Ø TIPO (I) COLECTOR PRINCIPAL (II) REDES SEC. METRADO FALTANTE METRADO FALTANTE (MM) (ML) (UND) (ML) (UND) (UND) (UND) (UND) 315 PVC- SN 2 1,240.13 215.00 215.00 80 135.00 - PVC- SN 4 582.35 102.00 102.00 106 - PVC- SN 6 79.05 15.00 15.00 0 15.00 - PVC- SN 8 36.00 8.00 8.00 14 - 200 PVC- SN 2 77.15 15.00 426.80 75.00 90.00 56 34.00 - PVC- SN 4 192.07 35.00 99.10 19.00 54.00 14 40.00 - PVC- SN 8 453.08 80.00 34.50 7.00 87.00 15 72.00 TOTAL (I+II) STOCK EN ALMACEN REQUERIM IENTO
-
Upload
patricia-ordonez -
Category
Documents
-
view
215 -
download
2
description
Requerimiento Tuberia Obra Parque Porcino
Transcript of Requerimiento Tuberia Obra Parque Porcino
Ø TIPO(I) COLECTOR PRINCIPAL (II) REDES SEC.
METRADO FALTANTE METRADO FALTANTE
(MM) (ML) (UND) (ML) (UND) (UND) (UND) (UND)
315
PVC- SN 2 1,240.13 215.00 215.00 80 135.00 -
PVC- SN 4 582.35 102.00 102.00 106 -
PVC- SN 6 79.05 15.00 15.00 0 15.00 -
PVC- SN 8 36.00 8.00 8.00 14 -
200
PVC- SN 2 77.15 15.00 426.80 75.00 90.00 56 34.00 -
PVC- SN 4 192.07 35.00 99.10 19.00 54.00 14 40.00 -
PVC- SN 8 453.08 80.00 34.50 7.00 87.00 15 72.00
TOTAL (I+II)
STOCK EN ALMACEN