presupuesto

3
OBRAS PRELIMINARES MOVIMIENTO DE TIERRAS 03 VEREDAS SARDINEL Y JARDINERAS OBRAS DE CONCRETO SIMPLE 04 02 01 OBRAS PROVISIONALES SEGURIDAD Y SALUD LABORAL M3 M3 03.04 CONTENCION SARDINELES 71,681.56 EXCAVACION PARA MUROS DE 6.06 567.56 11,828.64 20,046.22 54,530.03 - 17,151.53 03.03 35.32 19,461.63 EXCAVACION MANUAL PARA 584.59 EXCAVACION PARA GRADERIAS Y VEREDAS 03.05 M3 3,210.44 12.69 29,536.05 - 11,204.43 40,740.48 - PRELIMINAR - 5,791.44 6,023.10 20,617.55 1.40 23,165.78 TRAZO Y REPLANTEO 02.03 03.01 TRAZO NIVELES Y REPLANTEO 17,142.68 2,548.24 4,401.50 10,192.94 0.74 23,165.78 M2 CORTE EN MATERIAL SUELTO 106.81 RELLENO COMPACTADO 3,563.13 15,096.11 27.83 131.87 32,432.09 03.02 3,669.94 22,131.58 16,699.81 - 5,431.77 3.83 5,778.48 M3 M3 SUBRASANTE PARA VEREDAS 19,913.77 1,703.79 7,117.24 11,092.74 16.48 1,208.36 03.06 04.02.02 04.02.03 CONFORMACION DE 6,972.24 1,196.28 132.92 5,643.04 5.77 M2 F'C=175 KG/CM2 INC ACAB. 6,488.75 904.44 - 5,584.31 35.80 181.25 BASE GRANULAR PARA 04.02.04 VEREDAS E=0.15M 10,561.44 7,489.25 2,887.31 58.27 181.25 M2 04.02.01 M2 49,515.24 1,208.36 236.71 1,194.52 M3 04.01.01 04.01 139,567.72 ELIMINACION CON TRANSPORTE 9,030.57 45,892.17 - 3,623.07 3.28 146.86 M3 M2 (CARGUIO C/MAQUINARIA) 174,832.13 C/EQUIPO MAT/PROPIO 04.02 SARDINEL DESENCOFRADO NORMAL EN ENCOFRADO Y 308,527.29 134,156.54 128,416.52 M2 33.90 9,101.10 M2 04.01.02 KG/CM2 CONCRETO SARDINEL F'C=140 282,754.83 5,278.64 - 1,483.05 1.00 GLB 01.06 ENERGIA ELECTRICA PROVICIONAL 2,669.52 LIMPIEZA PERMANENTE DE OBRA 2,669.52 - 381.36 7.00 MES 01.05 AGUA PROVISIONAL PARA LA OBRA 1,661.03 - 805.08 GLB 01.08 P/PERSONAL COMEDOR PROVISIONAL 805.08 - - - 1,483.05 1.00 GLB 01.07 PROVISIONALES P/PERSONAL SERVICIOS HIGIENICOS 1,483.05 - 805.08 11,260.00 - 343.14 761.55 1.00 UND 01.02 10.29 CASETA PARA GUARDIANIA Y 761.55 96.00 7,972.00 3,192.00 140.75 80.00 M2 01.01 ALMACEN 7,118.65 - 237.29 7.00 MES 01.04 GUARDIANIA 408.12 - 1,661.03 - 1,016.95 7.00 MES 01.03 OBRA (BANNER 3.60x2.40 M.) CARTEL DE IDENTIFICACION DE LA 7,118.65 1.00 1,779.66 SEGURIDAD SEÑALIZACIÓN TEMPORAL DE 2,711.86 - 2,711.86 GLB 2,711.86 1.00 GLB 01.09.04 TRABAJO SEGURIDAD Y SALUD EN EL ADMINISTRACIÓN DEL PLAN DE IMPLEMENTACIÓN Y 1.00 - 02.01 ENCOFRADO Y 3,083.50 CONCRETO EN VEREDAS - 2,936.64 440.50 01.09.05 MES - Y SALUD CAPACITACIÓN EN SEGURIDAD 2,118.64 - 2,118.64 - 2,118.64 7.00 01.09.01 ELABORACIÓN, 30,469.50 28,524.00 1,945.50 - 10,156.50 PERSONAL OBRERO MUDA (2MUDASx3MESES) 01.09 P/PERSONAL VESTUARIOS PROVISIONALES 889.83 - 889.83 02.02 3.00 2,643.68 1,779.66 - 1,779.66 1.00 GLB 01.09.03 IMPLEMENTOS DE SEGURIDAD IMPLEMENTOS DE SEGURIDAD 889.83 2,643.68 - - 2,643.68 1.00 GLB 01.09.02 PERSONAL TECNICO DESENCOFRADO DE VEREDAS 184.88 ASOCIACION DEL ASENTAMIENTO HUMANO CERRO BUENA VISTA III PAUCARPATA - AREQUIPA - AREQUIPA PAUCARPATA - AREQUIPA" " MEJORAMIENTO DE LOS ACCESOS VIALES Y PEATONALES DEL AA.HH. CERRO BUENA VISTA III, DISTRITO DE 01 - VEREDAS, BERMAS, MUROS DE CONTENCION Y SARDINELES. Noviembre - 2013 Sub Presupuesto Cliente Obra Costo a : Ubicacion Unidad M.Obra Total Equipo Material Metrado Descripción Item Precio Presupuesto Desagregado P.1/3

