Presupuesto desagregado 01

6
OBRAS DE CONCRETO SIMPLE MOVIMIENTO DE TIERRAS 03 OBRAS PROVISIONALES 01 04 02 TRABAJOS PRELIMINARES SEGURIDAD Y SALUD LABORAL 27.73 RELLENO COMPACTADO CON MATERIAL PROPIO EXCAVACION PARA VIGAS DE 944.76 44.92 - M3 34.07 03.04 M3 03.03 HASTA 2.50 M TERRENO NORMAL EXCAVACION PARA ZAPATAS 3,874.08 113.21 899.84 26.32 65.46 03.05 55.99 2,795.80 EXCAVACION PARA SARDINELES 3.20 CIMENTACION HASTA 1.40 MT 106.03 TERRENO NORMAL 4.15 13.09 03.02 856.22 - 3,665.11 M3 - 318.03 4.00 UND 02.04 TRAZO DE NIVELES Y REPLANTEO 368.91 69.97 66.79 99.31 1.16 - M2 02.03 LIMPIEZA DE TERRENO MANUAL 473.86 22.26 - 451.60 232.15 1,395.51 39.01 03.06 M3 617.41 HASTA 2.00 MT TERRENO NORMAL EXCAVACION PARA CIMIENTOS 1,437.52 62.80 - 243.88 39.01 36.85 M3 03.01 REMOCION DE ARBOLES 251.20 7.32 3,760.87 42.01 04.04 M3 SOBRECIMIENTOS MEZCLA 1:8 + 1,531.36 65.03 838.15 628.18 265.40 04.05 M3 M2 1:10 + 30% P.G. CIMIENTOS CORRIDOS MEZCLA 3,288.60 75.93 2,446.13 766.54 177.57 305.65 5.77 04.06 MEZCLA 1:8 + 25% P.M. CONCRETO EN SARDINELES 1,375.34 44.12 813.68 517.54 282.41 25% P.M. M3 04.03 NORMAL EN SOBRECIMIENTOS ENCOFRADO Y DESENCOFRADO 2,404.20 41.46 980.07 1,382.67 40.01 60.09 4.87 03.07 18.52 ELIMINACION CON TRANSPORTE 5,743.47 4,550.29 - 1,193.18 41.06 04.01 M3 M3 APISONADO MANUAL NIVELACION INTERIOR Y 684.66 18.34 48.91 109.23 2.24 1.49 139.88 04.02 30% P.G. SUB CIMIENTOS MEZCLA 1:12 + 1,714.75 37.76 1,296.10 380.89 173.91 (CARGUIO A MANO) REN.=25 M3/DIA M3 M2 CEMENTO HORMIGON + 30% P.G. SUB ZAPATA, MEZCLA 1:12 2,496.16 54.63 1,884.57 556.96 175.91 14.19 9.86 1.00 P/PERSONAL PROVISIONALES P/PERSONAL SERVICIOS HIGIENICOS 1,750.00 - 1,750.00 GLB 1,750.00 1.00 GLB 01.05 ENERGIA ELECTRICA PROVICIONAL 3,600.00 - 3,600.00 - P/PERSONAL VESTUARIOS PROVISIONALES 800.00 800.00 HASTA 0.80 MT TERRENO NORMAL 800.00 1.00 01.06 01.07 8.00 COMEDOR PROVISIONAL 650.00 - 650.00 - 650.00 GLB 4,967.70 815.87 1.00 UND 01.02 Y ALMACEN PROVISIONAL DE OBRA CASETA DE GUARDIANIA, OFICINA - 57.00 9.69 1,898.40 230.77 30.00 M2 01.01 318.03 6,923.10 280.00 - MES 01.04 AGUA PROVISIONAL PARA LA OBRA 2,240.00 - 322.98 - 483.20 8.00 MES 01.03 OBRA (BANNER 3.60x2.40 M.) CARTEL DE IDENTIFICACION DE LA 815.87 450.00 2,240.00 3,200.00 2,500.00 1.00 GLB 01.08.05 SEGURIDAD SEÑALIZACIÓN TEMPORAL DE SEGURIDAD Y SALUD EN EL - - - - 1.00 01.08 01.08.04 TRABAJO 3,200.00 561.91 M2 02.02 Y MATERIALES TRANSPORTE DE HERRAMIENTAS 16,857.30 11,687.70 - 2,919.60 2,500.00 30.00 VJE 02.01 Y SALUD CAPACITACIÓN EN SEGURIDAD 2,500.00 GLB 2,250.00 55,896.00 1.00 GLB 01.08.02 ADMINISTRACIÓN DEL PLAN DE PERSONAL OBRERO 3,119.60 59,568.00 (2MUDASx3MESES) 3,672.00 - 7,446.00 8.00 MES 01.08.01 3,200.00 - IMPLEMENTACIÓN Y ELABORACIÓN, IMPLEMENTOS DE SEGURIDAD - 2,500.00 2,500.00 2,500.00 1.00 GLB 01.08.03 PERSONAL TECNICO IMPLEMENTOS DE SEGURIDAD 3,119.60 3,119.60 - - HUNTER - AREQUIPA - AREQUIPA GOBIERNO REGIONAL DE AREQUIPA "MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA" 01 - CONSTRUCCION DE TALLERES 01 Abril - 2013 Sub Presupuesto Cliente Obra Ubicacion Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES Costo a : Item Descripción Unidad Metrado Precio M.Obra Material Equipo Total Presupuesto Desagregado P.1/6

