1.0 PRESUPUESTO DE OBRA Item Descripción Und. Metrado Precio S/. 01 OBRAS PRELIMINARES 01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO est 1.00 16,213.8800 01.02 CAMPAMENTO DE OBRA (ALMACEN) m2 80.00 158.6142 01.03 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m u 1.00 592.9010 01.04 TRAZO, NIVELACION Y REPLANTEO (Ejecución de obra) km 2.20 111.9227 01.05 LIMPIEZA Y DESFORESTACION R= 1.0 Ha/día ha 2.20 100.0913 01.06 CONTROL TROPOGRAFICO km 2.16 1,385.5029 01.07 DEMARCACION DE TALUDES km 2.20 135.0140 01.08 TRANSPORTE DE MATERIALES A OBRA glb 1.00 9,816.0300 02 MOVIMIENTO DE TIERRAS 02.01 CORTE EN MATERIAL SUELTO R=540 m3/día m3 41,382.59 4.0977 02.02 CORTE EN ROCA SUELTO R=250 m3/día m3 1,240.00 16.5094 02.03 CONFORMACION DE TERRAPLENES R= 920 m3/día m3 6,048.00 4.2469 02.04 PERFILADO Y COMPACION DE SUB-RASANTE EN ZONAS-CORTE R=3220 m2/día m2 9,200.00 1.2455 02.05 EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES R.S. m3 225.00 13.4708 02.06 EXCAVACION DE CUNETAS EN MATERIAL SUELTO m 2,110.00 0.6208 02.07 EXCAVACION DE CUNETAS EN ROCA SUELTO m 50.00 11.1934 03 CONFORMACION DE SUPERFICIE DE RODADURA 03.01 EXTRACCION Y APILAMIENTO DE MATERIAL AFIRMADO EN CANTERA R=530 m3/día m3 2,592.00 4.2222 03.02 ZARANDEADO R=350 m3/día m3 1,814.40 3.7651 03.03 CARGUIO DE MATERIAL AFIRMADO R= 750 m3/día m3 311.40 2.0487 03.04 TRANSPORTE DE MATERIAL AFIRMADO (DM) m3k 18,144.00 2.8000 03.05 EXTENDIDO, NIVELADO Y COMPACTADO DE MATERIAL AFIRMADO m3 2,592.00 5.9513 03.06 RIEGO m3 1,728.00 2.5924 04 OBRAS DE ARTE 04.01 MURO DE CONTENCIÓN 04.01.01 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 10.78 1.6222 04.01.02 EXCAVACION PARA ESTRUCTURAS m3 10.78 13.7522 04.01.03 ELIMINACION DE MATERIAL EXCEDENTE CON CARRETILLA D=30m m3 10.78 8.0220 04.01.04 CONCRETO SIMPLE f'c=175 kg/cm2+ 50% P.M. m3 34.84 201.1186 04.01.05 ENCOFRADO Y DESENCOFRADO m2 46.72 121.5846 04.01.06 RELLENO COMPACTADO CON MATERIAL PROPIO m3 12.37 11.2455 04.01.07 RELLENO COMPACTADO MANUAL- CON MATERIAL FILTRO m3 2.86 74.2980 04.02 DISPADOR DE ENERGIA 04.02.01 TRAZO Y REPLANTEO m2 11.75 4.2882 04.02.02 EXCAVACION PARA ESTRUCTURAS m3 7.76 13.7522 04.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 7.76 10.6961 04.02.04 CONCRETO F'C=140 KG/CM2 +30% PM m3 4.70 185.5588 04.02.05 CONCRETO 1:10 +30% P.G. PARA UÑA m3 3.06 148.9857 04.02.06 ENCOFRADO Y DESENCOFRADO m2 4.79 121.5846 04.03 BADEN L=6M (4 UND) 04.03.01 TRAZO Y REPLANTEO m2 118.96 4.2882 04.03.02 EXCAVACION PARA ESTRUCTURAS m3 50.67 13.7522 04.03.03 ELIMINACION MATERIAL EXCEDENTE m3 50.67 7.8692 04.03.04 CONCRETO 1:10 +30% P.G. PARA UÑA m3 14.98 148.9857 04.03.05 ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60 kg 884.11 5.9379 04.03.06 ENCOFRADO Y DESENCOFRADO m2 26.16 121.5846 04.03.07 CONCRETO f'c=175 kg/cm2 m3 35.69 302.7993 04.03.08 JUNTAS ASFALTICAS m 20.00 4.7433 05 PUENTE (L=10m) 05.01 TRAZO Y REPLANTEO m2 225.00 4.2882 05.02 EXCAVACION MANUAL PARA ESTRUCTURAS m3 253.50 17.1137 05.03 ELIMINACION DE MATERIAL EXCEDENTE m3 253.50 10.6961 05.04 ENCOFRADO Y DESENCOFRADO m2 313.75 121.5846 05.05 CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM. m3 178.56 195.2258 05.06 ACERO DE REFUERZO fy=4200 kg/cm2 kg 9,446.92 5.4188 05.07 CONCRETO f'c= 210 kg/cm2 EN LOSA m3 57.24 639.5150 05.08 RELLENO CON MATERIAL SELECCIONADO m3 52.50 14.9602 05.09 BARANDAS DE ACERO m 24.00 38.1745 05.10 APOYO MOVIL DE NEOFRENO u 2.00 1,167.4144 05.11 APOYO FIJO u 2.00 1,301.5144

description

carretera

Transcript of Programacion.paras

PRESUPUESTO TROCHA2 PRESUPUESTO DE OBRA2.1 PRESUPUESTO TOTAL DE OBRA1.0 PRESUPUESTO DE OBRA0.00GASTOS DE SUPERVISIONGASTOS DE EVALUACIONGASTOS DE LIQUIDACION0.00PresupuestoTROCHA CARROZABLE COMUNIDAD DE HOSPICIOEntidadMUNICIPALIDAD DISTRITAL DE PARASLugarAYACUCHO-CANGALLO PARASItemDescripcinUnd.MetradoPrecio S/.Parcial S/.01OBRAS PRELIMINARES43,068.094901.01MOVILIZACION Y DESMOVILIZACION DE EQUIPOest1.0016,213.880016,213.880001.02CAMPAMENTO DE OBRA (ALMACEN)m280.00158.614212,689.136001.03CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 mu1.00592.9010592.901001.04TRAZO, NIVELACION Y REPLANTEO (Ejecucin de obra)km2.20111.9227246.229901.05LIMPIEZA Y DESFORESTACION R= 1.0 Ha/daha2.20100.0913220.200901.06CONTROL TROPOGRAFICOkm2.161,385.50292,992.686301.07DEMARCACION DE TALUDESkm2.20135.0140297.030801.08TRANSPORTE DE MATERIALES A OBRAglb1.009,816.03009,816.030002MOVIMIENTO DE TIERRAS232,089.434202.01CORTE EN MATERIAL SUELTO R=540 m3/dam341,382.594.0977169,573.439002.02CORTE EN ROCA SUELTO R=250 m3/dam31,240.0016.509420,471.656002.03CONFORMACION DE TERRAPLENES R= 920 m3/dam36,048.004.246925,685.251202.04PERFILADO Y COMPACION DE SUB-RASANTE EN ZONAS-CORTE R=3220 m2/dam29,200.001.245511,458.600002.05EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES R.S.m3225.0013.47083,030.930002.06EXCAVACION DE CUNETAS EN MATERIAL SUELTOm2,110.000.62081,309.888002.07EXCAVACION DE CUNETAS EN ROCA SUELTOm50.0011.1934559.670003CONFORMACION DE SUPERFICIE DE RODADURA89,121.941803.01EXTRACCION Y APILAMIENTO DE MATERIAL AFIRMADO EN CANTERA R=530 m3/dam32,592.004.222210,943.942403.02ZARANDEADO R=350 m3/dam31,814.403.76516,831.397403.03CARGUIO DE MATERIAL AFIRMADO R= 750 m3/dam3311.402.0487637.965203.04TRANSPORTE DE MATERIAL AFIRMADO (DM)m3k18,144.002.800050,803.200003.05EXTENDIDO, NIVELADO Y COMPACTADO DE MATERIAL AFIRMADOm32,592.005.951315,425.769603.06RIEGOm31,728.002.59244,479.667204OBRAS DE ARTE38,611.404204.01MURO DE CONTENCIN13,291.216804.01.01TRAZO, NIVELACION Y REPLANTEO PRELIMINARm210.781.622217.487304.01.02EXCAVACION PARA ESTRUCTURASm310.7813.7522148.248704.01.03ELIMINACION DE MATERIAL EXCEDENTE CON CARRETILLA D=30mm310.788.022086.477204.01.04CONCRETO SIMPLE f'c=175 kg/cm2+ 50% P.M.m334.84201.11867,006.972004.01.05ENCOFRADO Y DESENCOFRADOm246.72121.58465,680.432504.01.06RELLENO COMPACTADO CON MATERIAL PROPIOm312.3711.2455139.106804.01.07RELLENO COMPACTADO MANUAL- CON MATERIAL FILTROm32.8674.2980212.492304.02DISPADOR DE ENERGIA2,150.518004.02.01TRAZO Y REPLANTEOm211.754.288250.386404.02.02EXCAVACION PARA ESTRUCTURASm37.7613.7522106.717104.02.03ELIMINACION DE MATERIAL EXCEDENTEm37.7610.696183.001704.02.04CONCRETO F'C=140 KG/CM2 +30% PMm34.70185.5588872.126404.02.05CONCRETO 1:10 +30% P.G. PARA UAm33.06148.9857455.896204.02.06ENCOFRADO Y DESENCOFRADOm24.79121.5846582.390204.03BADEN L=6M (4 UND)23,169.669404.03.01TRAZO Y REPLANTEOm2118.964.2882510.124304.03.02EXCAVACION PARA ESTRUCTURASm350.6713.7522696.824004.03.03ELIMINACION MATERIAL EXCEDENTEm350.677.8692398.732404.03.04CONCRETO 1:10 +30% P.G. PARA UAm314.98148.98572,231.805804.03.05ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60kg884.115.93795,249.756804.03.06ENCOFRADO Y DESENCOFRADOm226.16121.58463,180.653104.03.07CONCRETO f'c=175 kg/cm2m335.69302.799310,806.907004.03.08JUNTAS ASFALTICASm20.004.743394.866005PUENTE (L=10m)177,138.251305.01TRAZO Y REPLANTEOm2225.004.2882964.845005.02EXCAVACION MANUAL PARA ESTRUCTURASm3253.5017.11374,338.323005.03ELIMINACION DE MATERIAL EXCEDENTEm3253.5010.69612,711.461405.04ENCOFRADO Y DESENCOFRADOm2313.75121.584638,147.168305.05CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM.m3178.56195.225834,859.518805.06ACERO DE REFUERZO fy=4200 kg/cm2kg9,446.925.418851,190.970105.07CONCRETO f'c= 210 kg/cm2 EN LOSAm357.24639.515036,605.838605.08RELLENO CON MATERIAL SELECCIONADOm352.5014.9602785.410505.09BARANDAS DE ACEROm24.0038.1745916.188005.10APOYO MOVIL DE NEOFRENOu2.001,167.41442,334.828805.11APOYO FIJOu2.001,301.51442,603.028805.12CONSTRUCCION DE ACCESO AUXILIAR PARA PASO DE VEHICULOSglb1.001,680.67001,680.670006POSTES KILOMETRICOS425.860006.01INSTALACIONDE POSTES KILOMETRICOS (Inc. suministros)u4.00106.4650425.860007ENSAYOS DE CONTROL DE CALIDAD2,150.000007.01ENSAYO DE MEC. DE SUELOS-MAT. AFIRMADOu1.00500.0000500.000007.02ENSAYO DE CONTROL DE COMPACTACIONu9.0050.0000450.000007.03ENSAYOS DE RESISTENCIA DEL CONCRETOu24.0050.00001,200.000008PLAN DE MANEJO AMBIENTAL4,771.994408.01MEDIDAS DE MITIGACION3,428.237108.01.01RECUPERACION DE CULTIVOS AFECTADOSha2.171,328.92022,883.756808.01.02ESTABILIZACION DE CURSOS DE AGUAm22.17250.9126544.480308.02MEDIDAS DE CONTROL1,343.757308.02.01CONSTRUCCION DE POZO DE RESIDUOSm316.5018.7954310.124108.02.02RECOLECCION MANUAL DE RESIDUOS SLIDOS DEL AREA CIRCUNDANTEm311.0012.5907138.497708.02.03CONSTRUCCION RELLENO DE SEGURIDADm34.5045.7661205.947508.02.04LETRINAS MOVILESu1.00575.0780575.078008.02.05LETRINAS TEMPORALESu1.00114.1100114.110009MEDIDAS DE PREVENCION6,049.200009.01EQUIPO DE PROTECCION PERSONALglb1.003,494.20003,494.200009.02ELABORACION DE PROCEDIMIENTOS DE SEGURIDAD AMBIENTALglb1.00500.0000500.000009.03PROGRAMA DE INDUCCION AL PERSONALu1.00525.0000525.000009.04CAPACITACION EN TEMAS AMBIENTALESu1.00525.0000525.000009.05REUNION INFORMATIVA DEL PLAN DE MANEJO AMBIENTALu1.001,005.00001,005.000010FORTALECIMIENTO DE LA CONSERVACION DE CAMINOS3,500.000010.01CAPACITACION EN GESTION VIALglb1.002,000.00002,000.000010.02CONFORMACION Y CAPACITACION DEL COMITE DE MANTENIMIENTOglb1.001,500.00001,500.0000Costo directo596,926.1808Gastos Generales 10%79,278.0000Gastos de Supervision 3.%22,258.5000Gastos de Evaluacion 2.37%14,165.5000Gastos de Liquidacion 1.06%6,329.0000Presupuesto Total S/.718,957.1808