description

presupuesto desagregado

Transcript of presupuesto

  • OBRAS PRELIMINARES

    MOVIMIENTO DE TIERRAS03

    VEREDAS

    SARDINEL Y JARDINERAS

    OBRAS DE CONCRETO SIMPLE04

    02

    01 OBRAS PROVISIONALES

    SEGURIDAD Y SALUD LABORAL

    M3

    M303.04CONTENCION

    SARDINELES71,681.56EXCAVACION PARA MUROS DE 6.06

    567.56

    11,828.64

    20,046.22

    54,530.03- 17,151.5303.03

    35.32 19,461.63

    EXCAVACION MANUAL PARA

    584.59EXCAVACION PARA GRADERIAS Y VEREDAS

    03.05 M3 3,210.44 12.69 29,536.05 - 11,204.43 40,740.48

    -

    PRELIMINAR

    -

    5,791.446,023.1020,617.551.4023,165.78TRAZO Y REPLANTEO02.03

    03.01

    TRAZO NIVELES Y REPLANTEO 17,142.682,548.244,401.5010,192.940.7423,165.78

    M2

    CORTE EN MATERIAL SUELTO106.81

    RELLENO COMPACTADO

    3,563.13

    15,096.11

    27.83131.87

    32,432.09

    03.02 3,669.9422,131.5816,699.81- 5,431.773.835,778.48M3

    M3

    SUBRASANTE PARA VEREDAS19,913.771,703.797,117.2411,092.7416.481,208.36

    03.06

    04.02.02

    04.02.03

    CONFORMACION DE 6,972.241,196.28132.925,643.045.77

    M2

    F'C=175 KG/CM2 INC ACAB.6,488.75904.44- 5,584.3135.80181.25

    BASE GRANULAR PARA

    04.02.04

    VEREDAS E=0.15M10,561.447,489.252,887.3158.27181.25M2

    04.02.01

    M2

    49,515.24

    1,208.36

    236.711,194.52M304.01.0104.01

    139,567.72

    ELIMINACION CON TRANSPORTE

    9,030.57

    45,892.17- 3,623.073.28

    146.86

    M3

    M2

    (CARGUIO C/MAQUINARIA)