description

presupuesto

Transcript of Presupuesto desagregado 01

Page 1: Presupuesto desagregado 01

OBRAS DE CONCRETO SIMPLE

MOVIMIENTO DE TIERRAS03

OBRAS PROVISIONALES01

04

02 TRABAJOS PRELIMINARES

SEGURIDAD Y SALUD LABORAL

27.73

RELLENO COMPACTADO CON MATERIAL PROPIO

EXCAVACION PARA VIGAS DE 944.7644.92-

M3

34.07

03.04

M303.03HASTA 2.50 M TERRENO NORMALEXCAVACION PARA ZAPATAS 3,874.08113.21

899.84

26.32

65.4603.05 55.99 2,795.80

EXCAVACION PARA SARDINELES 3.20

CIMENTACION HASTA 1.40 MT

106.03TERRENO NORMAL

4.15

13.09

03.02

856.22

-

3,665.11M3

-

318.034.00UND02.04

TRAZO DE NIVELES Y REPLANTEO 368.9169.9766.79

99.31

1.16-

M202.03LIMPIEZA DE TERRENO MANUAL 473.8622.26- 451.60

232.15

1,395.51

39.01

03.06

M3

617.41

HASTA 2.00 MT TERRENO NORMALEXCAVACION PARA CIMIENTOS 1,437.52

62.80

-

243.88

39.0136.85M303.01

REMOCION DE ARBOLES 251.207.32

3,760.87

42.01

04.04

M3

SOBRECIMIENTOS MEZCLA 1:8 + 1,531.3665.03838.15628.18265.40

04.05

M3

M2

1:10 + 30% P.G.CIMIENTOS CORRIDOS MEZCLA 3,288.6075.932,446.13766.54177.57

305.65

5.77

04.06MEZCLA 1:8 + 25% P.M.CONCRETO EN SARDINELES 1,375.3444.12813.68517.54282.41

25% P.M.

