1 de 42 PROYECTO DE EXPANSIÓN DEL AEROPUERTO INTERNACIONAL JORGE CHAVEZ AL AÑO 2008 REPORTE DE AVANCE - CURVA S Projecto : OBRAS CIVILES Y SERVICIOS ENTERRADOS ESPIGON NORTE Y TERMINAL SUR Contrato No: CR2868-C01-03.06.00 Contratista : AVANZIT PERU S.A.C. Semana: 02/06/2008 al 08/06/2008 Item Peso Avance físico % SEMANA No. Descripción Prog Real 11/02/08 10/03/08 17/03/08 24/03/08 31/03/08 07/04/08 14/04/08 21/04/08 28/04/08 05/05/08 12/05/08 19/05/08 26/05/08 02/06/08 09/06/08 16/06/08 23/06/08 30/06/08 07/07/08 14/07/08 1 TRABAJOS PRELIMINARES 1002.7 1.65% 90.00% 49.51% 0.82% Prog. 0.00% 10.00% 20.00% 40.00% 45.00% 50.00% 55.00% 60.00% 65.00% 70.00% 75.00% 80.00% 85.00% 90.00% 92.50% 100.00% 100.00% 100.00% 100.00% 100.00% ESPIGON NORTE Real 0.00% 1.00% 3.70% 6.16% 6.51% 6.60% 7.96% 8.45% 19.00% 28.00% 37.00% 39.62% 45.57% 49.51% PRIMER NIVEL Proy. 8.40% 30.00% 40.00% 50.00% 60.00% 70.00% 80.00% 90.00% 95.00% 98.00% 98.00% 98.00% 98.00% 2 ZAPATAS 1279.5 2.11% 100.00% 100.00% 2.1% Prog. 10.00% 50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Real 5.00% 17.47% 40.67% 63.50% 95.36% 97.70% 97.70% 97.70% 97.70% 97.87% 97.87% 100.00% Proy. 97.65% 100.00% 100.00% 100.00% 100.00% 97.87% 97.87% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 3 COLUMNAS 2023.6 3.33% 100.00% 100.00% 3.33% Prog. 2.00% 8.00% 15.00% 45.00% 60.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Real 2.10% 4.01% 11.08% 19.47% 49.56% 86.45% 89.00% 92.00% 95.00% 100.00% 100.00% 100.00% Proy. 86.30% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 4 LOSA Y VIGAS 11187.5 18.43% 100.00% 82.99% 15.3% Prog. 7.00% 24.00% 41.00% 59.00% 77.00% 94.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Real 0.00% 0.91% 12.00% 24.00% 36.00% 51.52% 68.95% 82.99% Proy. 1.00% 15.80% 42.50% 58.90% 76.80% 70.00% 85.00% 95.00% 100.00% 100.00% 100.00% 100.00% 100.00% 5 MUROS 1437.5 2.37% 100.00% 0.21% 0.0% Prog. 0.21% 8.00% 67.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Real 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.21% Proy. 0.00% 15.00% 30.00% 50.00% 65.00% 85.00% 95.00% 100.00% 6 LOSA DE PISO Y SOBRECIMIENTOS 1543.1 2.54% 100.00% 0.00% 0.00% Prog. 0.00% 0.00% 5.00% 10.00% 10.00% 10.00% 10.00% 30.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Real 8.01% 21.21% 21.21% 21.21% 21.21% 0.00% 0.00% 0.00% SEGUNDO NIVEL Proy. 21.00% 16.90% 21.50% 21.50% 21.50% 0.00% 30.00% 60.00% 90.00% 100.00% 100.00% 100.00% 100.00% 7 COLUMNAS 1715.9 2.83% 100.00% 64.29% 1.8% Prog. 8.00% 26.00% 44.00% 62.00% 80.00% 95.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Real 1.31% 1.95% 7.00% 11.00% 16.00% 21.43% 51.08% 64.29% Proy. 1.95% 5.70% 12.80% 48.90% 73.40% 35.00% 50.00% 65.00% 83.00% 100.00% 100.00% 100.00% 100.00% 8 LOSA Y VIGAS 9871.8 16.26% 76.00% 12.02% 2.0% Prog. 7.00% 23.00% 40.00% 58.00% 76.00% 96.10% 100.00% 100.00% 100.00% 100.00% 100.00% Real 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 12.02% Proy. 1.20% 15.60% 25.60% 0.00% 15.00% 30.00% 45.00% 60.00% 80.00% 90.00% 100.00% 9 MUROS Y PARAPETOS 1326.9 2.19% 0.00% 0.00% 0.0% Prog. 0.00% 0.00% 31.20% 69.40% 69.40% 69.40% 69.40% Real 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Proy. 0.00% 0.00% 0.00% 0.00% 15.00% 30.00% 50.00% 70.00% 10 REMODELACION C8-C9/4C - CONST. 3182.5 5.24% 77.00% 0.00% 0.0% Prog. 3.00% 21.00% 39.00% 39.00% 39.00% 77.00% 96.00% 100.00% 100.00% 100.00% 100.00% 100.00% ESCALERAS Y POZOS ASCENSOR Real 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Proy. 1.60% 18.70% 35.90% 48.90% 10.00% 20.00% 40.00% 60.00% 80.00% 100.00% 100.00% 100.00% 11 CONSTRUCCION BASES PLBs Y POSTES 770.98 1.27% 100.00% 58.27% 0.74% Prog. 5.00% 5.00% 10.00% 15.00% 30.00% 65.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Real 25.14% 30.45% 35.00% 45.00% 55.00% 65.32% 49.09% 58.27% Proy. 30.00% 25.14% 30.30% 50.60% 65.60% 80.00% 90.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 12 SERVICIOS ENTERRADOS 12767.5 21.03% 99.00% 0.70% 0.148% Prog. 6.00% 15.00% 28.00% 43.00% 58.00% 73.00% 86.00% 95.00% 98.00% 99.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Real 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.70% 0.04% 0.04% 0.70% TERMINAL SUR Proy. 0.04% 1.50% 8.90% 19.80% 25.90% 0.00% 10.00% 20.00% 45.00% 60.00% 75.00% 85.00% 100.00% 13 ZAPATAS 4090.4 6.74% 100.00% 59.9% 4.0% Prog. 3.00% 25.00% 70.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Real 0.00% 16.84% 33.02% 49.19% 50.00% 50.81% 50.90% 59.91% Proy. 19.11% 78.60% 100.00% 100.00% 100.00% 50.81% 65.00% 85.00% 100.00% 100.00% 100.00% 100.00% 100.00% 14 LOSA DE PISO 1150.6 1.90% 100.00% 0.00% 0.0% Prog. 57.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Real 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Proy. 15.60% 38.10% 0.00% 0.00% 0.00% 0.00% 15.00% 40.00% 70.00% 100.00% 15 COLUMNAS 2868.2 4.72% 100.00% 53.87% 2.5% Prog. 35.00% 70.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Real 2.60% 2.76% 3.30% 26.65% 50.00% 50.00% 53.87% Proy. 2.40% 8.90% 46.80% 100.00% 100.00% 50.00% 60.00% 75.00% 90.00% 100.00% 100.00% 100.00% 100.00% 16 VIGAS /LOSA 3989.3 6.57% 100.00% 5.52% 0.4% Prog. 18.00% 62.00% 95.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Real 0.00% 0.00% 0.00% 0.63% 5.52% Proy. 15.90% 36.80% 75.60% 5.00% 15.00% 35.00% 60.00% 80.00% 90.00% 95.00% 100.00% 17 MUROS Y PARAPETOS 500.7 0.82% 100.00% 0.00% 0.0% Prog. 3.00% 26.00% 49.00% 72.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Real 0.00% 0.00% 0.00% 0.00% 0.00% Proy. 30.50% 0.00% 0.00% 0.00% 0.00% 0.00% 25.00% 55.00% 85.00% TOTAL 60708.9 100.0% 33.16% Programado - Avance físico % 0.0% 0.2% 0.6% 2.0% 6.1% 13.7% 23.6% 36.9% 46.6% 58.5% 71.1% 80.4% 86.9% 92.3% 96.8% 98.5% 99.3% 99.3% 99.3% 99.3% Real - Avance físico % 0.0% 0.02% 0.24% 0.60% 1.33% 2.10% 4.36% 7.50% 11.10% 14.91% 18.94% 22.77% 26.76% 33.16% Proyectado - Avance físico % 0.0% 0.02% 0.24% 0.60% 1.33% 2.10% 4.36% 7.50% 11.10% 14.91% 18.94% 22.77% 28.10% 39.85% 52.53% 67.38% 77.57% 87.16% 92.71% 99.19% HH total contractual Avance físico del total % go de cost

description

va

Transcript of Plan Semana 12

1 de 24

PROYECTO DE EXPANSIÓN DEL AEROPUERTO INTERNACIONAL JORGE CHAVEZ AL AÑO 2008REPORTE DE AVANCE - CURVA S

Projecto : OBRAS CIVILES Y SERVICIOS ENTERRADOS ESPIGON NORTE Y TERMINAL SUR

Contrato No: CR2868-C01-03.06.00

Contratista : AVANZIT PERU S.A.C.

Semana: 02/06/2008 al 08/06/2008

ItemPeso

Avance físico % SEMANA

No. Descripción Prog Real 11/02/08 10/03/08 17/03/08 24/03/08 31/03/08 07/04/08 14/04/08 21/04/08 28/04/08 05/05/08 12/05/08 19/05/08 26/05/08 02/06/08 09/06/08 16/06/08 23/06/08 30/06/08 07/07/08 14/07/08 21/07/08 28/07/08

1 TRABAJOS PRELIMINARES 1002.7 1.65% 90.00% 49.51% 0.82% Prog. 0.00% 10.00% 20.00% 40.00% 45.00% 50.00% 55.00% 60.00% 65.00% 70.00% 75.00% 80.00% 85.00% 90.00% 92.50% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

ESPIGON NORTE Real 0.00% 1.00% 3.70% 6.16% 6.51% 6.60% 7.96% 8.45% 19.00% 28.00% 37.00% 39.62% 45.57% 49.51%

PRIMER NIVEL Proy. 8.40% 30.00% 40.00% 50.00% 60.00% 70.00% 80.00% 90.00% 95.00% 98.00% 98.00% 98.00% 98.00% 98.00% 100.00%

2 ZAPATAS 1279.5 2.11% 100.00% 100.00% 2.1% Prog. 10.00% 50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 5.00% 17.47% 40.67% 63.50% 95.36% 97.70% 97.70% 97.70% 97.70% 97.87% 97.87% 100.00%

Proy. 97.65% 100.00% 100.00% 100.00% 100.00% 97.87% 97.87% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

3 COLUMNAS 2023.6 3.33% 100.00% 100.00% 3.33% Prog. 2.00% 8.00% 15.00% 45.00% 60.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 2.10% 4.01% 11.08% 19.47% 49.56% 86.45% 89.00% 92.00% 95.00% 100.00% 100.00% 100.00%

Proy. 86.30% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

4 LOSA Y VIGAS 11187.5 18.43% 100.00% 82.99% 15.3% Prog. 7.00% 24.00% 41.00% 59.00% 77.00% 94.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.91% 12.00% 24.00% 36.00% 51.52% 68.95% 82.99%

Proy. 1.00% 15.80% 42.50% 58.90% 76.80% 70.00% 85.00% 95.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

5 MUROS 1437.5 2.37% 100.00% 0.21% 0.0% Prog. 0.21% 8.00% 67.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.21%

Proy. 0.00% 15.00% 30.00% 50.00% 65.00% 85.00% 95.00% 100.00% 100.00% 100.00%

6 LOSA DE PISO Y SOBRECIMIENTOS 1543.1 2.54% 100.00% 0.00% 0.00% Prog. 0.00% 0.00% 5.00% 10.00% 10.00% 10.00% 10.00% 30.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 8.01% 21.21% 21.21% 21.21% 21.21% 0.00% 0.00% 0.00%

SEGUNDO NIVEL Proy. 21.00% 16.90% 21.50% 21.50% 21.50% 0.00% 30.00% 60.00% 90.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

7 COLUMNAS 1715.9 2.83% 100.00% 64.29% 1.8% Prog. 8.00% 26.00% 44.00% 62.00% 80.00% 95.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 1.31% 1.95% 7.00% 11.00% 16.00% 21.43% 51.08% 64.29%

Proy. 1.95% 5.70% 12.80% 48.90% 73.40% 35.00% 50.00% 65.00% 83.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

8 LOSA Y VIGAS 9871.8 16.26% 76.00% 12.02% 2.0% Prog. 7.00% 23.00% 40.00% 58.00% 76.00% 96.10% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 12.02%

Proy. 1.20% 15.60% 25.60% 0.00% 15.00% 30.00% 45.00% 60.00% 80.00% 90.00% 100.00% 100.00% 100.00%

9 MUROS Y PARAPETOS 1326.9 2.19% 0.00% 0.00% 0.0% Prog. 0.00% 0.00% 31.20% 69.40% 69.40% 69.40% 69.40% 69.40% 100.00%

Real 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Proy. 0.00% 0.00% 0.00% 0.00% 15.00% 30.00% 50.00% 70.00% 90.00% 100.00%

10 REMODELACION C8-C9/4C - CONST. 3182.5 5.24% 77.00% 0.00% 0.0% Prog. 3.00% 21.00% 39.00% 39.00% 39.00% 77.00% 96.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

ESCALERAS Y POZOS ASCENSOR Real 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Proy. 1.60% 18.70% 35.90% 48.90% 10.00% 20.00% 40.00% 60.00% 80.00% 100.00% 100.00% 100.00% 100.00% 100.00%

11 CONSTRUCCION BASES PLBs Y POSTES 770.98 1.27% 100.00% 58.27% 0.74% Prog. 5.00% 5.00% 10.00% 15.00% 30.00% 65.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 25.14% 30.45% 35.00% 45.00% 55.00% 65.32% 49.09% 58.27%

Proy. 30.00% 25.14% 30.30% 50.60% 65.60% 80.00% 90.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

12 SERVICIOS ENTERRADOS 12767.5 21.03% 99.00% 0.70% 0.148% Prog. 6.00% 15.00% 28.00% 43.00% 58.00% 73.00% 86.00% 95.00% 98.00% 99.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.70% 0.04% 0.04% 0.70%

TERMINAL SUR Proy. 0.04% 1.50% 8.90% 19.80% 25.90% 0.00% 10.00% 20.00% 45.00% 60.00% 75.00% 85.00% 100.00% 100.00% 100.00%

13 ZAPATAS 4090.4 6.74% 100.00% 59.9% 4.0% Prog. 3.00% 25.00% 70.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 16.84% 33.02% 49.19% 50.00% 50.81% 50.90% 59.91%

Proy. 19.11% 78.60% 100.00% 100.00% 100.00% 50.81% 65.00% 85.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

14 LOSA DE PISO 1150.6 1.90% 100.00% 0.00% 0.0% Prog. 57.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Proy. 15.60% 38.10% 0.00% 0.00% 0.00% 0.00% 15.00% 40.00% 70.00% 100.00% 100.00% 100.00%

15 COLUMNAS 2868.2 4.72% 100.00% 53.87% 2.5% Prog. 35.00% 70.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 2.60% 2.76% 3.30% 26.65% 50.00% 50.00% 53.87%

Proy. 2.40% 8.90% 46.80% 100.00% 100.00% 50.00% 60.00% 75.00% 90.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

16 VIGAS /LOSA 3989.3 6.57% 100.00% 5.52% 0.4% Prog. 18.00% 62.00% 95.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.00% 0.00% 0.63% 5.52%

Proy. 15.90% 36.80% 75.60% 5.00% 15.00% 35.00% 60.00% 80.00% 90.00% 95.00% 100.00% 100.00% 100.00%

17 MUROS Y PARAPETOS 500.7 0.82% 100.00% 0.00% 0.0% Prog. 3.00% 26.00% 49.00% 72.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.00% 0.00% 0.00% 0.00%Proy. 30.50% 0.00% 0.00% 0.00% 0.00% 0.00% 25.00% 55.00% 85.00% 100.00% 100.00%

TOTAL 60708.9 100.0% 33.16%

Programado - Avance físico % 0.0% 0.2% 0.6% 2.0% 6.1% 13.7% 23.6% 36.9% 46.6% 58.5% 71.1% 80.4% 86.9% 92.3% 96.8% 98.5% 99.3% 99.3% 99.3% 99.3% 99.3% 100.0%

Real - Avance físico % 0.0% 0.02% 0.24% 0.60% 1.33% 2.10% 4.36% 7.50% 11.10% 14.91% 18.94% 22.77% 26.76% 33.16%

Proyectado - Avance físico % 0.0% 0.02% 0.24% 0.60% 1.33% 2.10% 4.36% 7.50% 11.10% 14.91% 18.94% 22.77% 28.10% 39.85% 52.53% 67.38% 77.57% 87.16% 92.71% 99.19% 99.75% 100.00%

HH total contractual

Avance físico del total %

Código de

costo

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2 de 24

PROYECTO DE EXPANSIÓN DEL AEROPUERTO INTERNACIONAL JORGE CHAVEZ AL AÑO 2008REPORTE DE AVANCE - CURVA S

Projecto : OBRAS CIVILES Y SERVICIOS ENTERRADOS ESPIGON NORTE Y TERMINAL SUR

Contrato No: CR2868-C01-03.06.00

Contratista : AVANZIT PERU S.A.C.

