OBRAS DE CONCRETO SIMPLE 05 REVOQUES, ENLUCIDOS Y MOVIMIENTO DE TIERRAS 02 03 BANCAS COLUMNAS / PEDESTALES MOLDURAS ZAPATAS OBRAS DE CONCRETO ARMADO 04 TRABAJOS PRELIMINARES 01 ACERO ESTRUCTURAL FY=4200 KG/CM2 GRADO 60 769.82 436.27 04.02.01 M3 4.90 20.53 576.51 04.02 612.79 172.78 55.57 2,137.72 CONCRETO EN COLUMNAS F'C=210 KG/CM2 04.02.02 M2 52.32 51.65 1,655.41 997.22 49.70 2,702.33 1,469.36 M2 ENCOFRADO Y DESENCOFRADO NORMAL PARA SARDINELES 04.01 04.01.01 M3 8.64 352.36 411.70 2,573.33 59.36 3,044.39 CONCRETO EN ZAPATAS 04.01.03 04.01.02 4.50 28.80 44.95 728.93 543.74 21.89 1,294.56 ENCOFRADO Y DESENCOFRADO NORMAL EN 4.66 ZAPATAS ENCOFRADO Y KG 171.07 F'C=210 KG/CM2 45.98 KG BANCAS 04.03.03 KG 40.42 4.50 40.82 136.22 4.85 181.89 ACERO ESTRUCTURAL FY=4200 KG/CM2 GRADO 60 05.01 ENCOFRADO Y BANCAS 6,549.29 2,684.68 3,750.78 23.59 277.63 M2 05.02 58.08 TARRAJEO EN SUPERFICIE DE 2,670.52 55.76 750.98 1,863.78 892.51 M2 457.42 COLUMNAS 04.02.03 5,715.36 529.54 34.31 561.31 1,784.55 121.80 2,467.66 ACERO ESTRUCTURAL FY=4200 KG/CM2 GRADO 60 04.03 04.03.01 DESENCOFRADO NORMAL EN EN BANCAS 16.42 329.36 546.73 51.65 17.28 M3 04.03.02 1.41 CONCRETO F'C=210 KG/CM2 644.96 29.65 405.71 209.60 DESENCOFRADO NORMAL EN M2 REMOCION DE ARBOLES 1,319.31 305.98 - 132.16 438.14 DEMOLICION DE PISO DE CONCRETO 01.05 UND 4.00 62.80 243.88 - 119.06 2,100.08 27.62 M3 02.02 TERRENO NIVELACION Y COMPACTACION DE 7.32 707.01 251.20 1,565.89 8.35 523.71 M2 02.01 M2 4,372.98 244.38 01.01 M2 523.71 1.49 743.67 - 36.66 780.33 LIMPIEZA DE TERRENO MANUAL 01.02 M2 1,110.81 1.16 3.68 561.91 01.04 Y MATERIALES TRANSPORTE DE HERRAMIENTAS 2,809.55 1,947.95 810.89 486.60 233.27 5.00 VJE 01.03 TRAZO DE NIVELES Y REPLANTEO 1,288.54 - 375.00 23.69 2,138.77 ELIMINACION CON TRANSPORTE (CARGUIO A MANO) REN.=25 M3/DIA 03.01 M3 6.88 177.57 284.76 908.71 28.21 1,221.68 CIMIENTOS CORRIDOS MEZCLA 1:10 + 30% P.G. 39.01 CONCRETO EN SARDINELES C/MORTERO 1:5 X 1.5CM. 4,267.78 TARRAJEO EN SARDINELES 166.58 M2 03.02 MEZCLA 1:8 + 25% P.M. M3 6,690.29 214.63 3,958.12 2,517.54 282.41 592.15 03.03 M3 1,546.62 694.06 20.31 - 673.75 HASTA 0.80 MT TERRENO NORMAL 26.37 02.04 02.03 HASTA 2.00 MT TERRENO NORMAL EXCAVACION PARA CIMIENTOS 1,077.46 31.49 128.27 26.32 889.12 1,045.97 70.54 30.32 M3 02.05 EXCAVACION PARA SARDINELES RELLENO COMPACTADO CON - 207.71 3.18 678.23 55.99 15.88 M3 MATERIAL PROPIO 113.83 GOBIERNO REGIONAL DE AREQUIPA "MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA" HUNTER - AREQUIPA - AREQUIPA Abril - 2013 03 - CONSTRUCCION DE PISOS Y COBERTURA Costo a : Cliente Sub Presupuesto Obra Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES Ubicacion Descripción M.Obra Total Equipo Material Precio Unidad Item Metrado Presupuesto Desagregado P.1/2

