PrecioParticularInsumoTipoV construccion

2
1 Página : S10 Precios y cantidades de recursos requeridos por tipo Obra CONSTRUCCION DE VEREDAS Y PAVIMENTO CALLES 1,2,3,4,5,6,8,9,11,12,13,AA.HH. CAJUCA II.DISTRITO DE NAZCA, PROVINCIA DE NAZCA-ICA 1301001 Subpresupuesto 001 CONSTRUCCION DE VEREDAS Y PAVIMENTO CALLES 1,2,3,4,5,6,8,9,11,12,13,AA.HH. CAJUCA II.DISTRITO DE NA Fecha 01/12/2011 ICA - NAZCA - NAZCA Lugar 110301 Código Cantidad Unidad Recurso Parcial S/. resupuestado S/. Precio S/. MANO DE OBRA 35.5502 537.87 533.25 15.13 TOPOGRAFO 0147000032 hh 4,910.2093 74,291.47 74,277.99 15.13 OPERARIO 0147010002 hh 1,746.5342 22,966.92 22,938.55 13.15 OFICIAL 0147010003 hh 19,503.1968 231,307.91 231,318.47 11.86 PEON 0147010004 hh 329,068.26 329,104.17 MATERIALES 87.4990 393.75 393.75 4.50 ALAMBRE NEGRO RECOCIDO # 8 0202000008 kg 456.7848 2,055.53 2,055.53 4.50 CLAVOS Fo No C/C 3" 0202020004 kg 170.0000 676.60 676.60 3.98 FIERRO CORRUGADO PROMEDIO 0203000032 kg 138.8299 4,859.05 4,880.00 35.00 ARENA FINA 0204000000 m3 10.0000 200.00 200.00 20.00 TIERRA DE CHACRA 0204110012 m3 2.3774 83.21 83.16 35.00 GRAVILLA 0205000001 m3 429.8310 21,491.55 21,491.55 50.00 PIEDRA CHANCADA DE 1/2" 0205000003 m3 1.8700 65.45 65.45 35.00 PIEDRA CHANCADA DE 3/4" 0205000004 m3 172.9000 4,322.50 4,322.50 25.00 PIEDRA GRANDE DE 8" 0205000009 m3 522.5260 25,342.51 25,357.57 48.50 ARENA GRUESA 0205010004 m3 1.7000 59.50 59.50 35.00 ARENA GRUESA DE RIO 0205010005 m3 1,483.0855 48,941.82 48,941.82 33.00 MATERIAL GRANULAR 0205030075 m3 643.5852 16,089.63 16,090.92 25.00 PIEDRA 0205330003 m3 1,644.4698 17,266.93 17,299.04 10.50 ASFALTO RC-250 0213000006 gln 231.0763 94,741.28 94,741.28 410.00 ASFALTO EN CALIENTE (PUESTO EN OBRA) 0213020100 m3 231.0763 30,039.92 30,039.92 130.00 TRANSPORTE DE MEZCLA ASFALTICA 0213020101 m3 7,329.7007 116,175.76 116,197.75 15.85 CEMENTO PORTLAND TIPO I (42.5KG) 0221000000 BOL 66.7430 17,686.90 17,686.90 265.00 CONCRETO PRE-MEZCLADO F'C=175 KG/CM2 0221990028 m3 300.8460 6,016.92 6,016.92 20.00 CEMENTO PORTLAND TIPO V 0223010001 BOL 56.4585 228.66 228.52 4.05 TECKNOPORT E= 1" 0229120063 m2 