PISCINA

UNIDAD CANTIDAD

PU

S/. 26,141.52 S/. 164.14

TRABAJOS PRELIMINARESLIMPIEZA DE TERRENO MANUAL TRAZO Y REPLANTEO PRELIMINAR m2 m2 192.08 192.08 S/. 0.23 S/. 0.62

S/. 44.32 S/. 119.83 S/. 2,361.09

MOVIMIENTO DE TIERRASCORTE MASIVO CON MAQUINARIA AFIRMADO COMPACTADO A MANO E=0.10m EXCAVACION DE ZANJAS PARA CIMENTACION ACARREO DE MATERIAL EXCEDENTE HASTA D>2km.. m3 m2 m3 m3 81.24 52.41 13.85 122.67 S/. 4.15 S/. 18.03 S/. 8.24 S/. 7.87

S/. 336.96 S/. 944.99 S/. 114.15 S/. 965.00 S/. 5,784.33

CONCRETO SIMPLECIMIENTO CORRIDO MEZCLA 1:10+30% PG TMN 6" CONCRETO PARA ESCALERAS f'c = 175 kg/cm2 CONCRETO EN FALSO PISO f'c = 140 kg/cm2 m3 m3 m3 13.85 4.98 7.33 S/. 179.87 S/. 258.91 S/. 273.26

S/. 2,491.70 S/. 1,289.63 S/. 2,003.00 S/. 8,563.48

CONCRETO ARMADOLOSA INFERIOR CONCRETO LOSA INFERIOR F'C=210 KG/CM2 LOSA INFERIOR ACERO fy=4200 Kg/cm2 MURO ARMADO CONCRETO MUROS F'C=210 KG/CM2 ENCOFRADO Y DESENCOFRADO DE MUROS ACERO EN MUROS ARMADOS (25 x 1.50) INC. GANCHO A CIMENTACION m3 m2 ml. 11.64 30.36 30.36 S/. 302.31 S/. 45.13 S/. 42.81 m3 kg 4.89 191.69 S/. 302.31 S/. 4.67

S/. 1,478.32 S/. 895.30

S/. 3,520.12 S/. 1,370.05 S/. 1,299.69 S/. 943.28

REVOQUES, ENLUCIDOSTARRAJEO IMPERMEABLE m2 79.73 S/. 11.83

S/. 943.28 S/. 7,195.85

PISOS Y PAVIMENTOSPISO CERAMICO DE 30X30cm m2 106.07 S/. 67.84

S/. 7,195.85 S/. 1,055.51

INSTALACIONES SANITARIASSALIDA DE DESAGE DE 4" SALIDA DE DESAGE DE 6" CAJA DE REGISTRO 12"X24" pto pto pza 2.00 1.00 1.00 S/. 57.79 S/. 770.19 S/. 169.75

S/. 115.58 S/. 770.19 S/. 169.75 S/. 62.59

TUBERIA DE REBOSETUBERIA DE REBOSE DE 4" CON SALIDA A RO pto 2.00 S/. 31.29

S/. 62.59 S/. 73.82

SISTEMA DE AGUA FRIASALIDA DE AGUA FRIA PVC 3/4" VALVULA COMPUERTA DE 3/4" pto pza 1.00 1.00 S/. 48.26 S/. 25.56

S/. 48.26 S/. 25.56

LIMPIEZA DE TERRENO MANUAL M2/DIA MO 500.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO PEON EQUIPOS HERRAMIENTAS MANUALES TRAZO Y REPLANTEO PRELIMINAR M2/DIA MO 500.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO PEON MATERIALES CLAVOS PARA MADERA C/C 3/4" YESO BOLSA DE 12 kg. ESTACAS DE MADERA EUCALIPTO EQUIPOS HERRAMIENTAS MANUALES CORTE MASIVO CON MAQUINARIA M3/DIA MO 400.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO PEON hh hh 1.0000 2.0000 0.0200 0.0400 S/. 6.00 S/. 3.50 UNIDAD CUADRILLA CANTIDAD 400.0000 S/. 4.15 PRECIO %MO 0.0300 S/. 0.21 kg. Bls. und. 0.0400 0.0500 0.0200 S/. 4.24 S/. 4.70 S/. 0.25 hh hh 1.0000 2.0000 0.0160 0.0320 S/. 6.00 S/. 3.50 UNIDAD CUADRILLA CANTIDAD 500.0000 S/. 0.62 PRECIO %MO 0.0300 S/. 0.22 hh hh 0.0000 4.0000 0.0000 0.0640 S/. 6.00 S/. 3.50 UNIDAD CUADRILLA CANTIDAD 500.0000 S/. 0.23 PRECIO