description

presupuesto

Transcript of Presupuesto desagregado 03

Page 1: Presupuesto desagregado 03

OBRAS DE CONCRETO SIMPLE

05 REVOQUES, ENLUCIDOS Y

MOVIMIENTO DE TIERRAS02

03

BANCAS

COLUMNAS / PEDESTALES

MOLDURAS

ZAPATAS

OBRAS DE CONCRETO ARMADO04

TRABAJOS PRELIMINARES01

ACERO ESTRUCTURAL FY=4200 KG/CM2 GRADO 60

769.82

436.2704.02.01 M3 4.90

20.53576.51

04.02612.79

172.78

55.57 2,137.72CONCRETO EN COLUMNAS F'C=210 KG/CM2

04.02.02 M2 52.32 51.65 1,655.41 997.22 49.70 2,702.33

1,469.36

M2

ENCOFRADO Y DESENCOFRADO NORMAL PARA SARDINELES

04.0104.01.01 M3 8.64 352.36 411.70 2,573.33 59.36 3,044.39CONCRETO EN ZAPATAS

04.01.03

04.01.02

4.50

28.80 44.95 728.93 543.74 21.89 1,294.56ENCOFRADO Y DESENCOFRADO NORMAL EN

4.66

ZAPATAS

ENCOFRADO Y

KG 171.07

F'C=210 KG/CM2

45.98

KG

BANCAS04.03.03 KG 40.42 4.50 40.82 136.22 4.85 181.89ACERO ESTRUCTURAL

FY=4200 KG/CM2 GRADO 60

05.01

ENCOFRADO Y

BANCAS6,549.292,684.683,750.7823.59277.63

M2

05.02

58.08TARRAJEO EN SUPERFICIE DE 2,670.5255.76750.981,863.78

892.51

M2

457.42

COLUMNAS04.02.03

5,715.36

529.54

34.31

561.31 1,784.55 121.80 2,467.66ACERO ESTRUCTURAL FY=4200 KG/CM2 GRADO 60

04.0304.03.01

DESENCOFRADO NORMAL EN

EN BANCAS16.42329.36546.7351.6517.28

M3

04.03.02

1.41CONCRETO F'C=210 KG/CM2 644.9629.65405.71209.60

DESENCOFRADO NORMAL EN

M2

REMOCION DE ARBOLES

1,319.31

305.98 - 132.16 438.14DEMOLICION DE PISO DE CONCRETO

01.05 UND 4.00 62.80 243.88 -

119.06

2,100.08

27.62M302.02TERRENONIVELACION Y COMPACTACION DE

7.32

707.01

251.20

1,565.898.35523.71M202.01

M2

4,372.98

244.3801.01 M2 523.71 1.49 743.67 - 36.66 780.33LIMPIEZA DE TERRENO MANUAL01.02 M2 1,110.81 1.16

3.68

561.91

01.04Y MATERIALESTRANSPORTE DE HERRAMIENTAS 2,809.551,947.95

810.89486.60

233.275.00VJE01.03

TRAZO DE NIVELES Y REPLANTEO 1,288.54

-

375.00

23.69

2,138.77ELIMINACION CON TRANSPORTE (CARGUIO A MANO) REN.=25 M3/DIA

03.01 M3 6.88 177.57 284.76 908.71 28.21 1,221.68CIMIENTOS CORRIDOS MEZCLA 1:10 + 30% P.G.

39.01

CONCRETO EN SARDINELES

C/MORTERO 1:5 X 1.5CM.

4,267.78

TARRAJEO EN SARDINELES

166.58M2

03.02MEZCLA 1:8 + 25% P.M.

M3 6,690.29214.633,958.122,517.54282.41

592.15

03.03

M3

1,546.62

694.0620.31- 673.75HASTA 0.80 MT TERRENO NORMAL

26.37

02.04

02.03HASTA 2.00 MT TERRENO NORMALEXCAVACION PARA CIMIENTOS 1,077.4631.49

128.27

26.32

889.12

1,045.97

70.5430.32M302.05

EXCAVACION PARA SARDINELES

RELLENO COMPACTADO CON

-

207.713.18678.2355.9915.88M3MATERIAL PROPIO

113.83

GOBIERNO REGIONAL DE AREQUIPA

"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"

HUNTER - AREQUIPA - AREQUIPA Abril - 2013

03 - CONSTRUCCION DE PISOS Y COBERTURA

Costo a :