Semana: 02/06/2008 al 08/06/2008

HH - PROGRAMADAS

Staff y supervisión 10 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14

Obreros directos (Oo, Of, Pe, Op equi) - - 21 47 72 84 136 158 125 139 142 88 57 67 46 52 33 33 33 33 33 18

HH Total personalHH Directas programadas 0 100 269 834 2503 4608 6009 8061 5924 7184 7677 5619 3961 3304 2742 1002 11515 7554 4250 1508 507 406

HH Directas acumuladas - 100.3 369 1,203 3,706 8,314 14,323 22,385 28,308 35,492 43,169 48,788 52,749 56,053 58,795 59,796 60,303 60,303 60,303 60,303 60,303 60,709

% Completado del total 0% 0% 1% 2% 6% 14% 24% 37% 47% 58% 71% 80% 87% 92% 97% 98% 99% 99% 99% 99% 99% 100%

HH - REALES

Staff y supervisión 9 9 9 9 11 12 12 12 12 8 13 13 0 0 0 0 0 0 0 0

Obreros directos (Oo, Of, Pe, Op equi) 0 0 10 21 25 30 44 66 101 120 124 138 154 159 0 0 0 0 0 0 0 0

Total personal 0 0 19 30 34 39 55 78 113 132 136 146 167 172 0 0 0 0 0 0 0 0

HH Directas reales 0 0 312 1008 1091 1230 2509 3708 5400 6415.5 6629.0 6362 8529 6574 0 0 0 0 0 0 0 60709

HH Directas acumuladas 0 0 312 1320 2411 3641 6150 9858 15258 21674 28303 34664 43193 49767 0 0 0 0 0 0 0 60709

% Completado del total 0.00% 0.00% 0.51% 2.17% 3.97% 6.00% 10.13% 16.24% 25.13% 35.70% 47% 57% 71% 82% 0% 0% 0% 0% 0% 0% 0% 100%

HH - GANADAS

Staff y supervisiónObreros directos (Oo, Of, Pe, Op equi) 0 10 144 366 815 1277 2648 4550 6736 9052 11496 13825 16247 20132 0 0 0 0 0 0 0 0

HH Total personal 0 10 144 366 815 1277 2648 4550 6736 9052 11496 13825 16247 20132 0 0 0 0 0 0 0 0

HH Directas ganadas 0 10 134 223 449 462 1324 1949 2186 2316 2444 2328 2422 3885 0 0 0 0 0 0 0 0

HH Directas acumuladas 0 10 144 366 815 1277 2601 4550 6736 9052 11496 13825 16247 20132

% Completado del total 0.0% 0.0% 0.2% 0.6% 1.3% 2.1% 4.3% 7.50% 11.1% 14.9% 18.9% 22.8% 26.8% 33.2% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

CPI = 0.40 +

SPI = 0.36 7713.871717

3 de 24

PROYECTO DE EXPANSIÓN DEL AEROPUERTO INTERNACIONAL JORGE CHAVEZ AL AÑO 2008REPORTE DE AVANCE - CURVA S ESPIGON NORTE

Projecto : OBRAS CIVILES Y SERVICIOS ENTERRADOS ESPIGON NORTE Y TERMINAL SUR

Sub Projecto : Espigón Norte

Contrato No: CR2868-C01-03.06.00

Contratista : AVANZIT PERU S.A.C.

Semana: 02/06/2008 al 08/06/2008

ItemPeso

Avance físico % SEMANA

No. Descripción Prog Real 11/02/08 10/03/08 17/03/08 24/03/08 31/03/08 07/04/08 14/04/08 21/04/08 28/04/08 05/05/08 12/05/08 19/05/08 26/05/08 02/06/08 09/06/08 16/06/08 23/06/08 30/06/08 07/07/08 14/07/08 21/07/08 28/07/08

1 TRABAJOS PRELIMINARES 1002.7 2.84% 85.00% 55.500% 1.57% Prog. 0.00% 10.00% 20.00% 40.00% 45.00% 50.00% 55.00% 60.00% 65.00% 70.00% 75.00% 80.00% 85.00% 90.00% 92.50% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

ESPIGON NORTE Real 0.00% 1.00% 3.70% 6.16% 6.51% 6.60% 7.96% 10.42% 19.00% 28.00% 37.00% 48.00% 55.50% 55.50%

PRIMER NIVEL Proy. 8.40% 25.00% 35.00% 45.00% 55.00% 65.00% 70.00% 75.00% 80.00% 85.00% 90.00% 95.00% 100.00% 100.00% 100.00%

2 ZAPATAS 1279.5 3.62% 100.00% 100.000% 3.6% Prog. 10.00% 50.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 5.00% 17.47% 40.67% 63.50% 95.36% 97.70% 97.70% 97.70% 97.70% 97.87% 97.87% 100.00%

Proy. 97.60% 100.00% 100.00% 100.00% 100.00% 97.87% 97.87% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

3 COLUMNAS 2023.6 5.73% 100.00% 100.000% 5.73% Prog. 2.00% 8.00% 15.00% 45.00% 60.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 2.10% 4.01% 11.08% 19.47% 49.56% 86.45% 89.00% 92.00% 95.00% 100.00% 100.00% 100.00%

Proy. 86.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

4 LOSA Y VIGAS 11187.5 31.65% 100.00% 82.994% 26.3% Prog. 7.00% 24.00% 41.00% 59.00% 77.00% 94.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.91% 12.00% 24.00% 36.00% 51.52% 68.95% 82.99%

Proy. 1.00% 15.80% 42.50% 58.90% 76.80% 70.00% 85.00% 95.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

5 MUROS 1437.5 4.07% 100.00% 0.209% 0.0% Prog. 8.00% 67.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.00% 0.21%

Proy. 0.00% 15.00% 30.00% 50.00% 65.00% 85.00% 95.00% 100.00% 100.00% 100.00%

6 LOSA DE PISO Y SOBRECIMIENTOS 1543.1 4.37% 100.00% 0.000% 0.00% Prog. 0.00% 0.00% 5.00% 10.00% 10.00% 10.00% 10.00% 30.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 8.01% 21.21% 21.21% 21.21% 21.21% 0.00% 0.00% 0.00%

SEGUNDO NIVEL Proy. 18.60% 16.90% 21.50% 21.50% 21.50% 0.00% 30.00% 60.00% 90.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

7 COLUMNAS 1715.9 4.86% 100.00% 64.286% 3.1% Prog. 8.00% 26.00% 44.00% 62.00% 80.00% 95.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 1.31% 1.95% 7.00% 11.00% 16.00% 21.43% 51.08% 64.29%

Proy. 1.95% 5.70% 12.80% 48.90% 73.40% 35.00% 50.00% 65.00% 83.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

8 LOSA Y VIGAS 9871.8 27.93% 58.00% 12.020% 3.4% Prog. 7.00% 23.00% 40.00% 58.00% 76.00% 96.10% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.00% 12.02%

Proy. 1.20% 15.60% 25.60% 0.00% 15.00% 30.00% 45.00% 60.00% 80.00% 90.00% 100.00% 100.00% 100.00%

9 MUROS Y PARAPETOS 1326.9 3.75% 0.00% 0.000% 0.0% Prog. 0.00% 0.00% 0.00% 0.00% 31.20% 69.40% 69.40% 100.00% 100.00% 100.00% 100.00%

Real 0.00%

Proy. 0.00% 0.00% 0.00% 0.00% 0.00% 15.00% 30.00% 50.00% 70.00% 90.00% 100.00%

10 REMODELACION C8-C9/4C - CONST. 3182.5 9.00% 39.00% 0.000% 0.0% Prog. 3.00% 21.00% 39.00% 39.00% 39.00% 77.00% 96.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

ESCALERAS Y POZOS ASCENSOR Real 0.00% 0.00% 0.00%

Proy. 1.60% 18.70% 35.90% 48.90% 10.00% 20.00% 40.00% 60.00% 80.00% 100.00% 100.00% 100.00% 100.00% 100.00%

11 CONSTRUCCION BASES PLBs Y POSTES 771.0 2.18% 15.00% 58.274% 1.27% Prog. 5.00% 5.00% 10.00% 15.00% 30.00% 65.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 25.14% 30.45% 35.00% 45.00% 55.00% 65.32% 49.09% 58.27%

Proy. 30.00% 25.14% 30.30% 50.60% 65.60% 80.00% 90.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

TOTAL 35342.2 100.00% 44.95% Proy.

Programado - Avance físico % 0.0% 0.3% 1.0% 3.4% 8.0% 15.2% 22.3% 31.5% 38.6% 49.0% 60.8% 69.4% 78.6% 87.2% 94.6% 97.4% 98.9% 98.9% 100.0% 100.0% 100.0% 100.0%

Real - Avance físico % 0.0% 0.03% 0.41% 1.04% 2.29% 3.60% 7.48% 10.76% 15.00% 19.64% 24.32% 29.40% 36.22% 44.95%

Proyectado - Avance físico % 0.00% 0.03% 0.41% 1.04% 2.29% 3.60% 7.48% 10.76% 15.00% 19.64% 24.32% 29.40% 37.62% 50.46% 62.71% 73.42% 81.99% 90.89% 94.98% 98.87% 99.62% 100.00%

0.087

HH total contractual

Avance físico del total %

Código de costo

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

4 de 24

PROYECTO DE EXPANSIÓN DEL AEROPUERTO INTERNACIONAL JORGE CHAVEZ AL AÑO 2008REPORTE DE AVANCE - CURVA S

Projecto : OBRAS CIVILES Y SERVICIOS ENTERRADOS ESPIGON NORTE Y TERMINAL SUR

Contrato No: CR2868-C01-03.06.00

Contratista : AVANZIT PERU S.A.C.

Semana: 02/06/2008 al 08/06/2008

ItemPeso

Avance físico % SEMANA

No. Descripción Prog Real 11/02/08 10/03/08 17/03/08 24/03/08 31/03/08 07/04/08 14/04/08 21/04/08 28/04/08 05/05/08 12/05/08 19/05/08 26/05/08 02/06/08 09/06/08 16/06/08 23/06/08 30/06/08 07/07/08 14/07/08 21/07/08

Corte y demolicion de pavimentos 809.85 6.34% 100.00% 10.53% 0.668% Prog. 5.00% 21.00% 45.00% 85.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.04% 10.53%

Proy. 19.00% 53.00% 95.00% 0.00% 10.00% 20.00% 45.00% 60.00% 75.00% 85.00% 100.00% 100.00%

Excavacion de Estructuras 3661.79 28.68% 100.00% 0.13% 0.036% Prog. 2.00% 15.00% 20.00% 31.00% 42.00% 65.00% 85.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.00% 0.13%

Proy. 0.00% 8.00% 44.00% 72.00% 0.00% 10.00% 20.00% 45.00% 60.00% 75.00% 85.00% 100.00% 100.00%

Solado para tuberias 18.92 0.15% 100.00% 0.00% 0.000% Prog. 5.00% 14.00% 42.00% 71.00% 90.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.00%

Proy. 4.00% 19.00% 33.00% 0.00% 10.00% 20.00% 45.00% 60.00% 75.00% 85.00% 100.00% 100.00%

Tuberias y Ductos 5207.96 40.79% 100.00% 0.00% 0.000% Prog. 4.00% 11.00% 32.00% 49.00% 65.00% 90.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.00%

Proy. 9.00% 32.00% 0.00% 10.00% 20.00% 45.00% 60.00% 75.00% 85.00% 100.00% 100.00%

Concreto para ductos para buzones 1075.31 8.42% 100.00% 0.00% 0.000% Prog. 4.00% 21.00% 42.00% 65.00% 90.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.00%

Proy. 0.00% 0.00% 0.00% 0.00% 7.00% 0.00% 10.00% 20.00% 45.00% 60.00% 75.00% 85.00% 100.00% 100.00%

Relleno para Ductos y buzones 1603.61 12.56% 100.00% 0.00% 0.000% Prog. 4.00% 16.00% 35.00% 59.00% 71.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.00%

Proy. 9.00% 0.00% 10.00% 20.00% 45.00% 60.00% 75.00% 85.00% 100.00% 100.00%

Reposicion de pavimentos 390.09 3.06% 14.00% 0.00% 0.000% 14.00% 34.00% 56.00% 95.00% 100.00% 100.00% 100.00% 100.00%

0.00% 0.00%

0.00% 10.00% 20.00% 45.00% 60.00% 75.00% 85.00% 100.00% 100.00%

TOTAL 12767.5 100.0% 0.70%

Programado - Avance físico % 0.0% 0.0% 0.0% 0.0% 0.9% 5.6% 10.2% 18.8% 32.3% 48.9% 65.3% 84.8% 92.5% 97.4% 98.0% 98.7% 99.8% 100.0% 100.0% 100.0% 100.0%

Real - Avance físico % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.7% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Proyectado - Avance físico % 0.0% 0.0% 10.0% 20.0% 45.0% 60.0% 75.0% 85.0% 100.0% 100.0%

HH total contractual

Avance físico del total %

Código de costo

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

5 de 24

PROYECTO DE EXPANSIÓN DEL AEROPUERTO INTERNACIONAL JORGE CHAVEZ AL AÑO 2008REPORTE DE AVANCE - CURVA S TERMINAL SUR

Projecto : OBRAS CIVILES Y SERVICIOS ENTERRADOS ESPIGON NORTE Y TERMINAL SUR

Contrato No: CR2868-C01-03.06.00

Contratista : AVANZIT PERU S.A.C.

Semana: 02/06/2008 al 08/06/2008

ItemPeso

Avance físico % SEMANA

No. Descripción Prog Real 11/02/08 10/03/08 17/03/08 24/03/08 31/03/08 07/04/08 14/04/08 21/04/08 28/04/08 05/05/08 12/05/08 19/05/08 26/05/08 02/06/08 09/06/08 16/06/08 23/06/08 30/06/08 07/07/08 14/07/08 21/07/08 28/07/08

1 TRABAJOS PRELIMINARES 0.0 0.00% 90.00% 31.54% 0.00% Prog. 0.00% 10.00% 20.00% 40.00% 45.00% 50.00% 55.00% 60.00% 65.00% 70.00% 75.00% 80.00% 85.00% 90.00% 95.00% 98.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 2.70% 3.71% 4.72% 9.59% 14.46% 15.77% 31.54%

Proy. 2.70% 10.00% 20.00% 30.00% 40.00% 30.00% 50.00% 70.00% 80.00% 90.00% 100.00% 100.00% 100.00% 100.00% 100.00%

13 ZAPATAS 4090.4 32.47% 100.00% 59.91% 19.4% Prog. 3.00% 25.00% 70.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 16.84% 33.02% 49.19% 50.00% 50.81% 50.90% 59.91%

Proy. 16.80% 78.60% 100.00% 100.00% 100.00% 50.81% 65.00% 85.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

14 LOSA DE PISO 1150.6 9.13% 100.00% 0.00% 0.0% Prog. 57.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.00% 0.00%

Proy. 15.60% 38.10% 0.00% 0.00% 0.00% 0.00% 15.00% 40.00% 70.00% 100.00% 100.00% 100.00%

15 COLUMNAS 2868.2 22.76% 100.00% 53.87% 12.3% Prog. 35.00% 70.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 2.23% 2.76% 3.30% 26.65% 50.00% 50.00% 53.87%

Proy. 2.30% 8.90% 46.80% 100.00% 100.00% 50.00% 60.00% 75.00% 90.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

16 VIGAS /LOSA 3989.3 31.66% 100.00% 5.52% 1.7% Prog. 18.00% 62.00% 95.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.63% 5.52%

Proy. 15.90% 36.80% 75.60% 5.00% 15.00% 35.00% 60.00% 80.00% 90.00% 95.00% 98.00% 100.00% 100.00%

17 MUROS Y PARAPETOS 500.7 3.97% 100.00% 0.00% 0.0% Prog. 3.00% 26.00% 49.00% 72.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Real 0.00% 0.00% 0.00%

Proy. 30.50% 0.00% 0.00% 0.00% 0.00% 0.00% 25.00% 55.00% 70.00% 85.00% 100.00%

TOTAL 12599.2 100.0% 33.46%

Programado - Avance físico % 0.0% 0.0% 0.0% 0.0% 1.0% 8.1% 22.7% 45.6% 57.5% 70.2% 85.0% 96.4% 98.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

Real - Avance físico % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 5.97% 11.35% 16.72% 22.30% 27.88% 28.11% 33.46%

Proyectado - Avance físico % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 5.97% 11.35% 16.72% 22.30% 27.88% 29.46% 39.51% 55.75% 71.95% 81.93% 88.37% 93.89% 98.17% 99.40% 100.00%

HH total contractual

Avance físico del total %

Código de costo

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

document.xls / Avance Detallado ok 6 / 24

INFORME DE AVANCE DETALLADO

FECHA DE CORTE: 8-Jun-08 REALIZÓ: M. Espinoza

FECHA REPORTE: 9-Jun-08 REVISÓ: Juan C. Tokomuri

ITEM DESCRIPCION UND

% POND AVANCE REAL

ESPIGON NORTE1.00 TRABAJOS PRELIMINARES NORTE glb 1 0.56

03.01.00 Facilidades temporales, Transporte Horizontal y Vertical

03.01.00.01 Movilización y desmovilización 10.00% 50.00% 5.0% 0.05

03.01.00.02. Construccion y mantenimiento de facilidades 10.00% 100.00% 10.0% 0.10

03.01.00.03. Proteccion de instalaciones existentes 10.00% 40.00% 4.0% 0.04

03.01.00.04. Letreros de obra 10.00% 50.00% 5.0% 0.05

03.01.00.05. Obras preliminares de construccion 10.00% 50.00% 5.0% 0.05

03.01.00.06. Limpieza permanente y final de obra 15.00% 40.00% 6.0% 0.06

03.01.00.07. Transporte Horizontal y Vertical 15.00% 30.00% 4.5% 0.05

80.00% 39.5% 0.40

03.01.01. . Obras Preliminares y Demoliciones y Desmontajes03.01.01.01. Obras preliminares

03.01.01.01.01 Trazo y replanteo m2 20.00% 80.00% 16.0% 0.16

03.01.01.01.02 Proteccion de instalaciones existentes glb 0.00% 20.00% 0.0% 0.00

03.01.01.01.03 Señalizacion de seguridad glb 0.00% 25.00% 0.0% 0.00

03.01.01.01.05 Mov. y Desm. de Equipos glb 0.00% 20.00% 0.0% 0.00

03.01.01.01.06 Escalera de acceso p/obra mes 0.00% 100.00% 0.0% 0.00

20.00% 16.0% 0.16

100.00% 55.5% 0.56

PRIMER NIVEL2.00 ZAPATAS

03.01.02.03.01 Zapatas m3 201.57 201.57

03.01.02.03.01a Concreto f'c=320 Kg/cm2 C-IP - Zapa tas m3 22.80% 100.00% 22.8% 45.96

