43
DIMENCIONES DE CARGA A 7 B 6 C 1 5 2 6 3 5 4 LOSA NPISO H B V1V4 HREAL = ### SE ASUMIRA = 65 B 33 SE ASUMIRA = 35 V2V3 HREAL = ### SE ASUMIRA = 65 B 33 SE ASUMIRA = 35 VAVD HREAL = 54 SE ASUMIRA = 55 B 28 SE ASUMIRA = 30 VBVC HREAL = 54 SE ASUMIRA = 55 B 28 SE ASUMIRA = 30 LOSA TECHO V1V4 HREAL = ### SE ASUMIRA = 65 B 33 SE ASUMIRA = 35 V2V3 HREAL = ### SE ASUMIRA = 65 B 33 SE ASUMIRA = 35 VAVD HREAL = ### SE ASUMIRA = 55 B 28 SE ASUMIRA = 30 VBVC HREAL = ### SE ASUMIRA = 55 B 28 SE ASUMIRA = 30 LN-1

description

PROYECTO DE SISMO DE 3X 3 PORTICOS

Transcript of Proyecto Sismo

Page 1: Proyecto Sismo

DIMENCIONES DE CARGAA 7 B 6 C

1

5

2

6

3

5

4

LOSA NPISO H BV1V4 HREAL = 63.00 SE ASUMIRA = 65 B 33 SE ASUMIRA = 35 H 43.52V2V3 HREAL = 63.00 SE ASUMIRA = 65 B 33 SE ASUMIRA = 35 H 59.04VAVD HREAL = 54 SE ASUMIRA = 55 B 28 SE ASUMIRA = 30 H 42.20VBVC HREAL = 54 SE ASUMIRA = 55 B 28 SE ASUMIRA = 30 H 64.11

LOSA TECHOV1V4 HREAL = 63.00 SE ASUMIRA = 65 B 33 SE ASUMIRA = 35 H 39.11V2V3 HREAL = 63.00 SE ASUMIRA = 65 B 33 SE ASUMIRA = 35 H 52.27VAVD HREAL = 54.00 SE ASUMIRA = 55 B 28 SE ASUMIRA = 30 H 37.59VBVC HREAL = 54.00 SE ASUMIRA = 55 B 28 SE ASUMIRA = 30 H 56.34

LN-1

Page 2: Proyecto Sismo

7 D

HREALSE ASUMIRA = 45SE ASUMIRA = 60SE ASUMIRA = 45SE ASUMIRA = 65

SE ASUMIRA = 40SE ASUMIRA = 55SE ASUMIRA = 40SE ASUMIRA = 60

Page 3: Proyecto Sismo

LOSA DE TECHOA 7 B 6 C 7 D

1

5

2

6

3

5

4

5 6 5

500/18,5 600/21 500/18,5

27.03 32.43 27.03

SOBRE PISO= 3

LOSA= 5

25

D= 27.03

BLOQUE PIÑATA =

LN-1

Page 4: Proyecto Sismo

D= 30

CARGA DE LA LOSA TECHOPESO PROPIO 360 KG/M2TABIQUERIA 150 KG/M2FRISO 38 KG/M2SOBREPISO 100 KG/M2CERAMICACP 648 KG/M2CV 100 KG/M2WS 748 KG/M2

PREDICIONAMIENTO DE VIGAA 7 B 6 C 7 D

1 3.5 9.5 9.5 3.5

52.5

5.52

6

5.53

52.5

4

VIGAS DE CARGA = V1,V2,V3,V4

7 6 7

A B C D

V1=V4 ,V2=V3H =L x 0,09 H =L x 0,09 H =L x 0,09

LN-1

Page 5: Proyecto Sismo

0.63 0.54 0.63

H SE ASUMIRA= 65

B= H/2 32.5

SE ASUMIRA= 35H= 65

35FORMULAS B

QPP= 568.75

VIGAS V1=V4

QVIGA LEP= 2438.75 KG/M

VIGA V1-V4 LNE7 6 7

A B C D

QXL2/12 QXL2/12 QXL2/12

9,958 7,316 9,958

FORMULAS FM=(1,2+1,6X(CV/CP))/1+(CP/CP)

