S10 Página 1 ING. CARLOS OLIVOS LARA CIP:56310 PRESUPUESTO OBRA : CONSTRUCCION Y EQUIPAMIENTO LABORATORIOS DE QUIMICA, METODOS, AUTOMATIZACION Y FISICA CLIENTE : UNIVERSIDAD NACIONAL DE INGENIERIA - FIIS DEPARTAMENTO :LIMA PROVINCIA : LIMA DISTRITO : SAN MARTIN DE PORRAS COSTOS AL : 30/11/2010 INSTALACIONES ELECTRICAS 003 Subpresupuesto Precio S/. Parcial S/. Item Descripción Und. Metrado ILUMINACION 18 39,015.80 28,981.74 409.00 SALIDAS DE CENTROS DE LUZ PVC-P pto 18.01 70.86 478.98 6.00 SALIDA DE BRAQUETES PVC-P pto 18.02 79.83 3,750.28 53.00 SALIDA DE INTERRUPTORES SIMPLES pto 18.03 70.76 3,146.40 38.00 SALIDA DE INTERRUPTORES DOBLES pto 18.04 82.80 1,444.32 18.00 SALIDA DE INTERRUPTORES SIMPLE 3 VIAS pto 18.05 80.24 1,214.08 16.00 SALIDAS DE CENTROS DE LUZ PVC-P - PARA LUZ DE EMERGENCIA pto 18.06 75.88 TOMACORRIENTES Y FUERZA 19 29,747.29 9,439.08 102.00 SALIDA PARA TOMACORRIENTES DOBLES CON TT pto 19.01 92.54 1,480.64 16.00 SALIDA PARA TOMACORRIENTES DOBLES PARA LUCES DE EMERGENCIA CON TT pto 19.02 92.54 7,588.28 82.00 SALIDA PARA TOMACORRIENTES DOBLES ESTABILIZADOS CON TT pto 19.03 92.54 9,254.00 100.00 SALIDA PARA TOMACORRIENTES DOBLES ESTABILIZADOS CON TT EN PISOS pto 19.04 92.54 832.86 9.00 SALIDA PARA TOMACORRIENTES DOBLES CON TT EN TECHO pto 19.05 92.54 431.52 4.00 SALIDA DE FUERZA PARA EXTRACTOR pto 19.06 107.88 377.24 4.00 SALIDA DE PULSADOR PARA EXTRACTOR pto 19.07 94.31 72.13 1.00 SALIDA DE FUERZA PARA CONTROL DE NIVEL DE AGUA pto 19.08 72.13 271.54 2.00 SALIDA DE FUERZA PARA EQUIPOS 2.5 HP PVC-P pto 19.09 135.77 TABLEROS ELECTRICOS 20 40,119.69 8,773.02 1.00 TABLERO ELECTRICO GENERAL TGN und 20.01 8,773.02 2,104.31 1.00 TABLERO ELECTRICO ST1 und 20.02 2,104.31 1,589.51 1.00 TABLERO ELECTRICO ST1.1 und 20.03 1,589.51 1,596.11 1.00 TABLERO ELECTRICO ST1.2 und 20.04 1,596.11 1,657.11 1.00 TABLERO ELECTRICO ST1.3 und 20.05 1,657.11 578.21 1.00 TABLERO ELECTRICO TB-AGUA und 20.06 578.21 1,064.26 1.00 TABLERO ELECTRICO TB und 20.07 1,064.26 1,098.16 1.00 TABLERO ELECTRICO NUCLEO ASCENSOR und 20.08 1,098.16 1,808.11 1.00 TABLERO ELECTRICO ST2 und 20.09 1,808.11 1,498.01 1.00 TABLERO ELECTRICO ST2.1 und 20.10 1,498.01 2,311.69 1.00 TABLERO ELECTRICO ST2.2 und 20.11 2,311.69 1,313.01 1.00 TABLERO ELECTRICO ST2.3 und 20.12 1,313.01 5,028.61 1.00 TABLERO ELECTRICO TG-ES und 20.13 5,028.61 1,556.21 1.00 TABLERO ELECTRICO TES1.1 und 20.14 1,556.21 1,208.91 1.00 TABLERO ELECTRICO TES1.2 und 20.15 1,208.91 1,556.21 1.00 TABLERO ELECTRICO TES1.3 und 20.16 1,556.21 1,539.61 1.00 TABLERO ELECTRICO TES2 und 20.17 1,539.61 1,232.11 1.00 TABLERO ELECTRICO TES2.1 und 20.18 1,232.11 1,374.41 1.00 TABLERO ELECTRICO TES2.2 und 20.19 1,374.41 1,232.11 1.00 TABLERO ELECTRICO TES2.3 und 20.20 1,232.11 TUBERIAS Y ALIMENTADORES 21 73,298.03 ACOMETIDAS SECUNDARIAS 21.01 49,495.94 29,552.25 118.98 CONDUCTOR N2XY 1KV 3 - 1X300mm2 m 21.01.01 248.38 3,497.33 178.80 CONDUCTOR LSOH -50mm2 m 21.01.02 19.56 9,545.57 679.40 CONDUCTOR LSOH -35mm2 m 21.01.03 14.05 2,697.24 260.10 CONDUCTOR LSOH -25mm2 m 21.01.04 10.37 578.92 82.00 CONDUCTOR LSOH - 16mm2 m 21.01.05 7.06