M3

04.03

NORMAL EN SOBRECIMIENTOSENCOFRADO Y DESENCOFRADO 2,404.2041.46980.071,382.6740.0160.09

4.87

03.07

18.52

ELIMINACION CON TRANSPORTE 5,743.474,550.29- 1,193.1841.06

04.01

M3

M3

APISONADO MANUALNIVELACION INTERIOR Y 684.6618.3448.91

109.23

2.24

1.49

139.88

04.0230% P.G.SUB CIMIENTOS MEZCLA 1:12 + 1,714.7537.761,296.10380.89173.91

(CARGUIO A MANO) REN.=25 M3/DIA

M3

M2

CEMENTO HORMIGON + 30% P.G.SUB ZAPATA, MEZCLA 1:12 2,496.1654.631,884.57556.96175.9114.19

9.86

1.00

P/PERSONAL

PROVISIONALES P/PERSONALSERVICIOS HIGIENICOS 1,750.00- 1,750.00

GLB

1,750.00

1.00

GLB01.05ENERGIA ELECTRICA PROVICIONAL 3,600.00- 3,600.00

-

P/PERSONALVESTUARIOS PROVISIONALES 800.00800.00

HASTA 0.80 MT TERRENO NORMAL

800.001.00

01.06

01.07

8.00

COMEDOR PROVISIONAL 650.00- 650.00- 650.00

GLB

4,967.70

815.871.00UND01.02Y ALMACEN PROVISIONAL DE OBRACASETA DE GUARDIANIA, OFICINA

-

57.00

9.69

1,898.40230.7730.00M201.01

318.03

6,923.10

280.00

-

MES01.04AGUA PROVISIONAL PARA LA OBRA 2,240.00-

322.98

-

483.20

8.00MES01.03OBRA (BANNER 3.60x2.40 M.)CARTEL DE IDENTIFICACION DE LA 815.87

450.002,240.00

3,200.00

2,500.001.00GLB01.08.05SEGURIDADSEÑALIZACIÓN TEMPORAL DE

SEGURIDAD Y SALUD EN EL

-

-

-

-

1.00

01.08

01.08.04TRABAJO

3,200.00

561.91

M202.02Y MATERIALESTRANSPORTE DE HERRAMIENTAS 16,857.3011,687.70

-

2,919.60

2,500.00

30.00VJE02.01

Y SALUDCAPACITACIÓN EN SEGURIDAD 2,500.00

GLB

2,250.00

55,896.00

1.00GLB01.08.02

ADMINISTRACIÓN DEL PLAN DE

PERSONAL OBRERO

3,119.60

59,568.00

(2MUDASx3MESES)

3,672.00- 7,446.008.00MES01.08.01

3,200.00

- IMPLEMENTACIÓN Y ELABORACIÓN,

IMPLEMENTOS DE SEGURIDAD

-

2,500.00 2,500.002,500.001.00GLB01.08.03PERSONAL TECNICOIMPLEMENTOS DE SEGURIDAD 3,119.603,119.60-

-

HUNTER - AREQUIPA - AREQUIPA

GOBIERNO REGIONAL DE AREQUIPA

"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"

01 - CONSTRUCCION DE TALLERES 01

Abril - 2013

Sub Presupuesto

Cliente

Obra

Ubicacion

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Costo a :