FM= FACTOR MAYORACION

CV/CP= 0.154320988

FM= 1.25

QPP= bXhXrcQVIGA= WSXAT+QPP

Page 6: Proyecto Sismo

MU=MAX*FM

MU= 12,482.40 KG/M

FORMULASBASUM*D REAL2=MU*100/(O*JUE*F*FY(1-0,59*F*FY/FC))

FY= 4200 KG/CMFC= 250 KG/CM

DREAL= 34.11 (+5) 39.11 SE ASUMIRA 40

VIGAS V2=V3

QVIGA LEP= 4682.75 KG/M

7 6 7

A B C

QXL2/12 QXL2/12 QXL2/12

19,121 14,048 19,121

FORMULAS FM=(1,2+1,6X(CV/CP))/1+(CP/CP)

FM= FACTOR MAYORACION

CV/CP= 0.15

FM= 1.25

MU=MAX*FM

MU= 23,968.00 KG/M

Page 7: Proyecto Sismo

FORMULASBASUM*D REAL2=MU*100/(O*JUE*F*FY(1-0,59*F*FY/FC))

FY= 4200 KG/CMFC= 250 KG/CM

DREAL= 47.27 (+5) 52.27 SE ASUMIRA 55

VIGA VA-VD LNE

QVIGA LEP= 3030.5 KG/M

5 6 5

A 45 B 54 C 45

QXL2/12 QXL2/12 QXL2/12

6,314 9,092 6,314

B= 54 SE ASUMIRA H= 55B= 28

SE ASUMIRA B= 30QPP= 413

FORMULAS FM=(1,2+1,6X(CV/CP))/1+(CP/CP)

FM= FACTOR MAYORACION

CV/CP= 0.15

FM= 1.25

MU=MAX*FM

MU= 11,395.98 KG/M

FORMULASBASUM*D REAL2=MU*100/(O*JUE*F*FY(1-0,59*F*FY/FC))

Page 8: Proyecto Sismo

FY= 4200 KG/CMFC= 250 KG/CM

DREAL= 32.59 (+5) 37.59 SE ASUMIRA H= 40

VIGA VB-VC LNE

QVIGA LEP= 7518.5 KG/M

5 6 5

A 45 B 54 C 45

QXL2/12 QXL2/12 QXL2/12

15,664 22,556 15,664

B= 54 SE ASUMIRA H= 55B= 28

SE ASUMIRA B= 30QPP= 413

FORMULAS FM=(1,2+1,6X(CV/CP))/1+(CP/CP)

FM= FACTOR MAYORACION

CV/CP= 0.15

FM= 1.25

MU=MAX*FM

MU= 28,272.78 KG/M

FORMULASBASUM*D REAL2=MU*100/(O*JUE*F*FY(1-0,59*F*FY/FC))

FY= 4200 KG/CMFC= 250 KG/CM

Page 9: Proyecto Sismo

DREAL= 51.34 (+5) 56.34 SE ASUMIRA H= 60

Page 10: Proyecto Sismo

LOSA NERVADA ENTRE PISO 1A 7 B 6 C 7 D

1

5

2

6

3

5

4

5 6 5

500/18,5 600/21 500/18,5

27.03 32.43 27.03

CERAMICA= 2SOBRE PISO= 3

LOSA= 5

25

D= 27.03

BLOQUE PIÑATA =

LN-1

Page 11: Proyecto Sismo

25

D= 30

CARGA DE LA LOSA ENTRE PISOPESO PROPIO 360 KG/M2TABIQUERIA 150 KG/M2FRISO 38 KG/M2SOBREPISO 100 KG/M2CERAMICACP 648 KG/M2CV 300 KG/M2WS 948 KG/M2

PREDICIONAMIENTO DE VIGAA 7 B 6 C 7 D

1 3.5 9.5 9.5 3.5

52.5

5.52

6

5.53

52.5

4

VIGAS DE CARGA = V1,V2,V3,V4

7 6 7

A B C D

V1=V4 ,V2=V3H =L x 0,09 H =L x 0,09 H =L x 0,09

63 54 63

LN-1

Page 12: Proyecto Sismo

H SE ASUMIRA= 65

B= H/2 32.5

SE ASUMIRA= 35H= 65

35FORMULAS B

QPP= 568.75

VIGAS V1=V4

QVIGA LEP= 2938.75 KG/M

VIGA V1-V4 LNE7 6 7

A B C D

QXL2/12 QXL2/12 QXL2/12

12,000 8,816 12,000

FORMULAS FM=(1,2+1,6X(CV/CP))/1+(CP/CP)