description

Pres Iiee Data Comunic

Transcript of Pres Iiee Data Comunic

Page 1: Pres Iiee Data Comunic

S10 Página 1ING. CARLOS OLIVOS LARA CIP:56310

PRESUPUESTO

OBRA : CONSTRUCCION Y EQUIPAMIENTO LABORATORIOS DE QUIMICA, METODOS, AUTOMATIZACION Y FISICA

CLIENTE : UNIVERSIDAD NACIONAL DE INGENIERIA - FIIS

DEPARTAMENTO :LIMA PROVINCIA : LIMA DISTRITO : SAN MARTIN DE PORRAS

COSTOS AL : 30/11/2010INSTALACIONES ELECTRICAS003Subpresupuesto

Precio S/. Parcial S/.Item Descripción Und. Metrado

ILUMINACION18 39,015.80

28,981.74409.00 SALIDAS DE CENTROS DE LUZ PVC-P pto18.01 70.86

478.986.00 SALIDA DE BRAQUETES PVC-P pto18.02 79.83

3,750.2853.00 SALIDA DE INTERRUPTORES SIMPLES pto18.03 70.76

3,146.4038.00 SALIDA DE INTERRUPTORES DOBLES pto18.04 82.80

1,444.3218.00 SALIDA DE INTERRUPTORES SIMPLE 3 VIAS pto18.05 80.24

1,214.0816.00 SALIDAS DE CENTROS DE LUZ PVC-P - PARA LUZ DE EMERGENCIA pto18.06 75.88

TOMACORRIENTES Y FUERZA19 29,747.29

9,439.08102.00 SALIDA PARA TOMACORRIENTES DOBLES CON TT pto19.01 92.54

1,480.6416.00 SALIDA PARA TOMACORRIENTES DOBLES PARA LUCES DE EMERGENCIA CON TT

pto19.02 92.54

7,588.2882.00 SALIDA PARA TOMACORRIENTES DOBLES ESTABILIZADOS CON TT pto19.03 92.54

9,254.00100.00 SALIDA PARA TOMACORRIENTES DOBLES ESTABILIZADOS CON TT EN PISOS pto19.04 92.54

832.869.00 SALIDA PARA TOMACORRIENTES DOBLES CON TT EN TECHO pto19.05 92.54

431.524.00 SALIDA DE FUERZA PARA EXTRACTOR pto19.06 107.88

377.244.00 SALIDA DE PULSADOR PARA EXTRACTOR pto19.07 94.31

72.131.00 SALIDA DE FUERZA PARA CONTROL DE NIVEL DE AGUA pto19.08 72.13

271.542.00 SALIDA DE FUERZA PARA EQUIPOS 2.5 HP PVC-P pto19.09 135.77

TABLEROS ELECTRICOS20 40,119.69

8,773.021.00 TABLERO ELECTRICO GENERAL TGN und20.01 8,773.02

2,104.311.00 TABLERO ELECTRICO ST1 und20.02 2,104.31

1,589.511.00 TABLERO ELECTRICO ST1.1 und20.03 1,589.51

1,596.111.00 TABLERO ELECTRICO ST1.2 und20.04 1,596.11

1,657.111.00 TABLERO ELECTRICO ST1.3 und20.05 1,657.11

578.211.00 TABLERO ELECTRICO TB-AGUA und20.06 578.21

1,064.261.00 TABLERO ELECTRICO TB und20.07 1,064.26

1,098.161.00 TABLERO ELECTRICO NUCLEO ASCENSOR und20.08 1,098.16

1,808.111.00 TABLERO ELECTRICO ST2 und20.09 1,808.11

1,498.011.00 TABLERO ELECTRICO ST2.1 und20.10 1,498.01

2,311.691.00 TABLERO ELECTRICO ST2.2 und20.11 2,311.69

1,313.011.00 TABLERO ELECTRICO ST2.3 und20.12 1,313.01

5,028.611.00 TABLERO ELECTRICO TG-ES und20.13 5,028.61

1,556.211.00 TABLERO ELECTRICO TES1.1 und20.14 1,556.21

1,208.911.00 TABLERO ELECTRICO TES1.2 und20.15 1,208.91

1,556.211.00 TABLERO ELECTRICO TES1.3 und20.16 1,556.21