Cliente

Sub Presupuesto

Obra

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Ubicacion

Descripción M.Obra TotalEquipoMaterialPrecioUnidadItem Metrado

Presupuesto Desagregado

P.1/2

Page 2: Presupuesto desagregado 03

8,336.31

09

SISTEMA DE DESAGUE 11

VARIOS, LIMPIEZA

PINTURA08

12

COBERTURA

07

PISOS Y PAVIMENTOS06

SISTEMA DE AGUA FRIA

167,298.4745,505.11

CARPINTERIA METALICA

10115.0010.01 929.20 507.15 27.60 1,463.95RED DE DISTRIBUCION TUBERIA M 12.73

PVC DE 1"10.02 M 27.60 9.02 152.08 92.18 4.69 248.95TUBERIA PVC SAP 1/2" P/RIEGO

UND

414.40

10.03

284.48

07.07 M 56.00 92.40 3,314.64 5,174.40TUBO DE ACERO CIRCULAR DE 4"

08.01 M2 56.00 12.32

959.99

MALLA RACHELL AL 90 %

3.00

711.20TUBO DE ACERO CIRCULAR DE 4"

09.01 M2 143.00 13.45 833.69 1,065.35 24.31 1,923.35

12.70

3.682.00 16.57 11.02 21.78 0.34 33.14SEMBRADOD DE GRASS

12.02 UND 16.00 37.30

21.16

472.00

H=0.60

596.80PLANTADO DE ARBOLES12.03 M2 523.71 2.34 1,188.82 - 36.66 1,225.48LIMPIEZA FINAL DE OBRA

121.12

39.77

16.29 568.77 0.48 585.54GRIFO DE RIEGO DE 1/2" INC. CAJUELA DE CONCRETO+VALV.1/2" Y ACCES.

11.01 M 110.47

TENSOR P/ MALLA RACHELL

M2

1,544.48

12.01

2,337.55TUBERIA PVC SAL 4" P/DESAGUE11.02 PZA 3.00 100.32 145.35 151.26 4.35 300.96CAJA DE REGISTRO 0.60x0.30

195.18

1,337.79

52.12

6.99

06.04 M2 35.87 56.72 528.01 1,429.78

315.28

2,034.55

1,596.80

BRUÑADO DOBLE C/0.50M06.05

PISO DE CEMENTO FROTACHADO

69.15

3,105.57

739.91 2,756.32 107.87 3,604.10PISO DE CEMENTO FROTACHADO BRUÑADO DOBLE C/2.00M

06.06 M 174.79 7.15 208.00 1,034.76

M2

3,904.82

06.01 M2 225.81 56.72 3,323.92 9,000.79 483.23 12,807.94PISO DE CEMENTO FROTACHADO BRUÑADO C/0.50M

06.02 M2

BRUÑADO DOBLE C/0.40M

53.34

PISO DE CEMENTO FROTACHADO

13,223.95 567.31 17,696.08PISO DE CEMENTO FROTACHADO BRUÑADO C/1.00M

06.03 M2 52.53 59.12 883.55 2,093.85 128.17

331.76

183.25

VIGA METALICA P/ MALLA RACHELL07.04 M 124.50 243.06 1,584.89 28,628.77 47.31 30,260.97ARRIOSTRE P/ MALLA RACHELL07.05 M

35,377.56

14.32CABLE ACERO TRENZADO Ø1/4" 1,136.52 5.55 1,325.32

1,249.75

P/MALLA RASCHELL

76.76

M 80.00 19.96 226.40 1,364.00 6.40

92.55

31,035.20

07.06

604.80

JUNTA ASFALTICA C/ 3.00M

07.01 UND 8.00 3,879.40 674.96 20.24COLUMNA METALICA DE MALLA RACHELL C-1

07.02 UND

M 33,328.801,443.96

30,340.00

108.00

4.00

07.03RACHELL C-2

14,721.6010.1214,374.003,680.40COLUMNA METALICA DE MALLA

327.57

337.48

DOSCIENTOS CUARENTA Y OCHO MIL SETECIENTOS OCHENTA Y DOS CON 38/100 NUEVOS SOLES

248,782.38COSTO TOTAL PRESUPUESTAL

Son :

GUZMAN DE HUNTER, AREQUIPA"

GOBIERNO REGIONAL DE AREQUIPA

16,364.35

HUNTER - AREQUIPA - AREQUIPA

GASTOS DE LIQUIDACION

"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y

GASTOS GENERALES221,139.89

1.80 %

COSTO DIRECTO

7,297.627.40 %3.30 %GASTOS DE SUPERVISION

3,980.52

03 - CONSTRUCCION DE PISOS Y COBERTURA

Abril - 2013Costo a :Ubicacion

Sub Presupuesto

Cliente

Obra

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

M.Obra Material EquipoItem Descripción Unidad Metrado Precio Total

Presupuesto Desagregado

P.2/2