35.5502 284.40 284.40 8.00 YESO DE 28 Kg 0230020001 BOL 35.5502 1,066.51 1,066.51 30.00 WINCHA 0230990080 und 20.0000 1,480.00 1,480.00 74.00 CAJA DE CONCRETO P/MEDIDOR AGUA 0231510020 und 1.0000 6,500.00 6,500.00 6,500.00 MOVILIZACION Y DESMOVILIZACION 0232970002 GLB 300.8460 10,529.61 10,529.61 35.00 HORMIGON 0238000000 m3 965.8510 17,095.56 17,103.13 17.70 AGUA 0239050000 m3 1.0000 385.04 385.04 385.04 SUMINISTRO E INSTALACION DE CARTEL D EOBRA BANNER 0239130018 GLB 1.0000 3,500.00 3,500.00 3,500.00 MANTENIMIENTO DE TRANSITO 0239900075 GLB 100.0000 3,000.00 3,000.00 30.00 ARBOL 0243160053 und 71.1004 277.29 284.40 3.90 ESTACA DE MADERA 0244010000 p2 4,050.0140 21,505.57 21,513.51 5.31 MADERA TORNILLO INC.CORTE P/ENCOFRADO 0245010001 p2 20.0000 1,700.00 1,700.00 85.00 CAJA DE DESAGUE DE 12"X24" 0250010000 und 74.9997 877.50 881.97 11.70 MICROESFERAS DE VIDRIO 0254220021 kg 5.0201 225.90 232.07 45.00 XILOL 0254440080 gln 8.7353 524.12 524.12 60.00 PINTURA TRAFICO 0254450100 gln 100.0000 1,450.00 1,450.00 14.50 TUBERIA PVC SAP A-10 DE 1/2" 0272010004 m 17.8087 80.32 80.40 4.51 TUBERIA PVC SAP PRESION PARA AGUA C-5 EC DE 2'' 0272010012 m 100.0000 1,930.00 1,930.00 19.30 TUBERIA PVC SAL 6" 0273010033 m 2,213.5050 18,814.79 18,825.33 8.50 GRASS AMERICANO 0286010001 m2 498,099.17 497,964.08 EQUIPOS 35.5502 533.25 533.25 15.00 MIRAS Y JALONES 0337540001 hm 48.5384 1,456.15 1,456.15 30.00 EQUIPO DE PINTURA 0337900050 hm 27.2000 481.44 481.44 17.70 MEZCLADORA CONCRETO TAMBOR 11 P3-18 HP 0348010008 hm 62.0700 8,565.66 8,548.29 138.00 CAMION CISTERNA 4x2 (AGUA) 122 HP 1,500 0348040001 hm 34.1282 4,266.02 4,266.02 125.00 CAMION VOLQUETE 7 M3. 0348040032 hm 275.5428 38,575.99 38,575.99 140.00 VOLQUETE DE 10 M3 0348110004 hm 614.0346 9,210.52 9,208.80 15.00 COMPACTADOR VIBR. TIPO PLANCHA 4 HP 0349030001 hm 114.7649 1,721.47 1,719.32 15.00 COMPACTADOR VIBR. TIPO PLANCHA 5.8 HP 0349030003 hm 56.8804 6,825.65 6,825.64 120.00 RODILLO LISO VIBR AUTOP 101-135HP 10-12T 0349030007 hm 11.3761 1,444.76 1,457.56 127.00 RODILLO NEUMATICO AUTOP. 127 HP 8-23 TON 0349030018 hm 16/03/2012 11:48:34a.m. Fecha :