CRONOGRAMACRONOGRAMA DE EJECUCION DE OBRAObraCONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIOEntidadMUNICIPALIDAD DISTRITAL DE PARASLugarAYACUCHO CANGALLO DISTRITO DE PARASItemDescripcinUnd.MetradoPrecio S/.Parcial S/.PRIMER MESSEGUNDO MESTERCER MESCUARTO MESQUINTO MES1ra Sem.2da Sem.3ra Sem.4ta Sem.5ta Sem.6ta Sem.7ma Sem.8va Sem.9na Sem.10ma Sem.11ma Sem.12ma Sem.13ra Sem.14ta Sem.15ta Sem.16ta Sem.17ma Sem.18va Sem.19na Sem.20ma Sem.01OBRAS PRELIMINARES43,068.094901.01MOVILIZACION Y DESMOVILIZACION DE EQUIPOest1.0016,213.880016,213.880001.02CAMPAMENTO DE OBRA (ALMACEN)m280.00158.614212,689.136001.03CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 mu1.00592.9010592.901001.04TRAZO, NIVELACION Y REPLANTEO (Ejecucin de obra)km2.20111.9227246.229901.05LIMPIEZA Y DESFORESTACION R= 1.0 Ha/daha2.20100.0913220.200901.06CONTROL TROPOGRAFICOkm2.161,385.50292,992.686301.07DEMARCACION DE TALUDESkm2.20135.0140297.030801.08TRANSPORTE DE MATERIALES A OBRAglb1.009,816.03009,816.030002MOVIMIENTO DE TIERRAS232,089.434202.01CORTE EN MATERIAL SUELTO R=540 m3/dam341,382.594.0977169,573.439002.02CORTE EN ROCA SUELTO R=250 m3/dam31,240.0016.509420,471.656002.03CONFORMACION DE TERRAPLENES R= 920 m3/dam36,048.004.246925,685.251202.04PERFILADO Y COMPACION DE SUB-RASANTE EN ZONAS-CORTE R=3220 m2/dam29,200.001.245511,458.600002.05EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES R.S.m3225.0013.47083,030.930002.06EXCAVACION DE CUNETAS EN MATERIAL SUELTOm2,110.000.62081,309.888002.07EXCAVACION DE CUNETAS EN ROCA SUELTOm50.0011.1934559.670003CONFORMACION DE SUPERFICIE DE RODADURA89,121.941803.01EXTRACCION Y APILAMIENTO DE MATERIAL AFIRMADO EN CANTERA R=530 m3/dam32,592.004.222210,943.942403.02ZARANDEADO R=350 m3/dam31,814.403.76516,831.397403.03CARGUIO DE MATERIAL AFIRMADO R= 750 m3/dam3311.402.0487637.965203.04TRANSPORTE DE MATERIAL AFIRMADO (DM)m3k18,144.002.800050,803.200003.05EXTENDIDO, NIVELADO Y COMPACTADO DE MATERIAL AFIRMADOm32,592.005.951315,425.769603.06RIEGOm31,728.002.59244,479.667204OBRAS DE ARTE38,611.404204.01MURO DE CONTENCIN13,291.216804.01.01TRAZO, NIVELACION Y REPLANTEO PRELIMINARm210.781.622217.487304.01.02EXCAVACION PARA ESTRUCTURASm310.7813.7522148.248704.01.03ELIMINACION DE MATERIAL EXCEDENTE CON CARRETILLA D=30mm310.788.022086.477204.01.04CONCRETO SIMPLE f'c=175 kg/cm2+ 50% P.M.m334.84201.11867,006.972004.01.05ENCOFRADO Y DESENCOFRADOm246.72121.58465,680.432504.01.06RELLENO COMPACTADO CON MATERIAL PROPIOm312.3711.2455139.106804.01.07RELLENO COMPACTADO MANUAL- CON MATERIAL FILTROm32.8674.2980212.492304.02DISPADOR DE ENERGIA2,150.518004.02.01TRAZO Y REPLANTEOm211.754.288250.386404.02.02EXCAVACION PARA ESTRUCTURASm37.7613.7522106.717104.02.03ELIMINACION DE MATERIAL EXCEDENTEm37.7610.696183.001704.02.04CONCRETO F'C=140 KG/CM2 +30% PMm34.70185.5588872.126404.02.05CONCRETO 1:10 +30% P.G. PARA UAm33.06148.9857455.896204.02.06ENCOFRADO Y DESENCOFRADOm24.79121.5846582.390204.03BADEN L=6M (4 UND)23,169.669404.03.01TRAZO Y REPLANTEOm2118.964.2882510.124304.03.02EXCAVACION PARA ESTRUCTURASm350.6713.7522696.824004.03.03ELIMINACION MATERIAL EXCEDENTEm350.677.8692398.732404.03.04CONCRETO 1:10 +30% P.G. PARA UAm314.98148.98572,231.805804.03.05ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60kg884.115.93795,249.756804.03.06ENCOFRADO Y DESENCOFRADOm226.16121.58463,180.653104.03.07CONCRETO f'c=175 kg/cm2m335.69302.799310,806.907004.03.08JUNTAS ASFALTICASm20.004.743394.866005PUENTE (L=10m)177,138.251305.01TRAZO Y REPLANTEOm2225.004.2882964.845005.02EXCAVACION MANUAL PARA ESTRUCTURASm3253.5017.11374,338.323005.03ELIMINACION DE MATERIAL EXCEDENTEm3253.5010.69612,711.461405.04ENCOFRADO Y DESENCOFRADOm2313.75121.584638,147.168305.05CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM.m3178.56195.225834,859.518805.06ACERO DE REFUERZO fy=4200 kg/cm2kg9,446.925.418851,190.970105.07CONCRETO f'c= 210 kg/cm2 EN LOSAm357.24639.515036,605.838605.08RELLENO CON MATERIAL SELECCIONADOm352.5014.9602785.410505.09BARANDAS DE ACEROm24.0038.1745916.188005.10APOYO MOVIL DE NEOFRENOu2.001,167.41442,334.828805.11APOYO FIJOu2.001,301.51442,603.028805.12CONSTRUCCION DE ACCESO AUXILIAR PARA PASO DE VEHICULOSglb1.001,680.67001,680.670006POSTES KILOMETRICOS425.860006.01INSTALACIONDE POSTES KILOMETRICOS (Inc. suministros)u4.00106.4650425.860007ENSAYOS DE CONTROL DE CALIDAD2,150.000007.01ENSAYO DE MEC. DE SUELOS-MAT. AFIRMADOu1.00500.0000500.000007.02ENSAYO DE CONTROL DE COMPACTACIONu9.0050.0000450.000007.03ENSAYOS DE RESISTENCIA DEL CONCRETOu24.0050.00001,200.000008PLAN DE MANEJO AMBIENTAL4,771.994408.01MEDIDAS DE MITIGACION3,428.237108.01.01RECUPERACION DE CULTIVOS AFECTADOSha2.171,328.92022,883.756808.01.02ESTABILIZACION DE CURSOS DE AGUAm22.17250.9126544.480308.02MEDIDAS DE CONTROL1,343.757308.02.01CONSTRUCCION DE POZO DE RESIDUOSm316.5018.7954310.124108.02.02RECOLECCION MANUAL DE RESIDUOS SLIDOS DEL AREA CIRCUNDANTEm311.0012.5907138.497708.02.03CONSTRUCCION RELLENO DE SEGURIDADm34.5045.7661205.947508.02.04LETRINAS MOVILESu1.00575.0780575.078008.02.05LETRINAS TEMPORALESu1.00114.1100114.110009MEDIDAS DE PREVENCION6,049.200009.01EQUIPO DE PROTECCION PERSONALglb1.003,494.20003,494.200009.02ELABORACION DE PROCEDIMIENTOS DE SEGURIDAD AMBIENTALglb1.00500.0000500.000009.03PROGRAMA DE INDUCCION AL PERSONALu1.00525.0000525.000009.04CAPACITACION EN TEMAS AMBIENTALESu1.00525.0000525.000009.05REUNION INFORMATIVA DEL PLAN DE MANEJO AMBIENTALu1.001,005.00001,005.000010FORTALECIMIENTO DE LA CONSERVACION DE CAMINOS3,500.000010.01CAPACITACION EN GESTION VIALglb1.002,000.00002,000.000010.02CONFORMACION Y CAPACITACION DEL COMITE DE MANTENIMIENTOglb1.001,500.00001,500.0000

Cronograma Val.CRONOGRAMA DE VALORIZACION DE OBRAObraCONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIOEntidadMUNICIPALIDAD DISTRITAL DE PARAS166.26035LugarAYACUCHO- CANGALLO DISTRITO DE PARASItemDescripcinUnd.MetradoPrecio S/.Parcial S/.PRIMER MESSEGUNDO MESTERCER MESCUARTO MESQUINTO MESMonto%Monto%Monto%Monto%Monto%01OBRAS PRELIMINARES43,068.094901.01MOVILIZACION Y DESMOVILIZACION DE EQUIPOest1.0016,213.880016,213.880016,213.8800100.00%01.02CAMPAMENTO DE OBRA (ALMACEN)m280.00158.614212,689.136012,689.1360100.00%01.03CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 mu1.00592.9010592.9010592.9010100.00%01.04TRAZO, NIVELACION Y REPLANTEO (Ejecucin de obra)km2.20111.9227246.2299246.2299100.00%01.05LIMPIEZA Y DESFORESTACION R= 1.0 Ha/daha2.20100.0913220.2009220.2009100.00%01.06CONTROL TROPOGRAFICOkm2.161,385.50292,992.6863498.781116.67%665.041422.22%665.041422.22%665.041422.22%498.7810516.67%01.07DEMARCACION DE TALUDESkm2.20135.0140297.0308297.0308100.00%01.08TRANSPORTE DE MATERIALES A OBRAglb1.009,816.03009,816.03009,816.0300100.00%02MOVIMIENTO DE TIERRAS232,089.434202.01CORTE EN MATERIAL SUELTO R=540 m3/dam341,382.594.0977169,573.439028,262.2416.67%37,682.9922.22%37,682.9922.22%37,682.9922.22%28,262.2416.67%9420.746611111102.02CORTE EN ROCA SUELTO R=250 m3/dam31,240.0016.509420,471.656020,471.66100.00%02.03CONFORMACION DE TERRAPLENES R= 920 m3/dam36,048.004.246925,685.251225,685.25100.00%02.04PERFILADO Y COMPACION DE SUB-RASANTE EN ZONAS-CORTE R=3220 m2/dam29,200.001.245511,458.600011,458.60100.00%02.05EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES R.S.m3225.0013.47083,030.9300606.1920.00%606.1920.00%606.1920.00%606.1920.00%606.1920.00%02.06EXCAVACION DE CUNETAS EN MATERIAL SUELTOm2,110.000.62081,309.88801,309.89100.00%02.07EXCAVACION DE CUNETAS EN ROCA SUELTOm50.0011.1934559.6700559.67100.00%03CONFORMACION DE SUPERFICIE DE RODADURA89,121.941803.01EXTRACCION Y APILAMIENTO DE MATERIAL AFIRMADO EN CANTERA R=530 m3/dam32,592.004.222210,943.942410,943.9424100.00%03.02ZARANDEADO R=350 m3/dam31,814.403.76516,831.39746,831.3974100.00%03.03CARGUIO DE MATERIAL AFIRMADO R= 750 m3/dam3311.402.0487637.9652637.9652100.00%03.04TRANSPORTE DE MATERIAL AFIRMADO (DM)m3k18,144.002.800050,803.200050,803.2000100.00%03.05EXTENDIDO, NIVELADO Y COMPACTADO DE MATERIAL AFIRMADOm32,592.005.951315,425.769615,425.7696100.00%03.06RIEGOm31,728.002.59244,479.66724,479.6672100.00%04OBRAS DE ARTE38,611.404204.01MURO DE CONTENCIN13,291.216804.01.01TRAZO, NIVELACION Y REPLANTEO PRELIMINARm210.781.622217.487317.4873100.00%04.01.02EXCAVACION PARA ESTRUCTURASm310.7813.7522148.2487148.2487100.00%04.01.03ELIMINACION DE MATERIAL EXCEDENTE CON CARRETILLA D=30mm310.788.022086.477286.4772100.00%04.01.04CONCRETO SIMPLE f'c=175 kg/cm2+ 50% P.M.m334.84201.11867,006.97207,006.9720100.00%04.01.05ENCOFRADO Y DESENCOFRADOm246.72121.58465,680.43255,680.4325100.00%04.01.06RELLENO COMPACTADO CON MATERIAL PROPIOm312.3711.2455139.1068139.1068100.00%04.01.07RELLENO COMPACTADO MANUAL- CON MATERIAL FILTROm32.8674.2980212.4923212.4923100.00%04.02DISPADOR DE ENERGIA2,150.518004.02.01TRAZO Y REPLANTEOm211.754.288250.386450.3864100.00%04.02.02EXCAVACION PARA ESTRUCTURASm37.7613.7522106.7171106.7171100.00%04.02.03ELIMINACION DE MATERIAL EXCEDENTEm37.7610.696183.001783.0017100.00%04.02.04CONCRETO F'C=140 KG/CM2 +30% PMm34.70185.5588872.1264872.1264100.00%04.02.05CONCRETO 1:10 +30% P.G. PARA UAm33.06148.9857455.8962455.8962100.00%04.02.06ENCOFRADO Y DESENCOFRADOm24.79121.5846582.3902582.3902100.00%04.03BADEN L=6M (4 UND)23,169.669404.03.01TRAZO Y REPLANTEOm2118.964.2882510.1243127.53107525.00%127.5325.00%127.53107525.00%127.53107525.00%04.03.02EXCAVACION PARA ESTRUCTURASm350.6713.7522696.8240174.20625.00%174.2125.00%174.20625.00%174.20625.00%04.03.03ELIMINACION MATERIAL EXCEDENTEm350.677.8692398.732499.683125.00%99.6825.00%99.683125.00%99.683125.00%04.03.04CONCRETO 1:10 +30% P.G. PARA UAm314.98148.98572,231.8058557.9514525.00%557.9525.00%557.9514525.00%557.9514525.00%04.03.05ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60kg884.115.93795,249.75681312.439225.00%1,312.4425.00%1312.439225.00%1312.439225.00%04.03.06ENCOFRADO Y DESENCOFRADOm226.16121.58463,180.6531795.16327525.00%795.1625.00%795.16327525.00%795.16327525.00%04.03.07CONCRETO f'c=175 kg/cm2m335.69302.799310,806.90702701.7267525.00%2,701.7325.00%2701.7267525.00%2701.7267525.00%04.03.08JUNTAS ASFALTICASm20.004.743394.866023.716525.00%23.7225.00%23.716525.00%23.716525.00%05PUENTE (L=10m)177,138.251305.01TRAZO Y REPLANTEOm2225.004.2882964.8450964.8450100.00%05.02EXCAVACION MANUAL PARA ESTRUCTURASm3253.5017.11374,338.32304,338.3230100.00%05.03ELIMINACION DE MATERIAL EXCEDENTEm3253.5010.69612,711.46142,711.4614100.00%05.04ENCOFRADO Y DESENCOFRADOm2313.75121.584638,147.168338,147.1683100.00%05.05CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM.m3178.56195.225834,859.518834,859.5188100.00%05.06ACERO DE REFUERZO fy=4200 kg/cm2kg9,446.925.418851,190.970138393.22757575.00%12797.74252525.00%12797.74252505.07CONCRETO f'c= 210 kg/cm2 EN LOSAm357.24639.515036,605.838636,605.8386100.00%05.08RELLENO CON MATERIAL SELECCIONADOm352.5014.9602785.4105785.4105100.00%05.09BARANDAS DE ACEROm24.0038.1745916.1880916.1880100.00%05.10APOYO MOVIL DE NEOFRENOu2.001,167.41442,334.82882,334.8288100.00%05.11APOYO FIJOu2.001,301.51442,603.02882,603.0288100.00%05.12CONSTRUCCION DE ACCESO AUXILIAR PARA PASO DE VEHICULOSglb1.001,680.67001,680.67001,680.6700100.00%06POSTES KILOMETRICOS425.860006.01INSTALACIONDE POSTES KILOMETRICOS (Inc. suministros)u4.00106.4650425.8600425.8600100.00%07ENSAYOS DE CONTROL DE CALIDAD2,150.000007.01ENSAYO DE MEC. DE SUELOS-MAT. AFIRMADOu1.00500.0000500.0000500.00100.00%07.02ENSAYO DE CONTROL DE COMPACTACIONu9.0050.0000450.000022550.00%22550.00%07.03ENSAYOS DE RESISTENCIA DEL CONCRETOu24.0050.00001,200.000024020.00%24020.00%24020.00%24020.00%24020.00%08PLAN DE MANEJO AMBIENTAL4,771.994408.01MEDIDAS DE MITIGACION3,428.237108.01.01RECUPERACION DE CULTIVOS AFECTADOSha2.171,328.92022,883.75682,883.7568100.00%08.01.02ESTABILIZACION DE CURSOS DE AGUAm22.17250.9126544.4803544.4803100.00%08.02MEDIDAS DE CONTROL1,343.757308.02.01CONSTRUCCION DE POZO DE RESIDUOSm316.5018.7954310.1241310.12100.00%08.02.02RECOLECCION MANUAL DE RESIDUOS SLIDOS DEL AREA CIRCUNDANTEm311.0012.5907138.4977138.4977100.00%08.02.03CONSTRUCCION RELLENO DE SEGURIDADm34.5045.7661205.9475205.9475100.00%08.02.04LETRINAS MOVILESu1.00575.0780575.0780575.0780100.00%08.02.05LETRINAS TEMPORALESu1.00114.1100114.1100114.1100100.00%09MEDIDAS DE PREVENCION6,049.200009.01EQUIPO DE PROTECCION PERSONALglb1.003,494.20003,494.20003,494.2000100.00%09.02ELABORACION DE PROCEDIMIENTOS DE SEGURIDAD AMBIENTALglb1.00500.0000500.0000500.0000100.00%09.03PROGRAMA DE INDUCCION AL PERSONALu1.00525.0000525.0000525.0000100.00%09.04CAPACITACION EN TEMAS AMBIENTALESu1.00525.0000525.0000525.0000100.00%09.05REUNION INFORMATIVA DEL PLAN DE MANEJO AMBIENTALu1.001,005.00001,005.0000502.550.00%502.550.00%10FORTALECIMIENTO DE LA CONSERVACION DE CAMINOS3,500.000010.01CAPACITACION EN GESTION VIALglb1.002,000.00002,000.00002,000.0000100.00%10.02CONFORMACION Y CAPACITACION DEL COMITE DE MANTENIMIENTOglb1.001,500.00001,500.00001,500.0000100.00%Monto Mensual91,851.3156,445.23164,401.18212,528.9471,699.53Monto Total596,926.18

Cronograma de InsumosCRONOGRAMA DE ADQUISICION DE INSUMOSObraCONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIOEntidadMUNICIPALIDAD DISTRITAL DE PARAS271.6444444444LugarAYACUCHO - CANGALLO DISTRITO DE PARASNPartidasUnd.CantidadPrecio Unitario S/Costo Parcial (S/.)Mes 01Mes 02Mes 03Mes 04Mes 05CANT.COSTOCANT.COSTOCANT.COSTOCANT.COSTOCANT.COSTO01.01MOVILIZACION Y DESMOVILIZACION DE EQUIPOMateriales16,213.8800MOVILIZACION Y DESMOVILIZACIONglb1.000016,213.880016,213.88000.58106.940.58106.9416213.8816,213.880016213.88000.000016213.8801.02CAMPAMENTO DE OBRA (ALMACEN)0.0000Mano de Obra8,307.20000.0000OFICIALhh640.00005.34003,417.6000640.003,417.603,417.60003417.60000.000012,689.1360PEONhh1,280.00003.82004,889.60001,280.004,889.604,889.60004889.60000.0000Materiales4,132.72000.0000CLAVOS PARA MADERA CON CABEZA DE 3"kg20.00006.3000126.000020.00126.00126.0000126.00000.0000CLAVOS PARA CALAMINAkg8.00008.000064.00008.0064.0064.000064.00000.0000MADERA 2X3"p2666.40001.80001,199.5200666.401,199.521,199.52001199.52000.0000TABLONES DE MADERA 2X6"p2480.00001.6000768.0000480.00768.00768.0000768.00000.0000ARPILLERAm80.00006.0000480.000080.00480.00480.0000480.00000.0000CALAMINA DE 1.83mx0.83mx2.7mmpza71.200021.00001,495.200071.201,495.201,495.20001495.20000.0000Equipos249.21600.0000HERRAMIENTAS MANUALES%MO3.00008,307.2000249.21603.00249.22249.2160249.21600.000001.03CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m0.0000592.9010Mano de Obra7.64000.0000PEONhh2.00003.82007.64002.007.647.64007.64000.0000Materiales583.16000.000.000.0000ALAMBRE NEGRO # 8kg10.00004.800048.000010.0048.0048.000048.00000.0000CLAVOS PARA MADERA CON CABEZA DE 5"kg5.00006.500032.50005.0032.5032.500032.50000.0000CARTEL DE OBRAu1.0000500.0000500.00001.00500.00500.0000500.00000.0000MADERA 3x4"p21.00002.66002.66001.002.662.66002.66000.0000Equipos2.10100.000.000.0000HERRAMIENTAS MANUALES%MO27.50007.64002.101027.502.102.10102.10100.000001.04TRAZO, NIVELACION Y REPLANTEO (Ejecucin de obra)0.0000Mano de Obra0.77480.0000246.2300TOPOGRAFOhh0.03529.03000.31790.040.320.31790.3179-0.0000OFICIALhh0.03525.34000.18800.040.190.18800.1880-0.0000PEONhh0.07043.82000.26890.070.270.26890.26890.0000Materiales242.61600.0000YESO EN BOLSAS DE 18 kgbls0.858012.000010.29600.8610.3010.296010.29600.0000ESTACA DE MADERAp2116.16002.0000232.3200116.16232.32232.3200232.32000.0000Equipos2.83920.000.000.0000HERRAMIENTAS MANUALES%MO3.00000.77480.02323.000.020.02320.02320.0000TEODOLITOhe0.035250.00001.76000.041.761.76001.76000.0000NIVEL TOPOGRFICOhe0.035230.00001.05600.041.061.05601.05600.000001.05LIMPIEZA DE TERRENOR= 1.0 Ha/da0.0000Mano de Obra213.78720.0000220.2008OPERARIOhh1.76006.870012.09121.7612.0912.091212.09120.0000PEONhh52.80003.8200201.696052.80201.70201.6960201.69600.0000Equipos6.41360.0000HERRAMIENTAS MANUALES%MO3.0000213.78726.41363.006.416.41366.41360.000001.06CONTROL TROPOGRAFICO0.0000Mano de Obra505.81090.00002,992.6877TOPOGRAFOhh24.68589.0300222.91284.114337.1521295.485733333349.5361725.485733333349.5361725.485733333349.5361724.114337.1521291.3714333333222.9128222.9128-0.0000PEONhh74.05713.8200282.898112.3428547.14968716.457133333362.866249333316.457133333362.866249333316.457133333362.866249333312.3428547.1496874.1142833333282.8981282.89810.0000Materiales373.40950.0000CEMENTO PORTLAND TIPO I (42.5 kg)bls0.432026.000011.23200.0721.8720.0962.4960.0962.4960.0962.4960.0721.8720.02411.232011.23200.0000HORMIGON (PUESTO EN