Item Descripción Unidad Metrado Precio M.Obra Material Equipo Total

Presupuesto Desagregado

P.1/6

Page 2: Presupuesto desagregado 01

ZAPATAS

COLUMNAS

VIGAS

VIGAS DE CIMENTACION

OBRAS DE CONCRETO ARMADO

ESCALERAS

05

LOSAS ALIGERADAS

5,847.72KG05.04.04VIGAS

47.52 10,984.54ENCOFRADO Y 20,623.68329.849,309.30

4.50

DESENCOFRADO NORMAL EN

M3ALIGERADAS F'C=210 KG/CM2CONCRETO EN LOSAS 19,142.71505.0114,615.674,022.03

FY=4200 KG/CM2 GRADO 60

50.10

5,906.20

05.05.0105.05

ACERO ESTRUCTURAL 26,314.74701.7319,706.81

382.09

ACERO ESTRUCTURAL

2,413.27387.9728.95M305.04.01

05.04.03

FY=4200 KG/CM2 GRADO 60

11,231.73

39,782.481,060.8729,792.658,928.964.508,840.55

05.04

363.35

M2KG/CM2

13,033.53

CONCRETO EN VIGAS F'C=175 824.8017.14

8,445.58

189.23

372.88

2.27M305.04.02KG/CM2CONCRETO EN VIGAS F'C=210

434.00

618.43

F'C=210 KG/CM2

7,402.07

740.86899.8458.6428.44 1,667.7205.06.02 ENCOFRADO Y

CONCRETO EN ESCALERAS 2,718.8960.881,848.87809.14420.23

M2

383.13

KG

ENCOFRADO Y

FY=4200 KG/CM2 GRADO 60ACERO ESTRUCTURAL 1,706.99

27.02

1,278.34

05.06.01

4.50379.33KG05.06.03ESCALERASDESENCOFRADO NORMAL EN

45.52

DESENCOFRADO NORMAL EN

8,990.992,694.634.502,667.95KG

6.47

LOSAS ALIGERADASACERO ESTRUCTURAL

ENCOFRADO Y 164.115,467.3530.18431.86M2

05.05.03

3,046.93

05.05.02

05.06

ALIGERADO15X30X30 CM PARA TECHO LADRILLO HUECO DE ARCILLA 14,316.90

320.16

11,196.55

12,005.78

3.903,671.00UND05.05.04FY=4200 KG/CM2 GRADO 60

M3

73.42

5,158.40

65.97 3,901.66

05.03.04

DESENCOFRADO NORMAL EN ZAPATAS

05.01.03 KG 1,146.31 4.50 1,157.78

05.02.02

137.56

44.95

ACERO ESTRUCTURAL FY=4200 KG/CM2 GRADO 60

05.0205.02.01 M3 373.78 4,139.79 137.93 5,303.94CONCRETO EN VIGAS DE

CIMENTACION F'C= 210 KG/CM2

3,863.06

35.47

04.07 M2 55.32 34.31 1,417.30 438.13 42.60 1,898.03ENCOFRADO Y DESENCOFRADO NORMAL PARA SARDINELES

05.01

1,638.78

M3

2,196.91

352.36 1,690.15 10,564.38 243.68 12,498.21CONCRETO EN ZAPATAS F'C=210 KG/CM2

05.01.02 M2 86.80

1,026.22

05.01.01

F'C=175 KG/CM2

597.28 22,978.34CONCRETO EN COLUMNAS

M2

05.03.02

14.19

6.27 411.85 784.13 1,727.07 71.10

15,794.15

CONCRETO EN COLUMNAS F'C=210 KG/CM2

05.03.03 M2 657.57 51.65 20,805.52 12,533.28 624.69 33,963.49ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS

2,582.30

VIGAS DE CIMENTACION

113.53 42.75 2,873.45 1,893.68 86.28

M3

6,586.91

DESENCOFRADO NORMAL EN 4,853.41

05.02.03 KG 2,761.03

05.03436.2752.67

ENCOFRADO Y

05.03.01

4.50FY=4200 KG/CM2 GRADO 60ACERO ESTRUCTURAL 12,424.64331.339,304.672,788.64

M3

HUNTER - AREQUIPA - AREQUIPA

GOBIERNO REGIONAL DE AREQUIPA

"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"

01 - CONSTRUCCION DE TALLERES 01

Abril - 2013Costo a :

Cliente

Sub Presupuesto

Obra

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Ubicacion

EquipoItem TotalM.Obra MaterialUnidad Metrado PrecioDescripción

Presupuesto Desagregado

P.2/6

Page 3: Presupuesto desagregado 01

PISOS Y PAVIMENTOS09

MOLDURAS

10 ZOCALOS Y CONTRAZOCALOS

06

CIELORRASOS08

MUROS Y TABIQUES DE

VARIOS

ALBAÑILERIA

07 REVOQUES, ENLUCIDOS Y

19,955.32VIGAS

07.05 M2

TARRAJEO EN SUPERFICIE DE

657.57 31.63 15,827.71 20,798.94473.45TARRAJEO EN SUPERFICIE DE COLUMNAS

07.06

4,497.78

C/MORTERO 1:5 X

EMPOT)07.03 M2 323.12 21.91 4,785.41 2,151.98 142.17

434.00

TARRAJEO EXTERIOR

416.641.5CM.(INC.COLUMNAS EMPOT)

07.04

TARRAJEO EN SARDINELES

M2

M2

45.98 13,927.06 5,611.62

7,079.56

26.79

239.85

M

130.80 7.25 377.90REVESTIMIENTO DE LAVATORIOS CONCRETO C/MORT. 1:4

17.01

M2

11.88

540.89 16.34 852.19REVESTIMIENTO DE ESCALERAS C/MORT. 1:4

07.10

SELLADO DE JUNTA DE

1:5 X1.5 CM.(INC.COLUMNAS

07.09

183.33

23.59 560.53 401.21 978.75C/MORTERO 1:5 X 1.5CM.

07.07 M 291.00

650.60

2,793.60

31.81

84.39 3,061.32VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS C:A 1:5 E=1.5 CM -

07.08 M2

41.49

10.52

ENCOFRADO DE MADERA

CONSTRUCCIONM2 1,523.44 3.06 1,889.07 2,742.19 30.4705.07.03 ADITIVO DESMOLDANTE PARA

4,492.56

05.07.04 M2 1,523.44 2.03 335.16 2,742.19 15.23 3,092.58

4,661.73

295.19

6.61

294.96

05.0705.07.01 M2 29.49 10.01 122.38

7,540.45

2.36

61.25

JUNTA DE CONSTRUCCION CON TEKNOPORT

05.07.02 M 360.27 20.93 2,986.64

06.01

170.45

PRIMARIO C/MORTERO 1:5

ADITIVO CURADOR DE

07.01 M2 6.25 17.90 70.75 39.00 2.13

ARCILLA DE SOGA C/M 1:4 X

TARRAJEO DE TIPO RAYADO O

MUROS DE LADRILLO KK DE

07.02 M2 363.41 19.89 4,666.18 2,420.31 141.73 7,228.22

111.88

1.0CM.