FM= FACTOR MAYORACION

CV/CP= 0.46

FM= 1.33

MU=MAX*FM

QPP= bXhXrcQVIGA= WSXAT+QPP

Page 13: Proyecto Sismo

MU= 15,918.85 KG/M

FORMULASBASUM*D REAL2=MU*100/(O*JUE*F*FY(1-0,59*F*FY/FC))

FY= 4200 KG/CMFC= 250 KG/CM

DREAL= 38.52 (+5) 43.52 SE ASUMIRA 45

VIGAS V2=V3

QVIGA LEP= 5782.75 KG/M

7 6 7

A B C

QXL2/12 QXL2/12 QXL2/12

23,613 17,348 23,613

FORMULAS FM=(1,2+1,6X(CV/CP))/1+(CP/CP)

FM= FACTOR MAYORACION

CV/CP= 0.46

FM= 1.33

MU=MAX*FM

MU= 31,324.45 KG/M

FORMULASBASUM*D REAL2=MU*100/(O*JUE*F*FY(1-0,59*F*FY/FC))

FY= 4200 KG/CMFC= 250 KG/CM

Page 14: Proyecto Sismo

DREAL= 54.04 (+5) 59.04 SE ASUMIRA 60

VIGA VA-VD LNE

QVIGA LEP= 3730.5 KG/M

5 6 5

A 45 B 54 C 45

QXL2/12 QXL2/12 QXL2/12

7,772 11,192 7,772

B= 54 SE ASUMIRA H= 55B= 28

SE ASUMIRA B= 30QPP= 413

FORMULAS FM=(1,2+1,6X(CV/CP))/1+(CP/CP)

FM= FACTOR MAYORACION

CV/CP= 0.46

FM= 1.33

MU=MAX*FM

MU= 14,846.45 KG/M

FORMULASBASUM*D REAL2=MU*100/(O*JUE*F*FY(1-0,59*F*FY/FC))

FY= 4200 KG/CMFC= 250 KG/CM

DREAL= 37.20 (+5) 42.20 SE ASUMIRA H= 45

Page 15: Proyecto Sismo

VIGA VB-VC LNE

QVIGA LEP= 9418.5 KG/M

5 6 5

A 45 B 54 C 45

QXL2/12 QXL2/12 QXL2/12

19,622 28,256 19,622

B= 54 SE ASUMIRA H= 55B= 28

SE ASUMIRA B= 30QPP= 413

FORMULAS FM=(1,2+1,6X(CV/CP))/1+(CP/CP)

FM= FACTOR MAYORACION

CV/CP= 0.46

FM= 1.33

MU=MAX*FM

MU= 37,483.25 KG/M

FORMULASBASUM*D REAL2=MU*100/(O*JUE*F*FY(1-0,59*F*FY/FC))

FY= 4200 KG/CMFC= 250 KG/CM

DREAL= 59.11 (+5) 64.11 SE ASUMIRA H= 65

Page 16: Proyecto Sismo

PREDICIONAMIENTO DE VIGAA 7 B 6 C 7 D

3.5 6.5 6.5 3.51

5

2.5

5.52 5.0

6

5.53

52.5

4

COLUMNA AT TOTAL CONDICIONA1,A4,D1,D4 2.5 3.5 8.75 ESQUINAB1,C1,B4,C4 6.5 2.5 16.25 BORDEA2,A3,D2,D3 5.5 3.5 19.25 BORDEB2,B3,C2,C3 6.5 5.0 32.50 CENTRALES

Page 17: Proyecto Sismo

COLUMNA A1,A4,D1,D4COLUMNA AT (m2) WS QV kg/m2 FM QU ∑QU Ø FC AC (cm2) RAIZ BXT

NT 8.75 748 200 1.25 10397.58 10397.58 0.2 250 207.95 14.42 30 X 30N5 8.75 948 200 1.33 13325.52 23723.10 0.2 250 474.46 21.78 30 X 30N4 8.75 948 200 1.33 13325.52 37048.62 0.2 250 740.97 27.22 30 X 30N3 8.75 948 200 1.33 13325.52 50374.14 0.2 250 1007.48 31.74 35 X 35N2 8.75 948 200 1.33 13325.52 63699.66 0.2 250 1273.99 35.69 40 X 40N1 8.75 948 200 1.33 13325.52 77025.18 0.2 250 1540.50 39.25 40 X 40