OBRA)m30.058325.00001.45750.00971666670.24291666670.01295555560.32388888890.01295555560.32388888890.01295555560.32388888890.00971666670.24291666670.00323888891.45751.45750.0000ESTACA DE MADERA TORNILLO TRATADAp2108.00003.2000345.60001857.62476.82476.82476.81857.66345.6000345.60000.0000PINTURA ESMALTE METALIT MADERA ESMALTEX CON COLORgal0.432035.000015.12000.0722.520.0963.360.0963.360.0963.360.0722.520.02415.120015.12000.0000Equipos2,113.46730.0000HERRAMIENTAS MANUALES%MO3.0000505.810915.17430.52.52905450.66666666673.37207266670.66666666673.37207266670.66666666673.37207266670.52.52905450.166666666715.174315.17430.0000NIVEL TOPOGRAFICO CON TRIPODEhe24.685835.0000864.00304.1143144.00055.4857333333192.00066666675.4857333333192.00066666675.4857333333192.00066666674.1143144.00051.3714333333864.0030864.00300.0000TEODOLITOhm24.685850.00001,234.29004.1143205.7155.4857333333274.28666666675.4857333333274.28666666675.4857333333274.28666666674.1143205.7151.37143333331,234.29001234.29000.000001.07DEMARCACION DE TALUDES0.0000Mano de Obra146.69600.0000297.0308TOPOGRAFOhh8.80009.030079.46408.800079.46479.464079.46400.0000PEONhh17.60003.820067.232017.600067.23267.232067.23200.0000Materiales55.00000.0000YESO EN BOLSAS DE 18 kgbls2.200012.000026.40002.200026.426.400026.40000.0000PLASTICOm11.00001.000011.000011.00001111.000011.00000.0000PINTURA ESMALTE SINTETICOgal0.440040.000017.60000.440017.617.600017.60000.0000Equipos95.33480.0000HERRAMIENTAS MANUALES%MO5.0000146.69607.33485.00007.33487.33487.33480.0000WINCHA DE 50 mhe1.100080.000088.00001.10008888.000088.00000.000001.08TRANSPORTE DE MATERIALES A OBRA0.0000Materiales9,816.03000.0000FLETE POR TRASNPORTE DE MATERIALES PARAS - OBRAglb1.00009,816.03009,816.03001.00009816.039,816.03009816.03000.00009,816.030002.01CORTE EN MATERIAL SUELTO R=540 m3/da0.0000Mano de Obra4,010.13870.0000169,575.4666OPERARIOhh124.14786.8700852.895420.6913142.14923127.5884189.53230827.5884189.53230827.5884189.53230820.6913142.1492316.8971852.8954852.8954-0.0000PEONhh612.46233.82002,339.6060102.07705389.934331136.1027333333519.9124413333136.1027333333519.9124413333136.1027333333519.9124413333102.07705389.93433134.02568333332,339.60602339.6060-0.0000CONTROLADOR OFICIALhh153.11565.3400817.637325.5192666667136.27288434.0256888889181.697178666734.0256888889181.697178666734.0256888889181.697178666725.5192666667136.2728848.5064222222817.6373817.63730.0000Equipos165,565.32790.0000HERRAMIENTAS MANUALES%MO5.00004,010.1387200.50690.833333333333.41782251.111111111144.55709666671.111111111144.55709666671.111111111144.55709666670.833333333333.41782250.2777777778200.5069200.50690.0000TRACTOR DE ORUGAS DE 190-240 HPhm612.4623270.0000165,364.8210102.0770527560.8035136.102733333336747.738136.102733333336747.738136.102733333336747.738102.0770527560.803534.0256833333165,364.8210165364.82100.000002.02CORTE EN ROCA SUELTO R=250 m3/da0.0000Mano de Obra1,742.34880.000020,471.6262OFICIALhh79.36005.3400423.782479.3600423.7824423.7824423.78240.0000PEONhh317.44003.82001,212.6208317.44001212.62081,212.62081212.62080.0000CONTROLADOR OFICIALhh19.84005.3400105.945619.8400105.9456105.9456105.94560.0000Materiales5,964.40000.0000CORDON DETONANTE 3 pm620.00002.00001,240.0000620.000012401,240.00001240.00000.0000FULMINANTEu620.00002.00001,240.0000620.000012401,240.00001240.00000.0000DINAMITA SEMEXA 60kg93.00008.0000744.000093.0000744744.0000744.00000.0000Anfo NITROSEMkg186.00006.20001,153.2000186.00001153.21,153.20001153.20000.0000BARRENO 5' X 1/8"u4.9600320.00001,587.20004.96001587.21,587.20001587.20000.0000Equipos12,764.87740.0000HERRAMIENTAS MANUALES%MO5.00001,742.348887.11745.000087.1174487.117487.11740.0000COMPRESORA NEUMATICA 87 HP 250-330 PCMhm39.6800120.00004,761.600039.68004761.64,761.60004761.60000.0000TRACTOR DE ORUGAS DE 190-240 HPhm25.7920270.00006,963.840025.79206963.846,963.84006963.84000.0000MARTILLO NEUMATICO DE 25 kghm79.360012.0000952.320079.3600952.32952.3200952.32000.000002.03CONFORMACION DE TERRAPLENES R= 920 m3/da0.0000Mano de Obra1,474.22420.000025,685.5034PEONhh345.34083.82001,319.2019345.34081319.20191,319.20191319.2019-0.0000CONTROLADOR OFICIALhh29.03045.3400155.022329.0304155.0223155.0223155.02230.0000Equipos24,211.27920.0000HERRAMIENTAS MANUALES%MO5.00001,474.224273.71125.000073.711273.711273.71120.0000CAMION CISTERNA 4 X 2 (AGUA) 122 HP 2,000 glhm29.0304120.00003,483.648029.03043483.64803,483.64803483.64800.0000RODILLO LISO VIBRATORIO AUTOPROPULSADO 70-100 HP 7-9 tonhm42.9408170.00007,299.936042.94087299.93607,299.93607299.93600.0000TRACTOR DE ORUGAS DE 190-240 HPhm29.0304270.00007,838.208029.03047838.20807,838.20807838.20800.0000MOTONIVELADORA DE 125 HPhm29.0304190.00005,515.776029.03045515.77605,515.77605515.77600.000002.04PERFILADO Y COMPACION DE SUB-RASANTE EN ZONAS-CORTE R=3220 m2/da0.0000Mano de Obra406.87920.000011,459.0856PEONhh91.08003.8200347.925691.0800347.9256347.9256347.92560.0000CONTROLADOR OFICIALhh11.04005.340058.953611.040058.953658.953658.95360.0000Equipos11,052.20640.0000HERRAMIENTAS MANUALES%MO3.0000406.879212.20643.000012.20637612.206412.2064-0.0000CAMION CISTERNA 4 X 2 (AGUA) 122 HP 2,000 glhm23.0000120.00002,760.000023.000027602,760.00002760.00000.0000RODILLO LISO VIBRATORIO AUTOPROPULSADO 70-100 HP 7-9 tonhm23.0000170.00003,910.000023.000039103,910.00003910.00000.0000MOTONIVELADORA DE 125 HPhm23.0000190.00004,370.000023.000043704,370.00004370.00000.000002.05EXCAVACION, DESQUINCHE Y PEINADO DE TALUDES R.S.0.0000Mano de Obra2,942.64000.00003,030.9192OFICIALhh36.00005.3400192.24007.238.4487.238.4487.238.4487.238.4487.238.448192.2400192.24000.0000PEONhh720.00003.82002,750.4000144550.08144550.08144550.08144550.08144550.082,750.40002750.40000.0000Equipos88.27920.0000HERRAMIENTAS MANUALES%MO3.00002,942.640088.27920.617.655840.617.655840.617.655840.617.655840.617.6558488.279288.27920.000002.06EXCAVACION DE CUNETAS EN MATERIAL SUELTO0.0000Mano de Obra25.79260.00001,309.9622PEONhh6.75203.820025.79266.752025.7926425.792625.79260.0000Equipos1,284.16960.0000HERRAMIENTAS MANUALES%MO5.000025.79261.28965.0000128.9631.2896128.9630127.6734MOTONIVELADORA DE 125 HPhm6.7520190.00001,282.88006.75201282.881,282.88001282.88000.000002.07EXCAVACION DE CUNETAS EN ROCA SUELTO0.0000Mano de Obra38.57000.0000559.6685OFICIALhh1.33505.34007.12891.33507.12897.12897.12890.0000PEONhh8.00003.820030.56008.000030.5630.560030.56000.0000CONTROLADOR OFICIALhh0.16505.34000.88110.16500.88110.88110.88110.0000Materiales265.25000.0000CORDON DETONANTE 3 pm50.00002.0000100.000050.0000100100.0000100.00000.0000FULMINANTEu50.00002.0000100.000050.0000100100.0000100.00000.0000DINAMITA SEMEXA 60kg1.25008.000010.00001.25001010.000010.00000.0000Anfo NITROSEMkg3.75006.200023.25003.750023.2523.250023.25000.0000BARRENO 5' X 1/8"u0.1000320.000032.00000.10003232.000032.00000.0000Equipos255.84850.0000HERRAMIENTAS MANUALES%MO5.000038.57001.92855.00001.92851.92851.92850.0000COMPRESORA NEUMATICA 87 HP 250-330 PCMhm1.6700120.0000200.40001.6700200.4200.4000200.40000.0000MARTILLO NEUMATICO DE 25 kghm4.460012.000053.52004.460053.5253.520053.52000.000003.01EXTRACCION Y APILAMIENTO DE MATERIAL AFIRMADO EN CANTERA R=530 m3/da0.0000Mano de Obra358.51500.000010,944.0248PEONhh39.13923.8200149.511739.1392149.511744149.5117149.51170.0000CONTROLADOR OFICIALhh39.13925.3400209.003339.1392209.003328209.0033209.00330.0000Equipos10,585.50980.0000HERRAMIENTAS MANUALES%MO5.0000358.515017.92585.000017.9257517.925817.9258-0.0001TRACTOR DE ORUGAS DE 190-240 HPhm39.1392270.000010,567.584039.139210567.58410,567.584010567.58400.000003.02ZARANDEADO R=350 m3/da0.0000Mano de Obra99.11330.00006,831.3698PEONhh25.94593.820099.113325.945999.11333899.113399.11330.0000Equipos6,732.25650.0000CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3hm25.9459185.00004,799.991525.94594799.99154,799.99154799.99150.0000ZARANDA DE FIERRO DE CONSTRUCCION FY:4200 KG/CM2u0.54433,550.00001,932.26500.54431932.2651,932.26501932.26500.000003.03CARGUIO DE MATERIAL AFIRMADO R= 750 m3/da0.0000Mano de Obra21.54130.0000637.9613PEONhh3.33203.820012.72823.332012.7282412.728212.72820.0000CONTROLADOR OFICIALhh1.65045.34008.81311.65048.8131368.81318.81310.0000Equipos616.42000.0000CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3hm3.3320185.0000616.42003.3320616.42616.4200616.42000.000003.04TRANSPORTE DE MATERIAL AFIRMADO (DM)0.0000Materiales50,803.20000.0000TRANSPORTE DE MATERIAL DE AFIRMADOm3k18,144.00002.800050,803.200018,144.000050803.250,803.200050803.20000.000050,803.200003.05EXTENDIDO, NIVELADO Y COMPACTADO DE MATERIAL AFIRMADO0.0000Mano de Obra738.86770.000015,425.7951OPERARIOhh8.03526.870055.20188.035255.20182455.201855.20180.0000PEONhh122.08323.8200466.3578122.0832466.357824466.3578466.35780.0000CONTROLADOR