03.01.02.03.01b Acero de refuerzo kg 41.68% 100.00% 41.7% 84.01

03.01.02.03.01c Encofrado - Zapatas m2 27.55% 100.00% 27.6% 55.53

03.01.02.03.01g Aplicacion de pegamento epoxico m2 2.42% 100.00% 2.4% 4.88

03.01.02.03.01h Encofrado anillo para columnas m2 5.55% 100.00% 5.6% 11.19 100.00% 100.00% 201.57

3.00 COLUMNAS m3 84.62 84.62

03.01.02.03.05a Concreto f'c=320 Kg/cm2 C-I - Columnas Circulares m3 9.58% 100.00% 9.6% 8.11

03.01.02.03.05b Acero de refuerzo kg 38.35% 100.00% 38.4% 32.45

03.01.02.03.05c Encofrado-Columnas Circulares (incl tubería de drenaje pluvial 3") m2 49.11% 100.00% 49.1% 41.56

03.01.02.03.05d Empalme mecanico p/varilla de 1" und 2.96% 100.00% 3.0% 2.50 100.00% 100.00% 84.62

4.00 LOSA Y VIGAS4.01 Encofrado de Vigas y Losa m2 3143.54 2599.86

03.01.02.03.08 Losa Macisa03.01.02.03.08c Encofrado - Losa Maciza m2 77.63% 85.00% 66.0% 2,074.28

03.01.02.03.08d Encofrado tipo puente Ejes C6-C7/1C -4C mes 0.00% 50.00% 0.0% 0.00

Vigas - Estructura Principal03.01.02.03.10c Encofrado - Vigas Estructura Principal m2 19.67% 85.00% 16.7% 525.58

03.01.02.03.10d Escarificado superficial de viga m2 0.28% 0.00% 0.0% 0.00

03.01.02.03.19 Parapeto03.01.02.03.19c Encofrado y desencofrado - Parapeto m2 2.42% 0.00% 0.0% 0.00

100.00% 82.7% 2599.86

4.02 Acero de Vigas y Losa kg 69710.25 58821.16

03.01.02.03.08 Losa Maciza03.01.02.03.08b Acero de refuerzo kg 37.58% 85.00% 31.9% 22,267.55

03.01.02.03.10 Vigas - Estructura Principal03.01.02.03.10b Acero de refuerzo kg 61.69% 85.00% 52.4% 36,553.62

03.01.02.03.19 Parapeto03.01.02.03.19b Acero de refuerzo kg 0.73% 0.00% 0.0% 0.00

100.00% 84.4% 58821.16

4.03 Concreto en losas y Viga m3 510.46 410.31

03.01.02.03.08 Losa Maciza03.01.02.03.08a Concreto f'c=320 Kg/cm2 C-I - Losa Maciza m3 56.13% 80.38% 45.1% 230.31

03.01.02.03.10 Vigas - Estructura Pricipal03.01.02.03.10a Concreto f'c=320 Kg/cm2 C-I - Viga Estructura Principal m3 42.47% 80.38% 34.1% 174.26

03.01.02.03.10e Aplicacion de pegamento epoxico m2 1.40% 80.38% 1.1% 5.74 100.00% 80.4% 410.31

5.00 MUROS m2 980.20 2.05

03.01.02.03.11a Bloques concreto 19cm - Relleno completo en alveolo m2 4.02% 0.00% 0.0% 0.00

03.01.02.03.11b Bloques concreto 19cm - Relleno par cial cada 40cm en alveolo m2 22.43% 0.00% 0.0% 0.00

03.01.02.03.11c Bloques concreto 19cm - Relleno par cial cada 60cm en alveolo m2 17.19% 0.00% 0.0% 0.00

03.01.02.03.11g Escalerilla de refuerzo horiz. 4.80 mm diam. ml 14.15% 0.00% 0.0% 0.00

03.01.02.03.11h Angulo 6"x6"x150mmx3/16" A-36 galva nizado und 1.38% 0.00% 0.0% 0.00

03.01.02.03.11i Angulo 4"x4"x150mmx5/16" A-36 galvanizado und 8.93% 0.00% 0.0% 0.00

03.01.02.03.11j Platina 150x370x3/8" A-36 galvanizado und 2.08% 0.00% 0.0% 0.00

03.01.02.03.11l Perno expansion 1/2"x4.1/2" Kwik Bo lt 2 Galvanizado o similar und 5.82% 0.00% 0.0% 0.00

02/06/2008 al 08/06/2008

% AVANCE REAL

TOTAL AVANCE REAL

document.xls / Avance Detallado ok 7 / 24

INFORME DE AVANCE DETALLADO

FECHA DE CORTE: 8-Jun-08 REALIZÓ: M. Espinoza

FECHA REPORTE: 9-Jun-08 REVISÓ: Juan C. Tokomuri

ITEM DESCRIPCION UND

% POND AVANCE REAL02/06/2008 al 08/06/2008

% AVANCE REAL

TOTAL AVANCE REAL

03.01.02.03.11o Perno expansion 5/8"x4.3/4" Kwik Bo lt 2 Galvanizado o similar und 1.84% 0.00% 0.0% 0.00

03.01.02.03.11r Sello d/junta c/elastomerico y varilla de respaldo ml 0.90% 0.00% 0.0% 0.00

03.01.02.03.11s Sello d/junta c/cortafuego y lana mineral ml 11.79% 0.00% 0.0% 0.00

03.01.02.03.11t Dowell prof. 10cm p/varilla 5/8" und 6.36% 0.00% 0.0% 0.00

03.01.02.03.11w Angulo 8"x6"x150mmx3/16" A-36 galvanizado und 0.40% 0.00% 0.0% 0.00

03.01.02.03.11x Angulo 6"x4"x150mmx3/16" A-36 galvanizado und 0.62% 0.00% 0.0% 0.00

03.01.02.03.11z Escarificado de losa piso existente m2 2.09% 10.00% 0.2% 2.05 100.00% 0.2% 2.05

6.00 LOSA DE PISO Y SOBRECIMIENTOS m2 136.96 0.00

03.01.02.02.01 Concreto Pobre03.01.02.02.01a Concreto Pobre f'c=20 C-IP Kg/cm2 m3 36.64% 0.0% 0.0% 0.00

03.01.02.03.03 Sobrecimiento

03.01.02.03.03a Concreto f'c=320 Kg/cm2 C-IP - Sobrecimiento m3 0.40% 0.00% 0.0% 0.00

03.01.02.03.03b Acero de refuerzo kg 0.28% 0.00% 0.0% 0.00

03.01.02.03.03c Encofrado - Sobrecimiento m2 4.83% 0.00% 0.0% 0.00

03.01.02.03.07 Losa de Piso03.01.02.03.07a Concreto f'c= 320 kg/cm2 C-IP - Los a de Piso m3 13.54% 0.00% 0.0% 0.00

03.01.02.03.07b Acero de refuerzo kg 23.90% 0.00% 0.0% 0.00

03.01.02.03.07c Encofrado - Losa de Piso m2 1.61% 0.00% 0.0% 0.00

03.01.02.03.07d ml 0.14% 0.00% 0.0% 0.00

03.01.02.03.07e Junta de Aislamiento - Losa de Piso ml 1.51% 0.00% 0.0% 0.00

03.01.02.03.07h m2 0.96% 0.00% 0.0% 0.00

03.01.02.03.07i Concreto f'c=20 kg/cm2 para nivelac ion m3 2.30% 0.00% 0.0% 0.00

03.01.02.03.07k Aplicacion de pegamento epoxico m2 2.01% 0.00% 0.0% 0.00

03.01.02.03.07l Escarificado de losa de piso m2 11.88% 0.00% 0.0% 0.00 100.00% 0.00

SEGUNDO NIVEL7.00 COLUMNAS m3 69.23 44.51

03.01.02.03.05a Concreto f'c=320 Kg/cm2 C-I - Columnas Circulares m3 9.24% 64.29% 5.9% 4.11

03.01.02.03.05b Acero de refuerzo kg 37.01% 64.29% 23.8% 16.47

03.01.02.03.05c m2 47.39% 64.29% 30.5% 21.09

03.01.02.03.05f Doblado de acero de columnas 2do ni vel und 6.36% 64.29% 4.1% 2.83 100.00% 44.51

8.00 LOSA Y VIGAS8.01 Encofrado de Vigas y Losa m2 2743.63 410.35

03.01.02.03.08 Losa Macisa03.01.02.03.08c Encofrado - Losa Maciza m2 79.55% 15.00% 11.9% 327.38

03.01.02.03.08d Encofrado tipo puente Ejes C6-C7/1C -4C mes 0.00% 0.00% 0.0% 0.00

03.01.02.03.10 Vigas - Estructura Pricipal03.01.02.03.10c Encofrado - Vigas Estructura Princi pal m2 20.16% 15.00% 3.0% 82.97

03.01.02.03.10d Escarificado superficial de viga m2 0.29% 0.00% 0.0% 0.00 100.00% 410.35

8.02 Acero de Vigas y Losa kg 61818.53 6,464.24

03.01.02.03.08 Losa Maciza03.01.02.03.08b Acero de refuerzo kg 37.86% 3.00% 1.1% 702.13

03.01.02.03.10 Vigas - Estructura Principal03.01.02.03.10b Acero de refuerzo kg 62.14% 15.00% 9.3% 5,762.11

100.00% 6,464.24

8.03 Concreto en losas y Viga m3 452.67 0.00

03.01.02.03.08 Losa Maciza03.01.02.03.08a Concreto f'c=320 Kg/cm2 C-I - Losa Maciza m3 56.14% 0.00% 0.0% 0.00

03.01.02.03.10 Vigas - Estructura Pricipal03.01.02.03.10a Concreto f'c=320 Kg/cm2 C-I - Viga Estructura Principal m3 42.47% 0.00% 0.0% 0.00

03.01.02.03.10e Aplicacion de pegamento epoxico m2 1.39% 0.00% 0.0% 0.00 100.00% 0.00

9.00 MUROS Y PARAPETOS m2 869.24 0.00

03.01.02.03.11a Bloques concreto 19cm - Relleno completo en alveolo m2 4.02% 0.00% 0.0% 0.00

03.01.02.03.11b Bloques concreto 19cm - Relleno par cial cada 40cm en alveolo m2 22.43% 0.00% 0.0% 0.00

03.01.02.03.11c Bloques concreto 19cm - Relleno par cial cada 60cm en alveolo m2 17.19% 0.00% 0.0% 0.00

03.01.02.03.11g Escalerilla de refuerzo horiz. 4.80 mm diam. ml 14.15% 0.00% 0.0% 0.00

03.01.02.03.11h Angulo 6"x6"x150mmx3/16" A-36 galva nizado und 1.38% 0.00% 0.0% 0.00

03.01.02.03.11i Angulo 4"x4"x150mmx5/16" A-36 galvanizado und 8.93% 0.00% 0.0% 0.00

03.01.02.03.11j Platina 150x370x3/8" A-36 galvanizado und 2.08% 0.00% 0.0% 0.00

03.01.02.03.11l Perno expansion 1/2"x4.1/2" Kwik Bo lt 2 Galvanizado o similar und 5.82% 0.00% 0.0% 0.00

03.01.02.03.11o Perno expansion 5/8"x4.3/4" Kwik Bo lt 2 Galvanizado o similar und 1.84% 0.00% 0.0% 0.00

03.01.02.03.11r Sello d/junta c/elastomerico y varilla de respaldo ml 0.90% 0.00% 0.0% 0.00

03.01.02.03.11s Sello d/junta c/cortafuego y lana mineral ml 11.78% 0.00% 0.0% 0.00

Junta de Contracci「n - Losa de Piso

Manta plastica 0.45mm entre losa nueva y concreto pobre o pavimento ex.

Encofrado - Columnas Circulares (incluye tubería de drenaje pluvial 3")

document.xls / Avance Detallado ok 8 / 24

INFORME DE AVANCE DETALLADO

FECHA DE CORTE: 8-Jun-08 REALIZÓ: M. Espinoza

FECHA REPORTE: 9-Jun-08 REVISÓ: Juan C. Tokomuri

ITEM DESCRIPCION UND

% POND AVANCE REAL02/06/2008 al 08/06/2008

% AVANCE REAL

TOTAL AVANCE REAL

03.01.02.03.11t Dowell prof. 10cm p/varilla 5/8" und 6.36% 0.00% 0.0% 0.00

03.01.02.03.11w Angulo 8"x6"x150mmx3/16" A-36 galvanizado und 0.40% 0.00% 0.0% 0.00

03.01.02.03.11x Angulo 6"x4"x150mmx3/16" A-36 galvanizado und 0.63% 0.00% 0.0% 0.00

03.01.02.03.11z Escarificado de losa piso existente m2 2.09% 0.00% 0.0% 0.00

100.00% 0.00

REMODELACION C8-C9/4C - CONST.ESCALERAS Y POZOS ASCENSOR

10.00 Demolicion, excavacion y eliminacion m2 152.92 0.00

03.01.01.02. Demoliciones y Desmontajes03.01.01.02.03 Demolicion de muros de bloques de concreto m2 16.91% 0.00% 0.0% 0.00

03.01.01.02.04 Demoliciones localizadas de estructuras m3 6.30% 0.00% 0.0% 0.00

03.01.01.02.05 Eliminación y Limpieza de material de demolición m3 1.18% 0.00% 0.0% 0.00

03.01.01.02.08 Rebajo de losa existente (hprom=10 cm) m3 12.28% 0.00% 0.0% 0.00

03.01.01.02.09 Demolicion de losa y desmontaje de plancha colaborante m2 8.31% 0.00% 0.0% 0.00

04.03.01.02. Demoliciones y Desmontajes

04.03.01.02.02 m2 37.00% 0.00% 0.0% 0.00

04.03.01.02.03 Demolicion de muros de bloques de concreto m2 16.10% 0.00% 0.0% 0.00

04.03.01.02.05 Eliminación y Limpieza de material de demolición m3 1.92% 0.00% 0.0% 0.00 100.00% 0.00

11.01 Acero de C8-C9/4C pozo, ascensor, escaleras, vigas y losa kg 5156.53 0.00

03.01.02.03.28 Losa Maciza ejes C8-C9 y 4C03.01.02.03.28e Acero de refuerzo kg 8.47% 0.00% 0.0% 0.0

03.01.02.03.29 Vigas ejes C8-C9 y 4C03.01.02.03.29b Acero de refuerzo kg 8.58% 0.00% 0.0% 0.0

03.01.02.03.29f Dowell prof. 40cm p/varilla 1" und 2.67% 0.00% 0.0% 0.0

03.01.02.03.14 Ascensor03.01.02.03.14b Acero de refuerzo kg 22.87% 0.00% 0.0% 0.0

03.01.02.03.15 Escalera03.01.02.03.15b Acero de refuerzo kg 39.73% 0.00% 0.0% 0.0

03.01.02.03.15f Dowell prof. 15cm p/varilla 5/8" und 6.24% 0.00% 0.0% 0.0

03.01.02.03.16 Cuarto de Maquinas03.01.02.03.16b Acero de refuerzo kg 3.36% 0.00% 0.0% 0.0

03.01.02.03.17 Pozo para escalera mecan ica03.01.02.03.17b Acero de refuerzo kg 4.53% 0.00% 0.0% 0.0

03.01.02.03.18 Pozo sub-estacion03.01.02.03.18b Acero de refuerzo kg 3.03% 0.00% 0.0% 0.0

03.01.02.03.27 Pedestales03.01.02.03.27b Acero de refuerzo kg 0.52% 0.00% 0.0% 0.0

100.00% 0.00

11.02 Encofrado de pozo, ascensor, escaleras, vigas y losa m2 648.01 0.00

03.01.02.03.28 Losa Maciza ejes C8-C9 y 4C03.01.02.03.28a Demolicion localizada de losa maciza m3 1.19% 0.00% 0.0% 0.0

03.01.02.03.28f Encofrado - Losa Maciza C8-C9 y 4C m2 11.52% 0.00% 0.0% 0.0

03.01.02.03.29 Vigas ejes C8-C9 y 4C03.01.02.03.29c Encofrado - Vigas ejes C8-C9 y 4C m2 2.72% 0.00% 0.0% 0.0

03.01.02.03.29d Escarificado superficial de viga m2 0.07% 0.00% 0.0% 0.0

03.01.02.03.14 Ascensor03.01.02.03.14c Encofrado y desencofrado - Ascensor m2 24.84% 0.00% 0.0% 0.0

03.01.02.03.15 Escalera03.01.02.03.15c Encofrado y desencofrado - Escalera m2 53.13% 0.00% 0.0% 0.0

03.01.02.03.15d Escarificado de apoyo de escalera m2 0.12% 0.00% 0.0% 0.0

03.01.02.03.16 Cuarto de Maquinas03.01.02.03.16c Encofrado y desencofrado - Cto. Máquinas m2 2.32% 0.00% 0.0% 0.0

03.01.02.03.17 Pozo para escalera mecánica03.01.02.03.17c Encofrado y desencofrado - Pozo p/escalera mecánicas m2 2.17% 0.00% 0.0% 0.0

03.01.02.03.18 Pozo sub-estacion

03.01.02.03.18c m2 1.58% 0.00% 0.0% 0.0

03.01.02.03.27 Pedestales03.01.02.03.27c Encofrado de pedestales m2 0.34% 0.00% 0.0% 0.0

100.00% 0.00

11.03 Concreto de pozo, ascensor, escaleras, vigas y losa m3 142.16 0.00

03.01.02.03.28 Losa Maciza ejes C8-C9 y 4C03.01.02.03.28b Eliminacion y Limpieza de material de demolicion m3 0.28% 0.00% 0.0% 0.0

03.01.02.03.28c Aplicacion de pegamento epoxico m2 1.65% 0.00% 0.0% 0.0

03.01.02.03.28d Concreto f'c=320 Kg/cm2 C-I - Losa Maciza ejes C8-C9 y 4C m3 9.14% 0.00% 0.0% 0.0