COLUMNA B1,C1,B4,C4COLUMNA AT (m2) WS QV kg/m2 FM QU ∑QU Ø FC AC (cm2) RAIZ BXT

NT 16.25 748 200 1.25 19309.80 19309.80 0.2 250 386.20 19.65 30 X 30N5 16.25 948 200 1.33 24747.39 44057.19 0.2 250 881.14 29.68 30 X 30N4 16.25 948 200 1.33 24747.39 68804.58 0.2 250 1376.09 37.10 40 X 40N3 16.25 948 200 1.33 24747.39 93551.97 0.2 250 1871.04 43.26 45 X 45N2 16.25 948 200 1.33 24747.39 118299.37 0.2 250 2365.99 48.64 50 X 50N1 16.25 948 200 1.33 24747.39 143046.76 0.2 250 2860.94 53.49 55 X 55

COLUMNA A2,A3,D2,D3COLUMNA AT (m2) WS QV kg/m2 FM QU ∑QU Ø FC AC (cm2) RAIZ BXT

NT 19.25 748 200 1.25 22874.68 22874.68 0.2 250 457.49 21.39 30 X 30N5 19.25 948 200 1.33 29316.14 52190.82 0.2 250 1043.82 32.31 35 X 35N4 19.25 948 200 1.33 29316.14 81506.97 0.2 250 1630.14 40.37 45 X 45N3 19.25 948 200 1.33 29316.14 110823.11 0.2 250 2216.46 47.08 50 X 50N2 19.25 948 200 1.33 29316.14 140139.25 0.2 250 2802.78 52.94 55 X 55N1 19.25 948 200 1.33 29316.14 169455.39 0.2 250 3389.11 58.22 60 X 60

Page 18: Proyecto Sismo

COLUMNA B2,B3,C2,C3COLUMNA AT (m2) WS QV kg/m2 FM QU ∑QU Ø FC AC (cm2) RAIZ BXT

NT 32.50 748 200 1.25 38619.59 38619.59 0.2 250 772.39 27.79 30 X 30N5 32.50 948 200 1.33 49494.78 88114.38 0.2 250 1762.29 41.98 45 X 45N4 32.50 948 200 1.33 49494.78 137609.16 0.2 250 2752.18 52.46 55 X 55N3 32.50 948 200 1.33 49494.78 187103.95 0.2 250 3742.08 61.17 65 X 65N2 32.50 948 200 1.33 49494.78 236598.73 0.2 250 4731.97 68.79 70 X 70N1 32.50 948 200 1.33 49494.78 286093.52 0.2 250 5721.87 75.64 80 X 80