OFICIALhh40.69445.3400217.308140.6944217.308096217.3081217.3081-0.0000Equipos14,686.92740.0000HERRAMIENTAS MANUALES%MO5.0000738.867736.94345.000036.94338536.943436.9434-0.0000RODILLO LISO VIBRATORIO AUTOPROPULSADO 70-100 HP 7-9 tonhm40.6944170.00006,918.048040.69446918.0486,918.04806918.04800.0000MOTONIVELADORA DE 125 HPhm40.6944190.00007,731.936040.69447731.9367,731.93607731.93600.000003.06RIEGO0.0000Mano de Obra316.56960.00004,479.5981PEONhh34.56003.8200132.019234.5600132.0192132.0192132.01920.0000CONTROLADOR OFICIALhh34.56005.3400184.550434.5600184.5504184.5504184.55040.0000Equipos4,163.02850.0000HERRAMIENTAS MANUALES%MO5.0000316.569615.82855.000015.8284815.828515.8285-0.0000CAMION CISTERNA 4 X 2 (AGUA) 122 HP 2,000 glhm34.5600120.00004,147.200034.56004147.24,147.20004147.20000.000004.01.01TRAZO, NIVELACION Y REPLANTEO PRELIMINAR0.0000Mano de Obra1.70710.000017.4892TOPOGRAFOhh0.04319.03000.38920.04310.3891930.38920.3892-0.0000PEONhh0.34503.82001.31790.34501.31791.31791.31790.0000Materiales7.07170.0000YESO EN BOLSAS DE 18 kgbls0.539012.00006.46800.53906.4686.46806.46800.0000MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADOp20.21562.80000.60370.21560.603680.60370.6037-0.0000Equipos8.71040.0000HERRAMIENTAS MANUALES%MO5.00001.70710.08545.00000.0853550.08540.0854-0.0000TEODOLITOhe0.172550.00008.62500.17258.6258.62508.62500.000004.01.02EXCAVACION PARA ESTRUCTURAS0.0000Mano de Obra141.18830.0000148.2477PEONhh36.96033.8200141.188336.9603141.188346141.1883141.18830.0000Equipos7.05940.0000HERRAMIENTAS MANUALES%MO5.0000141.18837.05945.00007.0594157.05947.05940.000004.01.03ELIMINACION DE MATERIAL EXCEDENTE CON CARRETILLA D=30m0.0000Mano de Obra82.35920.000086.4772PEONhh21.56003.820082.359221.560082.359282.359282.35920.0000Equipos4.11800.0000HERRAMIENTAS MANUALES%MO5.000082.35924.11805.00004.117964.11804.1180-0.000004.01.04CONCRETO SIMPLE f'c=175 kg/cm2+ 50% P.M.0.0000Mano de Obra1,005.24040.00007,006.9736OPERARIOhh30.96936.8700212.759130.9693212.759091212.7591212.7591-0.0000OFICIALhh15.48295.340082.678715.482982.67868682.678782.6787-0.0000PEONhh185.81223.8200709.8026185.8122709.802604709.8026709.80260.0000Materiales5,971.57600.0000PIEDRA MEDIANAm315.678050.0000783.900015.6780783.9783.9000783.90000.0000ARENA GRUESAm310.452050.0000522.600010.4520522.6522.6000522.60000.0000CEMENTO PORTLAND TIPO I (42.5 kg)bls174.200026.00004,529.2000174.20004529.24,529.20004529.20000.0000GASOLINA 84 OCTANOSgal10.452013.0000135.876010.4520135.876135.8760135.87600.0000Equipos30.15720.0000HERRAMIENTAS MANUALES%MO3.00001,005.240430.15723.000030.15721230.157230.15720.000004.01.05ENCOFRADO Y DESENCOFRADO0.0000Mano de Obra1,016.02920.00005,680.4307OPERARIOhh29.90086.8700205.418529.9008205.418496205.4185205.4185-0.0000OFICIALhh44.85125.3400239.505444.8512239.505408239.5054239.50540.0000PEONhh149.50403.8200571.1053149.5040571.10528571.1053571.1053-0.0000Materiales4,613.60000.0000ALAMBRE NEGRO RECOCIDO # 16kg37.37604.7000175.667237.3760175.6672175.6672175.66720.0000ALAMBRE NEGRO # 8kg37.37604.8000179.404837.3760179.4048179.4048179.40480.0000CLAVOS PARA MADERA CON CABEZA DE 3"kg23.36006.3000147.168023.3600147.168147.1680147.16800.0000TRIPLAY DE 4' X 8' X 19 mmpl23.3600120.00002,803.200023.36002803.22,803.20002803.20000.0000MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADOp2467.20002.80001,308.1600467.20001308.161,308.16001308.16000.0000Equipos50.80150.0000HERRAMIENTAS MANUALES%MO5.00001,016.029250.80155.000050.8014650.801550.8015-0.000004.01.06RELLENO COMPACTADO CON MATERIAL PROPIO0.0000Mano de Obra92.35790.0000351.5978OFICIALhh5.49725.340029.35505.497229.35504829.355029.35500.0000PEONhh16.49293.820063.002916.492963.00287863.002963.0029-0.0000Equipos46.74830.0000HERRAMIENTAS MANUALES%MO3.000092.35792.77073.00002.7707372.77072.77070.0000PLANCHA COMPACTADORAhm5.49728.000043.97765.497243.977643.977643.97760.000004.01.070.0000Mano de Obra13.97090.0000OFICIALhh1.52525.34008.14461.52528.1445688.14468.1446-0.0000PEONhh1.52523.82005.82631.52525.8262645.82635.8263-0.0000Materiales185.90000.0000MATERIAL DE PRESTAMO SELECCIONADO OBRAm33.718050.0000185.90003.7180185.9185.9000185.90000.0000Equipos12.62070.0000HERRAMIENTAS MANUALES%MO3.000013.97090.41913.00000.4191270.41910.41910.0000PLANCHA COMPACTADORAhm1.52528.000012.20161.525212.201612.201612.20160.000004.02.01TRAZO Y REPLANTEO0.0000Mano de Obra6.26790.000050.3853TOPOGRAFOhh0.37609.03003.39530.37603.395283.39533.3953-0.0000PEONhh0.75203.82002.87260.75202.872642.87262.87260.0000Materiales6.20400.0000YESO EN BOLSAS DE 18 kgbls0.352512.00004.23000.35254.234.23004.23000.0000MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADOp20.70502.80001.97400.70501.9741.97401.97400.0000Equipos37.91340.0000HERRAMIENTAS MANUALES%MO5.00006.26790.31345.00000.3133950.31340.3134-0.0000TEODOLITOhe0.470050.000023.50000.470023.523.500023.50000.0000NIVEL TOPOGRFICOhe0.470030.000014.10000.470014.114.100014.10000.000004.02.02EXCAVACION PARA ESTRUCTURAS0.0000Mano de Obra101.63450.0000106.7162PEONhh26.60593.8200101.634526.6059101.634538101.6345101.63450.0000Equipos5.08170.0000HERRAMIENTAS MANUALES%MO5.0000101.63455.08175.00005.0817255.08175.08170.000004.02.03ELIMINACION DE MATERIAL EXCEDENTE0.0000Mano de Obra79.04960.000083.0021PEONhh20.69363.820079.049620.693679.04955279.049679.0496-0.0000Equipos3.95250.0000HERRAMIENTAS MANUALES%MO5.000079.04963.95255.00003.952483.95253.9525-0.000004.02.04CONCRETO F'C=140 KG/CM2 +30% PM0.0000Mano de Obra60.62890.0000872.1260OPERARIOhh1.04436.87007.17431.04437.1743417.17437.17430.0000OFICIALhh1.04435.34005.57661.04435.5765625.57665.5766-0.0000PEONhh12.53353.820047.878012.533547.8779747.878047.8780-0.0000Materiales778.34820.0000PIEDRA MEDIANAm31.410050.000070.50001.410070.570.500070.50000.0000ARENA GRUESAm31.677950.000083.89501.677983.89583.895083.89500.0000CEMENTO PORTLAND TIPO I (42.5 kg)bls23.293226.0000605.623223.2932605.6232605.6232605.62320.0000GASOLINA 84 OCTANOSgal1.410013.000018.33001.410018.3318.330018.33000.0000Equipos33.14890.0000HERRAMIENTAS MANUALES%MO3.000060.62891.81893.00001.8188671.81891.8189-0.0000MEZCLADORA CONCRETO TROMPO 8HP 9 P3hm1.566520.000031.33001.566531.3331.330031.33000.000004.02.05CONCRETO 1:10 +30% P.G. PARA UA0.0000Mano de Obra68.55600.0000455.8963OPERARIOhh1.35996.87009.34251.35999.3425139.34259.34250.0000OFICIALhh1.35995.34007.26191.35997.2618667.26197.2619-0.0000PEONhh13.59993.820051.951613.599951.95161851.951651.95160.0000Materiales359.45670.0000PIEDRA GRANDE DE 8"m31.542225.000038.55501.542238.55538.555038.55500.0000CEMENTO PORTLAND TIPO I (42.5 kg)bls9.317726.0000242.26029.3177242.2602242.2602242.26020.0000GASOLINA 84 OCTANOSgal0.918013.000011.93400.918011.93411.934011.93400.0000HORMIGON (PUESTO EN OBRA)m32.668325.000066.70752.668366.707566.707566.70750.0000Equipos27.88360.0000HERRAMIENTAS MANUALES%MO1.000068.55600.68561.00000.685560.68560.6856-0.0000MEZCLADORA CONCRETO TROMPO 8HP 9 P3hm1.359920.000027.19801.359927.19827.198027.19800.000004.02.06ENCOFRADO Y DESENCOFRADO0.0000Mano de Obra104.16920.0000582.3902OPERARIOhh3.06566.870021.06073.065621.06067221.060721.0607-0.0000OFICIALhh4.59845.340024.55554.598424.55545624.555524.5555-0.0000PEONhh15.32803.820058.553015.328058.5529658.553058.5530-0.0000Materiales473.01250.0000ALAMBRE NEGRO RECOCIDO # 16kg3.83204.700018.01043.832018.010418.010418.01040.0000ALAMBRE NEGRO # 8kg3.83204.800018.39363.832018.393618.393618.39360.0000CLAVOS PARA MADERA CON CABEZA DE 3"kg2.39506.300015.08852.395015.088515.088515.08850.0000TRIPLAY DE 4' X 8' X 19 mmpl2.3950120.0000287.40002.3950287.4287.4000287.40000.0000MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADOp247.90002.8000134.120047.9000134.12134.1200134.12000.0000Equipos5.20850.0000HERRAMIENTAS MANUALES%MO5.0000104.16925.20855.00005.208465.20855.2085-0.000004.03.01TRAZO Y REPLANTEO0.0000Mano de Obra63.45770.0000510.1135TOPOGRAFOhh3.80679.030034.37450.9516758.593625250.9516758.593625250.9516758.593625250.9516758.5936252534.374534.37450.0000PEONhh7.61343.820029.08321.903357.2707971.903357.2707971.903357.2707971.903357.27079729.083229.0832-0.0000Materiales62.81090.0000YESO EN BOLSAS DE 18 kgbls3.568812.000042.82560.892210.70640.892210.70640.892210.70640.892210.706442.825642.82560.0000MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADOp27.13762.800019.98531.78444.996321.78444.996321.78444.996321.78444.9963219.985319.9853-0.0000Equipos383.84490.0000HERRAMIENTAS MANUALES%MO5.000063.45773.17291.2579.3221251.2579.3221251.2579.3221251.2579.3221253.1729317.2885314.1156TEODOLITOhe4.758450.0000237.92001.189659.481.189659.481.189659.481.189659.48237.9200237.92000.0000NIVEL