PrecioParticularInsumoTipoV construccion
Transcript of PrecioParticularInsumoTipoV construccion
-
1Pgina :S10
Precios y cantidades de recursos requeridos por tipoObra CONSTRUCCION DE VEREDAS Y PAVIMENTO CALLES 1,2,3,4,5,6,8,9,11,12,13,AA.HH.
CAJUCA II.DISTRITO DE NAZCA, PROVINCIA DE NAZCA-ICA1301001
Subpresupuesto 001 CONSTRUCCION DE VEREDAS Y PAVIMENTO CALLES 1,2,3,4,5,6,8,9,11,12,13,AA.HH. CAJUCA II.DISTRITO DE NAFecha 01/12/2011
ICA - NAZCA - NAZCALugar 110301
Cdigo CantidadUnidadRecurso Parcial S/.resupuestado S/.Precio S/.
MANO DE OBRA35.5502 537.87 533.2515.13TOPOGRAFO0147000032 hh
4,910.2093 74,291.47 74,277.9915.13OPERARIO0147010002 hh1,746.5342 22,966.92 22,938.5513.15OFICIAL0147010003 hh
19,503.1968 231,307.91 231,318.4711.86PEON0147010004 hh
329,068.26329,104.17MATERIALES
87.4990 393.75 393.754.50ALAMBRE NEGRO RECOCIDO # 80202000008 kg456.7848 2,055.53 2,055.534.50CLAVOS Fo No C/C 3"0202020004 kg170.0000 676.60 676.603.98FIERRO CORRUGADO PROMEDIO0203000032 kg138.8299 4,859.05 4,880.0035.00ARENA FINA0204000000 m3
10.0000 200.00 200.0020.00TIERRA DE CHACRA0204110012 m32.3774 83.21 83.1635.00GRAVILLA0205000001 m3
429.8310 21,491.55 21,491.5550.00PIEDRA CHANCADA DE 1/2"0205000003 m31.8700 65.45 65.4535.00PIEDRA CHANCADA DE 3/4"0205000004 m3
172.9000 4,322.50 4,322.5025.00PIEDRA GRANDE DE 8"0205000009 m3522.5260 25,342.51 25,357.5748.50ARENA GRUESA0205010004 m3
1.7000 59.50 59.5035.00ARENA GRUESA DE RIO0205010005 m31,483.0855 48,941.82 48,941.8233.00MATERIAL GRANULAR0205030075 m3
643.5852 16,089.63 16,090.9225.00PIEDRA0205330003 m31,644.4698 17,266.93 17,299.0410.50ASFALTO RC-2500213000006 gln
231.0763 94,741.28 94,741.28410.00ASFALTO EN CALIENTE (PUESTO EN OBRA)0213020100 m3231.0763 30,039.92 30,039.92130.00TRANSPORTE DE MEZCLA ASFALTICA0213020101 m3
7,329.7007 116,175.76 116,197.7515.85CEMENTO PORTLAND TIPO I (42.5KG)0221000000 BOL66.7430 17,686.90 17,686.90265.00CONCRETO PRE-MEZCLADO F'C=175 KG/CM20221990028 m3
300.8460 6,016.92 6,016.9220.00CEMENTO PORTLAND TIPO V0223010001 BOL56.4585 228.66 228.524.05TECKNOPORT E= 1"0229120063 m235.5502 284.40 284.408.00YESO DE 28 Kg0230020001 BOL35.5502 1,066.51 1,066.5130.00WINCHA0230990080 und20.0000 1,480.00 1,480.0074.00CAJA DE CONCRETO P/MEDIDOR AGUA0231510020 und
1.0000 6,500.00 6,500.006,500.00MOVILIZACION Y DESMOVILIZACION0232970002 GLB300.8460 10,529.61 10,529.6135.00HORMIGON0238000000 m3965.8510 17,095.56 17,103.1317.70AGUA0239050000 m3
1.0000 385.04 385.04385.04SUMINISTRO E INSTALACION DE CARTEL D EOBRA BANNER
0239130018 GLB
1.0000 3,500.00 3,500.003,500.00MANTENIMIENTO DE TRANSITO0239900075 GLB100.0000 3,000.00 3,000.0030.00ARBOL0243160053 und
71.1004 277.29 284.403.90ESTACA DE MADERA0244010000 p24,050.0140 21,505.57 21,513.515.31MADERA TORNILLO INC.CORTE
P/ENCOFRADO0245010001 p2
20.0000 1,700.00 1,700.0085.00CAJA DE DESAGUE DE 12"X24"0250010000 und74.9997 877.50 881.9711.70MICROESFERAS DE VIDRIO0254220021 kg