03.01.02.03.29 Vigas ejes C8-C9 y 4C03.01.02.03.29a Concreto f'c=320 Kg/cm2 C-I - Vigas ejes C8-C9 y 4C m3 5.79% 0.00% 0.0% 0.0

03.01.02.03.29e Aplicacion de pegamento epoxico m2 0.38% 0.00% 0.0% 0.0

03.01.02.03.14 Ascensor03.01.02.03.14a Concreto f'c=320 Kg/cm2 C-I - Ascen sor m3 32.11% 0.00% 0.0% 0.0

Desmontaje muros de drywall (incluye muro ubicado en C8/1C-4C - Esp. Norte)

Encofrado y desencofrado - Pozo sub Encofrado y desencofrado - Pozo sub

document.xls / Avance Detallado ok 9 / 24

INFORME DE AVANCE DETALLADO

FECHA DE CORTE: 8-Jun-08 REALIZÓ: M. Espinoza

FECHA REPORTE: 9-Jun-08 REVISÓ: Juan C. Tokomuri

ITEM DESCRIPCION UND

% POND AVANCE REAL02/06/2008 al 08/06/2008

% AVANCE REAL

TOTAL AVANCE REAL

03.01.02.03.15 Escalera03.01.02.03.15a Concreto f'c=320 Kg/cm2 C-I - Escal era m3 35.95% 0.00% 0.0% 0.0

03.01.02.03.15e Apliacion de pegamento epoxico m2 0.66% 0.00% 0.0% 0.0

03.01.02.03.16 Cuarto de Maquinas03.01.02.03.16a Concreto f'c=320 Kg/cm2 C-I - Cto. Maquinas m3 3.77% 0.00% 0.0% 0.0

03.01.02.03.17 Pozo para escalera mecanica03.01.02.03.17a Concreto f'c=320 Kg/cm2 C-IP - Pozo p/escalera mecanica m3 6.04% 0.00% 0.0% 0.0

03.01.02.03.18 Pozo sub-estacion03.01.02.03.18a Concreto f'c=320 Kg/cm2 C-IP - Pozo sub-estacion m3 3.94% 0.00% 0.0% 0.0

03.01.02.03.27 Pedestales03.01.02.03.27a Concreto f'c=320 kg/cm2 C-I - Pedes tal m3 0.29% 0.00% 0.0% 0.0

100.00% 0.00% 0.00

12.00 Construccion de bases para PLB y Postes m3 64.24 37.44

03.01.02.03.12 Base de rotonda (PLB)03.01.02.03.12d Acero de refuerzo kg 25.96% 100.00% 26.0% 16.68

03.01.02.03.12e Encofrado y desencofrado - Base de rotonda (PLB) m2 21.80% 70.00% 15.3% 9.80

03.01.02.03.12a Concreto pobre f'c=20 kg/cm2 C-IP - Sub-zapatas PLBs m3 8.63% 100.00% 8.6% 5.54

03.01.02.03.12b Concreto f'c=320 Kg/cm2 C-IP - Base de rotonda (PLB) m3 4.50% 100.00% 4.5% 2.89

03.01.02.03.12c Concreto f'c=320 Kg/cm2 C-I - Base de rotonda (PLB) m3 4.43% 0.00% 0.0% 0.00

03.01.02.03.12f Instalacion pernos de anclaje PLB's und 9.81% 40.00% 3.9% 2.52

03.01.02.03.12g Grout nivelante m2 1.32% 0.00% 0.0% 0.00

03.01.02.03.25 Base de Postes de Alumbrado03.01.02.03.25b Acero de refuerzo kg 13.49% 0.00% 0.0% 0.00

03.01.02.03.25c Encofrado - Base de Postes de Alumb rado m2 4.53% 0.00% 0.0% 0.00

03.01.02.03.25a Concreto f'c=320 Kg/cm2 C-IP - Base de Postes de Alumbrado m3 4.80% 0.00% 0.0% 0.00

03.01.02.03.25d Grout nivelante m2 0.73% 0.00% 0.0% 0.00

100.00% 58.27% 37.44

SERVICIOS ENTERRADOS13.00 Corte y demolicion de pavimentos 309.54 32.61

UT.EL ELECTRICODEMOLICIONES

UT.EL.10 Corte de losa de concreto ml 4.06% 25.00% 1.5% 4.60

UT.EL.12 Demolición de pavimento de concreto existente e=0.35m. m2 5.95% 25.00% 0.1% 0.39

UT.EL.13 Eliminación de material común m3 0.51% 0.00% 0.0% 0.00

BUZONES PROYECTADOS 0.00

UT.EL.36 Corte de losa de concreto ml 0.95% 0.00% 0.0% 0.00

UT.EL.38 Demolición de pavimento de concreto existente e=0.35m. m2 3.50% 0.00% 0.0% 0.00

UT.DE DESAGÜE 0.00

DEMOLICIONES 0.0% 0.00

UT.DE.10 Corte de losa de concreto ml 11.12% 0.00% 0.0% 0.00

UT.DE.12 Demolición de pavimento de concreto existente e=0.35m. m2 18.67% 0.00% 0.0% 0.00

UT.DE.13 Eliminación de material común m3 3.30% 0.00% 0.0% 0.00

BUZONES PROYECTADOS 0.00

UT.DE.32 Corte de losa de concreto ml 0.38% 0.00% 0.0% 0.00

UT.DE.34 Demolición de pavimento de concreto existente e=0.35m. m2 0.57% 0.00% 0.0% 0.00

TRAMPA DE GRASA 0.00

UT.DE.70 Corte de losa de concreto ml 0.21% 0.00% 0.0% 0.00

UT.DE.71 Demolición de pavimento de concreto existente e=0.35m. m2 0.29% 0.00% 0.0% 0.00

UT.AG AGUA 0.00

DEMOLICIONES 0.00

UT.AG.10 Corte de losa de concreto ml 0.27% 0.00% 0.0% 0.00

UT.AG.12 Demolición de pavimento de concreto existente e=0.35m. m2 0.78% 0.00% 0.0% 0.00

UT.AG.13 Eliminación de material común m3 0.07% 0.00% 0.0% 0.00

BUZONES PROYECTADOS 0.00

UT.AG.33 Corte de losa de concreto ml 0.03% 0.00% 0.0% 0.00

UT.AG.35 Demolición de pavimento de concreto existente e=0.35m. m2 0.08% 0.00% 0.0% 0.00

UT.CI CONTRAINCENDIO 0.00

DEMOLICIONES 0.00

UT.CI.09 Corte de asfalto ml 0.48% 0.00% 0.0% 0.00

UT.CI.10 Corte de losa de concreto ml 8.98% 75.00% 6.7% 20.85

UT.CI.11 Demolición de asfalto de e=4" m2 1.81% 0.00% 0.0% 0.00

UT.CI.12 Demolición de pavimento de concreto existente e=0.35m. m2 21.85% 10.00% 2.2% 6.76

UT.CI.13 Eliminación de material común m3 1.99% 0.00% 0.0% 0.00

BUZONES PROYECTADOS 0.00

UT.CI.31 Corte de losa de concreto ml 0.27% 0.00% 0.0% 0.00

UT.CI.33 Demolición de pavimento de concreto existente e=0.35m. m2 0.29% 0.00% 0.0% 0.00

UT.CO COMBUSTIBLE 0.00

DEMOLICIONES 0.00% 0.00% 0.0% 0.00

UT.CO.10 Corte de losa de concreto ml 1.90% 0.00% 0.0% 0.00

UT.CO.12 Demolición de pavimento de concreto existente e=0.35m. m2 5.76% 0.00% 0.0% 0.00

UT.CO.13 Eliminación de material común m3 0.47% 0.00% 0.0% 0.00

BUZONES PROYECTADOS 0.00

UT.CO.31 Corte de losa de concreto ml 1.70% 0.00% 0.0% 0.00

document.xls / Avance Detallado ok 10 / 24

INFORME DE AVANCE DETALLADO

FECHA DE CORTE: 8-Jun-08 REALIZÓ: M. Espinoza

FECHA REPORTE: 9-Jun-08 REVISÓ: Juan C. Tokomuri

ITEM DESCRIPCION UND

% POND AVANCE REAL02/06/2008 al 08/06/2008

% AVANCE REAL

TOTAL AVANCE REAL

UT.CO.33 Demolición de pavimento de concreto existente e=0.35m. m2 3.76% 0.00% 0.0% 0.00

100.00% 32.61

14.00 Excavacion de Estructuras m3 767.5 0.98

UT.EL ELECTRICO

OBRAS PROVISIONALES Y PRELIMINARES

UT.EL.02 Trazo y replanteo de obra m2 0.14% 90.00% 0.1% 1

MOVIMIENTO DE TIERRA

UT.EL.14 Excavación de zanja m3 5.38% 0.00% 0.0% 0

UT.EL.15 Excavación de zanja localizada m3 0.95% 0.00% 0.0% 0

UT.EL.16 Eliminación de material de excavación m3 0.41% 0.00% 0.0% 0

UT.EL.17 Perfilado y Compactación de subrasante m2 0.68% 0.00% 0.0% 0

BUZONES PROYECTADOS

UT.EL.39 Excavación m3 5.65% 0.00% 0.0% 0

UT.EL.40 Eliminación de material excedente m3 0.37% 0.00% 0.0% 0

UT.EL.41 Perfilado y Compactación de subrasante m2 0.40% 0.00% 0.0% 0

UT.DE DESAGÜE

MOVIMIENTO DE TIERRA

UT.DE.14 Excavación de zanja m3 17.97% 0.00% 0.0% 0

UT.DE.15 Excavación de zanja localizada m3 2.04% 0.00% 0.0% 0

UT.DE.16 Eliminación de material de excavación m3 1.30% 0.00% 0.0% 0

UT.DE.17 Perfilado y Compactación de subrasante m2 2.14% 0.00% 0.0% 0

UT.DE.18 Entibado (para profundidades mayores a 1.20) m2 17.36% 0.00% 0.0% 0

BUZONES PROYECTADOSUT.DE.35 Excavación m3 1.45% 0.00% 0.0% 0

UT.DE.36 Eliminación de material excedente m3 0.10% 0.00% 0.0% 0

UT.DE.37 Perfilado y Compactación de subrasante m2 0.11% 0.00% 0.0% 0

TRAMPA DE GRASAUT.DE.72 Excavación m3 0.40% 0.00% 0.0% 0

UT.DE.73 Eliminación de material excedente m3 0.03% 0.00% 0.0% 0

UT.DE.74 Perfilado y Compactación de subrasante m2 0.03% 0.00% 0.0% 0

UT.AG AGUAOBRAS PROVISIONALES Y PRELIMINARES

UT.AG.02 Trazo y replanteo de obra m2 0.02% 0.00% 0.0% 0

MOVIMIENTO DE TIERRAUT.AG.14 Excavación de zanja m3 0.56% 0.00% 0.0% 0

UT.AG.15 Excavación de zanja localizado m3 0.10% 0.00% 0.0% 0

UT.AG.16 Eliminación de material de excavación m3 0.05% 0.00% 0.0% 0

UT.AG.17 Perfilado y Compactación de subrasante m2 0.09% 0.00% 0.0% 0

BUZONES PROYECTADOS

UT.AG.36 Excavación m3 0.13% 0.00% 0.0% 0

UT.AG.37 Eliminación de material excedente m3 0.01% 0.00% 0.0% 0

UT.AG.38 Perfilado y Compactación de subrasante m2 0.01% 0.00% 0.0% 0

UT.CI CONTRAINCENDIO

MOVIMIENTO DE TIERRA

UT.CI.14 Excavación de zanja m3 22.61% 0.00% 0.0% 0

UT.CI.15 Eliminación de material de excavación m3 1.47% 0.00% 0.0% 0

UT.CI.16 Perfilado y Compactación de subrasante m2 2.71% 0.00% 0.0% 0

BUZONES PROYECTADOS 0

UT.CI.34 Excavación m3 0.32% 0.00% 0.0% 0

UT.CI.35 Eliminación de material excedente m3 0.03% 0.00% 0.0% 0

UT.CO COMBUSTIBLE

MOVIMIENTO DE TIERRA

UT.CO.14 Excavación de zanja m3 7.20% 0.00% 0.0% 0

UT.CO.15 Eliminación de material de excavación m3 0.45% 0.00% 0.0% 0

UT.CO.16 Perfilado y Compactación de subrasante m2 0.66% 0.00% 0.0% 0

BUZONES PROYECTADOS

UT.CO.34 Excavación m3 5.81% 0.00% 0.0% 0

UT.CO.35 Eliminación de material excedente m3 0.52% 0.00% 0.0% 0

UT.CO.36 Perfilado y Compactación de subrasante m2 0.32% 0.00% 0.0% 0 100.00% 1

15.00 Solado para tuberias M2 97.33 0

UT.EL ELECTRICO

MOVIMIENTO DE TIERRA

UT.EL.28 Solado e=0.05m. m2 51.25% 0.00% 0.0% 0

BUZONES PROYECTADOS

UT.EL.49 Solado e=0.05m. m2 16.30% 0.00% 0.0% 0

UT.DE DESAGÜE

BUZONES PROYECTADOS

UT.DE.47 Solado e=0.05m. m2 8.55% 0.00% 0.0% 0

UT.AG AGUA

BUZONES PROYECTADOS 0.0% 0

UT.AG.46 Solado e=0.05m. m2 0.33% 0.00% 0.0% 0

document.xls / Avance Detallado ok 11 / 24

INFORME DE AVANCE DETALLADO

FECHA DE CORTE: 8-Jun-08 REALIZÓ: M. Espinoza

FECHA REPORTE: 9-Jun-08 REVISÓ: Juan C. Tokomuri

ITEM DESCRIPCION UND

% POND AVANCE REAL02/06/2008 al 08/06/2008

% AVANCE REAL

TOTAL AVANCE REAL

UT.CO COMBUSTIBLE

BUZONES PROYECTADOS

UT.CO.47 Solado e=0.05m. m2 23.57% 0.00% 0.0% 0 100.00% 0

16.00 Tuberias y Ductos ML 741.87 0

UT.EL ELECTRICO

TUBERIAS

UT.EL.65 Tubería PVC f=100mm. ml 5.05% 0.00% 0.0% 0

UT.EL.66 Tubería PVC f=150mm. ml 6.61% 0.00% 0.0% 0

UT.DE DESAGÜE

TUBERIAS

UT.DE.65 Tubería PVC f=90mm.DN ml 0.25% 0.00% 0.0% 0

UT.DE.66 Tubería PVC f=110mm.DN ml 0.75% 0.00% 0.0% 0

UT.DE.67 Tubería PVC f=160mm.DN ml 0.49% 0.00% 0.0% 0

UT.DE.68 Tubería PVC f=200mm.DN ml 0.26% 0.00% 0.0% 0

UT.DE.69 Tubería PVC f=250mm.DN ml 0.01% 0.00% 0.0% 0

UT.AG AGUA

TUBERIAS

UT.AG.61 Tubería PVC f=90mm. ml 0.00% 0.00% 0.0% 0

UT.AG.62 Tubería PVC f=110mm. ml 0.12% 0.00% 0.0% 0

UT.CI CONTRAINCENDIO

TUBERIAS

UT.CI.81 Máquina de Termofusión (incluye operador) Dias 3.38% 0.00% 0.0% 0

UT.CI.82 und0.31% 0.00% 0.0% 0

UT.CI.83 und0.14% 0.00% 0.0% 0

UT.CI.84 und0.07% 0.00% 0.0% 0

UT.CI.85 ANILLO ADPATADOR D.I. CON APROBACION FM CLASE 200 10" und0.13% 0.00% 0.0% 0

UT.CI.86 ANILLO ADPATADOR D.I. CON APROBACION FM CLASE 200 6" und 0.09% 0.00% 0.0% 0

UT.CI.87 ANILLO ADPATADOR D.I. CON APROBACION FM CLASE 200 8" und 0.04% 0.00% 0.0% 0

UT.CI.88 BRIDA CIEGA , CLASE 150 DE 10" und 0.06% 0.00% 0.0% 0

UT.CI.89 BRIDA SOLDABLE TIPO ANILLO, CLASE 150 DE 6" und 0.02% 0.00% 0.0% 0

UT.CI.90 BRIDA SOLDABLE TIPO ANILLO, CLASE 150 DE 8" und 0.03% 0.00% 0.0% 0

UT.CI.91 BRIDA SOLDABLE TIPO ANILLO, CLASE 150 DE 10" und 0.08% 0.00% 0.0% 0

UT.CI.92 CODO HDPE CON APROBACION FM, CLASE 200 DE Ø10" x 45º und1.93% 0.00% 0.0% 0

UT.CI.93 CODO HDPE CON APROBACION FM, CLASE 200 DE Ø10" x 90º und0.64% 0.00% 0.0% 0

UT.CI.94 CODO HDPE CON APROBACION FM, CLASE 200 DE Ø8" x 90º und 0.42% 0.00% 0.0% 0

UT.CI.95 TEE HDPE FM APPROVED, CLASE 200 DE Ø10" und 0.27% 0.00% 0.0% 0

UT.CI.96 und0.40% 0.00% 0.0% 0

UT.CI.97 und0.22% 0.00% 0.0% 0

UT.CI.98 TUBO HDPE CON APROBACION FM, CLASE 200 DE 10" ml 64.98% 0.00% 0.0% 0

UT.CI.99 TUBO HDPE CON APROBACION FM, CLASE 200 DE 6" ml 5.36% 0.00% 0.0% 0

UT.CI.100 TUBO HDPE CON APROBACION FM, CLASE 200 DE 8" ml 6.44% 0.00% 0.0% 0

UT.CI.101 PRUEBA HIDRAULICA A TUBERIA CONTRA INCENDIOS ml 0.11% 0.00% 0.0% 0

UT.CI.102 HYDRANTE CONTRA INCENDIOS, ENTERRADO und 0.16% 0.00% 0.0% 0

UT.CI.103 VALVULA DE COMPUERTA TIPO OS&Y, CLASE 175 DE Ø10" und 0.08% 0.00% 0.0% 0

UT.CI.104 VALVULA DE COMPUERTA TIPO OS&Y, CLASE 175 DE Ø6" und 0.08% 0.00% 0.0% 0

UT.CI.105 und0.15% 0.00% 0.0% 0

UT.CO COMBUSTIBLE

TUBERIAS

UT.CO.67 Tubería PVC f=200mm.DN ml 0.84% 0.00% 0.0% 0 100% 0

17.00 Concreto para ductos para buzones M3 54.24 0

UT.EL ELECTRICO

BANCO DE DUCTOS NUEVOS

UT.EL.29 Concreto f'c=140 kg/cm2 m3 6.72% 0.00% 0.0% 0

UT.EL.30 Armaduras para ductos kg 9.68% 0.00% 0.0% 0

BUZONES PROYECTADOS

UT.EL.43 Encofrado m2 17.07% 0.00% 0.0% 0

UT.EL.44 Concreto f'c=320 kg/cm2 m3 2.79% 0.00% 0.0% 0

UT.EL.45 Acero kg 6.97% 0.00% 0.0% 0

UT.EL.46 Juntas ml 0.65% 0.00% 0.0% 0

UT.EL.50 Solaqueado m2 1.27% 0.00% 0.0% 0

JUNTAS

ADAPTADOR DE BRIDA HDPE CON APROBACION FM, CLASE 200 DE Ø10"