EQUIPOS HERRAMIENTAS MANUALES TRACTOR D7 AFIRMADO COMPACTADO A MANO E=0.10m M2/DIA MO 200.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO OFICIAL PEON MATERIALES AFIRMADO EQUIPOS HERRAMIENTAS MANUALES COMPACTADOR VIBR. TIPO PLANCHA 4 HP ACARREO DE MATERIAL EXCEDENTE HASTA D>2km.. M3K/DIA MO 338.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OFICIAL EQUIPOS CAMION VOLQUETE 6x4.15M3 CARGADOR S/LLANTAS 125 - 155 HP 3YD3 EXCAVACION DE ZANJAS PARA CIMENTACION M2/DIA MO 3.5000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO UNIDAD CUADRILLA CANTIDAD 3.5000 S/. 8.24 PRECIO hm hm 1.0000 0.5000 0.0237 0.0118 S/. 242.43 S/. 175.38 hh 0.5000 0.0118 S/. 4.50 UNIDAD CUADRILLA CANTIDAD 338.0000 S/. 7.87 PRECIO %MO hm 1.0000 0.0300 0.0400 S/. 1.26 S/. 15.00 m3 0.1000 S/. 40.00 hh hh hh 1.0000 1.0000 6.0000 0.0400 0.0400 0.2400 S/. 6.00 S/. 4.50 S/. 3.50 UNIDAD CUADRILLA CANTIDAD 200.0000 S/. 5.90 PRECIO %MO hm. 1.0000 0.0300 0.0200 S/. 0.26 S/. 194.00

MANO DE OBRA PEON EQUIPOS HERRAMIENTAS MANUALES CIMIENTO CORRIDO MEZCLA 1:10+30% PG TMN 6" M2/DIA MO 15.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO OFICIAL PEON MATERIALES PIEDRA GRANDE DE 6" CEMENTO PORTLAND TIPO MS (42.5 kg) HORMIGON AGUA EQUIPOS HERRAMIENTAS MANUALES MEZCLADORA DE CONCRETO 9-11 pie3 CONCRETO PARA ESCALERAS f'c = 175 kg/cm2 M3/DIA MO 25.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO OFICIAL PEON MATERIALES PIEDRA DE RIO TMN 3/4" ARENA GRUESA DE RO CEMENTO PORTLAND TIPO MS (42.5 kg.) AGUA m3 m3 m3 m3 0.5570 0.5460 8.0000 0.1950 S/. 70.00 S/. 70.00 S/. 19.58 S/. 3.00 hh hh hh 2.0000 2.0000 8.0000 0.6400 0.6400 2.5600 S/. 6.00 S/. 4.50 S/. 3.50 UNIDAD CUADRILLA CANTIDAD 25.0000 S/. 258.91 PRECIO %MO hm 1.0000 0.0300 0.5333 S/. 22.93 S/. 14.00 m3 Bls. m3 m3 0.4800 2.9000 0.8300 0.1000 S/. 70.00 S/. 19.58 S/. 70.00 S/. 3.00 hh hh hh 1.0000 2.0000 8.0000 0.5333 1.0667 4.2667 S/. 6.00 S/. 4.50 S/. 3.50 UNIDAD CUADRILLA CANTIDAD 15.0000 S/. 179.87 PRECIO %MO 0.0300 S/. 8.00 hh 1.0000 2.2857 S/. 3.50

