OBRAS DE CONCRETO SIMPLE
05 REVOQUES, ENLUCIDOS Y
MOVIMIENTO DE TIERRAS02
03
BANCAS
COLUMNAS / PEDESTALES
MOLDURAS
ZAPATAS
OBRAS DE CONCRETO ARMADO04
TRABAJOS PRELIMINARES01
ACERO ESTRUCTURAL FY=4200 KG/CM2 GRADO 60
769.82
436.2704.02.01 M3 4.90
20.53576.51
04.02612.79
172.78
55.57 2,137.72CONCRETO EN COLUMNAS F'C=210 KG/CM2
04.02.02 M2 52.32 51.65 1,655.41 997.22 49.70 2,702.33
1,469.36
M2
ENCOFRADO Y DESENCOFRADO NORMAL PARA SARDINELES
04.0104.01.01 M3 8.64 352.36 411.70 2,573.33 59.36 3,044.39CONCRETO EN ZAPATAS
04.01.03
04.01.02
4.50
28.80 44.95 728.93 543.74 21.89 1,294.56ENCOFRADO Y DESENCOFRADO NORMAL EN
4.66
ZAPATAS
ENCOFRADO Y
KG 171.07
F'C=210 KG/CM2
45.98
KG
BANCAS04.03.03 KG 40.42 4.50 40.82 136.22 4.85 181.89ACERO ESTRUCTURAL
FY=4200 KG/CM2 GRADO 60
05.01
ENCOFRADO Y
BANCAS6,549.292,684.683,750.7823.59277.63
M2
05.02
58.08TARRAJEO EN SUPERFICIE DE 2,670.5255.76750.981,863.78
892.51
M2
457.42
COLUMNAS04.02.03
5,715.36
529.54
34.31
561.31 1,784.55 121.80 2,467.66ACERO ESTRUCTURAL FY=4200 KG/CM2 GRADO 60
04.0304.03.01
DESENCOFRADO NORMAL EN
EN BANCAS16.42329.36546.7351.6517.28
M3
04.03.02
1.41CONCRETO F'C=210 KG/CM2 644.9629.65405.71209.60
DESENCOFRADO NORMAL EN
M2
REMOCION DE ARBOLES
1,319.31
305.98 - 132.16 438.14DEMOLICION DE PISO DE CONCRETO
01.05 UND 4.00 62.80 243.88 -
119.06
2,100.08
27.62M302.02TERRENONIVELACION Y COMPACTACION DE
7.32
707.01
251.20
1,565.898.35523.71M202.01
M2
4,372.98
244.3801.01 M2 523.71 1.49 743.67 - 36.66 780.33LIMPIEZA DE TERRENO MANUAL01.02 M2 1,110.81 1.16
3.68
561.91
01.04Y MATERIALESTRANSPORTE DE HERRAMIENTAS 2,809.551,947.95
810.89486.60
233.275.00VJE01.03
TRAZO DE NIVELES Y REPLANTEO 1,288.54
-
375.00
23.69
2,138.77ELIMINACION CON TRANSPORTE (CARGUIO A MANO) REN.=25 M3/DIA
03.01 M3 6.88 177.57 284.76 908.71 28.21 1,221.68CIMIENTOS CORRIDOS MEZCLA 1:10 + 30% P.G.
39.01
CONCRETO EN SARDINELES
C/MORTERO 1:5 X 1.5CM.
4,267.78
TARRAJEO EN SARDINELES
166.58M2
03.02MEZCLA 1:8 + 25% P.M.