Transcript of PrecioParticularInsumoTipoV construccion

  • 1Pgina :S10

    Precios y cantidades de recursos requeridos por tipoObra CONSTRUCCION DE VEREDAS Y PAVIMENTO CALLES 1,2,3,4,5,6,8,9,11,12,13,AA.HH.

    CAJUCA II.DISTRITO DE NAZCA, PROVINCIA DE NAZCA-ICA1301001

    Subpresupuesto 001 CONSTRUCCION DE VEREDAS Y PAVIMENTO CALLES 1,2,3,4,5,6,8,9,11,12,13,AA.HH. CAJUCA II.DISTRITO DE NAFecha 01/12/2011

    ICA - NAZCA - NAZCALugar 110301

    Cdigo CantidadUnidadRecurso Parcial S/.resupuestado S/.Precio S/.

    MANO DE OBRA35.5502 537.87 533.2515.13TOPOGRAFO0147000032 hh

    4,910.2093 74,291.47 74,277.9915.13OPERARIO0147010002 hh1,746.5342 22,966.92 22,938.5513.15OFICIAL0147010003 hh

    19,503.1968 231,307.91 231,318.4711.86PEON0147010004 hh

    329,068.26329,104.17MATERIALES

    87.4990 393.75 393.754.50ALAMBRE NEGRO RECOCIDO # 80202000008 kg456.7848 2,055.53 2,055.534.50CLAVOS Fo No C/C 3"0202020004 kg170.0000 676.60 676.603.98FIERRO CORRUGADO PROMEDIO0203000032 kg138.8299 4,859.05 4,880.0035.00ARENA FINA0204000000 m3

    10.0000 200.00 200.0020.00TIERRA DE CHACRA0204110012 m32.3774 83.21 83.1635.00GRAVILLA0205000001 m3

    429.8310 21,491.55 21,491.5550.00PIEDRA CHANCADA DE 1/2"0205000003 m31.8700 65.45 65.4535.00PIEDRA CHANCADA DE 3/4"0205000004 m3

    172.9000 4,322.50 4,322.5025.00PIEDRA GRANDE DE 8"0205000009 m3522.5260 25,342.51 25,357.5748.50ARENA GRUESA0205010004 m3

    1.7000 59.50 59.5035.00ARENA GRUESA DE RIO0205010005 m31,483.0855 48,941.82 48,941.8233.00MATERIAL GRANULAR0205030075 m3

    643.5852 16,089.63 16,090.9225.00PIEDRA0205330003 m31,644.4698 17,266.93 17,299.0410.50ASFALTO RC-2500213000006 gln

    231.0763 94,741.28 94,741.28410.00ASFALTO EN CALIENTE (PUESTO EN OBRA)0213020100 m3231.0763 30,039.92 30,039.92130.00TRANSPORTE DE MEZCLA ASFALTICA0213020101 m3

    7,329.7007 116,175.76 116,197.7515.85CEMENTO PORTLAND TIPO I (42.5KG)0221000000 BOL66.7430 17,686.90 17,686.90265.00CONCRETO PRE-MEZCLADO F'C=175 KG/CM20221990028 m3

    300.8460 6,016.92 6,016.9220.00CEMENTO PORTLAND TIPO V0223010001 BOL56.4585 228.66 228.524.05TECKNOPORT E= 1"0229120063 m235.5502 284.40 284.408.00YESO DE 28 Kg0230020001 BOL35.5502 1,066.51 1,066.5130.00WINCHA0230990080 und20.0000 1,480.00 1,480.0074.00CAJA DE CONCRETO P/MEDIDOR AGUA0231510020 und

    1.0000 6,500.00 6,500.006,500.00MOVILIZACION Y DESMOVILIZACION0232970002 GLB300.8460 10,529.61 10,529.6135.00HORMIGON0238000000 m3965.8510 17,095.56 17,103.1317.70AGUA0239050000 m3

    1.0000 385.04 385.04385.04SUMINISTRO E INSTALACION DE CARTEL D EOBRA BANNER

    0239130018 GLB

    1.0000 3,500.00 3,500.003,500.00MANTENIMIENTO DE TRANSITO0239900075 GLB100.0000 3,000.00 3,000.0030.00ARBOL0243160053 und

    71.1004 277.29 284.403.90ESTACA DE MADERA0244010000 p24,050.0140 21,505.57 21,513.515.31MADERA TORNILLO INC.CORTE

    P/ENCOFRADO0245010001 p2

    20.0000 1,700.00 1,700.0085.00CAJA DE DESAGUE DE 12"X24"0250010000 und74.9997 877.50 881.9711.70MICROESFERAS DE VIDRIO0254220021 kg

    5.0201 225.90 232.0745.00XILOL0254440080 gln8.7353 524.12 524.1260.00PINTURA TRAFICO0254450100 gln

    100.0000 1,450.00 1,450.0014.50TUBERIA PVC SAP A-10 DE 1/2"0272010004 m17.8087 80.32 80.404.51TUBERIA PVC SAP PRESION PARA AGUA C-5

    EC DE 2''0272010012 m

    100.0000 1,930.00 1,930.0019.30TUBERIA PVC SAL 6"0273010033 m2,213.5050 18,814.79 18,825.338.50GRASS AMERICANO0286010001 m2