1,539.611.00 TABLERO ELECTRICO TES2 und20.17 1,539.61

1,232.111.00 TABLERO ELECTRICO TES2.1 und20.18 1,232.11

1,374.411.00 TABLERO ELECTRICO TES2.2 und20.19 1,374.41

1,232.111.00 TABLERO ELECTRICO TES2.3 und20.20 1,232.11

TUBERIAS Y ALIMENTADORES21 73,298.03

ACOMETIDAS SECUNDARIAS21.01 49,495.94

29,552.25118.98 CONDUCTOR N2XY 1KV 3 - 1X300mm2 m21.01.01 248.38

3,497.33178.80 CONDUCTOR LSOH -50mm2 m21.01.02 19.56

9,545.57679.40 CONDUCTOR LSOH -35mm2 m21.01.03 14.05

2,697.24260.10 CONDUCTOR LSOH -25mm2 m21.01.04 10.37

578.9282.00 CONDUCTOR LSOH - 16mm2 m21.01.05 7.06

Page 2: Pres Iiee Data Comunic

S10 Página 2ING. CARLOS OLIVOS LARA CIP:56310

PRESUPUESTO

OBRA : CONSTRUCCION Y EQUIPAMIENTO LABORATORIOS DE QUIMICA, METODOS, AUTOMATIZACION Y FISICA

CLIENTE : UNIVERSIDAD NACIONAL DE INGENIERIA - FIIS

DEPARTAMENTO :LIMA PROVINCIA : LIMA DISTRITO : SAN MARTIN DE PORRAS

COSTOS AL : 30/11/2010INSTALACIONES ELECTRICAS003Subpresupuesto

Precio S/. Parcial S/.Item Descripción Und. Metrado

2,906.57568.80 CONDUCTOR LSOH -10mm2 m21.01.06 5.11

718.06322.00 CONDUCTOR LSOH -4mm2 m21.01.07 2.23

TUBERIAS PVC-P Y/O F.G.21.02 6,079.22

665.00125.00 TUBERIAS PVC SAP (ELECTRICAS) D=3/4" - 20mm m21.02.01 5.32

2,842.42351.35 TUBERIAS PVC SAP (ELECTRICAS) D=11/2" - 40mm m21.02.02 8.09

832.2480.10 TUBERIAS PVC SAP (ELECTRICAS) D=2" - 50mm m21.02.03 10.39

1,739.56107.98 TUBERIAS PVC SAP (ELECTRICAS) D=3" - 80mm m21.02.04 16.11

VARIOS21.03 17,722.87

4,212.355.00 POZO DE CONEXION A TIERRA und21.03.01 842.47

2,226.97205.63 EXCAVACION DE ZANJAS HASTA 1.00 MT TERRENO NORMAL PARA REDES SANITARIAS Y/O ACI

m21.03.02 10.83

1,139.19205.63 CAMA DE ARENA m21.03.03 5.54

3,606.78338.03 RELLENO DE ZANJAS m21.03.04 10.67

2,244.786.00 BUZON - CAJA DE CONCRETO DE 80X80 C/TAPA und21.03.05 374.13

4,292.805.00 BUZON ELECTRICO DE CONCRETO DE 1.20x1.20 C/TAPA und21.03.06 858.56

CAJAS ESPECIALES22 899.49

321.4818.00 CAJA DE PASE DE F.G. DE 100X100X50MM und22.01 17.86

84.213.00 CAJA DE PASE DE F.G. DE 150X150X100MM und22.02 28.07

33.871.00 CAJA DE PASE DE F.G. DE 200X200X100MM und22.03 33.87

36.371.00 CAJA DE PASE DE F.G. DE 250X250X100MM und22.04 36.37

352.247.00 CAJA DE PASE DE F.G. DE 300X300X150MM und22.05 50.32

71.321.00 CAJA DE PASE DE F.G. DE 450X450X150MM und22.06 71.32

LUMINARIAS23 65,779.28

51,038.40336.00 ARTEFACTO 2X36W DE ADOSAR C/REJILLA ESPECULAR PARABOLICA und23.01 151.90

991.347.00 ARTEFACTO DE ADOSAR C/LAMPARA FLUORESCENTE 1X22W C/DIFUSOR ACRILICO

und23.02 141.62

23.021.00 ARTEFACTO BRAQUETE C/LAMPARA AHORRADORA DE 18W. und23.03 23.02