TOPOGRFICOhe4.758430.0000142.75201.189635.6881.189635.6881.189635.6881.189635.688142.7520142.75200.000004.03.02EXCAVACION PARA ESTRUCTURAS0.0000Mano de Obra663.63790.0000696.8198PEONhh173.72723.8200663.637943.4318165.90947643.4318165.90947643.4318165.90947643.4318165.909476663.6379663.63790.0000Equipos33.18190.0000HERRAMIENTAS MANUALES%MO5.0000663.637933.18191.258.295473751.258.295473751.258.295473751.258.2954737533.181933.1819-0.000004.03.03ELIMINACION MATERIAL EXCEDENTE0.0000Mano de Obra387.11880.0000398.7324PEONhh101.34003.8200387.118825.33596.779725.33596.779725.33596.779725.33596.7797387.1188387.11880.0000Equipos11.61360.0000HERRAMIENTAS MANUALES%MO3.0000387.118811.61360.752.9033910.752.9033910.752.9033910.752.90339111.613611.6136-0.000004.03.04CONCRETO 1:10 +30% P.G. PARA UA0.0000Mano de Obra335.60770.00002,231.8069OPERARIOhh6.65716.870045.73431.66427511.433569251.66427511.433569251.66427511.433569251.66427511.4335692545.734345.7343-0.0000OFICIALhh6.65715.340035.54891.6642758.88722851.6642758.88722851.6642758.88722851.6642758.887228535.548935.54890.0000PEONhh66.57713.8200254.324516.64427563.581130516.64427563.581130516.64427563.581130516.64427563.5811305254.3245254.32450.0000Materiales1,759.70110.0000PIEDRA GRANDE DE 8"m37.549925.0000188.74751.88747547.1868751.88747547.1868751.88747547.1868751.88747547.186875188.7475188.74750.0000CEMENTO PORTLAND TIPO I (42.5 kg)bls45.614126.00001,185.966611.403525296.4916511.403525296.4916511.403525296.4916511.403525296.491651,185.96661185.96660.0000GASOLINA 84 OCTANOSgal4.494013.000058.42201.123514.60551.123514.60551.123514.60551.123514.605558.422058.42200.0000HORMIGON (PUESTO EN OBRA)m313.062625.0000326.56503.2656581.641253.2656581.641253.2656581.641253.2656581.64125326.5650326.56500.0000Equipos136.49810.0000HERRAMIENTAS MANUALES%MO1.0000335.60773.35610.250.839019250.250.839019250.250.839019250.250.839019253.35613.3561-0.0000MEZCLADORA CONCRETO TROMPO 8HP 9 P3hm6.657120.0000133.14201.66427533.28551.66427533.28551.66427533.28551.66427533.2855133.1420133.14200.000004.03.05ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 600.0000Mano de Obra324.92890.00005,249.7540OPERARIOhh26.61176.8700182.82246.65292545.705594756.65292545.705594756.65292545.705594756.65292545.70559475182.8224182.8224-0.0000OFICIALhh26.61175.3400142.10656.65292535.52661956.65292535.52661956.65292535.52661956.65292535.5266195142.1065142.1065-0.0000Materiales4,908.57870.0000ALAMBRE NEGRO RECOCIDO # 16kg141.45764.7000664.850735.3644166.2126835.3644166.2126835.3644166.2126835.3644166.21268664.8507664.85070.0000ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg1,326.16503.20004,243.7280331.541251060.932331.541251060.932331.541251060.932331.541251060.9324,243.72804243.72800.0000Equipos16.24640.0000HERRAMIENTAS MANUALES%MO5.0000324.928916.24641.254.061611251.254.061611251.254.061611251.254.0616112516.246416.24640.000004.03.06ENCOFRADO Y DESENCOFRADO0.0000Mano de Obra568.90670.00003,180.6520OPERARIOhh16.74246.8700115.02034.185628.7550724.185628.7550724.185628.7550724.185628.755072115.0203115.0203-0.0000OFICIALhh25.11365.3400134.10666.278433.5266566.278433.5266566.278433.5266566.278433.526656134.1066134.10660.0000PEONhh83.71203.8200319.779820.92879.9449620.92879.9449620.92879.9449620.92879.94496319.7798319.77980.0000Materiales2,583.30000.0000ALAMBRE NEGRO RECOCIDO # 16kg20.92804.700098.36165.23224.59045.23224.59045.23224.59045.23224.590498.361698.36160.0000ALAMBRE NEGRO # 8kg20.92804.8000100.45445.23225.11365.23225.11365.23225.11365.23225.1136100.4544100.45440.0000CLAVOS PARA MADERA CON CABEZA DE 3"kg13.08006.300082.40403.2720.6013.2720.6013.2720.6013.2720.60182.404082.40400.0000TRIPLAY DE 4' X 8' X 19 mmpl13.0800120.00001,569.60003.27392.43.27392.43.27392.43.27392.41,569.60001569.60000.0000MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADOp2261.60002.8000732.480065.4183.1265.4183.1265.4183.1265.4183.12732.4800732.48000.0000Equipos28.44530.0000HERRAMIENTAS MANUALES%MO5.0000568.906728.44531.257.111333751.257.111333751.257.111333751.257.1113337528.445328.44530.000004.03.07CONCRETO f'c=175 kg/cm20.0000Mano de Obra920.77770.000010,806.9074OPERARIOhh15.86066.8700108.96233.9651527.24058053.9651527.24058053.9651527.24058053.9651527.2405805108.9623108.96230.0000OFICIALhh15.86065.340084.69563.9651521.1739013.9651521.1739013.9651521.1739013.9651521.17390184.695684.69560.0000PEONhh190.34553.8200727.119847.586375181.779952547.586375181.779952547.586375181.779952547.586375181.7799525727.1198727.11980.0000Materiales9,620.59640.0000PIEDRA MEDIANAm310.707050.0000535.35002.67675133.83752.67675133.83752.67675133.83752.67675133.8375535.3500535.35000.0000ARENA GRUESAm318.201950.0000910.09504.550475227.523754.550475227.523754.550475227.523754.550475227.52375910.0950910.09500.0000CEMENTO PORTLAND TIPO I (42.5 kg)bls309.075426.00008,035.960477.268852008.990177.268852008.990177.268852008.990177.268852008.99018,035.96048035.96040.0000GASOLINA 84 OCTANOSgal10.707013.0000139.19102.6767534.797752.6767534.797752.6767534.797752.6767534.79775139.1910139.19100.0000Equipos265.53330.0000HERRAMIENTAS MANUALES%MO3.0000920.777727.62330.756.905832750.756.905832750.756.905832750.756.9058327527.623327.62330.0000MEZCLADORA CONCRETO TROMPO 8HP 9 P3hm11.895520.0000237.91002.97387559.47752.97387559.47752.97387559.47752.97387559.4775237.9100237.91000.000004.03.08JUNTAS ASFALTICAS0.0000Mano de Obra26.88000.000094.8664OFICIALhh1.60005.34008.54400.42.1360.42.1360.42.1360.42.1368.54408.54400.0000PEONhh4.80003.820018.33601.24.5841.24.5841.24.5841.24.58418.336018.33600.0000Materiales67.18000.0000ARENA FINAm30.040017.00000.68000.010.170.010.170.010.170.010.170.68000.68000.0000ASFALTO RC-250gal2.660025.000066.50000.66516.6250.66516.6250.66516.6250.66516.62566.500066.50000.0000Equipos0.80640.0000HERRAMIENTAS MANUALES%MO3.000026.88000.80640.750.20160.750.20160.750.20160.750.20160.80640.80640.000005.01TRAZO Y REPLANTEO0.0000Mano de Obra120.02400.0000964.8252TOPOGRAFOhh7.20009.030065.01603.632.5083.632.50865.016065.01600.0000PEONhh14.40003.820055.00807.227.5047.227.50455.008055.00800.0000Materiales118.80000.0000YESO EN BOLSAS DE 18 kgbls6.750012.000081.00003.37540.53.37540.581.000081.00000.0000MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADOp213.50002.800037.80006.7518.96.7518.937.800037.80000.0000Equipos726.00120.0000HERRAMIENTAS MANUALES%MO5.0000120.02406.00122.53.00062.53.00066.00126.00120.0000TEODOLITOhe9.000050.0000450.00004.52254.5225450.0000450.00000.0000NIVEL TOPOGRFICOhe9.000030.0000270.00004.51354.5135270.0000270.00000.000005.02EXCAVACION MANUAL PARA ESTRUCTURAS0.0000Mano de Obra4,131.74450.00004,338.3317PEONhh1,081.60853.82004,131.7445540.804252065.872235540.804252065.8722354,131.74454131.7445-0.0000Equipos206.58720.0000HERRAMIENTAS MANUALES%MO5.00004,131.7445206.58722.5103.29361252.5103.2936125206.5872206.58720.000005.03ELIMINACION DE MATERIAL EXCEDENTE0.0000Mano de Obra2,582.35250.00002,711.4701PEONhh676.00853.82002,582.3525338.004251291.176235338.004251291.1762352,582.35252582.3525-0.0000Equipos129.11760.0000HERRAMIENTAS MANUALES%MO5.00002,582.3525129.11762.564.55881252.564.5588125129.1176129.11760.000005.04ENCOFRADO Y DESENCOFRADO0.0000Mano de Obra6,823.18400.000038,147.1557OPERARIOhh200.80006.87001,379.4960100.4689.748100.4689.7481,379.49601379.49600.0000OFICIALhh301.20005.34001,608.4080150.6804.204150.6804.2041,608.40801608.40800.0000PEONhh1,004.00003.82003,835.28005021917.645021917.643,835.28003835.28000.0000Materiales30,982.81250.0000ALAMBRE NEGRO RECOCIDO # 16kg251.00004.70001,179.7000125.5589.85125.5589.851,179.70001179.70000.0000ALAMBRE NEGRO # 8kg251.00004.80001,204.8000125.5602.4125.5602.41,204.80001204.80000.0000CLAVOS PARA MADERA CON CABEZA DE 3"kg156.87506.3000988.312578.4375494.1562578.4375494.15625988.3125988.31250.0000TRIPLAY DE 4' X 8' X 19 mmpl156.8750120.000018,825.000078.43759412.578.43759412.518,825.000018825.00000.0000MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADOp23,137.50002.80008,785.00001568.754392.51568.754392.58,785.00008785.00000.0000Equipos341.15920.0000HERRAMIENTAS MANUALES%MO5.00006,823.1840341.15922.5170.57962.5170.5796341.1592341.15920.000005.05CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM.0.0000Mano de Obra4,000.41090.000034,859.5262OPERARIOhh79.35216.8700545.148939.67605272.574463539.67605272.5744635545.1489545.14890.0000OFICIALhh79.35215.3400423.740239.67605211.87010739.67605211.870107423.7402423.74020.0000PEONhh793.59213.82003,031.5218396.796051515.760911396.796051515.7609113,031.52183031.52180.0000Materiales27,167.90300.0000PIEDRA