    498,099.17497,964.08EQUIPOS

    35.5502 533.25 533.2515.00MIRAS Y JALONES0337540001 hm48.5384 1,456.15 1,456.1530.00EQUIPO DE PINTURA0337900050 hm27.2000 481.44 481.4417.70MEZCLADORA CONCRETO TAMBOR 11 P3-18

    HP0348010008 hm

    62.0700 8,565.66 8,548.29138.00CAMION CISTERNA 4x2 (AGUA) 122 HP 1,5000348040001 hm34.1282 4,266.02 4,266.02125.00CAMION VOLQUETE 7 M3.0348040032 hm

    275.5428 38,575.99 38,575.99140.00VOLQUETE DE 10 M30348110004 hm614.0346 9,210.52 9,208.8015.00COMPACTADOR VIBR. TIPO PLANCHA 4 HP0349030001 hm114.7649 1,721.47 1,719.3215.00COMPACTADOR VIBR. TIPO PLANCHA 5.8 HP0349030003 hm

    56.8804 6,825.65 6,825.64120.00RODILLO LISO VIBR AUTOP 101-135HP 10-12T0349030007 hm11.3761 1,444.76 1,457.56127.00RODILLO NEUMATICO AUTOP. 127 HP 8-23

    TON0349030018 hm

    16/03/2012 11:48:34a.m.Fecha :

  • 2Pgina :S10

    Precios y cantidades de recursos requeridos por tipoObra CONSTRUCCION DE VEREDAS Y PAVIMENTO CALLES 1,2,3,4,5,6,8,9,11,12,13,AA.HH.

    CAJUCA II.DISTRITO DE NAZCA, PROVINCIA DE NAZCA-ICA1301001

    Subpresupuesto 001 CONSTRUCCION DE VEREDAS Y PAVIMENTO CALLES 1,2,3,4,5,6,8,9,11,12,13,AA.HH. CAJUCA II.DISTRITO DE NAFecha 01/12/2011

    ICA - NAZCA - NAZCALugar 110301

    Cdigo CantidadUnidadRecurso Parcial S/.resupuestado S/.Precio S/.

    11.3761 1,023.85 1,030.9690.00RODILLO TANDEM ESTATIC AUT 58-70HP 8-10T

    0349030043 hm

    6.3990 644.38 639.90100.70TRACTOR DE TIRO MF 265 DE 63 HP0349030061 hm91.8476 11,021.71 11,021.71120.00CARGADOR S/LLANTAS 125 HP 2.5 YD3.0349040009 hm24.6788 6,169.70 6,174.32250.00TRACTOR DE ORUGAS DE 190-240 HP0349040034 hm

    6.3990 906.10 888.76141.60BARREDORA MECANICA 10-20 HP 7 P.LONG.0349050003 hm11.3761 705.32 711.0062.00COCINA DE ASFALTO 320 GLNS0349050007 hm11.3761 1,649.53 1,635.31145.00PAVIMENTADORA SOBRE ORUGAS 69 HP

    10-16'0349050008 hm

    491.2968 3,684.73 3,696.557.50VIBRADOR DE CONCRETO 4 HP 2.40"0349070004 hm56.8804 7,963.26 7,963.24140.00MOTONIVELADORA DE 125 HP0349090000 hm

    605.9528 10,725.36 10,710.6217.70MEZCLADORA CONCRETO TAMBOR 18HP 11P3

    0349100007 hm

    14.7882 1,814.51 1,816.17122.70RODILLO NEUMAT.AUTOP.127 HP0349110090 hm6.3990 1,151.82 1,137.61180.00CAMION IMPRIMIDOR 6x2 178-210 HP 1,800 G0349130004 hm4.0000 712.00 712.00178.00GRUA HIDRAULICA AUTOP. 127HP 18TON-9M.0349180010 hm

    35.5502 355.50 355.5010.00TEODOLITO0349190001 hm2.6660 20.00 20.007.50VIBRADOR DE 4 HP CAB.=2.40"0349520003 hm

    121,586.11121,628.68

    La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizando

    Total S/.

    S/.

    948,696.93 948,753.54

    948,753.54

    16/03/2012 11:48:34a.m.Fecha :