Hoja1metrado de cargas Peso volumtrico del concreto armado2.4 ton/m3Peso volumtrico de la albailera1.8 ton/m3Peso volumtrico del tarrajeo2 ton/m3PP ventana0.02tn/m2piso terminado100tn/m2espesor losa0.13mespesor muros0.13m0.23mespesor tarrajeo0.02maltura de entrepiso2.6mmetrado cargas diretasmuro tipo 1
PP viga chata0.04056tn/m
H MURO2.6mPP MURO(13cm)0.6084tn/mPP MURO(23cm)1.0764tn/mtarrajeo(2cm)0.04tn/m
WD(13cm)=0.68896tn/mWD(25cm)=1.15696tn/m
muro tipo 2PP viga h viga0.3mPP viga(13cm) 0.0936tn/mPP viga(23cm) 0.1656tn/mH muro1.2mPP MURO(13cm)0.2808tn/mPP MURO(23cm)0.4968tn/mtarrajeo(2cm)0.04tn/m
WD(13cm)=0.4144tn/mWD(25cm)=0.7024tn/mventanas salamuro tipo 3PP viga h viga0.3mPP viga(13cm) 0.0936tn/mPP viga(23cm) 0.1656tn/maltura ventana0.4mH muro2.2mPP MURO(13cm)0.5148tn/mPP MURO(23cm)0.9108tn/mtarrajeo(2cm)0.04tn/m
WD(13cm)=0.6484tn/mWD(25cm)=1.1164tn/mmuro tipo 4PP viga h viga0.3mPP viga(13cm) 0.0936tn/mPP viga(23cm)0.1656
WD(13cm)=0.0936tn/mWD(25cm)=0.1656tn/m
metrado de escalerastramo1N Pasos =7.00Altura =1.47Cp =0.1800m2*Cp + P =0.61Paso (P) =0.25m61.00