ADAPTADOR DE BRIDA HDPE CON APROBACION FM, CLASE 200 DE Ø6"

ADAPTADOR DE BRIDA HDPE CON APROBACION FM, CLASE 200 DE Ø8"

TEE REDUCTORA HDPE CON APROBACION FM, CLASE 200 DE Ø10" x 6"

TEE REDUCTORA HDPE CON APROBACION FM, CLASE 200 DE Ø10" x 8"

VALVULA DE COMPUERTA TIPO ENTERRADA, CLASE 175 DE Ø6", PARA HIDRANTE

document.xls / Avance Detallado ok 12 / 24

INFORME DE AVANCE DETALLADO

FECHA DE CORTE: 8-Jun-08 REALIZÓ: M. Espinoza

FECHA REPORTE: 9-Jun-08 REVISÓ: Juan C. Tokomuri

ITEM DESCRIPCION UND

% POND AVANCE REAL02/06/2008 al 08/06/2008

% AVANCE REAL

TOTAL AVANCE REAL

UT.EL.60 Juntas de sello ml 3.48% 0.00% 0.0% 0

UT.DE DESAGÜE

BUZONES PROYECTADOS

UT.DE.39 Encofrado m2 4.67% 0.00% 0.0% 0

UT.DE.40 Concreto f'c=320 kg/cm2 m3 0.80% 0.00% 0.0% 0

UT.DE.41 Acero kg 1.29% 0.00% 0.0% 0

UT.DE.42 Juntas ml 0.26% 0.00% 0.0% 0

UT.DE.43 Concreto para anclaje de tuberia en entrada y salida m3 0.29% 0.00% 0.0% 0

UT.DE.44 Encofrado para anclaje m2 0.09% 0.00% 0.0% 0

UT.DE.45 Conformacion de 1/2 caña con concreto simple f'c =140 kg /cm2 m3 0.32% 0.00% 0.0% 0

UT.DE.48 Solaqueado m2 0.23% 0.00% 0.0% 0

UT.DE.49 Escalera de gato und 0.00% 0.00% 0.0% 0

BUZONES REFORZADOS 0.0% 0

UT.DE.50 Cambio de tapas D400 a Tapas F900 und 0.00% 0.00% 0.0% 0

UT.DE.60 JUNTAS

UT.DE.61 Juntas de Sello ml 4.91% 0.00% 0.0% 0

TRAMPA DE GRASA

UT.DE.76 Concreto f'c=320 kg/cm2 m3 0.25% 0.00% 0.0% 0

UT.DE.77 Encofrado m2 1.70% 0.00% 0.0% 0

UT.DE.78 Acero kg 0.30% 0.00% 0.0% 0

UT.DE.79 Juntas ml 0.06% 0.00% 0.0% 0

UT.DE.80 Pantalla metalica demontable de .40x1.15 und 0.00% 0.00% 0.0% 0

UT.DE.81 Angulo de 2x"2"x5/16" en tapas demomtable kg 0.05% 0.00% 0.0% 0

Descripción por caja de registro 0.0% 0

UT.DE.83 Concreto m3 0.06% 0.00% 0.0% 0

UT.DE.84 Encofrado m2 0.77% 0.00% 0.0% 0

UT.DE.85 Acero de refuerzo kg 0.05% 0.00% 0.0% 0

UT.DE.86 Cemento pulido interior m2 0.05% 0.00% 0.0% 0

UT.AG AGUA

BUZONES PROYECTADOS

UT.AG.40 Encofrado m2 0.38% 0.00% 0.0% 0

UT.AG.41 Concreto f'c=320 kg/cm2 m3 0.06% 0.00% 0.0% 0

UT.AG.42 Acero kg 0.19% 0.00% 0.0% 0

UT.AG.43 Juntas ml 0.02% 0.00% 0.0% 0

UT.AG.47 Solaqueado m2 0.01% 0.00% 0.0% 0

UT.AG.48 Escalera de gato (tipo marinero) und 0.03% 0.00% 0.0% 0

UT.AG.48 Escalera de gato (tipo marinero) und 0.00% 0.00% 0.0% 0

JUNTAS

UT.AG.57 Juntas de sello ml 0.23% 0.00% 0.0% 0

UT.CI CONTRAINCENDIO

BUZONES PROYECTADOS

UT.CI.39 Concreto f'c=320 kg/cm2 m3 0.62% 0.00% 0.0% 0

UT.CI.40 Acero kg 0.77% 0.00% 0.0% 0

UT.CI.47 Solaqueado m2 0.37% 0.00% 0.0% 0

BUZONES REFORZADOS

UT.CI.49 Cambio de tapas D400 a Tapas F900 und 0.00% 0.00% 0.0% 0

UT.CO COMBUSTIBLE

JUNTAS

UT.CI.59 Juntas de de sello ml 8.37% 0.00% 0.0% 0

BUZONES PROYECTADOS

UT.CO.38 Encofrado (incluye Geomembrana HDPE 2.5mm) m2 4.81% 0.00% 0.0% 0

UT.CO.39 Concreto f'c=320 kg/cm2 m3 3.83% 0.00% 0.0% 0

UT.CO.40 Acero kg 10.08% 0.00% 0.0% 0

UT.CO.41 Juntas ml 0.13% 0.00% 0.0% 0

UT.CO.42 Concreto para anclaje de tuberia en entrada y salida m3 0.05% 0.00% 0.0% 0

UT.CO.43 Encofrado para anclaje m2 0.09% 0.00% 0.0% 0

UT.CO.44 Conformacion de 1/2 caña con concreto simple f'c =140 kg /cm2 m30.16% 0.00% 0.0% 0

UT.CO.45 Marco y tapa de Hierro fundido Ductil tipo F -900 und 0.0% 0

UT.CO.48 Solaqueado m2 1.12% 0.00% 0.0% 0

UT.CO.49 Escalera de gato (tipo marinero) und 0.15% 0.00% 0.0% 0

JUNTAS

UT.CO.60 Juntas de Sello ml 1.95% 0.00% 0.0% 0

CANALETA DE DRENAJE

UT.CO.82 Concreto f'c=320 kg/cm2 m3 0.26% 0.00% 0.0% 0

UT.CO.83 Encofrado m2 0.49% 0.00% 0.0% 0

UT.CO.84 Acero de refuerzo kg 1.07% 0.00% 0.0% 0

UT.CO.85 Rejilla para pase de tráfico pesado m2 0.00% 0.00% 0.0% 0 100.0% 0

18.00 RELLENO PARA DUCTOS Y BUZONES M3 394.6 0

UT.EL ELECTRICO

document.xls / Avance Detallado ok 13 / 24

INFORME DE AVANCE DETALLADO

FECHA DE CORTE: 8-Jun-08 REALIZÓ: M. Espinoza

FECHA REPORTE: 9-Jun-08 REVISÓ: Juan C. Tokomuri

ITEM DESCRIPCION UND

% POND AVANCE REAL02/06/2008 al 08/06/2008

% AVANCE REAL

TOTAL AVANCE REAL

MOVIMIENTO DE TIERRA

UT.EL.19 Relleno de Material Selecto m3 6.31% 0.00% 0.0% 0

UT.EL.26 Cinta Señalizadora ml 0.00% 0.00% 0.0% 0

UT.EL.27 Conductor de Cobre para puesta a Tierra de 120 mm2 ml 0.13% 0.00% 0.0% 0

BUZONES PROYECTADOS

UT.EL.42 m33.59% 0.00% 0.0% 0

UT.DE DESAGÜE

MOVIMIENTO DE TIERRA

UT.DE.19 Relleno de Material Selecto m3 18.95% 0.00% 0.0% 0

UT.DE.21 Relleno de arena gruesa m3 7.51% 0.00% 0.0% 0

UT.DE.22 Relleno de arena fina m3 1.42% 0.00% 0.0% 0

UT.DE.23 Relleno con concreto f'c=20kg/cm2 m3 7.77% 0.00% 0.0% 0

BUZONES PROYECTADOS

UT.DE.38 m30.86% 0.00% 0.0% 0

BUZONES A ANULAR

UT.DE.51 Relleno con concreto pobre m3 0.43% 0.00% 0.0% 0

TRAMPA DE GRASA

UT.DE.75 m30.30% 0.00% 0.0% 0

UT.AG AGUA

MOVIMIENTO DE TIERRA

UT.AG.21 Relleno de arena gruesa m3 0.69% 0.00% 0.0% 0

UT.AG.22 Relleno de arena fina m3 0.16% 0.00% 0.0% 0

UT.AG.23 Relleno con concreto f'c=20kg/cm2 m3 0.68% 0.00% 0.0% 0

UT.AG.26 Relleno con concreto MR=55kg/cm2 m3 0.25% 0.00% 0.0% 0

BUZONES PROYECTADOS

UT.AG.39 m30.09% 0.00% 0.0% 0

UT.CI CONTRAINCENDIO

MOVIMIENTO DE TIERRA

UT.CI.20 Relleno de arena gruesa m3 16.77% 0.00% 0.0% 0

UT.CI.21 Relleno de arena fina m3 4.07% 0.00% 0.0% 0

UT.CI.22 Relleno con concreto f'c=20kg/cm2 m3 18.42% 0.00% 0.0% 0

UT.CO COMBUSTIBLE

MOVIMIENTO DE TIERRA

UT.CO.20 Relleno de arena gruesa m3 4.08% 0.00% 0.0% 0

UT.CO.21 Relleno de arena fina m3 0.81% 0.00% 0.0% 0

UT.CO.22 Relleno con concreto f'c=20kg/cm2 m3 5.25% 0.00% 0.0% 0

BUZONES PROYECTADOS

UT.CO.37 m31.45% 0.00% 0.0% 0

100.00% 0

19.00 REPOSICION DE PAVIMENTOS 132.7 0

UT.EL ELECTRICO

PAVIMENTOS DE REPOSICIÓN

UT.EL.55 Concreto Mr=55 kg/cm2 m3 10.11% 0.00% 0.0% 0

UT.DE DESAGÜE

PAVIMENTOS DE REPOSICIÓN

UT.DE.53 Concreto Mr=55 kg/cm2 m3 19.17% 0.00% 0.0% 0

UT.DE.54 Encofrado m2 2.65% 0.00% 0.0% 0

UT.DE.55 Acero de refuerzo kg 10.54% 0.00% 0.0% 0

UT.CI CONTRAINCENDIO

PAVIMENTOS DE REPOSICIÓN

UT.CI.52 Concreto Mr=55 kg/cm2 m3 38.21% 0.00% 0.0% 0

UT.CI.53 Encofrado m2 8.89% 0.00% 0.0% 0

UT.CO COMBUSTIBLE

PAVIMENTOS DE REPOSICIÓN

UT.CO.53 Concreto Mr=55 kg/cm2 m3 9.67% 0.00% 0.0% 0

UT.CO.54 Encofrado m2 0.76% 0.00% 0.0% 0

100.00% 0

04.03. . . 0130 TERMINAL SUR GLB 1.00 0.32

04.03.00. . Facilidades temporales, Transporte Horizontal y Vertical04.03.00.01. Movilización y desmovilización glb 0.00% 50.00% 0.0% 0.00

04.03.00.02. Construcción y mantenimiento de facilidades glb 0.00% 100.00% 0.0% 0.00

04.03.00.03. Protección de instalaciones existentes glb 0.00% 25.00% 0.0% 0.00

04.03.00.04. Letreros de obra glb 0.00% 30.00% 0.0% 0.00

04.03.00.05. Obras preliminares de construcción glb 0.00% 0.00% 0.0% 0.00

04.03.00.06. Limpieza permanente y final de obra glb 0.00% 25.00% 0.0% 0.00

04.03.00.07. Transporte Horizontal y Vertical glb 73.83% 25.00% 18.5% 0.18

Relleno de sobreexcavación alrededor del buzon de concreto f'c=20kg/cm2

Relleno de sobreexcavación alrededor del buzon de concreto f'c=20kg/cm2

Relleno de sobreexcavación alrededor del buzon de concreto f'c=20kg/cm2

Relleno de sobreexcavación alrededor del buzon de concreto f'c=20kg/cm2

Relleno de sobreexcavación alrededor del buzon de concreto f'c=20kg/cm2

document.xls / Avance Detallado ok 14 / 24

INFORME DE AVANCE DETALLADO

FECHA DE CORTE: 8-Jun-08 REALIZÓ: M. Espinoza

FECHA REPORTE: 9-Jun-08 REVISÓ: Juan C. Tokomuri

ITEM DESCRIPCION UND

% POND AVANCE REAL02/06/2008 al 08/06/2008

% AVANCE REAL

TOTAL AVANCE REAL

04.03.01. . Obras Preliminares y Demoliciones y Desmontajes04.03.01.01. Obras preliminares

04.03.01.01.01 Trazo y replanteo m2 26.17% 50.00% 13.1% 0.13

04.03.01.01.02 Proteccion de instalaciones existentes glb 0.00% 15.00% 0.0% 0.00

04.03.01.01.03 Señalizacion de seguridad glb 0.00% 15.00% 0.0% 0.00

04.03.01.01.05 Mov. y Desm. de Equipos glb 0.00% 15.00% 0.0% 0.00

04.03.01.01.06 Escalera de acceso p/obra mes 0.00% 0.00% 0.0% 0.00 100.00% 31.5% 0.32

20.00 ZAPATAS M3 138.29 82.85

04.03.02.03.01 Zapatas

04.03.02.03.01a Concreto f'c=320 Kg/cm2 C-IP - Zapatas m3 2.57% 66.67% 1.7% 2.27

04.03.02.03.01b Acero de refuerzo kg 77.00% 66.67% 51.3% 68.13

04.03.02.03.01c Encofrado - Zapatas m2 3.26% 66.67% 2.2% 2.88

04.03.02.03.01d Empalme mecanico p/varilla de 5/8" und 0.81% 33.33% 0.3% 0.36

04.03.02.03.01e Empalme mecanico p/varilla de 3/4" und 1.88% 33.33% 0.6% 0.83

04.03.02.03.01f Escarificado de cimiento existente m2 0.37% 50.00% 0.2% 0.25

04.03.02.03.01g Aplicacion de pegamento epoxico m2 0.32% 33.33% 0.1% 0.14

04.03.02.03.02 Cimiento Corrido, Viga de Cimentación, Cimientos 0.0%

04.03.02.03.02a Concreto f'c=320 Kg/cm2 C-IP - Cimientos m3 2.34% 33.33% 0.8% 1.04

04.03.02.03.02b Acero de refuerzo kg 8.50% 50.00% 4.3% 5.64

04.03.02.03.02c Encofrado - Cimiento Corrido m2 2.95% 33.33% 1.0% 1.31

100.00% 62.42% 82.85

21.00 LOSA DE PISO M3 107.11 0.00

04.03.02.02.01 Concreto Pobre

04.03.02.02.01a Concreto Pobre f'c=20 C-IP Kg/cm2 m3 25.01% 0.00% 0.0% 0.00

04.03.02.03.03 Sobrecimiento

04.03.02.03.03a Concreto f'c=320 Kg/cm2 C-IP - Sobr ecimiento m3 0.36% 0.00% 0.0% 0.00

04.03.02.03.03b Acero de refuerzo kg 1.04% 0.00% 0.0% 0.00

04.03.02.03.03c Encofrado - Sobrecimiento m2 4.32% 0.00% 0.0% 0.00

04.03.02.03.07 Losa de Piso

04.03.02.03.07a Concreto f'c= 320 kg/cm2 C-IP - Los a de Piso m3 13.83% 0.00% 0.0% 0.00

04.03.02.03.07b Acero de refuerzo kg 20.23% 0.00% 0.0% 0.00

04.03.02.03.07c Encofrado - Losa de Piso m2 4.00% 0.00% 0.0% 0.00

04.03.02.03.07d Junta de Contracción - Losa de Piso ml 1.94% 0.00% 0.0% 0.00

04.03.02.03.07e Junta de Aislamiento - Losa de Piso ml 1.91% 0.00% 0.0% 0.00

04.03.02.03.07j Relleno selecto para nivelacion m3 27.36% 0.00% 0.0% 0.00

100.00% 0.00% 0.00

22.00 COLUMNAS M3 131.87 71.04

04.03.02.03.04a Concreto f'c=320 Kg/cm2 C-I - Columnas Cuadradas y Rectangulares m3 10.53% 50.00% 5.3% 6.94