    174,832.13

    C/EQUIPO MAT/PROPIO

    04.02

    SARDINELDESENCOFRADO NORMAL EN ENCOFRADO Y 308,527.29

    134,156.54

    128,416.52

    M2

    33.909,101.10M204.01.02KG/CM2CONCRETO SARDINEL F'C=140 282,754.83

    5,278.64

    - 1,483.051.00GLB01.06

    ENERGIA ELECTRICA PROVICIONAL 2,669.52

    LIMPIEZA PERMANENTE DE OBRA

    2,669.52-

    381.367.00MES01.05AGUA PROVISIONAL PARA LA OBRA 1,661.03

    -

    805.08

    GLB01.08P/PERSONALCOMEDOR PROVISIONAL 805.08-

    -

    -

    1,483.05

    1.00GLB01.07PROVISIONALES P/PERSONALSERVICIOS HIGIENICOS 1,483.05

    -

    805.08

    11,260.00

    -

    343.14761.551.00UND01.02 10.29

    CASETA PARA GUARDIANIA Y

    761.55

    96.007,972.003,192.00140.7580.00M201.01ALMACEN

    7,118.65

    -

    237.297.00MES01.04GUARDIANIA

    408.12

    - 1,661.03

    - 1,016.957.00MES01.03OBRA (BANNER 3.60x2.40 M.)CARTEL DE IDENTIFICACION DE LA

    7,118.65

    1.00

    1,779.66

    SEGURIDADSEALIZACIN TEMPORAL DE 2,711.86- 2,711.86

    GLB

    2,711.86

    1.00

    GLB01.09.04TRABAJOSEGURIDAD Y SALUD EN EL ADMINISTRACIN DEL PLAN DE IMPLEMENTACIN Y

    1.00

    -

    02.01

    ENCOFRADO Y

    3,083.50

    CONCRETO EN VEREDAS

    - 2,936.64440.50

    01.09.05

    MES

    -

    Y SALUDCAPACITACIN EN SEGURIDAD 2,118.64- 2,118.64- 2,118.64

    7.00

    01.09.01

    ELABORACIN,

    30,469.5028,524.001,945.50- 10,156.50PERSONAL OBRERO

    MUDA

    (2MUDASx3MESES)

    01.09

    P/PERSONALVESTUARIOS PROVISIONALES 889.83- 889.83

    02.02

    3.00

    2,643.68

    1,779.66- 1,779.661.00GLB01.09.03

    IMPLEMENTOS DE SEGURIDAD

    IMPLEMENTOS DE SEGURIDAD

    889.83

    2,643.68- - 2,643.681.00GLB01.09.02PERSONAL TECNICO

    DESENCOFRADO DE VEREDAS

    184.88

    ASOCIACION DEL ASENTAMIENTO HUMANO CERRO BUENA VISTA IIIPAUCARPATA - AREQUIPA - AREQUIPA

    PAUCARPATA - AREQUIPA"" MEJORAMIENTO DE LOS ACCESOS VIALES Y PEATONALES DEL AA.HH. CERRO BUENA VISTA III, DISTRITO DE

    01 - VEREDAS, BERMAS, MUROS DE CONTENCION Y SARDINELES.

    Noviembre - 2013

    Sub PresupuestoCliente

    Obra

    Costo a :Ubicacion

    Unidad M.Obra TotalEquipoMaterialMetradoDescripcinItem Precio

    Presupuesto Desagregado

    P.1/3

  • 08

    OBRAS DE JARDINERIA07

    05

    MURO DE CONTENCION

    VEREDAS Y MARTILLOS

    BERMA DE ADOQUIN DE

    VARIOS

    06 PISOS Y PAVIMENTOS

    OBRAS DE CONCRETO ARMADO

    CONCRETO

    285,999.121,891,525.74

    GRADERIAS

    1,428,215.16

    2,590.23

    629.16 27,443.96ENCOFRADO Y DESENCOFRADO VEREDAS Y MARTILLOS

    06.01.04 M2 2,539.44 61.98

    5,662.44

    114,350.98

    M2

    157,394.49VEREDA DE CONCRETO F'c=175 Kg/Cm2 E =0.10 M INC. ACAB/BRUADO

    06.01.05 M 2,539.44 5.71 3,250.48

    40,453.28

    M2

    M2 7,549.93 5.77 35,258.18 830.49 7,474.43 43,563.10CONFORMACION DE SUBRASANTE PARA VEREDAS

    21.81

    06.01.02

    21,152.36

    7,549.93 16.48 69,308.36 44,469.09 124,422.85VEREDAS E=0.15M

    06.01.03

    14,500.20

    1,258.32

    M2

    Y MARTILLOS

    78.83

    11,148.14

    BERMAS E=0.15M06.02.03 M2 1,387.47 56.77 11,904.49 66,265.57 596.61 78,766.67

    22,865.51

    EN BERMAS

    1,956.33

    1,770.45

    07.01 UND 358.00 37.74 2,864.00 10,561.00 85.92 13,510.92PLANTADO DE ARBOLES

    M

    ADOQUINADO DE CONCRETO

    8,005.70

    08.01

    JUNTA ASFALTICA

    06.02

    BARANDA METALICA DE 2" 139,564.57

    06.02.01 M2 1,387.47 5.77 6,479.49

    BASE GRANULAR PARA

    1,373.59

    101.58

    CONFORMACION DE SUBRASANTE PARA BERMAS

    06.02.02

    478.02136,873.49

    10,645.40

    2,213.06

    1,387.47 16.48 12,736.98 8,172.20

    152.62

    DESENCOFRADO DE GRADERIAS

    1:12, C:H

    140,913.44CONCRETO EN GRADERIAS F'C=140 KG/CM2 INC ACAB.