MEDIANAm353.568050.00002,678.400026.7841339.226.7841339.22,678.40002678.40000.0000ARENA GRUESAm3136.955550.00006,847.775068.477753423.887568.477753423.88756,847.77506847.77500.0000CEMENTO PORTLAND TIPO I (42.5 kg)bls651.744026.000016,945.3440325.8728472.672325.8728472.67216,945.344016945.34400.0000GASOLINA 84 OCTANOSgal53.568013.0000696.384026.784348.19226.784348.192696.3840696.38400.0000Equipos3,691.21230.0000HERRAMIENTAS MANUALES%MO3.00004,000.4109120.01231.560.00616351.560.0061635120.0123120.01230.0000MEZCLADORA DE CONCRETO TROMPO 8 HP 9 p3hm71.424050.00003,571.200035.7121785.635.7121785.63,571.20003571.20000.000005.06ACERO DE REFUERZO fy=4200 kg/cm20.0000Mano de Obra9,975.72100.000051,190.7322OPERARIOhh568.70466.87003,907.0006284.35231953.500301284.35231953.5003013,907.00063907.00060.0000OFICIALhh1,136.46455.34006,068.7204568.232253034.360215568.232253034.3602156,068.72046068.72040.0000Materiales40,716.22520.0000ALAMBRE NEGRO RECOCIDO # 16kg944.69204.70004,440.0524472.3462220.0262472.3462220.02624,440.05244440.05240.0000ALAMBRE NEGRO # 8kg944.69204.80004,534.5216472.3462267.2608472.3462267.26084,534.52164534.52160.0000ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60kg9,919.26603.200031,741.65124959.63315870.82564959.63315870.825631,741.651231741.65120.0000Equipos498.78600.0000HERRAMIENTAS MANUALES%MO5.00009,975.7210498.78602.5249.3930252.5249.393025498.7860498.78610.000005.07CONCRETO f'c= 210 kg/cm2 EN LOSA0.0000Mano de Obra1,276.45200.000036,605.8386OPERARIOhh22.89606.8700157.295511.44878.6477611.44878.64776157.2955157.29550.0000OFICIALhh45.79205.3400244.529322.896122.2646422.896122.26464244.5293244.5293-0.0000PEONhh228.96003.8200874.6272114.48437.3136114.48437.3136874.6272874.62720.0000Materiales34,464.20400.0000ACEITE PARA MOTOR MULTIGRADOgal2.862072.0000206.06401.431103.0321.431103.032206.0640206.06400.0000ARENA GRUESAm324.040850.00001,202.040012.0204601.0212.0204601.021,202.04001202.04000.0000PIEDRA ZARANDEADAm348.654060.00002,919.240024.3271459.6224.3271459.622,919.24002919.24000.0000CEMENTO PORTLAND TIPO I (42.5 kg)bls1,144.800026.000029,764.8000572.414882.4572.414882.429,764.800029764.80000.0000GASOLINA 84 OCTANOSgal28.620013.0000372.060014.31186.0314.31186.03372.0600372.06000.0000Equipos865.18260.0000HERRAMIENTAS MANUALES%MO5.00001,276.452063.82262.531.91132.531.911363.822663.82260.0000MEZCLADORA CONCRETO TROMPO 8HP 9 P3hm22.896020.0000457.920011.448228.9611.448228.96457.9200457.92000.0000VIBRADOR DE CONCRETOhm22.896015.0000343.440011.448171.7211.448171.72343.4400343.44000.000005.08RELLENO CON MATERIAL SELECCIONADO0.0000Mano de Obra570.24970.0000785.4102OFICIALhh23.33105.3400124.587511.665562.2937711.665562.29377124.5875124.58750.0000PEONhh116.66553.8200445.662258.33275222.83110558.33275222.831105445.6622445.66220.0000Equipos215.16050.0000HERRAMIENTAS MANUALES%MO5.0000570.249728.51252.51425.624252.51425.6242528.51252851.24852,822.7360PLANCHA COMPACTADORAhm23.33108.0000186.648011.665593.32411.665593.324186.6480186.64800.000005.09BARANDAS DE ACERO0.0000Mano de Obra185.72560.0000916.1879OPERARIOhh12.79926.870087.93056.399643.9652526.399643.96525287.930587.93050.0000PEONhh25.60083.820097.795112.800448.89752812.800448.89752897.795197.7951-0.0000Materiales337.20000.0000CEMENTO PORTLAND TIPO I (42.5 kg)bls1.200026.000031.20000.615.60.615.631.200031.20000.0000SOLDADURA CELLOCORD P 3/16"kg1.200015.000018.00000.690.6918.000018.00000.0000TUBO FIERRO GALVANIZADO ESTANDAR ISO-I 2"m2.4000120.0000288.00001.21441.2144288.0000288.00000.0000Equipos393.26230.0000HERRAMIENTAS MANUALES%MO5.0000185.72569.28632.54.643142.54.643149.28639.2863-0.0000MOTOSOLDADORA DE 250 Ahm12.799230.0000383.97606.3996191.9886.3996191.988383.9760383.97600.000005.10APOYO MOVIL DE NEOFRENO0.0000Mano de Obra112.96000.00002,334.8288OPERARIOhh8.00006.870054.9600427.48427.4854.960054.96000.0000OFICIALhh8.00005.340042.7200421.36421.3642.720042.72000.0000PEONhh4.00003.820015.280027.6427.6415.280015.28000.0000Materiales2,218.48000.0000NEOPRENO INC/. PLANCHA METAL, D=1/8" + ANCLAJE DE 3/8"m21.76001,260.50002,218.48000.881109.240.881109.242,218.48002218.48000.0000Equipos3.38880.0000HERRAMIENTAS MANUALES%MO3.0000112.96003.38881.51.69441.51.69443.38883.38880.000005.11APOYO FIJO0.0000Mano de Obra112.96000.00002,603.0288OPERARIOhh8.00006.870054.9600427.48427.4854.960054.96000.0000OFICIALhh8.00005.340042.7200421.36421.3642.720042.72000.0000PEONhh4.00003.820015.280027.6427.6415.280015.28000.0000Materiales2,486.68000.0000ACERO DE REFUERZO fy=4200 kg/cm2 GRADO 60kg8.940030.0000268.20004.47134.14.47134.1268.2000268.20000.0000NEOPRENO INC/. PLANCHA METAL, D=1/8" + ANCLAJE DE 3/8"m21.76001,260.50002,218.48000.881109.240.881109.242,218.48002218.48000.0000Equipos3.38880.0000HERRAMIENTAS MANUALES%MO3.0000112.96003.38881.51.69441.51.69443.38883.38880.000005.12CONSTRUCCION DE ACCESO AUXILIAR PARA PASO DE VEHICULOS0.0000Materiales1,680.67000.0000ACCESO VEHICULAR PROVICIONALglb1.00001,680.67001,680.67001.00001680.671,680.67001680.67000.00001,680.670006.01INSTALACIONDE POSTES KILOMETRICOS (Inc. suministros)0.0000Mano de Obra69.22650.0000425.8601OFICIALhh5.33325.340028.47935.333228.47928828.479328.4793-0.0000PEONhh10.66683.820040.747210.666840.74717640.747240.7472-0.0000Materiales356.63360.0000ARENA GRUESAm30.216050.000010.80000.216010.810.800010.80000.0000CEMENTO PORTLAND TIPO I (42.5 kg)bls0.993626.000025.83360.993625.833625.833625.83360.0000POSTES KILOMETRICOSu4.000080.0000320.00004.0000320320.0000320.00000.000007.01ENSAYO DE MEC. DE SUELOS-MAT. AFIRMADO0.0000Materiales500.00000.0000500.0000ENSAYOS DE COMPACTACION PROCTOR MODIFICADOu1.0000500.0000500.00001.0000500500.0000500.00000.000007.02ENSAYO DE CONTROL DE COMPACTACION0.0000Materiales450.00000.0000ENSAYOS DE CONTROL DE COMPACTACIONu9.000050.0000450.00004.52254.5225450.0000450.00000.0000450.000007.03ENSAYOS DE RESISTENCIA DEL CONCRETO0.0000Materiales1,200.00000.0000ENSAYO DE ROTURA A LA COMPRESION DEL CONCRETOu24.000050.00001,200.00004.82404.82404.82404.82404.82401,200.00001200.00000.00001,200.000008.01.01RECUPERACION DE CULTIVOS AFECTADOS0.0000Mano de Obra692.96780.00002,883.7568OPERARIOhh4.34006.870029.81584.340029.815829.815829.81580.0000PEONhh173.60003.8200663.1520173.6000663.152663.1520663.15200.0000Materiales2,170.00000.0000PLANTONES DE CACAOu434.00002.0000868.0000434.0000868868.0000868.00000.0000PLANTONES DE MANIu651.00002.00001,302.0000651.000013021,302.00001302.00000.0000Equipos20.78900.0000HERRAMIENTAS MANUALES%MO3.0000692.967820.78903.000020.78903420.789020.78900.000008.01.02ESTABILIZACION DE CURSOS DE AGUA0.0000Mano de Obra1.92260.0000544.4803OPERARIOhh0.08686.87000.59630.08680.5963160.59630.59630.0000PEONhh0.34723.82001.32630.34721.3263041.32631.32630.0000Materiales542.50000.0000ESQUEJE DE PASTO ELEFANTEu2,170.00000.2500542.50002,170.0000542.5542.5000542.50000.0000Equipos0.05770.0000HERRAMIENTAS MANUALES%MO3.00001.92260.05773.00000.0576780.05770.0577-0.000008.02.01CONSTRUCCION DE POZO DE RESIDUOS0.0000Mano de Obra100.84800.0000310.1234PEONhh26.40003.8200100.848026.4000100.848100.8480100.84800.0000Materiales206.25000.0000SEAL VERTICAL INFORMATIVAu4.125050.0000206.25004.1250206.25206.2500206.25000.0000Equipos3.02540.0000HERRAMIENTAS MANUALES%MO3.0000100.84803.02543.00003.025443.02543.02540.000008.02.02RECOLECCION MANUAL DE RESIDUOS SLIDOS DEL AREA CIRCUNDANTE0.0000Mano de Obra134.46400.0000138.4979PEONhh35.20003.8200134.464035.2000134.464134.4640134.46400.0000Equipos4.03390.0000HERRAMIENTAS MANUALES%MO3.0000134.46404.03393.00004.033924.03394.03390.000008.02.03CONSTRUCCION RELLENO DE SEGURIDAD0.0000Mano de Obra145.33790.0000205.9480OFICIALhh5.14315.340027.46422.5715513.7320772.5715513.73207727.464227.4642-0.0000PEONhh30.85703.8200117.873715.428558.9368715.428558.93687117.8737117.87370.0000Materiales56.2500000.0000SEAL VERTICAL INFORMATIVAu1.125050.000056.25000.562528.1250.562528.12556.250056.25000.0000Equipos4.3601000.0000HERRAMIENTAS MANUALES%MO3.0000145.33794.36011.52.18006851.52.18006854.36014.36010.000008.02.04LETRINAS MOVILES0.0000Mano de Obra88.60000.0000575.0780OPERARIOhh4.00006.870027.48004.000027.4827.480027.48000.0000PEONhh16.00003.820061.120016.000061.1261.120061.12000.0000Materiales483.82000.0000CLAVOS PARA MADERA CON CABEZA DE 3"kg0.40006.30002.52000.40002.522.52002.52000.0000CLAVOS PARA CALAMINAkg0.60008.00004.80000.60004.84.80004.80000.0000SEAL VERTICAL INFORMATIVAu0.250050.000012.50000.250012.512.500012.50000.0000MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADOp2100.00002.8000280.0000100.0000280280.0000280.00000.0000CALAMINA