TARRAJEO INTERIOR C/MORTERO

M2 88.20 120.02 3,287.21 7,199.77 98.78 10,585.76

1.0CM.

ARCILLA DE CABEZA C/M 1:4 X

CONCRETO EN OBRA

06.02 M2 147.83 67.27 3,160.60 6,647.92 136.00 9,944.52

MUROS DE LADRILLO KK DE

2,350.20

PISO CERAMICO ANTIDESLIZANTE

6,019.74293.65

31.81

1,567.90107.17M209.05

10.01

PISO DE CEMENTO PULIDO E=5

M

43.80841.801,464.6039.1760.00M209.0440X40 CM

CM. MORTERO 1:4

10.02

4,176.85

NIVELCERAMICO DE 20 X 30 CM EN 2DO 1,315.8814.87803.93497.0884.95

VEREDA DE CONCRETO DE 4"

M2

56.17

H=10 CMCONTRAZOCALO DE CERAMICO 3,682.6074.121,130.262,478.2215.90231.61

15.49

8,313.30

2,189.7428.70178.90M209.01

C/MORTERO 1:5TARRAJEO DE CIELO RASO 14,558.00

2,699.60

5,994.22M2 33.71431.86

3,552.75

08.01

4,158.19

4,300.47123.62-

250.48

CONTRAPISO 5 CM. MORTERO 1:5

245.09

2,077.741,432.1759.7159.50M2

BRUÑAS DE 20mm

09.034,104.23233.77

1:10 (C:H)5,134.43FALSO PISO DE 4" DE CONCRETO

1,961.6009.0242.84

M2 175.77 23.35 1,908.86

HUNTER - AREQUIPA - AREQUIPA

"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"

GOBIERNO REGIONAL DE AREQUIPA01 - CONSTRUCCION DE TALLERES 01

Abril - 2013Ubicacion Costo a :

Obra

Cliente

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Sub Presupuesto

Equipo TotalMaterialM.ObraMetradoUnidadDescripciónItem Precio

Presupuesto Desagregado

P.3/6

Page 4: Presupuesto desagregado 01

SISTEMA DE AGUA FRIA

PINTURA

CERRAJERIA14

12 CARPINTERIA DE MADERA

SISTEMA DE DESAGUE

CARPINTERIA METALICA

17

13

18

11

15 VIDRIOS, CRISTALES Y SIMILARES

CUBIERTAS

16

PINTURA LATEX EXTERIOR

SALIDA DE AGUA FRIA PVC-SAP 1/2"