04.03.02.03.04b Acero de refuerzo kg 46.44% 58.33% 27.1% 35.72

04.03.02.03.04c m2 43.03% 50.00% 21.5% 28.37

100.00% 53.87% 71.04

23.01 ACERO EN VIGAS Y LOSA kg 27,339.89 0.00

04.03.02.03.08b Acero de refuerzo en losa kg 32.08% 0.00% 0.0% 0.00

04.03.02.03.10b Acero de refuerzo en viga kg 66.74% 0.00% 0.0% 0.00

04.03.02.03.19b Acero de refuerzo parapeto kg 0.98% 0.00% 0.0% 0.00

04.03.02.03.19b Acero de refuerzo pedestales kg 0.20% 0.00% 0.0% 0.00

100.00% 0.00% 0.00

23.02 ENCOFRADO EN VIGAS Y LOSA M2 1,072.84 103.81

04.03.02.03.08c Encofrado - Losa Maciza m2 74.63% 10.00% 7.5% 80.07

04.03.02.03.10c Encofrado - Vigas Estructura Principal m2 22.13% 10.00% 2.2% 23.74

04.03.02.03.19c Encofrado y desencofrado - Parapeto m2 3.03% 0.00% 0.0% 0.00

04.03.02.03.27c Encofrado de pedestales m2 0.21% 0.00% 0.0% 0.00

100.00% 9.68% 103.81

23.03 CONCRETO EN VIGAS Y LOSA m3 168.90 0.00

04.03.02.03.08a Concreto f'c=320 Kg/cm2 C-I - Losa Maciza m3 52.74% 0.00% 0.0% 0.00

04.03.02.03.10a Concreto f'c=320 Kg/cm2 C-I - Viga Estructura Principal m3 45.12% 0.00% 0.0% 0.00

04.03.02.03.19a Concreto f'c=320 Kg/cm2 C-I - Parapeto m3 1.97% 0.00% 0.0% 0.00

04.03.02.03.27a Concreto f'c=320 kg/cm2 C-I - Pedestal m3 0.17% 0.00% 0.0% 0.00

100.00% 0.00% 0.00

24.00 Muros m2 224.10 0.00

04.03.02.03.11b Bloques concreto 19cm - Relleno parcial cada 40cm en alveolo m2 28.91% 0.00% 0.0% 0.00

04.03.02.03.11g Escalerilla de refuerzo horiz. 4.80 mm diam. ml 11.69% 0.00% 0.0% 0.00

Encofrado - Columnas Cuadradas y Rectangulares (inc. Tuberia drenaje pluvial 3")

document.xls / Avance Detallado ok 15 / 24

INFORME DE AVANCE DETALLADO

FECHA DE CORTE: 8-Jun-08 REALIZÓ: M. Espinoza

FECHA REPORTE: 9-Jun-08 REVISÓ: Juan C. Tokomuri

ITEM DESCRIPCION UND

% POND AVANCE REAL02/06/2008 al 08/06/2008

% AVANCE REAL

TOTAL AVANCE REAL

04.03.02.03.11h Angulo 6"x6"x150mmx3/16" A-36 galvanizado und 2.21% 0.00% 0.0% 0.00

04.03.02.03.11j Platina 150x370x3/8" A-36 galvanizado und 13.74% 0.00% 0.0% 0.00

04.03.02.03.11l Perno expansion 1/2"x4.1/2" Kwik Bo lt 2 Galvanizado o similar und 4.83% 0.00% 0.0% 0.00

04.03.02.03.11o Perno expansion 5/8"x4.3/4" Kwik Bo lt 2 Galvanizado o similar und 1.79% 0.00% 0.0% 0.00

04.03.02.03.11r Sello d/junta c/elastomerico y varilla de respaldo ml 0.99% 0.00% 0.0% 0.00

04.03.02.03.11s Sello d/junta c/cortafuego y lana mineral ml 2.97% 0.00% 0.0% 0.00

04.03.02.03.11A Muro de drywall con aislamiento termo acústico standard m2 32.87% 0.00% 0.0% 0.00

100.00% 0.00% 0.00

document.xls / Avance Resumen ok 16 / 24

FASE II EXPANSIÓN DEL AEROPUERTO INTERNACIONAL JORGE CHAVEZRESUMEN DEL AVANCE (PREVIO AL RCHH)

CONTRATO NO: CR2868-C01-03.06.00 FECHA DE CORTE: 8-Jun-08

CONTRATISTA: AVANZIT PERU S.A.C. FECHA REPORTE: 9-Jun-08

PAY 02/06/2008 al 08/06/2008 CANTIDADES HORAS HOMBRE HORAS GANADAS

ITEM DESCRIPTION UNDProyec Esta Semana A la fecha Proyec FD

ESPIGON NORTEGENERAL

Trabajos Preliminares GLB 1.00 1.00 -0.06 0.495 1002.73 1002.73 0.00 3,088.5 49.51% (60.06) 496.46 0.2 0.56 3,088.5

PRIMER NIVEL 0.0 0

Zapatas m3 201.57 257.70 5.49 257.70 1279.54 1279.54 0.00 2,555.0 100.00% 27.25 1,279.52 0.5 252.21 2,555.0

Columnas m3 84.62 124.30 0.00 124.31 2023.65 2023.65 0.00 6,649.5 100.01% - 2,023.76 0.3 124.31 6,649.5

Losas y Vigas 0.0 0

Encofrado de Vigas y Losa m2 3143.54 3143.54 458.80 2,599.86 6765.92 6765.92 1518.77 12,696.6 82.7% 987.48 5,595.74 0.4 2,141.07 11,178

Acero de Vigas y Losa kg 69710.25 69710.25 6,920.14 58,821.16 3377.85 3377.85 399.47 7,590.3 84.4% 335.32 2,850.21 0.4 51,901.02 7,191

Concreto en losas y Viga m3 510.46 510.46 121.41 410.31 1043.74 1043.74 427.71 2,585.1 80.4% 248.25 838.97 0.3 288.90 2,157

Muros 2do Nivel m2 980.21 980.21 2.05 2.05 1437.51 1437.51 0.0 0.2% 3.00 3.00 - 0

Losa de piso y sobrecimiento m2 136.96 136.96 0.00 0.00 1543.13 1543.13 130.0 0.00% - 0.00 0.0 - 130

SEGUNDO NIVEL 0.0 0

Columnas m3 69.23 69.23 9.15 44.51 1715.92 1715.92 392.13 1,691.2 64.3% 226.7 1,103.08 0.7 35.36 1,299

Losas y Vigas 0.0 0

Encofrado de Vigas y Losa m2 2743.63 2743.63 410.35 410.35 5854.61 5854.61 2244.84 2,244.8 15.0% 875.65 875.65 0.4 - 0

Acero de Vigas y Losa kg 61818.53 61818.53 6,464.24 6,464.24 2973.47 2973.47 877.06 877.1 10.5% 310.93 310.93 0.4 - 0

Concreto en losas y Viga m3 452.67 452.67 0.00 0.00 1043.74 1043.74 0.00 0.0 0.0% - 0.00 - 0

Muros 2do Nivel m2 869.24 869.24 0.00 0.00 1326.93 1326.93 0.00 0.0 0.0% - 0.00 - 0

REMODELACION C8-C9/4C - CONST. ESCALERAS Y POZOS ASCENSOR 0.0 0

GENERAL 0.0 0

Demolicion, excavacion y eliminacion m2 104.35 104.35 0.00 0.00 970.57 970.57 0.00 85.1 0.0% - 0.00 0.0 - 85

Acero de C8-C9/4C pozo, ascensor, escaleras, vigas y losa kg 5156.53 5156.53 0.00 0.00 569.74 569.74 0.00 0.0 0.0% - 0.00 - 0

Encofrado de pozo, ascensor, escaleras, vigas y losa m2 648.01 648.01 0.00 0.00 1417.39 1417.39 0.00 0.0 0.0% - 0.00 - 0

Concreto de pozo, ascensor, escaleras, vigas y losa m3 142.16 142.16 0.00 0.00 224.77 224.77 0.00 354.0 0.0% - 0.00 0.0 - 354

Construccion de bases para PLB y Postes m3 64.24 64.24 5.90 37.44 770.98 770.98 0.00 0.0 58.27% 70.81 449.28 31.54 0

SERVICIOS ENTERRADOS 0.0 0

GENERAL 100.0 100

Corte y demolicion de pavimentos 309.54 309.54 32.61 32.61 809.85 809.85 51.00 51.0 10.54% 85.32 85.32 1.7 - 0

Excavacion de Estructuras m3 767.45 767.45 0.00 0.98 3661.79 3661.79 0.00 0.0 0.13% - 4.66 0.98 0

Solado para tuberias m2 97.33 97.33 0.00 0.00 18.92 18.92 0.00 0.0 0.00% - 0.00 - 0

Tuberias y Ductos ml 741.87 741.87 0.00 0.00 5207.96 5207.96 0.00 0.0 0.00% - 0.00 - 0

Concreto para ductos para buzones m3 54.24 54.24 0.00 0.00 1075.31 1075.31 0.00 0.0 0.00% - 0.00 - 0

Relleno para Ductos y buzones m3 394.61 394.61 0.00 0.00 1603.61 1603.61 0.00 0.0 0.00% - 0.00 - 0

Reposicion de pavimentos 132.72 132.72 0.00 0.00 390.09 390.09 0.00 200.0 0.00% - 0.00 0.0 - 200

TERMINAL SUR 2,712.0 2,712

GENERAL 0.0 0

Trabajos Preliminares gbl 1.00 1.00 0.16 0.32 0.00 0.00 0.00 2,463.5 - 0.00 0.0 0.16 2,464

PRIMER NIVEL 0.0 0

Zapatas m3 138.29 138.29 12.46 82.85 4090.40 4090.40 281.31 1,104.7 59.91% 368.58 2,450.38 2.2 70.38 823

Losa de piso y sobrecimiento M3 107.11 107.11 0.00 0.00 1150.62 1150.62 0.0 0.00% - 0.00 - 0

Columnas m3 131.87 131.87 5.10 71.04 2868.19 2868.19 183.60 1,015.6 53.87% 111.00 1,545.10 1.5 65.94 832

Losas y Vigas 0.0 0

Acero en vigas losa kg 27339.89 27339.89 0.00 0.00 1330.74 1330.74 45.90 45.9 0.00% - 0.00 0.0 - 0

Encofrado en vigas losa M2 1072.84 1072.84 91.94 103.81 2275.93 2275.93 109.69 731.7 9.68% 195.04 220.22 0.3 11.87 622

Concreto en Vigas Losa m3 168.90 168.90 0.00 0.00 382.59 382.59 42.50 42.5 0.00% - 0.00 0.0 - 0

Muros 224.10 224.10 0.00 0.00 500.73 500.73 753.1 0.0% - 0.00 0.0 - 753

TOTAL HORAS HOMBRE DIRECTAS 60,709 60,709 6,574.0 49,767 Total 3,785 20,132 0 54,924.3 43,193.2 TOTAL HORAS HOMBRE INDIRECTAS v/s 40,264.6

TOTAL HORAS HOMBRE 60,709 60,709 6,574.0 49,767 % Actual 33.16%

Contrato Base

Contrato Base

Esta Semana Gastado a la

fecha

% Avance Actual

Ganadas esta sem

Ganadas a la fecha

QTYS LAST WEEK

HOURS LAST WEEK

QTYBDG QTYFCT MHRSBDG MHRSFCT

document.xls / RCHH ok 17 de 24 17 / 24

FASE II EXPANSIÓN DEL AEROPUERTO INTERNACIONAL JORGE CHAVEZREPORTE DE CANTIDADES Y HORAS HOMBRE

CONTRATO NO: CR2868-C01-03.06.00 FECHA DE CORTE: 8-Jun-08

CONTRATISTA: AVANZI FECHA REPORTE: 9-Jun-08

CANTIDADES HORAS HOMBRE

CONTRATO AGI PAY ITEM DESCRIPTION BASE PROY BASE PROY ESTA SEM % CPT

CR2868-C01-03.06.00

CR2868-C01-03.06.00 03.01. . ESPIGON NORTEGENERAL

CR2868-C01-03.06.00 1 Trabajos Preliminares 1 1 -0.06 0.50 1002.7 1002.7 - 3,088.5 496.47 49.5%

CR2868-C01-03.06.00 PRIMER NIVEL 0.00 0.00 - - -

CR2868-C01-03.06.00 2 Zapatas 201.57 257.70 5.49 257.70 1279.5 1279.5 - 2,555.0 1,279.52 100.0%

CR2868-C01-03.06.00 3 Columnas 84.62 124.30 0.00 124.31 2023.6 2023.6 - 6,649.5 2,023.76 100.0%

CR2868-C01-03.06.00 4 Losas y Vigas 0.00 0.00 - - -

CR2868-C01-03.06.00 4.01 Enocfrado de Vigas y Losa 3,143.54 3,143.54 458.80 2599.86 6765.9 6765.9 1,518.8 12,696.6 5,595.74 82.7%

CR2868-C01-03.06.00 4.02 Acero de Vigas y Losa 69,710.25 69,710.25 6920.14 58821.16 3377.9 3377.9 399.5 7,590.3 2,850.21 84.4%

CR2868-C01-03.06.00 4.03 Concreto en losas y Viga 510.46 510.46 121.41 410.31 1043.7 1043.7 427.7 2,585.1 838.97 80.4%

CR2868-C01-03.06.00 5 Muros CMU 980.21 980.21 2.05 2.05 1437.5 1437.5 - - 3.00 0.2%

CR2868-C01-03.06.00 6 Losa de Piso y Sobrecimientos 136.96 136.96 0.00 0.00 1543.1 1543.1 - 130.0 - 0.0%

CR2868-C01-03.06.00 SEGUNDO NIVEL 0.00 0.00 - - -

CR2868-C01-03.06.00 7 Columnas 69.23 69.23 9.15 44.51 1715.9 1715.9 392.1 1,691.2 1,103.08 64.3%

CR2868-C01-03.06.00 Losas y Vigas 0.00 0.00 - - -

CR2868-C01-03.06.00 8.01 Enocfrado de Vigas y Losa 2,743.63 2,743.63 410.35 410.35 5854.6 5854.6 2,244.8 2,244.8 875.65 15.0%

CR2868-C01-03.06.00 8.02 Acero de Vigas y Losa 61,818.53 61,818.53 6464.24 6464.24 2973.5 2973.5 877.1 877.1 310.93 10.5%

CR2868-C01-03.06.00 8.03 Concreto en losas y Viga 452.67 452.67 0.00 0.00 1043.7 1043.7 - - - 0.0%

CR2868-C01-03.06.00 9 Muros de CMU 869.24 869.24 0.00 0.00 1326.9 1326.9 - - - 0.0%

CR2868-C01-03.06.00 REMODELACION C8-C9/4C - CONST. ESCALERAS Y POZOS ASCENSOR 0.00 0.00 - - -

GENERAL 0.00 0.00 - - -

CR2868-C01-03.06.00 10 Demolicion, excavacion y eliminacion 104.35 104.35 0.00 0.00 970.6 970.6 - 85.1 - 0.0%

CR2868-C01-03.06.00 11.01 Acero de C8-C9/4C pozo, ascensor, escaleras, vigas y losa 5,156.53 5,156.53 0.00 0.00 569.7 569.7 - - - 0.0%

CR2868-C01-03.06.00 11.02 Encofrado de pozo, ascensor, escaleras, vigas y losa 648.01 648.01 0.00 0.00 1417.4 1417.4 - - - 0.0%

CR2868-C01-03.06.00 11.03 Concreto de pozo, ascensor, escaleras, vigas y losa 142.16 142.16 0.00 0.00 224.8 224.8 - 354.0 - 0.0%

CR2868-C01-03.06.00 12 Construccion de bases para PLB y Postes 64.24 64.24 5.90 37.44 771.0 771.0 - - 449.28 58.3%

CR2868-C01-03.06.00 SERVICIOS ENTERRADOS 0.00 0.00 - - -

GENERAL 0.00 0.00 - 100.0 -

CR2868-C01-03.06.00 13 Corte y demolicion de pavimentos 309.54 309.54 32.61 32.61 809.9 809.9 51.0 51.0 85.32 10.5%

CR2868-C01-03.06.00 14 Excavacion de Estructuras 767.45 767.45 0.00 0.98 3661.8 3661.8 - - 4.66 0.127%

CR2868-C01-03.06.00 15 Solado para tuberias 97.33 97.33 0.00 0.00 18.9 18.9 - - - 0.0%

CR2868-C01-03.06.00 16 Tuberias y Ductos 741.87 741.87 0.00 0.00 5208.0 5208.0 - - - 0.0%

CR2868-C01-03.06.00 17 Concreto para ductos para buzones 54.24 54.24 0.00 0.00 1075.3 1075.3 - - - 0.0%

CR2868-C01-03.06.00 18 Relleno para Ductos y buzones 394.61 394.61 0.00 0.00 1603.6 1603.6 - - - 0.0%

CR2868-C01-03.06.00 19 Reposicion de pavimentos 132.72 132.72 0.00 0.00 390.1 390.1 - 200.0 - 0.0%

CR2868-C01-03.06.00 TERMINAL SUR 0.00 0.00 - 2,712.0 -

GENERAL 0.00 0.00 - - -

CR2868-C01-03.06.01 1 Trabajos Preliminares 1.00 1.00 0.16 0.32 - 2,463.5 -

CR2868-C01-03.06.00 PRIMER NIVEL 0.00 0.00 - - -

CR2868-C01-03.06.00 20 Zapatas 138.29 138.29 12.46 82.85 4090.4 4090.4 281.3 1,104.7 2,450.38 59.9%

CR2868-C01-03.06.00 21 Losa de piso y sobrecimientos 107.11 107.11 0.00 0.00 1150.6 1150.6 - - - 0.0%

CR2868-C01-03.06.00 22 Columnas 131.87 131.87 5.10 71.04 2868.2 2868.2 183.6 1,015.6 1,545.10 53.9%

CR2868-C01-03.06.00 LOSA Y VIGAS 0.00 0.00 - - -

CR2868-C01-03.06.00 23.01 Acero en vigas Losa 27,339.89 27,339.89 0.00 0.00 1330.7 1330.7 45.9 45.9 - 0.0%

