Solar Pumping in General
-
8/3/2019 Punjab Solar Pump Presentation
2/21
-
8/3/2019 Punjab Solar Pump Presentation
3/21
Type of Pumps
Submersible Pump
1800 Wp with 0.75 HP Grundfos Pump.Maximum Suction Capacity : 50 M
53,000 LPD at 30 M TDHApplication Agriculture, Drinking Water
400 1200 Wp Grundfos SQ Flex PumpRevolutionary Pump works on Grid, Solar, Wind & Diesel
Maximum suction 120 M20,000 LPD at 45 M TDHApplication Domestic & Community water supply
-
8/3/2019 Punjab Solar Pump Presentation
4/21
Surface Pump
Centrifugal / Surface
900 Wp Array with 1 HP Pump.1800 Wp Array with 2 HP Pump.
Maximum Suction Capacity: 7.5 MTotal Head Suction + Delivery: 15 M
Capacity of pumps
1 HP Pump. : 75,000 Liters Per Day(LPD) at 10 M Total Discharge Head
2 HP Pump: 1, 40,000 LPD at 10 M TDH.
-
8/3/2019 Punjab Solar Pump Presentation
5/21
Applications
Flood IrrigationDrip Irrigation
Community water supply
Fish FarmingPoultry FarmingCattle Watering
-
8/3/2019 Punjab Solar Pump Presentation
6/21
Community Water Supply
-
8/3/2019 Punjab Solar Pump Presentation
7/21
Flood Irrigation
-
8/3/2019 Punjab Solar Pump Presentation
8/21
Cattle Watering
-
8/3/2019 Punjab Solar Pump Presentation
9/21
Drip Irrigation
-
8/3/2019 Punjab Solar Pump Presentation
10/21
Total No of Solar Pumps Installed by Aurore Till Date
16881038TOTAL
6433632003
4152312002
3952192001
2352251993-1999
Total kWpSPS installed
-
8/3/2019 Punjab Solar Pump Presentation
11/21
Punjab Experience
-
8/3/2019 Punjab Solar Pump Presentation
12/21
Before Solar pumps
Erratic Grid SupplyHigh cost of Pumping - using Diesel
Logistics of getting Diesel to siteHigh Maintenance cost
Regular SupervisionPollution and Noise
Inefficient PumpsRemote site - Expensive to Get grid
-
8/3/2019 Punjab Solar Pump Presentation
13/21
Effect in Punjab
Taken Off 1,700 Solar Pumps In three years2004 700 pumps to be installedAttractive price due to additional subsidy by State GovernmentEarly pay back period
Reliable power supplyMore saving due to low maintenanceHassle FreeDemand for Bigger PumpFaith in Alternative Source of Power
A & SPV P i i P j b
-
8/3/2019 Punjab Solar Pump Presentation
14/21
Aurore & SPV Pumping in Punjab
Energy Service Company (ESCo)
5 year Annual Maintenance ContractField support office in Bathinda, PunjabService call response time: < 3 daysTrained Technicians
Promotion of Solar ProductsReliable Service
655TOTAL
2802003
2002002
1752001
SPS in Punjab &Haryana
Year
-
8/3/2019 Punjab Solar Pump Presentation
15/21
Installation
Human Resource
One Project Manager, 4 Team Leaders, 4 People in each teamChallenge To maintain enthusiasm & tempo
Site Location
Spread across 200 km from the base campOperating in 5 Districts
Working Conditions
Severe climatic conditions ( Extreme cold in winter to temperatures
in excess of 47 degrees Celsius in summer)7 days a week
Detailed Planning
Necessary for installing the system in a daySite should be readyMaterials & End user at site
-
8/3/2019 Punjab Solar Pump Presentation
16/21
Logistics
Transporting labour to siteTransporting heavy materialConcrete blocks to be taken to siteCivil work at site
Deadline
Within three months
-
8/3/2019 Punjab Solar Pump Presentation
17/21
Non Stop Action Civil Work at Site
FoundationHuman Resource
-
8/3/2019 Punjab Solar Pump Presentation
18/21
-
8/3/2019 Punjab Solar Pump Presentation
19/21
-
8/3/2019 Punjab Solar Pump Presentation
20/21
Effect of Solar Pumping In Punjab
Mature Solar Pump Market
Financially Beneficial High Subsidy Result Early Pay BackAwareness & Trust in Solar EnergyGrowing Solar Market - Demand for Solar ProductsPlenty of trained labour
Employment opportunity - Demand for Trained Solar TechniciansConfidence in Labour to handle complex installation Due to TrainingRealise the importance of training and quality installation
-