M

14.49 3,134.27 1,454.04M2 4,682.01

34.169.026.20M

MUROS Y COLUMNAS 2 MANOS

17.02

93.70

182.84

17.03TUBERIA PVC-SAP 1/2" 55.921.0520.71

6,288.66PINTURA LATEX VIGAS 2 MANOS

8.00

M2

106.00

12.82 1,477.35 822.78 43.88 2,344.01PINTURA LATEX INTERIOR MUROS Y COLUMNAS 2 MANOS

16.04

16.03

202.63

505.20

M

53.46

16.07

3.45

MANOSPINTURA LATEX EN ESCALERAS 2

115.23

13.06

14.49

436.7914.4945.03M216.06CONCRETO 2 MANOSPINTURA LATEX EM LAVATORIOS

652.48

PINTURA LATEX EN DERRAMES 2

11.60

172.14

387.6063.158.00PTO17.01

291.00MANOS

323.12

2,103.9334.92893.37

M2 11.88

1,175.647.23

16.05

189.24

18.01

1.4225.0047.6037.012.00PZAREGISTRO DE BRONCE 2"TUBERIA PVC SAL 2" P/DESAGUE

18.05

3.3174.52111.4120.579.20M18.03TUBERIA PVC SAL 4" P/DESAGUE

18.04

18.06H=0.60CAJA DE REGISTRO 0.60x0.30 100.321.4550.4248.45100.32

74.02

PZA

78.21

SUMIDERO DE BRONCE 2" 59.621.4210.6047.6029.812.00PZA1.00

1.00

PZA17.05BRONCE 1/2"VALVULA DE COMPUERTA DE 68.271.2126.69

190.44

68.27

40.37

PZA17.04TUBERIA PVC-SAP 3/4" 38.930.7115.0823.149.27

40.37

14.56

4.20

108.9921.169.00M18.02599.68100.64

1.00

74.96

56.58

PTO

125.86

PRE-FABRICADAS P/VALVULASCAJAS METALICAS 56.581.2115.00

3.24484.48

12,518.9912.01

5,932.50206.8893.75M212.02 178.13

PUERTA DE MADERA TABLEROS

19,395.00

555.876,452.365,510.76360.5734.72

2,277.60

REBAJADOS DE 4.5 MM DE CEDRO

12,200.17124.801,553.76599.04156.0013.02

BARANDA METALICA DE Ø 2"

13,284.37

253.23

P/DRENAJE EN TECHOS

985.24480.8127.95M13.01

VENTANA DE MADERA

13,438.64

3,553.20

M2

11.02CON MEZCLALADRILLO PASTELERO ASENTADO COBERTURA AZOTEA CON 18,711.00

33.64

15,051.96

194.23

74.25252.00M211.01

SALIDA DE DESAGUE EN PVC 2"

1,953.00

105.84

11.03 GARGOLA DE CONCRETO, 220.835.3138.07177.4573.61

M2

UND

14.60

COB. POLICARBONATOCLARABOYA DE FIERRO C/PERFIL 6,533.90380.132,497.433,656.34

3.00

CERRADURA PARA PUERTA 2

42.4011,545.601,257.729.091,413.17P2

PZAGOLPES

LAMINA DE SEGURIDAD

957.10

M

755.00

VARILLA DE SEGURIDAD DE LISO

95.7110.00

15.01

125.24

4,209.8014.49434.00M216.02MANOS

12,845.72

6,257.65

VIDRIO DOBLE INCOLORO INC.

1,943.374,189.0414.49431.86M216.01

196.20

PINTURA LATEX CIELO RASO 2

1,760.01

22.00UND13.04

14.02

PASAMANO DE TUBO F°G° DE 1

24.04

107.301/2" EN ESCALERA

536.64191.5512.55M13.03Ø1/2"

5.90

18.72PESADO DE 4''X4''BISAGRA DE ACERO ALUMINIZADO

2,403.95

1,282.32

141.24

644.80618.8024.66

383.46

PZA14.01

ESTRIADO 2''X1 1/8''CANTONERIA DE ALUMIONIO 528.884.18

52.00

HUNTER - AREQUIPA - AREQUIPA

GOBIERNO REGIONAL DE AREQUIPA

"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"