CR2868-C01-03.06.00 23.02 Encofrado en Vigas Losa 1,072.84 1,072.84 91.94 103.81 2275.9 2275.9 109.7 731.7 220.22 9.7%

CR2868-C01-03.06.00 23.03 Concreto en Vigas Losa 168.90 168.90 0.00 0.00 382.6 382.6 42.5 42.5 - 0.0%

CR2868-C01-03.06.00 24 Muros 224.10 224.10 0.00 0.00 500.7 500.7 - 753.1 - 0.0%

Total 69464.0 60708.9 6,574 49,767 20,132.29

P3 CODE

PAY ITEM

ESTA SEM

A LA FECHA

A LA FECHA

HORAS GANADAS

18 de 24

PROYECTO REMODELACIÓN AEROPUERTO JORGE CHAVEZTABULACIÓN DE PERSONAL

SUB-PROYECTO: OBRAS CIVILES Y SERVICIOS ENTERRADOS ESPIGON NORTE Y TERMINAL SURCONTRATO NO: CR2868-C01-03.06.00CONTRATISTA: AVANZIT P Fecha de corte: 08/06/08

CATEGORIAMes MARZO ABRIL MAYO JUNIO

TotalSemana 10/03/08 17/03/08 24/03/08 31/03/08 07/04/08 14/04/08 21/04/08 28/04/08 05/05/08 12/05/08 19/05/08 26/05/08 02/06/08 09/06/08 16/06/08 23/06/08 30/06/08

MANUAL

OPERARIO Prog 0 5 16 25 30 50 55 42 49 49 34 24 26 15 16 15 8 459

Real 3 11 14 17 25 35 45 51 55 58 65 71 450

Proy 35 50 52 76 70 70 68 52 52 28 8 561

OFICIAL Prog 0 6 14 28 30 50 62 42 49 49 30 20 26 12 16 10 5 449

Real 2 4 3 4 7 15 18 25 21 29 32 32 192

Proy 12 24 25 54 44 44 36 32 32 16 5 324

AYUDANTE Prog 8 10 12 15 25 30 30 30 35 15 8 10 14 16 4 3 265

Real 4 3 5 6 12 16 33 39 44 46 46 45 299

Proy 14 18 32 32 26 26 20 18 18 6 6 216

OPERADOR DE EQUIPO Prog 4 4 6 6 6 6 6 6 6 2 2 2 2 2 0 60

Real 0 0 0

Proy 0 0 1 1 1 1 1 1 1 1 8

CAPATAZ Prog 1 2 2 2 4 4 4 4 2 2 2 2 2 1 1 1 36

Real 1 2 2 2 4 4 3 4 5 5 32

Proy 3 3 3 3 3 3 3 3 3 3 1 31

TOPOGRAFO Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Real 1 1 1 1 1 1 1 6 6 19

Proy 1 1 1 1 1 1 1 1 1 1 1 1

SUPERVISOR DE CAMPO Prog 0

Real 0

Proy 0

SUB-TOTAL MANUAL Prog 0 21 47 72 84 136 158 125 139 142 88 57 67 46 52 33 18 1285

Real 10 21 25 30 44 66 101 120 124 138 154 159 0 0 0 0

Proy 65 96 113 167 145 145 129 107 107 55 22 1141

19 de 24

PROYECTO REMODELACIÓN AEROPUERTO JORGE CHAVEZTABULACIÓN DE PERSONAL

SUB-PROYECTO: OBRAS CIVILES Y SERVICIOS ENTERRADOS ESPIGON NORTE Y TERMINAL SURCONTRATO NO: CR2868-C01-03.06.00CONTRATISTA: AVANZIT P Fecha de corte: 08/06/08

CATEGORIAMes MARZO ABRIL MAYO JUNIO

TotalSemana 10/03/08 17/03/08 24/03/08 31/03/08 07/04/08 14/04/08 21/04/08 28/04/08 05/05/08 12/05/08 19/05/08 26/05/08 02/06/08 09/06/08 16/06/08 23/06/08 30/06/08

NON MANUAL

INGENIERO RESIDENTE Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17

Real 1 1 1 1 1 1 1 1 1 1 1 1 1 13

Proy 0

INGENIERO SEGURIDAD Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17

Real 1 1 1 1 1 1 1 1 1 1 1 2 2 15

Proy 0

INGENIERO CONSTRUCCION Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17

Real 1 1 1 1 1 1 1 1 1 1 1 2 2 15

Proy 0

INGENIERO QA/QC Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17

Real 1 1 1 1 1 1 1 1 1 1 1 1 1 13

Proy 0

INGENIERO PLANEAMIENTO Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17

Real 1 1 1 1 1 1 1 0 1 1 0 2 2 13

Proy 0

INGENIERO COSTOS Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17

Real 1 1 1 1 1 1 1 1 1 1 1 1 1 13

Proy

ADMINISTRADOR Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Real 0 1 1 1 1 1 1 1 1 1 1 1 1 12

Proy 0

CONTROL DOCUMENT Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Real 0 1 1 1 1 1 1 1 1 1 1 1 1 12

Proy 0

LABORATORISTA / CADISTA Prog 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Real 1 0 0

Proy

MAESTRO Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16

Real 1 0 0 0 0 1 1 3

Proy 0

ALMACENERO Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15

Real 1 1 1 1 1 1 1 1 1 1 1 11

Proy 0

OTROS Prog 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 33

Real 2 2 1 1 1 0 0 0 7

Proy 0

SUB-TOTAL NO MANUAL Prog 6 10 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 198

Real 6 9 9 9 9 11 12 9 10 10 8 13 13 127

TOTAL Prog 6 31 61 86 98 150 172 139 153 156 102 71 81 60 66 47 32 1483

Real 6 19 30 34 39 55 78 110 130 134 146 167 172

NOTA: Fuerza de trabajo representada en promedios semanales

20 de 24

FASE II EXPANSIÓN DEL AEROPUERTO INTERNACIONAL JORGE CHAVEZTABULACION DE EQUIPOS

SUB-PROYECTO: OBRAS CIVILES Y SERVICIOS ENTERRADOS ESPIGON NORTE Y TERMINAL SUR

CONTRATO NO: CR2868-C01-03.06.00 Fecha de corte: 6/8/2008

CONTRATISTA: AVANZIT PERU S.A02/06/2008 al 08/06/2008

CATEGORIA TotalFecha llegada ABRIL MAYO JUNIOInicial ### 07/04/08 14/04/08 21/04/08 28/04/08 05/05/08 12/05/08 19/05/08 26/05/08 02/06/08 09/06/08 16/06/08 23/06/08 30/06/08

Camion Volquete 10 m3 / 15 m3 03-Apr-2008 Prog 4 4 6 6 8 8 10 10 10 10 10 8 8 20

3 Real 0 0 0 0 0 0 0 Proy

Retroexcavadora c/ martillo 01-Apr-2008 Prog 1 1 2 2 2 2 2 2 2 2 1 7

1 Real 0 0 0 0 1 1 2 Proy

Compresora 24-Apr-2008 Prog 1 2 2 2 4 4 2 2 1 3

1 Real 0 0 0 2 2 2 2 8 Proy

Cargador frontal 24-Apr-2008 Prog 1 1 1 1 2 2 2 1 1 1 2

1 Real 0 1 1 0 0 0 0 2 Proy

Minicargador c/martillo 24-Apr-2008 Prog 1 2 2 2 2 2 2 1 1 1 3

1 Real 0 0 0 0 0 0 0 0 Proy

Retroexcavadora de 90 HP 01-Apr-2008 Prog 1 2 2 2 2 2 2 2 1 1 1 3

1 Real 0 0 0 0 0 0 0 0 Proy

Camion grúa 24-Mar-2008 Prog 1 1 2 2 2 2 2 2 2 2 1 1 1 8

1 Real 0 0 1 1 1 1 1 5 Proy

Grúa torre 15-Apr-2008 Prog 1 1 1 1 1 1 1 1 1 1 1 1 3

1 Real 0 0 0 0 0 0 0 Proy

Cortadora de pavimento 01-Apr-2008 Prog 3 5 5 5 5 2 2 0 0 20

1 Real 1 1 1 1 1 1 6 Proy

Martillo neumático 01-Apr-2008 Prog 2 4 8 8 8 8 8 8 4 4 2 22

1 Real 0 0 0 0 0 0 0 Proy

Martillo eléctrico 31-Mar-2008 Prog 2 2 2 4 4 4 4 0 0 12

1 Real 1 1 2 2 2 6 5 7 7 33 Proy

Plancha compactadora / 15-Apr-2008 Prog 2 2 4 4 4 4 4 4 4 16

vibropisonador 1 Real 0 0 0 1 1 1 3 Proy

Vibradores de concreto 19-Mar-2008 Prog 4 4 8 8 8 8 8 8 8 8 6 6 27

1 Real 2 2 3 3 3 4 4 4 4 29 Proy

Grupo electrogeno Prog 0 0 0 0 0 0 0 0 0 0 Real 1 1 1 6 6 6 7 28 Proy

Prog 0 Real 0 Proy

Total Prog ### 19 24 42 47 49 46 51 45 39 33 25 19 11 146 Real ### 3 3 6 8 9 20 20 23 24 0 0 0 0 116 Proy ### 0 0 0 0 0 0 0 0 0 0 0 0 0 0

FASE II EXPANSIÓN DEL AEROPUERTO INTERNACIONAL JORGE CHAVEZPROGRAMA DE ACTIVIDADES SEMANAL

SUB-PROYECOBRAS CIVILES Y SERVICIOS ENTERRADOS ESPIGON NORTE Y TERMINAL SUR

CONTRATO NCR2868-C01-03.06.00 Semana del 02 de Junio al 08 de Junio de 2008 FECHA DE CORTE 6/8/2008

CONTRATISTAVANZIT PERU S.A.C.

ITEM ACTIVIDADES RESP F Inicio F Fin Semana Nº 5

Alcanzado

Cumplimiento Causa de No Cumplimiento

L M M J V S D SI/NO

2/6 3/6 4/6 5/6 6/6 7/6 8/6

ESPIGON NORTE

PRIMER NIVEL

LOSAS Y VIGAS 21/04/08 26/06/08

Encofrado de vigas y losas C5 a C7 21/04/08 13/06/08 W W W W W W W 20% 20.0% SI

Acero de vigas C5 a C7 24/04/08 14/06/08 W W W W W W W 15% 15.0% SI

Concreto de vigas y losas Etapa 3 27/05/08 27/05/08 0 0 0 0 0 0 0

Concreto de vigas y losas Etapa 4 04/06/08 04/06/08 0 W 0 0 0 0 0 100% 100.0% SI

Concreto de vigas y losas Etapa 5 07/06/08 07/06/08 0 0 0 0 0 W 0 100% 100.0% SI

Desencofrado de losas y vigas C1 a C7 19/05/08 26/06/08 W W W W W W W 10.0% 10.0% SI

CONSTRUCCION DE BASES PARA PLB 12/05/08 11/06/08

Colocacion de Acero en Pedestales 12/05/08 22/05/08 0 0 0 0 0 0 0

Colocación de Pernos de Anclaje 04/06/08 10/06/08 0 0 W W W W W 20% 40.0% SI

Encofrado de Pedestales 05/06/08 11/06/08 0 0 0 W 0 0 0 10% 20.0% SI

Concreto en Pedestales 05/06/08 11/06/08 W 0 0 W 0 0 0 10% 0.0% NO OT

REPOSICION DE PAVIMENTO 21/04/08 18/07/08

Concreto Pobre Eje 1 - 2 21/04/08 13/06/08 0 0 W 0 0 0 0 50% 0.0% NO PLAN

SEGUNDO NIVEL

COLUMNAS 19/05/08 21/06/08

Acero En Columnas 19/05/08 19/06/08 0 0 0 W W 0 W 15% 15.0% SI

Encofrado de Columnas 20/05/08 20/06/08 W W 0 0 W W 0 25% 25.0% SI

Concreto en Columnas 21/05/08 21/06/08 W W 0 0 W W 0 25% 25.0% SI

LOSAS Y VIGAS 02/06/08 18/07/08

Encofrado de vigas y losas 02/06/08 01/07/08 W W W W W W W 15% 15.0% SI

Acero de vigas 05/06/08 04/07/08 0 0 0 W W W W 12% 9.0% NO SUMINISTRO DE ACERO

TERMINAL SUR

PRIMER NIVEL

OTROS 20/05/08 12/06/08

Aprobación Trabajos 20/05/08 20/05/08 0 0 0 0 0 0 0

Demolición de Pavimento existente 26/05/08 02/06/08 0 0 0 0 0 0 0

Demolición de Lean Concrete 31/05/08 07/06/08 W W W W W W 0 50% 50.0% SI

Excavación de Estructuras y Eliminación 04/06/08 12/06/08 0 0 W W W W W 50% 50.0% SI

DEMOLICION DE MUROS 03/05/08 29/05/08

Demolicón de Muro CMU Eje 3 03/05/08 04/06/08 W W W 0 0 0 0 100% 100.0% SI

Demolición de Muro Drywall Eje H' 13/05/08 27/05/08 0 0 0 0 0 0 0

ZAPATAS 22/05/08 28/06/08

Escarificado // Dem. de Zapatas Eje H' (3Und) 22/05/08 09/06/08 W 0 0 W W W W 50% 50.0% SI

Escarificado // Dem. de Zapatas Eje 3 (3Und) 11/06/08 16/06/08 0 W W W W W W 30% 30.0% SI

Acero en Zapatas, Cimientos Eje H' y Eje 3 31/05/08 28/06/08 W W W 0 0 0 0 30% 30.0% SI

Encofrado de Zapatas, Cimientos Eje H' y Eje 3 31/05/08 19/06/08 0 W W 0 0 0 0 30% 30.0% SI

Concreto en Zapatas, Cimientos Eje H' y Eje 3 31/05/08 20/06/08 0 0 W W 0 0 0 30% 30.0% SI

COLUMNAS 02/06/08 24/06/08

Acero en Columnas Eje H' y Eje 3 02/06/08 21/06/08 0 0 0 W W 0 0 30% 15.0% NO SUMINISTRO DE ACERO

Encofrado en Columnas Eje H' y Eje 3 03/06/08 22/06/08 0 0 0 0 W W 0 30% 0.0% NO SUMINISTRO DE ACERO

Concreto en Columnas Eje H' y Eje 3 03/06/08 24/06/08 0 0 0 0 0 W 0 30% 0.0% NO SUMINISTRO DE ACERO

LOSAS Y VIGAS 14/05/08 11/07/08

Encofrado de vigas y losas 28/05/08 03/07/08 W W W W W W W 10% 0.0% NO SUMINISTRO DE ACERO

Acero de vigas 30/05/08 05/07/08 0 0 0 W W W W 10% 0.0% NO SUMINISTRO DE ACERO

SERVICIOS ENTERRADOS 02/06/08 11/07/08

SE en Subestación 02/06/08 04/06/08 W W W W W 0 0 100% 5.0% NO OT

SE Eje 1C 05/06/08 20/06/08 0 W W W W W W 20% 5.0% NO OT

SE Eje C1 20/06/08 30/06/08 0 0 0 0 0 0 0 0%

SE Eje 4C 01/07/08 11/07/08 0 0 0 0 0 0 0 0%

REMODELACIONES 14/05/08 28/06/08

Excavación Cimentaciones - Ascensor, Escalera 14/05/08 28/06/08 0 W W W W W W 10% 2% NO EQUIPOS TARDIOS

N° de Actividades Planificadas 29 DESCRIPCCION COD CANT

N° de Actividades Completadas 18 DISEÑO INCOMPLETO DIS

PAC de la Semana 62.1% FALTA DE MATERIALES MAT 6

NOTA FALTA DE MANO DE OBRA MO

FALTA DE EQUIPOS EQ 1

PLANIFICACIÓN PLAN 1

OTROS OT 3

Compromiso

FASE II EXPANSIÓN DEL AEROPUERTO INTERNACIONAL JORGE CHAVEZ

PROGRAMA DE ACTIVIDADES SEMANALSUB-PROYECOBRAS CIVILES Y SERVICIOS ENTERRADOS ESPIGON NORTE Y TERMINAL SUR

CONTRATO NCR2868-C01-03.06.00 Semana del 09 de Junio al 15 de Junio de 2008CONTRATISTAVANZIT PERU S.A.C.