EQUIPOS HERRAMIENTAS MANUALES VIBRADOR DE CONCRETO 4 HP 2.40' MEZCLADORA DE CONCRETO 9-11 pie3 CONCRETO EN FALSO PISO f'c = 140 kg/cm2 M3/DIA MO 7.5000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OFICIAL PEON MATERIALES PIEDRA DE RIO TMN 3/4" ARENA GRUESA DE RO CEMENTO PORTLAND TIPO MS (42.5 kg.) AGUA EQUIPOS HERRAMIENTAS MANUALES VIBRADOR DE CONCRETO 4 HP 2.40' MEZCLADORA DE CONCRETO 9-11 pie3 CONCRETO LOSA INFERIOR F'C=210 KG/CM2 M3/DIA MO 25.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO OFICIAL PEON MATERIALES PIEDRA DE RIO TMN 3/4" ARENA GRUESA DE RO CEMENTO PORTLAND TIPO MS (42.5 kg.) AGUA m3 m3 m3 m3 0.5570 0.5460 10.2170 0.1950 S/. 70.00 S/. 70.00 S/. 19.58 S/. 3.00 hh HH hh 2.0000 2.0000 8.0000 0.6400 0.6400 2.5600 S/. 6.00 S/. 4.50 S/. 3.50 UNIDAD CUADRILLA CANTIDAD 25.0000 S/. 302.31 PRECIO %MO hm. hm 1.0000 1.0000 0.0300 1.0667 1.0667 S/. 15.79 S/. 12.00 S/. 14.00 m3 m3 m3 m3 0.6720 0.5360 7.3610 0.1930 S/. 70.00 S/. 70.00 S/. 19.58 S/. 3.00 hh hh 0.8000 3.2000 0.8533 3.4133 S/. 4.50 S/. 3.50 UNIDAD CUADRILLA CANTIDAD 7.5000 S/. 273.26 PRECIO %MO hm. hm 1.0000 1.0000 0.0300 0.3200 0.3200 S/. 15.68 S/. 12.00 S/. 14.00

EQUIPOS HERRAMIENTAS MANUALES VIBRADOR DE CONCRETO 4 HP 2.40' MEZCLADORA DE CONCRETO 9-11 pie3 LOSA INFERIOR ACERO fy=4200 Kg/cm2 KG/DIA MO 350.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO OFICIAL MATERIALES ALAMBRE NEGRO N16 ACERO DE REFUERZO DE 1/2" fy=4200 kg/cm2 G-60 EQUIPOS HERRAMIENTAS MANUALES CONCRETO MUROS F'C=210 KG/CM2 M3/DIA MO 25.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO OFICIAL PEON MATERIALES PIEDRA DE RIO TMN 3/4" ARENA GRUESA DE RO CEMENTO PORTLAND TIPO MS (42.5 kg.) AGUA EQUIPOS HERRAMIENTAS MANUALES VIBRADOR DE CONCRETO 4 HP 2.40' %MO hm. 1.0000 0.0300 0.3200 S/. 15.68 S/. 12.00 m3 m3 m3 m3 0.5570 0.5460 10.2170 0.1950 S/. 70.00 S/. 70.00 S/. 19.58 S/. 3.00 hh HH hh 2.0000 2.0000 8.0000 0.6400 0.6400 2.5600 S/. 6.00 S/. 4.50 S/. 3.50 UNIDAD CUADRILLA CANTIDAD 25.0000 S/. 302.31 PRECIO %MO 0.0300 S/. 0.24 kg. kg. 0.0014 2.0000 S/. 2.52 S/. 2.21 hh hh 1.0000 1.0000 0.0229 0.0229 S/. 6.00 S/. 4.50 UNIDAD CUADRILLA CANTIDAD 350.0000 S/. 4.67 PRECIO %MO hm. hm 1.0000 1.0000 0.0300 0.3200 0.3200 S/. 15.68 S/. 12.00 S/. 14.00