Abril - 2013

01 - CONSTRUCCION DE TALLERES 01Cliente

Sub Presupuesto

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Obra

Costo a :Ubicacion

M.Obra EquipoMaterial TotalPrecioMetradoUnidadDescripciónItem

Presupuesto Desagregado

P.4/6

Page 5: Presupuesto desagregado 01

VARIOS, LIMPIEZA

26

CAJAS

27

23

ARTEFACTOS

19 SALIDA DE INSTALACIONES ELECTRICAS

CANALIZACIONES Y/O TUBERIAS

24

20

22

POZO DE PUESTA A TIERRA

88,364.85

SALIDA PARA COMUNICACIONES

239,483.43

CONDUCTORES Y/O CABLES

TABLEROS

21

25

381,963.96

337.48

Mmm2

75.90

CONDUCTOR TIPO NH-80 2-1x2.5 156.603.1251.48102.0013.05

23.04 14.14 133.95 2.25

1,858.12

212.10CABLE DE COBRE DESNUDO 25 mm2

1.00PZA

12.00

24.01

15.00

M

20.15

23.01

TUBERIA PVC-SAP Ø50MM 300.844.14156.40140.30

102.00

46.00

65.36

22.07TUBERIA PVC-SAP Ø40MM 63.200.9031.8030.506.32

6.54

M

23.032-1x4mm2+1x4mm2(T)CONDUCTOR TIPO NH-80 80.601.0445.5634.00

M

4.00

M

23.02mm2CONDUCTOR TIPO N2XH 3-1x16 6,666.7226.525,773.20867.00

1,510.52

10.00

253.05

EVACUACIONSEÑALES DE SEGURIDAD Y 233.601.00185.00

UND

23.36

2.00

PZA27.01

EMERGENCIAEQUIPO AUTONOMO DE LUZ DE 3,118.207.65

416.33

47.60

M2

10.00

LIMPIEZA FINAL DE OBRA 887.6826.55- 861.1327.02

379.35

207.88

27.03EXTINGUIDORES DE 12 KG 342.741.24300.0041.50171.37

2.34

6.83

2,857.50

201.3467.00PZA26.01

OHMIOS

11,306.25

764.83

63.65

341.67764.831.00UND25.01

TABLERO DISTRIBUCION TD-6 1,858.12

POZO A TIERRA PARA R < 25

506.24

15.00PZA26.03HERMETICA 2x36WARTEFACTO FLUORESCENTE 3,339.84

2,119.88

2,818.40

10.12

208.7416.00PZA26.02REJILLA 2x36WARTEFACTO FLUORESCENTE 13,489.78

15.20

INTERRUPTOR DE CONMUTACION76.98 112.80 345.72 3.36 461.88INTERRUPTOR UNIPOLAR DOBLE

19.05 PTO 2.00 94.85 54.34 133.72

126.55

189.7019.04

20.01 PTO 5.00 72.58 126.55 232.55 3.80 362.90SALIDA PARA TELEFONO20.02 PTO 5.00 53.40

1.64

32.4019.01 PTO 98.00 102.00 4,420.78 5,531.12 44.10 9,996.00SALIDA DE TECHO19.02 PTO 24.00 175.08

6.007.00

PZA

SALIDA PARA TVC

527.243.92391.72

1,082.64

75.32

3,086.88

PZA19.03BIPOLAR DOBLE - PAREDSALIDA DE TOMACORRIENTE 4,201.92

M

131.60

89.28

22.03 UND 1.00 275.37 125.06 139.89 10.42 275.37BUZON DE REGISTRO 0.70x0.70x0.70 m

22.04 M 5.58

PROPIO (REDES EXT.ELEC.SANIT).

45.75

INTERRUPTOR UNIPOLAR SIMPLE

136.65

22.06TUBERIA PVC-SAP Ø25MM 85.35

39.0438.25

1.445.6915.00M22.05

TUBERIA PVC-SAP Ø20MM 16.001.35

16.46

18.61M322.01

CAJA DE PASE DE 200X200X100 MM 49.380.69

29.25

23.1321.01 3.00PTO

RELLENO MANUAL CON MATERIAL

267.00

48.80

3.80

25.56

257.19

528.52

291.9427.0525.7911.32M322.02

EXCAVACION DE ZANJAS PARA 544.3415.82

7.70

- REDES EXT.SANIT.ELECT.

COSTO TOTAL PRESUPUESTAL 798,538.77

GUZMAN DE HUNTER, AREQUIPA"

52,526.117.40 %709,812.24

12,776.6223,423.803.30 %

"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y

COSTO DIRECTOGASTOS GENERALES

GOBIERNO REGIONAL DE AREQUIPA

GASTOS DE LIQUIDACION 1.80 %

HUNTER - AREQUIPA - AREQUIPA

GASTOS DE SUPERVISION

01 - CONSTRUCCION DE TALLERES 01

Abril - 2013

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Cliente

Obra

Ubicacion

Sub Presupuesto

Costo a :

TotalM.Obra Material EquipoPrecioMetradoUnidadDescripciónItem

Presupuesto Desagregado

P.5/6

Page 6: Presupuesto desagregado 01

SETECIENTOS NOVENTA Y OCHO MIL QUINIENTOS TREINTA Y OCHO CON 77/100 NUEVOS SOLESSon :

GOBIERNO REGIONAL DE AREQUIPA

HUNTER - AREQUIPA - AREQUIPA

"MEJORAMIENTO DE LA INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA JUAN PABLO VIZCARDO Y GUZMAN DE HUNTER, AREQUIPA"

Abril - 2013

01 - CONSTRUCCION DE TALLERES 01

Obra

Ubicacion

Consorcio: Ing. YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

Costo a :

Sub Presupuesto

Cliente

Descripción TotalEquipoMaterialM.ObraPrecioUnidadItem Metrado

Presupuesto Desagregado

P.6/6