.
Soft skills• How to use all the tools available in order to solve a difficult
problem and not to be afraid to ask for help. (Online forums are great!).
• Not giving up after something has failed countless times.• Be attentive to the opinions of others as they will
sometimes have much better ideas than your own.
![Page 20: RFonseca HEV Intern Presentation](https://reader036.fdocuments.ec/reader036/viewer/2022062223/587ef8d21a28ab35528b592d/html5/thumbnails/20.jpg)
20
Thank You!
Questions?