Page 19: Proyecto Sismo

PREDICIONAMIENTO VIGAS LNEP-1A B C D

7 6 71 V 35 X 45 V 35 X 45 V 35 X 45

5

V V V V30 30 30 30X X X X

45 65 65 452 V 35 X 60 V 35 X 60 V 35 X 60

6

V V V V30 30 30 30X X X X

45 65 65 453 V 35 X 60 V 35 X 60 V 35 X 60

5

V V V V30 30 30 30X X X X

45 65 65 454 V 35 X 45 V 35 X 45 V 35 X 45

PREDICIONAMIENTO VIGAS LNTA B C D

7 6 71 V 35 X 40 V 35 X 40 V 35 X 40

5

V V V V30 30 30 30X X X X

40 60 60 402 V 35 X 55 V 35 X 55 V 35 X 55

6

V V V V30 30 30 30X X X X

40 60 60 403 V 35 X 55 V 35 X 55 V 35 X 55

5

V V V V30 30 30 30X X X X

40 60 60 404 V 35 X 40 VQXL2/12X 40 V 35 X 40

Page 20: Proyecto Sismo

PORTICO A=D

1 2 3 4NT V 30 40 V 30 40 V 30 40

30 30 30 30

X X X X

30 30 30 30

C C C C

N5 V 30 X 45 V 30 X 45 V 30 X 45

30 35 35 30

X X X X

30 35 35 30

C C C C

N4 V 30 X 45 V 30 X 45 V 30 X 45

30 45 45 30

X X X X

30 45 45 30

C C C C

N3 V 30 X 45 V 30 X 45 V 30 X 45

35 50 50 35

X X X X

35 50 50 35

C C C C

N2 V 30 X 45 V 30 X 45 V 30 X 45

40 55 55 40

X X X X

40 55 55 40

C C C C

N1 V 30 X 45 V 30 X 45 V 30 X 45

40 60 60 40

X X X X

40 60 60 40

C C C C

BASE

Page 21: Proyecto Sismo

PORTICO B=C1 2 3 4

NT V 30 X 60 V 30 X 60 V 30 X 60

30 30 30 30

X X X X

30 30 30 30

C C C C

N5 V 30 X 65 V 30 X 65 V 30 X 65

30 45 45 30

X X X X

30 45 45 30

C C C C

N4 V 30 X 65 V 30 X 65 V 30 X 65

40 55 55 40

X X X X

40 55 55 40

C C C C

N3 V 30 X 65 V 30 X 65 V 30 X 65

45 65 65 45

X X X X

45 65 65 45

C C C C

N2 V 30 X 65 V 30 X 65 V 30 X 65

50 70 70 50

X X X X

50 70 70 50

C C C C

N1 V 30 X 65 V 30 X 65 V 30 X 65

55 80 80 55

X X X X

55 80 80 55

C C C C

BASE

Page 22: Proyecto Sismo

PORTICO 2=3

NT V X 0 V X V X

X X X X

C C C C

N5 V X 30 V X V X

X X X X

C C C CN4 V X 30 V X V X

X X X X

C C C C

N3 V X 40 V X V X

X X X X

C C C C

N2 V X 45 V X V X

X X X X

C C C C

N1 V X 50 V X V X

X X X X

C C C C

BASE

Page 23: Proyecto Sismo

PORTICO A=D

NT V X 0 V X V X

X X X X

C C C C

N5 V X X V X V X

X X X X

C C C C

N4 V X X V X V X

X X X X

C C C C

N3 V X X V X V X

X X X X

C C C C

N2 V X X V X V X

X X X X

C C C C

N1 V X X V X V X

X X X X

C C C C

BASE

Page 24: Proyecto Sismo

n DESCCRIPCION UND CANT L A H AREA VOL WS P OBSERVACION

LNE 1.00 16.00 20.00 320.00 748.00 239,360.00

PES

O N

IVEL

TEC

HO

V1 V4 2.00 20.00 0.35 0.40 5.6 2,500.00 14,000.00

V2 V3 2.00 20.00 0.35 0.55 7.7 2,500.00 19,250.00

VA VD 2.00 16.00 0.30 0.40 3.84 2,500.00 9,600.00

VB VC 2.00 16.00 0.30 0.60 5.76 2,500.00 14,400.00

COL A1 A4 D1 D4 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

COL A2 A3 D2 D3 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

COL B1 C1 B4 C4 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

COL B2 B3 C2 C3 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

W TON 307.41

FM 1.25 WU TON 385.33

n DESCCRIPCION UND CANT L A H AREA VOL WS P OBSERVACION

LE1 1.00 16.00 20.00 - 320.00 948.00 303,360.00

PES

O N

IVEL

5

V1 V4 2.00 20.00 0.35 0.40 5.6 2,500.00 14,000.00

V2 V3 2.00 20.00 0.35 0.55 7.7 2,500.00 19,250.00

VA VB VC VD 2.00 16.00 0.30 0.40 3.84 2,500.00 9,600.00

COL A1 A4 D1 D4 2.00 16.00 0.30 0.60 5.76 2,500.00 14,400.00

COL A2 A3 D2 D3 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

COL B1 C1 B4 C4 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

COL B2 B3 C2 C3 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