GALVANIZADA N22pza8.000023.0000184.00008.0000184184.0000184.00000.0000Equipos2.65800.0000HERRAMIENTAS MANUALES%MO3.000088.60002.65803.00002.6582.65802.65800.000008.02.05LETRINAS TEMPORALES0.0000Mano de Obra88.60000.0000114.1100OPERARIOhh4.00006.870027.48004.000027.4827.480027.48000.0000PEONhh16.00003.820061.120016.000061.1261.120061.12000.0000Materiales13.85200.0000ALAMBRE NEGRO RECOCIDO # 16kg0.10004.70000.47000.10000.470.47000.47000.0000CLAVOS PARA MADERA CON CABEZA DE 3"kg0.14006.30000.88200.14000.8820.88200.88200.0000SEAL VERTICAL INFORMATIVAu0.250050.000012.50000.250012.512.500012.50000.0000Equipos11.65800.0000HERRAMIENTAS MANUALES%MO3.000088.60002.65803.00002.6582.65802.65800.0000PLASTICOm9.00001.00009.00009.000099.00009.00000.000009.01EQUIPO DE PROTECCION PERSONAL0.0000Materiales1,634.20000.00003,494.2000CINTA DE SEGURIDADrll1.000085.000085.00001.00008585.000085.00000.0000VIVERESmes2.0000624.60001,249.20002.00001249.21,249.20001249.20000.0000MEDICAMENTOSglb1.0000300.0000300.00001.0000300300.0000300.00000.0000Equipos1,860.00000.0000CASCO AMARILLOu20.000018.0000360.000020.0000360360.0000360.00000.0000CASCO BLANCOu4.000025.0000100.00004.0000100100.0000100.00000.0000BOTAS DE SEGURIDADpar20.000020.0000400.000020.0000400400.0000400.00000.0000GUANTES DE CUEROpar20.000015.0000300.000020.0000300300.0000300.00000.0000CHALECOS DE SEGURIDADu20.000025.0000500.000020.0000500500.0000500.00000.0000LENTES DE PROTECCIONu20.000010.0000200.000020.0000200200.0000200.00000.000009.02ELABORACION DE PROCEDIMIENTOS DE SEGURIDAD AMBIENTAL0.0000Mano de Obra500.00000.0000500.0000CONSULTOR (ING. SANITARIO - AMBIENTAL)est1.0000500.0000500.00001.0000500500.0000500.00000.000009.03PROGRAMA DE INDUCCION AL PERSONAL0.0000Mano de Obra200.00000.0000525.0000ESPECIALISTA AMBIENTALd1.0000200.0000200.00001.0000200200.0000200.00000.0000Materiales200.00000.0000MANUAL DE CAPACITACIONu20.000010.0000200.000020.0000200200.0000200.00000.0000Equipos125.00000.0000PROYECTOR MULTIMEDIAu0.500050.000025.00000.50002525.000025.00000.0000COMPUTADORA ( LAPTOP)u0.5000200.0000100.00000.5000100100.0000100.00000.000009.04CAPACITACION EN TEMAS AMBIENTALES0.0000Mano de Obra200.00000.0000525.0000ESPECIALISTA AMBIENTALd1.0000200.0000200.00001.0000200200.0000200.00000.0000Materiales200.00000.0000MANUAL DE CAPACITACIONu20.000010.0000200.000020.0000200200.0000200.00000.0000Equipos125.00000.0000PROYECTOR MULTIMEDIAu0.500050.000025.00000.50002525.000025.00000.0000COMPUTADORA ( LAPTOP)u0.5000200.0000100.00000.5000100100.0000100.00000.000009.05REUNION INFORMATIVA DEL PLAN DE MANEJO AMBIENTAL0.0000Mano de Obra200.00000.00001,005.0000ESPECIALISTA AMBIENTALd1.0000200.0000200.00000.51000.5100200.0000200.00000.0000Materiales400.00000.0000MANUAL DE CAPACITACIONu40.000010.0000400.00002020020200400.0000400.00000.0000Equipos405.00000.0000PROYECTOR MULTIMEDIAu0.500050.000025.00000.2512.50.2512.525.000025.00000.0000COMPUTADORA ( LAPTOP)u0.5000200.0000100.00000.25500.2550100.0000100.00000.0000REFRIGERIOglb40.00007.0000280.00002014020140280.0000280.00000.000010.01CAPACITACION EN GESTION VIAL0.0000Materiales2,000.00000.0000CAPACITACION EN GESTION VIALglb1.00002,000.00002,000.00001.000020002,000.00002000.00000.00002,000.000010.02CONFORMACION Y CAPACITACION DEL COMITE DE MANTENIMIENTO0.00000.00001,500.00000.0000CONFORMACION Y CAP. DEL COMITE DE MANTENIMIENTOest1.00001,500.00001,500.00001.000015001,500.00001500.00000.00001,500.0000MONTO MENSUAL91,851.3156,445.23164,401.18212,528.9471,699.53596,928.7217596928.7217596926.1808MONTO TOTAL858,924.36

Mano de ObraREQUERIMIENTO Y CRONOGRANA DE PERSONALObraCONST. TROCHA CARROZABLE DE LA COMUNIDAD DE HOSPICIOEntidadMUNICIPALIDAD DISTRITAL DE PARASLugarAYACUCHO - CANGALLO DISTRITO DE PARASUnd.DESCRIPCIONUnd.Total1er. MES2do. MES3er. MES4to. MES5to. MESSaldoOBSERVACION1ING SUPERVISORMES2.500.50.50.50.50.50.0Por Contratar2ING RESIDENTEMES5.00111110.0Por Contratar3ASISTENTE ADMINISTRATIVOMES5.00111110.0Por Contratar4MAESTRO DE OBRAMES5.00111110.0Por Contratar5ALMACENEROMES5.00111110.0Por Contratar6TOPOGRAFOHH44.958.998.998.998.998.990.0Por Contratar7OPERARIOHH1,179.11235.82235.82235.82235.82235.820.0Por Contratar8OFICIALHH2,519.55377.93503.91755.86503.91377.930.0Por Contratar9PEONHH9,139.901,370.981,827.982,741.971,827.981,370.980.0Por Contratar10CONTROLADOR OFICIALHH329.4765.8965.8965.8965.8965.890.0Por Contratar11ESPECIALISTA AMBIENTALd3.000.00.00.00.03.000.0Por Contratar12CONSULTOR (ING. SANITARIO - AMBIENTAL)est1.000.00.00.00.01.000.0Por Contratar0TOPOGRAFOhh44.94849.0300405.8841ESPECIALISTA AMBIENTALd3.0000200.0000600.0000CONSULTOR (ING. SANITARIO - AMBIENTAL)est1.0000500.0000500.0000OPERARIOhh1,179.11056.87008,100.4891OFICIALhh2,519.54875.340013,454.3901PEONhh9,139.89853.820034,914.4123CONTROLADOR OFICIALhh329.46605.34001,759.348459,734.5240

Cronograma Maq.REQUERIMIENTO Y CRONOGRANA DE MAQUINARIAProyecto: Construiccion Trocha comunidad de hospicioEntidad : Municipalidad distrital de ParasLugar : ayacucho-cangallo distrito de parasEQUIPOSNRecursoUnidadCantidad1er Mes2do Mes3er Mes4to Mes5to MesSaldo1MEZCLADORA CONCRETO TROMPO 8HP 9 P3hm115.799028.949828.949828.949828.94980.02.00CAMION CISTERNA 4 X 2 (AGUA) 122 HP 2,000 glhm86.5921.6521.6521.6521.650.03.00PROYECTOR MULTIMEDIAu1.501.500.04.00COMPUTADORA ( LAPTOP)u1.501.500.06.00COMPRESORA NEUMATICA 87 HP 250-330 PCMhm41.3541.350.07.00RODILLO LISO VIBRATORIO AUTOPROPULSADO 70-100 HP 7-9 tonhm106.6426.6626.6626.6626.660.08.00CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3hm29.2829.280.09.00TRACTOR DE ORUGAS DE 190-240 HPhm706.42141.28141.28141.28141.28141.280.010.00MARTILLO NEUMATICO DE 25 kghm83.8283.820.011.00MOTOSOLDADORA DE 250 Ahm12.8012.800.012.00VIBRADOR DE CONCRETOhm22.905.725.725.725.720.013.00ZARANDA DE FIERRO DE CONSTRUCCION FY:4200 KG/CM2u0.540.540.014.00MOTONIVELADORA DE 125 HPhm99.4899.480.015.00PLANCHA COMPACTADORAhm30.357.597.597.597.590.016.00NIVEL TOPOGRAFICO CON TRIPODEhe38.9538.950.017.00TEODOLITOhm39.1239.120.0

no imprimirCRONOGRAMA : USO DEL INSUMO MANO DE OBRA (Dias laborables)Obra: CONSTRUCCIN TROCHA CARROZABLEDepartamento : AYACUCHO PROVINCAI DE CANGALLO DISTRITO DE PARASPeriodoMES 1MES 2MES 3Promedio GeneralPromedio Mano de Obra x mes:5.56.7555Semana 1Semana 2Semana 3Semana 4Semana 5Semana 6Semana 7Semana 8Semana 9Semana 10Semana 11Semana 12Semana 13TotalDia 1-6Dia 8-13Dia 15-20Dia 22-27Dia 29-30Dia 1-4Dia 6-11Dia 13-18Dia 20-25Dia 27-30Dia 1-2Dia 4-9Dia 11-16Dia 18-23Dia 25-30OPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPE4a) N de das tiles66662466666666684b) N de obreros0230113133143143142322212611124122113023033023c) compensacin econmica = (N de das x S/.)24018012024018012024018012024018012080604016012080240180120240180120240180120240180120240180120240180120240180120240180120240180120d) Total de MO = ( b x c )03603600180120720180360720180480240601604801203204805402404803601204801,0801,320240360480240360240240180360036036005403600360360Montos Totales por mes4,120.007,100.003,960.0015,180.0Por tanto, la cantidad de mano de obra promedio mensual trabajando en el proyecto es:5527887575555CRONOGRAMA : USO DEL INSUMO MANO DE OBRA (Dominical)Obra: CONSTRUCCIN TROCHA CARROZABLEDepartamento : AYACUCHO Provincia : DE CANGALLO Distrito : PARASPeriodoMES 1MES 2MES 3Promedio GeneralPromedio Mano de Obra x mes:69.25.26Semana 1Semana 2Semana 3Semana 4Semana 5Semana 6Semana 7Semana 8Semana 9Semana 10Semana 11Semana 12Semana 13TotalDia 1-6Dia 8-13Dia 15-20Dia 22-27Dia 29-30Dia 1-4Dia 6-11Dia 13-18Dia 20-25Dia 27-30Dia 1-2Dia 4-9Dia 11-16Dia 18-23Dia 25-30OPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEOPOFPEa) N de das tiles11110111101111113b) N de obreros0230113133143143142322212611124122113023033023c) compensacin econmica = (N de das x S/.)403020403020403020403020000403020403020403020403020000403020403020403020403020403020d) Total de MO = ( b x c )060600302012030601203080000120308080904080602080180220000406040403060060600906006060Montos Totales por mes610.001,080.00660.002,350.017,530.0Por tanto, la cantidad de mano de obra promedio mensual trabajando en el proyecto es:517,431.285278887519755565961510142221014143200.222.24413.3466666667300.002012009

Calculo Mano de Obra2.2 CALCULO MANO DE OBRAITEMCONCEPTOCATEGORIAOPERARIOOFICIALPEON1.00REMUNERACIN BASICA VIGENTE453525Establecido por el Gobieno Local mediante norma municipal2.00SEGURO DE SALUD (9&RBV)4.053.152.253.00SEGURO DE ACCIDENTES (1.58% RBV)0.710.550.44.00ONP/AFP (11.5% RBV)5.184.032.88COSTO DIA HOMBRE (DH)54.9442.7330.53COSTO HORA HOMBRE (HH)6.875.343.82COSTO MES HOMBRE (MH)1648.201281.90915.90