    04.03.04 M2 714.97 59.66 36,706.56 - 5,948.55

    71,954.58

    ENCOFRADO Y

    63,374.94

    05.0105.01.01 M2 4,100.45 39.65 71,798.88 84,223.24 6,560.72 162,582.84SOLADO PARA MUROS

    CONTENCION E=2" MEZCLA

    42,655.11

    1,909.65

    04.0304.03.01 M2 1,909.65 5.77 8,918.07 210.06 1,890.55 11,018.68CONFORMACION DE

    SUBRASANTE PARA GRADERIAS

    5,583.92

    M2GRADERIAS E=0.10M

    15.00 17,530.58 8,421.56 2,692.61

    BASE GRANULAR PARA

    BASE GRANULAR PARA

    06.01.01

    04.03.03 M3 714.97 197.09

    04.03.02

    M3

    410,897.32FY=4200 KG/CM2 GRADO 60

    28,644.75

    M 2,050.38 6.92 2,624.49 11,482.12 82.02 14,188.63JUNTA DE CONSTRUCCION

    13,354.16

    05.01.06

    ACERO ESTRUCTURAL

    369.10 79.94 8,858.40 20,381.70 265.75 29,505.85FILTRO DE GRAVA PARA DRENAJE EN MUROS DE CONTENCION

    06.01

    05.01.02

    CON TEKNOPORT

    M2

    M3 2,333.96 397.94 305,655.40 590,865.31 32,255.33 928,776.04CONCRETO EN MURO DE CONTENCION F'C=210KG/CM2

    05.01.05

    05.01.03

    286,600.88

    5,968.89

    KG 110,942.284.00

    INC. ACAB. CARAVISTA

    102,724.33

    40.96

    05.01.04MUROS DE CONTENCIONDESENCOFRADO NORMAL EN ENCOFRADO Y 244,485.734,357.2994,189.08145,939.36

    " MEJORAMIENTO DE LOS ACCESOS VIALES Y PEATONALES DEL AA.HH. CERRO BUENA VISTA III, DISTRITO DE PAUCARPATA - AREQUIPA"

    ASOCIACION DEL ASENTAMIENTO HUMANO CERRO BUENA VISTA IIIPAUCARPATA - AREQUIPA - AREQUIPA

    UTILIDAD 8.00 %6.63 % 239,020.46

    COSTO DIRECTOGASTOS GENERALES

    288,459.20

    3,605,740.02

    Noviembre - 2013

    01 - VEREDAS, BERMAS, MUROS DE CONTENCION Y SARDINELES.Sub PresupuestoCliente

    Obra

    Ubicacion Costo a :

    Descripcin MaterialM.ObraPrecioUnidad EquipoItem TotalMetrado

    Presupuesto Desagregado

    P.2/3

  • NUEVOS SOLESCUATRO MILLONES OCHOCIENTOS SETENTA Y SIETE MIL CIENTO NOVENTA Y NUEVE CON 22/100 Son :

    PRESUPUESTO TOTAL 4,877,199.22

    743,979.54

    PAUCARPATA - AREQUIPA - AREQUIPA

    SUB TOTAL 4,133,219.68

    " MEJORAMIENTO DE LOS ACCESOS VIALES Y PEATONALES DEL AA.HH. CERRO BUENA VISTA III, DISTRITO DE PAUCARPATA - AREQUIPA"

    ASOCIACION DEL ASENTAMIENTO HUMANO CERRO BUENA VISTA III

    IMPUESTO GENERAL A LAS VENTAS 18.00 %

    01 - VEREDAS, BERMAS, MUROS DE CONTENCION Y SARDINELES.

    Noviembre - 2013Cliente

    Obra

    Costo a :

    Sub Presupuesto

    Ubicacion

    M.ObraDescripcin Precio Equipo TotalMetradoUnidadItem Material

    Presupuesto Desagregado

    P.3/3