W TON 368.71

FM 1.33 WU TON 489.12

n DESCCRIPCION UND CANT L A H AREA VOL WS P OBSERVACION

LE1 1.00 16.00 20.00 - 320.00 948.00 303,360.00

PES

O N

IVEL

4

V1 V4 2.00 20.00 0.35 0.40 5.6 2,500.00 14,000.00

V2 V3 2.00 20.00 0.35 0.55 7.7 2,500.00 19,250.00

VA VB VC VD 2.00 16.00 0.30 0.40 3.84 2,500.00 9,600.00

COL A1 A4 D1 D4 2.00 16.00 0.30 0.60 5.76 2,500.00 14,400.00

COL A2 A3 D2 D3 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

COL B1 C1 B4 C4 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

COL B2 B3 C2 C3 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

W TON 368.71

FM 1.33 WU TON 489.12

n DESCCRIPCION UND CANT L A H AREA VOL WS P OBSERVACION

LE1 1.00 16.00 20.00 - 320.00 948.00 303,360.00

PES

O N

IVEL

3

V1 V4 2.00 20.00 0.35 0.40 5.6 2,500.00 14,000.00

V2 V3 2.00 20.00 0.35 0.55 7.7 2,500.00 19,250.00

VA VB VC VD 2.00 16.00 0.30 0.40 3.84 2,500.00 9,600.00

COL A1 A4 D1 D4 2.00 16.00 0.30 0.60 5.76 2,500.00 14,400.00

COL A2 A3 D2 D3 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

COL B1 C1 B4 C4 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

COL B2 B3 C2 C3 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

W TON 368.71

FM 1.33 WU TON 489.12

Page 25: Proyecto Sismo

n DESCCRIPCION UND CANT L A H AREA VOL WS P OBSERVACION

LE1 1.00 16.00 20.00 - 320.00 948.00 303,360.00

PES

O N

IVEL

2

V1 V4 2.00 20.00 0.35 0.40 5.6 2,500.00 14,000.00

V2 V3 2.00 20.00 0.35 0.55 7.7 2,500.00 19,250.00

VA VB VC VD 2.00 16.00 0.30 0.40 3.84 2,500.00 9,600.00

COL A1 A4 D1 D4 2.00 16.00 0.30 0.60 5.76 2,500.00 14,400.00

COL A2 A3 D2 D3 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

COL B1 C1 B4 C4 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

COL B2 B3 C2 C3 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

W TON 368.71

FM 1.33 WU TON 489.12

n DESCCRIPCION UND CANT L A H AREA VOL WS P OBSERVACION

LE1 1.00 16.00 20.00 - 320.00 948.00 303,360.00

PES

O N

IVEL

1

V1 V4 2.00 20.00 0.35 0.40 5.6 2,500.00 14,000.00

V2 V3 2.00 20.00 0.35 0.55 7.7 2,500.00 19,250.00

VA VB VC VD 2.00 16.00 0.30 0.40 3.84 2,500.00 9,600.00

COL A1 A4 D1 D4 2.00 16.00 0.30 0.60 5.76 2,500.00 14,400.00

COL A2 A3 D2 D3 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

COL B1 C1 B4 C4 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

COL B2 B3 C2 C3 4.00 3.00 0.30 0.30 1.08 2,500.00 2,700.00

W TON 368.71

FM 1.33 WU TON 489.12

NIVEL W WU

NT 307.41 385.33

N5 368.71 489.12

N4 368.71 489.12

N3 368.71 489.12

N2 368.71 489.12

N1 368.71 489.12

W TOTAL 2,150.96 2,830.95 PESO TOTAL DE LA ESTRUCTURA TONELADAS

Page 26: Proyecto Sismo

PESO TOTAL DE LA ESTRUCTURA = 2830.95 TON

CORTE BASAL

VO=U*AD*W

W= 2830.95 TON

NIVELES 6

U= 0.875

SE CONPARA U1 CONB U2 Y SE AGARRA EL DE MAYOR VALOR

α θ β Αο r1.3 0.75 2.8 0.3 6

ad= 0.1365 0.136

FUERZA SISMICA EN LA BASEvo= 336.88326 TON

TON

NT #REF!N5 #REF!N4 #REF!N3 #REF!N2 #REF!N1 #REF!PB

VO =ACCION TOTAL

∑FI+FT

ad=αθβΑο/r

Page 27: Proyecto Sismo

FTOPE= (0,06 T/T*-0,02)*Vo

5.59 TON 10% DE Vo

SE TOMA 11,90

NIVEL VO FTOPE WI HI WI*HI ∑LOSA PISO 980 26 24 624CORREAS IPN 260 41.9 26CORREAS IPN 260 41.9 13CORREAS IPN 260 41.9 6VIGAS A-E IPN 300 54.2 24VIGAS B-C-D IPN 360 76.2 24VIGAS 1-2-3-4 IPN 280 48 26HEA 300 88.3 2.8 HEA 360 112 2.8HEA 400 125 2.8

Page 28: Proyecto Sismo

336.883264