5.0201 225.90 232.0745.00XILOL0254440080 gln8.7353 524.12 524.1260.00PINTURA TRAFICO0254450100 gln
100.0000 1,450.00 1,450.0014.50TUBERIA PVC SAP A-10 DE 1/2"0272010004 m17.8087 80.32 80.404.51TUBERIA PVC SAP PRESION PARA AGUA C-5
EC DE 2''0272010012 m
100.0000 1,930.00 1,930.0019.30TUBERIA PVC SAL 6"0273010033 m2,213.5050 18,814.79 18,825.338.50GRASS AMERICANO0286010001 m2
498,099.17497,964.08EQUIPOS
35.5502 533.25 533.2515.00MIRAS Y JALONES0337540001 hm48.5384 1,456.15 1,456.1530.00EQUIPO DE PINTURA0337900050 hm27.2000 481.44 481.4417.70MEZCLADORA CONCRETO TAMBOR 11 P3-18
HP0348010008 hm
62.0700 8,565.66 8,548.29138.00CAMION CISTERNA 4x2 (AGUA) 122 HP 1,5000348040001 hm34.1282 4,266.02 4,266.02125.00CAMION VOLQUETE 7 M3.0348040032 hm
275.5428 38,575.99 38,575.99140.00VOLQUETE DE 10 M30348110004 hm614.0346 9,210.52 9,208.8015.00COMPACTADOR VIBR. TIPO PLANCHA 4 HP0349030001 hm114.7649 1,721.47 1,719.3215.00COMPACTADOR VIBR. TIPO PLANCHA 5.8 HP0349030003 hm
56.8804 6,825.65 6,825.64120.00RODILLO LISO VIBR AUTOP 101-135HP 10-12T0349030007 hm11.3761 1,444.76 1,457.56127.00RODILLO NEUMATICO AUTOP. 127 HP 8-23
TON0349030018 hm
16/03/2012 11:48:34a.m.Fecha :
-
2Pgina :S10
Precios y cantidades de recursos requeridos por tipoObra CONSTRUCCION DE VEREDAS Y PAVIMENTO CALLES 1,2,3,4,5,6,8,9,11,12,13,AA.HH.
CAJUCA II.DISTRITO DE NAZCA, PROVINCIA DE NAZCA-ICA1301001
Subpresupuesto 001 CONSTRUCCION DE VEREDAS Y PAVIMENTO CALLES 1,2,3,4,5,6,8,9,11,12,13,AA.HH. CAJUCA II.DISTRITO DE NAFecha 01/12/2011
ICA - NAZCA - NAZCALugar 110301
Cdigo CantidadUnidadRecurso Parcial S/.resupuestado S/.Precio S/.
11.3761 1,023.85 1,030.9690.00RODILLO TANDEM ESTATIC AUT 58-70HP 8-10T
0349030043 hm
6.3990 644.38 639.90100.70TRACTOR DE TIRO MF 265 DE 63 HP0349030061 hm91.8476 11,021.71 11,021.71120.00CARGADOR S/LLANTAS 125 HP 2.5 YD3.0349040009 hm24.6788 6,169.70 6,174.32250.00TRACTOR DE ORUGAS DE 190-240 HP0349040034 hm
6.3990 906.10 888.76141.60BARREDORA MECANICA 10-20 HP 7 P.LONG.0349050003 hm11.3761 705.32 711.0062.00COCINA DE ASFALTO 320 GLNS0349050007 hm11.3761 1,649.53 1,635.31145.00PAVIMENTADORA SOBRE ORUGAS 69 HP
10-16'0349050008 hm
491.2968 3,684.73 3,696.557.50VIBRADOR DE CONCRETO 4 HP 2.40"0349070004 hm56.8804 7,963.26 7,963.24140.00MOTONIVELADORA DE 125 HP0349090000 hm
605.9528 10,725.36 10,710.6217.70MEZCLADORA CONCRETO TAMBOR 18HP 11P3
0349100007 hm
14.7882 1,814.51 1,816.17122.70RODILLO NEUMAT.AUTOP.127 HP0349110090 hm6.3990 1,151.82 1,137.61180.00CAMION IMPRIMIDOR 6x2 178-210 HP 1,800 G0349130004 hm4.0000 712.00 712.00178.00GRUA HIDRAULICA AUTOP. 127HP 18TON-9M.0349180010 hm
35.5502 355.50 355.5010.00TEODOLITO0349190001 hm2.6660 20.00 20.007.50VIBRADOR DE 4 HP CAB.=2.40"0349520003 hm
121,586.11121,628.68
La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizando
Total S/.
S/.
948,696.93 948,753.54
948,753.54
16/03/2012 11:48:34a.m.Fecha :