12,559.8066.00 SPOTS ADOSABLE C/ESPEJO ALUMINIO FACETADO CON LAMP. AHORR. 1X20W und23.04 190.30

1,166.7216.00 ARTEFACTO LUZ DE EMERGENCIA CON BATERIA DE RESPALDO und23.05 72.92

INSTALACIONES MECANICAS - ELECTRICAS Y ESPECIALES24 489,307.88

INSTALACIONES ELECTRICAS24.01 32,156.88

6,652.441.00 SUMINISTRO E INSTALACION TRANSFORMADO DE AISLAMIENTO DE 30KVA - INC. FLETE

und24.01.01 6,652.44

25,504.441.00 SUMINISTRO E INSTALACION UPS DE 30KVA - INC. FLETE und24.01.02 25,504.44

INSTALACIONES DE VOZ Y DATA Y ESPECIALES24.02 457,151.00

44,666.001.00 SUMINISTROS Y MATERIALES VOZ Y DATA Y OTROS - LABORATORIO DE METODOS

GLB24.02.01 44,666.00

43,506.001.00 SUMINISTROS Y MATERIALES VOZ Y DATA Y OTROS - LABORATORIO DE FISICA

GLB24.02.02 43,506.00

36,698.001.00 SUMINISTROS Y MATERIALES VOZ Y DATA Y OTROS - LABORATORIO DE QUIMICA

GLB24.02.03 36,698.00

60,738.001.00 SUMINISTROS Y MATERIALES VOZ Y DATA Y OTROS - CUARTOS TELECOMUNICACIONES

GLB24.02.04 60,738.00

21,340.001.00 SUMINISTROS Y MATERIALES VOZ Y DATA Y OTROS - CUARTOS DE MONITOREO

GLB24.02.05 21,340.00

42,272.001.00 SUMINISTROS Y MATERIALES VOZ Y DATA Y OTROS - AREA ADMINISTRATIVASGLB24.02.06 42,272.00

34,542.001.00 SUMINISTROS Y MATERIALES VOZ Y DATA Y OTROS - LABORATORIO DE PLC Y REDES INDUSTRIALES

GLB24.02.07 34,542.00

29,836.001.00 SUMINISTROS Y MATERIALES VOZ Y DATA Y OTROS - LABORATORIO DE CONTROL DE PROCESOS

GLB24.02.08 29,836.00

Page 3: Pres Iiee Data Comunic

S10 Página 3ING. CARLOS OLIVOS LARA CIP:56310

PRESUPUESTO

OBRA : CONSTRUCCION Y EQUIPAMIENTO LABORATORIOS DE QUIMICA, METODOS, AUTOMATIZACION Y FISICA

CLIENTE : UNIVERSIDAD NACIONAL DE INGENIERIA - FIIS

DEPARTAMENTO :LIMA PROVINCIA : LIMA DISTRITO : SAN MARTIN DE PORRAS

COSTOS AL : 30/11/2010INSTALACIONES ELECTRICAS003Subpresupuesto

Precio S/. Parcial S/.Item Descripción Und. Metrado

29,936.001.00 SUMINISTROS Y MATERIALES VOZ Y DATA Y OTROS - LABORATORIO DE MANUFACTURA INTEGRAL

GLB24.02.09 29,936.00

29,296.001.00 SUMINISTROS Y MATERIALES VOZ Y DATA Y OTROS - LABORATORIO DE ELECTRONEUMATICA

GLB24.02.10 29,296.00

29,636.001.00 SUMINISTROS Y MATERIALES VOZ Y DATA Y OTROS - LABORATORIO DE NEUMATICA

GLB24.02.11 29,636.00

29,636.001.00 SUMINISTROS Y MATERIALES VOZ Y DATA Y OTROS - LABORATORIO DE SENSORES

GLB24.02.12 29,636.00

25,049.001.00 SUMINISTROS Y MATERIALES VOZ Y DATA Y OTROS - SALA DE SUPERVISION Y CONTROL DE REDES

GLB24.02.13 25,049.00

COSTO DIRECTO 738,167.46

GASTOS GENERALES 73,816.75

SUB TOTAL 811,984.21

IGV 19% 154,277.00

PRESPUPUESTO TOTAL 966,261.21

SON : NOVECIENTOS SESENTISEIS MIL DOSCIENTOS SESENTIUNO Y 21/100 NUEVOS SOLES