ITEM ACTIVIDADES F Inicio F Fin Semana Nº 5 Restricciones

L M M J V S D

9/6 10/6 11/6 12/6 13/6 14/6 15/6

ESPIGON NORTE

PRIMER NIVEL

LOSAS Y VIGAS 21/04/08 26/06/08

Encofrado de vigas y losas C6 a C7 21/04/08 13/06/08 0 0 W W W 0 0 10% Iluminación Pasadizo, Pintura

Acero de vigas C6 a C7 24/04/08 14/06/08 0 0 W W W W 0 10% Iluminación Pasadizo, Pintura - Acero

Concreto de vigas y losas Etapa 6 14/06/08 14/06/08 0 0 0 0 0 W 0 100% 2 Anteriores

Desencofrado de losas y vigas C4 a C5 19/05/08 26/06/08 W W W W W W W 50%

Resane final y limpieza 19/05/08 26/06/08 W W W W W W W 50%

AMPLIACION LOSA - ESPIGON EXISTENTE 09/06/08 11/07/08

Solicitud de Permiso y Aprobación por LAP 09/06/08 15/06/08 W W W W W W W 100.0% Gestión de Oficina Técnica

MUROS Y PARAPETOS 02/06/08 08/07/08

Escarificado de Losa Existente 02/06/08 18/06/08 W W W W W W W 20% En Proceso

Perforación y Colocación de Dowells 09/06/08 28/06/08 W W W W W W W 35% Suministro de Epóxico

Emplantillado Para Muros 07/06/08 24/06/08 0 W W W W W W 35% Bloquetas de Muros CMU, Dowell

Muros CMU Subestación 09/06/08 27/06/08 0 0 W W W W W 10% Bloquetas de Muros CMU

LOSA DE PISO 09/06/08 23/06/08

Concreto Pobre y Manta Plástica 18/06/08 20/06/08 0 0 0 0 0 0 0

Losa de Piso 21/06/08 23/06/08 0 0 0 0 0 0 0

Sobrecimiento 09/06/08 19/06/08 W W W W W W W 25% Dowells

SEGUNDO NIVEL 0 0 0 0 0 0 0

COLUMNAS 19/05/08 21/06/08

Acero En Columnas 19/05/08 19/06/08 W 0 0 W W 0 0 20% Acero

Encofrado de Columnas 20/05/08 20/06/08 0 W 0 0 W W 0 20% Acero

Concreto en Columnas 21/05/08 21/06/08 0 W 0 0 W W 0 20% Encofrado

LOSAS Y VIGAS 02/06/08 18/07/08

Encofrado de vigas y losas 02/06/08 01/07/08 W W W W W W W 15%

Acero de vigas 05/06/08 04/07/08 W W W W W W W 15%

Concreto de vigas y losas Etapa 1 12/06/08 12/06/08 0 0 0 W W 0 0 100% Definir Fecha

TERMINAL SUR

PRIMER NIVEL

OTROS 20/05/08 12/06/08

Excavación de Estructuras y Eliminación 04/06/08 12/06/08 W W W W 0 0 0 35%

Excavación Falsa Zapata 09/06/08 12/06/08 W W 0 0 0 0 0 30%

Concreto Falsa Zapata 09/06/08 12/06/08 0 0 W 0 0 0 0 30%

Concreto Pobre (Lean Concrete Sobre Zapatas) 09/06/08 12/06/08 0 0 0 0 0 0 0

Encofrado Viga de Cimentación 14/06/08 14/06/08 0 0 0 0 W W 0 30%

Concreto Viga de Cimentación 14/06/08 14/06/08 0 0 0 0 W W 0 30%

ZAPATAS 22/05/08 28/06/08

Escarificado // Dem. de Zapatas Eje H' (3Und) 22/05/08 09/06/08 W W 0 0 0 0 0 30%

Escarificado // Dem. de Zapatas Eje 3 (3Und) 11/06/08 16/06/08 W 0 0 0 0 W W 20%

Acero en Zapatas, Cimientos 31/05/08 28/06/08 0 0 W W 0 0 0 15%

Encofrado de Zapatas, Cimientos 31/05/08 19/06/08 0 0 0 W W 0 0 15%

Concreto en Zapatas, Cimientos 31/05/08 20/06/08 0 0 0 W W 0 0 15%

COLUMNAS 02/06/08 24/06/08

Acero en Columnas 02/06/08 21/06/08 W 0 0 0 0 W W 15%

Encofrado en Columnas 03/06/08 22/06/08 W W 0 0 0 0 W 25%

Concreto en Columnas 03/06/08 24/06/08 0 W 0 0 0 0 0 10%

LOSAS Y VIGAS 28/05/08 14/07/08

Encofrado de vigas y losas 28/05/08 03/07/08 W W W W W W W 10%

Acero de vigas 30/05/08 05/07/08 0 0 0 W W W W 10%

SERVICIOS ENTERRADOS 02/06/08 11/07/08

SE en Subestación 02/06/08 20/06/08 W W W W W W W 10%

SE Eje 1C 03/06/08 24/06/08 W W W W W W W 10%

REMODELACIONES 06/06/08 26/06/08

Demolición de Piso Ascensor 06/06/08 10/06/08 W W 0 0 0 0 0 100%

Excavación para Pit Ascensor 11/06/08 13/06/08 0 0 W W W 0 0 100%

Excavación Para falza zapata Ascensor 13/06/08 15/06/08 0 0 0 0 W W W 15%

N° de Actividades Planificadas 37 DESCRIPCCION COD CANT

N° de Actividades Completadas DISEÑO INCOMPLETO DIS

PAC de la Semana FALTA DE MATERIALES MAT

NOTA FALTA DE MANO DE OBRA MO

FALTA DE EQUIPOS EQ

PLANIFICACIÓN PLAN

OTROS OT

Compromiso

23 de 24

FASE II EXPANSIÓN DEL AEROPUERTO INTERNACIONAL JORGE CHAVEZPROGRAMA DE 3 SEMANAS

Semana del 09 de Junio al 15 de Junio del 2008

FECHA DE CORTE 6/1/2008

W: REPROGRAMADO

CONTRATISTA: EDELNOR / JUAN GALINDO PROGRAMADO

REPROGRAMADO PROGRAMADO0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Nº ACTIVIDADES F. Inicio F. Fin F. Inicio F. FinL M M J V S D L M M J V S D L M M J V S D Restricciones

Observación9-Jun 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun 26-Jun 27-Jun 28-Jun 29-Jun Diseño Material M.O. Equipos Pre-req Otro

CO ESPIGON NORTE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

PRIMER NIVEL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

LOSAS Y VIGAS 21/04/08 20/06/08 21/04/08 26/06/08 W W W W W W W W W W W W 0 0 0 0 0 0 0 0 0 ACTIVIDAD CRITICA (VERIFICAR INICIO)

Encofrado de vigas y losas C1 a C7 21/04/08 06/06/08 21/04/08 13/06/08 0 0 W W W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Acero de vigas C1 a C7 24/04/08 09/06/08 24/04/08 14/06/08 0 0 W W W W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Concreto de vigas y losas Etapa 6 14/06/08 14/06/08 0 0 0 0 0 W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Desencofrado de losas y vigas C1 a C7 19/05/08 20/06/08 19/05/08 26/06/08 W W W W W W W W W W W W W W W W W W 0 0 0

Resane final y limpieza 19/05/08 12/06/08 19/05/08 26/06/08 W W W W W W W W W W W W W W W W W W 0 0 0

AMPLIACION LOSA - ESPIGON EXISTENTE 29/05/08 12/07/08 09/06/08 11/07/08 W W W W W W W W W W W W W W W W W W W W W Hacer Seguimiento a Permiso LAP

Solicitud de Permiso y Aprobación por LAP 29/05/08 07/06/08 09/06/08 15/06/08 W W W W W W W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 X

Desmontaje Drywall Eje 4C de C8 a C10 09/06/08 14/06/08 16/06/08 21/06/08 0 0 0 0 0 0 0 W W W W W W 0 0 0 0 0 0 0 0

Escarificado Viga C8 a C10 16/06/08 21/06/08 21/06/08 25/06/08 0 0 0 0 0 0 0 0 0 0 0 0 W W W W W 0 0 0 0

Ampliación Losa C8 a C10 20/06/08 28/06/08 24/06/08 29/06/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W W W W W W

Desencofrado Losa C8 a C10 09/07/08 12/07/08 05/07/08 11/07/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

MUROS Y PARAPETOS 02/06/08 08/07/08 02/06/08 08/07/08 W W W W W W W W W W W W W W W W W W W W W X Seguimiento Provisión Muro CMU, Losa Piso

Escarificado de Losa Existente 02/06/08 18/06/08 02/06/08 18/06/08 W W W W W W W W W W 0 0 0 0 0 0 0 0 0 0 0

Perforación y Colocación de Dowells 12/06/08 28/06/08 09/06/08 28/06/08 W W W W W W W W W W W W W W W W W W W W 0

Emplantillado Para Muros 13/06/08 24/06/08 07/06/08 24/06/08 0 W W W W W W W W W W W W W W W 0 0 0 0 0

Muros CMU Subestación 14/06/08 27/06/08 09/06/08 27/06/08 0 0 W W W W W W W W W W W W W W W W W 0 0

Muros CMU Resto de Ambientes 25/06/08 03/07/08 25/06/08 03/07/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W W W W W

Sello de Juntas y Arriostres 23/06/08 08/07/08 23/06/08 08/07/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W W W W W W W

LOSA DE PISO 02/06/08 19/06/08 09/06/08 23/06/08 W W W W W W W W W W W 0 0 0 0 0 0 0 0 0 0 Restricción: Servicio enterrado en SE

Concreto Pobre y Manta Plástica 02/06/08 12/06/08 18/06/08 20/06/08 0 0 0 0 0 0 0 0 0 W W W 0 0 0 0 0 0 0 0 0

Losa de Piso 06/06/08 17/06/08 21/06/08 23/06/08 0 0 0 0 0 0 0 0 0 0 0 0 W W W 0 0 0 0 0 0

Sobrecimiento 09/06/08 19/06/08 09/06/08 19/06/08 W W W W W W W W W W W 0 0 0 0 0 0 0 0 0 0

CONSTRUCCION DE BASES PARA PLB 12/05/08 12/06/08 12/05/08 26/06/08 W W W W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Colocacion de Acero en Pedestales 12/05/08 22/05/08 12/05/08 22/05/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Colocación de Pernos de Anclaje 26/05/08 10/06/08 16/06/08 25/06/08 0 0 0 0 0 0 0 W W W W W W W W W W 0 0 0 0

Encofrado de Pedestales 27/05/08 11/06/08 17/06/08 26/06/08 0 0 0 0 0 0 0 0 W W W W W W W W W W 0 0 0

Concreto en Pedestales 29/05/08 12/06/08 17/06/08 26/06/08 0 0 0 0 0 0 0 0 W W W W W W W W W W 0 0 0

SEGUNDO NIVEL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

COLUMNAS 19/05/08 21/06/08 19/05/08 21/06/08 W W W W W W W W W W W W W 0 0 0 0 0 0 0 0

Acero En Columnas 19/05/08 19/06/08 19/05/08 19/06/08 W 0 0 W W 0 0 W W 0 0 0 0 0 0 0 0 0 0

Encofrado de Columnas 20/05/08 20/06/08 20/05/08 20/06/08 0 W 0 0 W W 0 W W 0 0 0 0 0 0 0 0 0

Concreto en Columnas 21/05/08 21/06/08 21/05/08 21/06/08 0 W 0 0 W W 0 W W 0 0 0 0 0 0 0 0

LOSAS Y VIGAS 02/06/08 18/07/08 02/06/08 18/07/08 W W W W W W W W W W W W W W W W W W W W W X ACTIVIDAD CRITICA (VERIFICAR INICIO)

Encofrado de vigas y losas 02/06/08 01/07/08 02/06/08 01/07/08 W W W W W W W W W W W W W W W W W W W W W

Acero de vigas 05/06/08 04/07/08 05/06/08 04/07/08 W W W W W W W W W W W W W W W W W W W W W

Concreto de vigas y losas Etapa 1 10/06/08 10/06/08 12/06/08 12/06/08 0 0 0 W W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Concreto de vigas y losas Etapa 2 18/06/08 18/06/08 18/06/08 18/06/08 0 0 0 0 0 0 0 0 0 W 0 0 0 0 0 0 0 0 0 0 0

Concreto de vigas y losas Etapa 3 26/06/08 26/06/08 26/06/08 26/06/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W 0 0 0

Concreto de vigas y losas Etapa 4 05/07/08 05/07/08 05/07/08 05/07/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Desencofrado de losas y vigas 19/06/08 17/07/08 20/06/08 17/07/08 0 0 0 0 0 0 0 0 0 0 0 W W W W W W W W W W

Resane final y limpieza 20/06/08 18/07/08 20/06/08 18/07/08 0 0 0 0 0 0 0 0 0 0 0 W W W W W W W W W W

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 de 24

FASE II EXPANSIÓN DEL AEROPUERTO INTERNACIONAL JORGE CHAVEZPROGRAMA DE 3 SEMANAS

Semana del 09 de Junio al 15 de Junio del 2008

FECHA DE CORTE 6/1/2008

W: REPROGRAMADO

CONTRATISTA: EDELNOR / JUAN GALINDO PROGRAMADO

REPROGRAMADO PROGRAMADO0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Nº ACTIVIDADES F. Inicio F. Fin F. Inicio F. FinL M M J V S D L M M J V S D L M M J V S D Restricciones

Observación9-Jun 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun 26-Jun 27-Jun 28-Jun 29-Jun Diseño Material M.O. Equipos Pre-req Otro

TE TERMINAL SUR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

PRIMER NIVEL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

OTROS 20/05/08 12/06/08 20/05/08 12/06/08 W W W W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Aprobación Trabajos 20/05/08 20/05/08 20/05/08 20/05/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Demolición de Pavimento existente 26/05/08 02/06/08 26/05/08 02/06/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Demolición de Lean Concrete 31/05/08 07/06/08 31/05/08 07/06/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavación de Estructuras y Eliminación 04/06/08 12/06/08 04/06/08 12/06/08 W W W W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavación Falsa Zapata 09/06/08 12/06/08 W W 0 0 0 0 0 0 0 W W W W 0 0 0 0 0 0 0 0

Concreto Falsa Zapata 09/06/08 12/06/08 0 0 W 0 0 0 0 0 0 0 0 0 W 0 0 0 0 0 0 0 0

Concreto Pobre (Lean Concrete Sobre Zapatas) 09/06/08 12/06/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W 0

Encofrado Viga de Cimentación 14/06/08 14/06/08 0 0 0 0 W W 0 0 0 0 0 0 0 0 W 0 0 0 0 0

Concreto Viga de Cimentación 14/06/08 14/06/08 0 0 0 0 W W 0 0 0 0 0 0 0 0 W 0 0 0 0 0

DEMOLICION DE MUROS 03/05/08 29/05/08 03/05/08 29/05/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Demolicón de Muro CMU Eje 3 03/05/08 29/05/08 03/05/08 04/06/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Demolición de Muro Drywall Eje H' 13/05/08 27/05/08 13/05/08 27/05/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ZAPATAS 22/05/08 28/06/08 22/05/08 28/06/08 W W W W W W W W W W W W W W W W W W W W 0

Escarificado // Dem. de Zapatas Eje H' (3Und) 22/05/08 04/06/08 22/05/08 09/06/08 W W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Escarificado // Dem. de Zapatas Eje 3 (3Und) 11/06/08 24/06/08 11/06/08 16/06/08 W 0 0 0 0 W W W W W 0 0 0 0 0 0 0 0 0 0

Acero en Zapatas, Cimientos 31/05/08 28/06/08 31/05/08 28/06/08 0 0 W W 0 0 0 W 0

Encofrado de Zapatas, Cimientos 31/05/08 28/06/08 31/05/08 19/06/08 0 0 0 W W 0 0 W 0

Concreto en Zapatas, Cimientos 31/05/08 28/06/08 31/05/08 20/06/08 0 0 0 W W 0 0 W 0

COLUMNAS 02/06/08 01/07/08 02/06/08 24/06/08 W W W W W W W W W W W W W W W W W W W W W

Acero en Columnas 02/06/08 27/06/08 02/06/08 21/06/08 W 0 0 0 0 W W 0 0 W 0 0 0 0

Encofrado en Columnas 03/06/08 30/06/08 03/06/08 22/06/08 W W 0 0 0 0 W W 0 0 0 W 0 0 0

Concreto en Columnas 03/06/08 01/07/08 03/06/08 24/06/08 0 W 0 0 0 0 0 W W W 0 W 0 0

LOSAS Y VIGAS 28/05/08 21/07/08 28/05/08 14/07/08 W W W W W W W W W W W W W W W W W W W W W X ACTIVIDAD CRITICA (VERIFICAR INICIO)

Encofrado de vigas y losas 28/05/08 03/07/08 28/05/08 03/07/08 W W W W W W W W W W W W W W W W W W W W W

Acero de vigas 30/05/08 05/07/08 30/05/08 05/07/08 0 0 0 W W W W W W W W W W W W W W W W W W

Concreto de vigas y losas Etapa 1 14/06/08 14/06/08 19/06/08 19/06/08 0 0 0 0 0 0 0 0 0 0 W 0 0 0 0 0 0 0 0 0 0

Concreto de vigas y losas Etapa 2 07/07/08 07/07/08 01/07/08 01/07/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Desencofrado de losas y vigas 26/06/08 19/07/08 25/06/08 14/07/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W W W W W

Resane final y limpieza 27/06/08 21/07/08 25/06/08 14/07/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W W W W W

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SE SERVICIOS ENTERRADOS 02/06/08 11/07/08 02/06/08 11/07/08 W W W W W W W W W W W W W W W W W W W W W X

SE en Subestación 02/06/08 11/07/08 02/06/08 20/06/08 W W W W W W W W W W W W 0 0 0 0 0 0 0 0 0 VERIFICAR: TUBERIAS PARA TRABAJOS

SE Eje 1C 02/06/08 11/07/08 03/06/08 24/06/08 W W W W W W W W W W W W W W W W 0 0 0 0 0

SE Eje C1 02/06/08 11/07/08 20/06/08 30/06/08 0 0 0 0 0 0 0 0 0 0 0 W W W W W W W W W W

SE Eje 4C 02/06/08 11/07/08 01/07/08 11/07/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

SE COMBUSTIBLE 06/07/08 24/07/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

RE REMODELACIONES 14/05/08 28/06/08 06/06/08 26/06/08 W W W W W W W W W W W W W W W W W W W W 0 X PLAZO: 1MES Y MEDIO

Demolición de Piso Ascensor 06/06/08 10/06/08 W W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavación para Pit Ascensor 11/06/08 13/06/08 0 0 W W W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Excavación Para falza zapata Ascensor 13/06/08 15/06/08 0 0 0 0 W W W 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Concreto Falza Zapata 16/06/08 16/06/08 0 0 0 0 0 0 0 W 0 0 0 0 0 0 0 0 0 0 0 0 0

Acero Base Ascensor 17/06/08 18/06/08 0 0 0 0 0 0 0 0 W W 0 0 0 0 0 0 0 0 0 0 0

Encofrado Pit Ascensor 19/06/08 21/06/08 0 0 0 0 0 0 0 0 0 0 W W W 0 0 0 0 0 0 0 0

Concreto Base Ascensor 21/06/08 21/06/08 0 0 0 0 0 0 0 0 0 0 0 0 W 0 0 0 0 0 0 0 0

Acero Placa Ascensor 1er nivel 22/06/08 24/06/08 0 0 0 0 0 0 0 0 0 0 0 0 0 W W W 0 0 0 0 0

Encofrado Placa Ascensor 1er nivel 24/06/08 26/06/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W W W 0 0 0

Concreto Placa Ascensor 1er nivel 26/06/08 26/06/08 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0