MEZCLADORA DE CONCRETO 9-11 pie3

hm

1.0000

0.3200

S/. 14.00

ACERO EN MUROS ARMADOS (25 x 1.50) INC. GANCHO A CIMENTACION ML/DIA MO 350.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO OFICIAL MATERIALES ALAMBRE NEGRO N16 ACERO DE REFUERZO DE 3/4" fy=4200 kg/cm2 G-60 ACERO DE REFUERZO DE 1/2" fy=4200 kg/cm2 G-60 EQUIPOS HERRAMIENTAS MANUALES ENCOFRADO Y DESENCOFRADO DE MUROS M2/DIA MO 8.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO PEON OFICIAL MATERIALES CLAVOS PARA MADERA C/C 3/4" ALAMBRE NEGRO N8 MADERA TORNILLO PARA ENCOFRADO EQUIPOS HERRAMIENTAS MANUALES TARRAJEO IMPERMEABLE M3/DIA MO 16.0000 EQ 16.0000 %MO 0.0300 S/. 12.80 kg. kg. p2 0.1500 0.3000 5.4700 S/. 4.24 S/. 4.62 S/. 5.47 hh HH HH 1.0000 0.4000 1.2000 1.0000 0.4000 1.2000 S/. 6.00 S/. 3.50 S/. 4.50 UNIDAD CUADRILLA CANTIDAD 8.0000 S/. 45.13 PRECIO %MO 0.0300 S/. 0.24 kg. kg. kg. 0.0027 13.9688 4.9700 S/. 2.52 S/. 2.26 S/. 2.21 hh HH 1.0000 1.0000 0.0229 0.0229 S/. 6.00 S/. 4.50 UNIDAD CUADRILLA CANTIDAD 350.0000 S/. 42.81 PRECIO

COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO PEON MATERIALES ARENA FINA DE CERRO PARA TARRAJEO REGLA DE MADERA CEMENTO PORTLAND TIPO MS (42.5 kg.) AGUA EQUIPOS HERRAMIENTAS MANUALES PISO CERAMICO DE 30X30cm M3/DIA MO 12.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO PEON MATERIALES CERMICA 30x30 cm. FRAGUA CEMENTO PORTLAND TIPO MS (42.5 kg.) CRUCETA DE 3 MM. AGUA EQUIPOS HERRAMIENTAS MANUALES SALIDA DE DESAGE DE 4" M3/DIA MO 20.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO UNIDAD CUADRILLA CANTIDAD %MO 0.0300 m2 m2 bls. cto m3 1.0300 0.2500 0.1790 0.0500 0.0015 hh hh 1.0000 0.5000 0.6667 0.3333 UNIDAD CUADRILLA CANTIDAD %MO 0.0300 m3 p2 bls. m3 0.0170 0.5460 0.0250 0.0040 hh hh 1.0000 0.7500 0.5000 0.3750 UNIDAD CUADRILLA CANTIDAD

S/. 11.83 PRECIO

S/. 6.00 S/. 3.50

S/. 100.00 S/. 9.50 S/. 19.58 S/. 3.00

S/. 4.31

12.0000 S/. 67.84 PRECIO

S/. 6.00 S/. 3.50

S/. 50.00 S/. 30.00 S/. 19.58 S/. 0.20 S/. 3.00

S/. 5.17

20.0000 S/. 57.79 PRECIO

MANO DE OBRA OPERARIO PEON MATERIALES PEGAMENTO PARA PVC TUBERIA PVC SAL 4" x 3m SUMIDERO DE BRONCE DE 4" CODO PVC SAL 90 4" EQUIPOS HERRAMIENTAS MANUALES SALIDA DE DESAGE DE 6" M3/DIA MO 20.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO PEON MATERIALES PEGAMENTO PARA PVC TUBERIA PVC SAL 6" x 3m EQUIPOS HERRAMIENTAS MANUALES CAJA DE REGISTRO 12"X24" M3/DIA MO 3.0000 EQ COSTO UNITARIO: DESCRIPCION DEL RECURSO MANO DE OBRA OPERARIO PEON MATERIALES ARENA FINA LADRILLO KK DE ARCILLA 9X14X24CM M3 UND 0.0300 84.0000 S/. 100.00 S/. 0.49 hh hh 2.0000 0.7500 5.333