M3 6,690.29214.633,958.122,517.54282.41
592.15
03.03
M3
1,546.62
694.0620.31- 673.75HASTA 0.80 MT TERRENO NORMAL
26.37
02.04
02.03HASTA 2.00 MT TERRENO NORMALEXCAVACION PARA CIMIENTOS 1,077.4631.49
128.27
26.32
889.12
1,045.97
70.5430.32M302.05
EXCAVACION PARA SARDINELES
RELLENO COMPACTADO CON
-
207.713.18678.2355.9915.88M3MATERIAL PROPIO
113.83
GOBIERNO REGIONAL DE AREQUIPA
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"
HUNTER - AREQUIPA - AREQUIPA Abril - 2013
03 - CONSTRUCCION DE PISOS Y COBERTURA
Costo a :
Cliente
Sub Presupuesto
Obra
Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES
Ubicacion
Descripción M.Obra TotalEquipoMaterialPrecioUnidadItem Metrado
Presupuesto Desagregado
P.1/2
8,336.31
09
SISTEMA DE DESAGUE 11
VARIOS, LIMPIEZA
PINTURA08
12
COBERTURA
07
PISOS Y PAVIMENTOS06
SISTEMA DE AGUA FRIA
167,298.4745,505.11
CARPINTERIA METALICA
10115.0010.01 929.20 507.15 27.60 1,463.95RED DE DISTRIBUCION TUBERIA M 12.73
PVC DE 1"10.02 M 27.60 9.02 152.08 92.18 4.69 248.95TUBERIA PVC SAP 1/2" P/RIEGO
UND
414.40
10.03
284.48
07.07 M 56.00 92.40 3,314.64 5,174.40TUBO DE ACERO CIRCULAR DE 4"
08.01 M2 56.00 12.32
959.99
MALLA RACHELL AL 90 %
3.00
711.20TUBO DE ACERO CIRCULAR DE 4"
09.01 M2 143.00 13.45 833.69 1,065.35 24.31 1,923.35
12.70
3.682.00 16.57 11.02 21.78 0.34 33.14SEMBRADOD DE GRASS
12.02 UND 16.00 37.30
21.16
472.00
H=0.60
596.80PLANTADO DE ARBOLES12.03 M2 523.71 2.34 1,188.82 - 36.66 1,225.48LIMPIEZA FINAL DE OBRA
121.12
39.77
16.29 568.77 0.48 585.54GRIFO DE RIEGO DE 1/2" INC. CAJUELA DE CONCRETO+VALV.1/2" Y ACCES.
11.01 M 110.47
TENSOR P/ MALLA RACHELL
M2
1,544.48
12.01
2,337.55TUBERIA PVC SAL 4" P/DESAGUE11.02 PZA 3.00 100.32 145.35 151.26 4.35 300.96CAJA DE REGISTRO 0.60x0.30
195.18
1,337.79
52.12
6.99
06.04 M2 35.87 56.72 528.01 1,429.78
315.28
2,034.55
1,596.80
BRUÑADO DOBLE C/0.50M06.05
PISO DE CEMENTO FROTACHADO
69.15
3,105.57
739.91 2,756.32 107.87 3,604.10PISO DE CEMENTO FROTACHADO BRUÑADO DOBLE C/2.00M
06.06 M 174.79 7.15 208.00 1,034.76
M2
3,904.82
06.01 M2 225.81 56.72 3,323.92 9,000.79 483.23 12,807.94PISO DE CEMENTO FROTACHADO BRUÑADO C/0.50M
06.02 M2
BRUÑADO DOBLE C/0.40M
53.34
PISO DE CEMENTO FROTACHADO
13,223.95 567.31 17,696.08PISO DE CEMENTO FROTACHADO BRUÑADO C/1.00M
06.03 M2 52.53 59.12 883.55 2,093.85 128.17
331.76
183.25
VIGA METALICA P/ MALLA RACHELL07.04 M 124.50 243.06 1,584.89 28,628.77 47.31 30,260.97ARRIOSTRE P/ MALLA RACHELL07.05 M
35,377.56
14.32CABLE ACERO TRENZADO Ø1/4" 1,136.52 5.55 1,325.32
1,249.75
P/MALLA RASCHELL
76.76
M 80.00 19.96 226.40 1,364.00 6.40
92.55
31,035.20
07.06
604.80
JUNTA ASFALTICA C/ 3.00M
07.01 UND 8.00 3,879.40 674.96 20.24COLUMNA METALICA DE MALLA RACHELL C-1
07.02 UND
M 33,328.801,443.96
30,340.00
108.00
4.00
07.03RACHELL C-2
14,721.6010.1214,374.003,680.40COLUMNA METALICA DE MALLA
327.57
337.48
DOSCIENTOS CUARENTA Y OCHO MIL SETECIENTOS OCHENTA Y DOS CON 38/100 NUEVOS SOLES
248,782.38COSTO TOTAL PRESUPUESTAL
Son :
GUZMAN DE HUNTER, AREQUIPA"
GOBIERNO REGIONAL DE AREQUIPA
16,364.35
HUNTER - AREQUIPA - AREQUIPA
GASTOS DE LIQUIDACION
"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y
GASTOS GENERALES221,139.89
1.80 %
COSTO DIRECTO
7,297.627.40 %3.30 %GASTOS DE SUPERVISION
3,980.52
03 - CONSTRUCCION DE PISOS Y COBERTURA
Abril - 2013Costo a :Ubicacion
Sub Presupuesto
Cliente
Obra
Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES
M.Obra Material EquipoItem Descripción Unidad Metrado Precio Total
Presupuesto Desagregado
P.2/2