Mem Calc y Volumenes de Obras Alcantarillado Sanitario

21
TABLA DE CALCULO HIDRAULICO GEOMETRICO DE ALCANTARILLADO SANITARIO Página 1 HABITACIONAL MUNICIPIO: POBLACION = 528 Hab ESTADO: DENSIDAD POBLACION = 0.61 Hab/m DOTACION = 125 l/Hab/Día Coef. Seguridad = 1.50 APORTACION = 100 l/Hab/Día Coef. Harmon =3.80 Qmin = 1.5 lps Long. total red = 860.60 m Qmed = 1.5 lps Qmax inst = 5.7 lps Qmax extr = 8.55 lps NOMBRE DE LA CALLE TRAMO LONGITUD(m) POBLACION COEF. HARMON GASTOS(lps) Tramo Tributaria Total Qmed Qmin QMax Extr CALLE GUILLERMO PRIETO 1 2 18.90 0.00 18.90 12 3.800 1.500 1.500 8.550 CALLE GUILLERMO PRIETO 2 3 19.07 18.90 37.97 23 3.800 1.500 1.500 8.550 CALLE GUILLERMO PRIETO 7 3 62.28 0.00 62.28 38 3.800 1.500 1.500 8.550 CALLE GUILLERMO PRIETO 3 4 31.40 100.24 131.65 81 3.800 1.500 1.500 8.550 CALLE GUILLERMO PRIETO 4 5 37.18 131.65 168.82 104 3.800 1.500 1.500 8.550 CALLE GUILLERMO PRIETO 5 6 90.22 168.82 259.04 159 3.800 1.500 1.500 8.550 CALLE 5 DE MAYO 8 9 75.10 0.00 75.10 46.00 3.800 1.500 1.500 8.550

Transcript of Mem Calc y Volumenes de Obras Alcantarillado Sanitario

Page 1: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

TABLA DE CALCULO HIDRAULICO GEOMETRICO DE ALCANTARILLADO SANITARIO

Página 1

HABITACIONAL MUNICIPIO:POBLACION = 528 Hab ESTADO:

DENSIDAD POBLACION = 0.61 Hab/m

DOTACION = 125 l/Hab/Día Coef. Seguridad = 1.50

APORTACION = 100 l/Hab/Día Coef. Harmon =3.80

Qmin = 1.5 lps Long. total red = 860.60 m

Qmed = 1.5 lps

Qmax inst = 5.7 lps

Qmax extr = 8.55 lps

NOMBRE DE LA CALLE TRAMO

LONGITUD(m)

POBLACION

GASTOS(lps) COTAS TERRENO(m)

Tramo Tributaria Total Qmed Qmin QMax Extr Inicial

CALLE GUILLERMO PRIETO 1 2 18.90 0.00 18.90 12 3.800 1.500 1.500 8.550 161.98

CALLE GUILLERMO PRIETO 2 3 19.07 18.90 37.97 23 3.800 1.500 1.500 8.550 154.79

CALLE GUILLERMO PRIETO 7 3 62.28 0.00 62.28 38 3.800 1.500 1.500 8.550 150.27

CALLE GUILLERMO PRIETO 3 4 31.40 100.24 131.65 81 3.800 1.500 1.500 8.550 153.15

CALLE GUILLERMO PRIETO 4 5 37.18 131.65 168.82 104 3.800 1.500 1.500 8.550 141.58

CALLE GUILLERMO PRIETO 5 6 90.22 168.82 259.04 159 3.800 1.500 1.500 8.550 127.05

CALLE 5 DE MAYO 8 9 75.10 0.00 75.10 46.00 3.800 1.500 1.500 8.550 129.08

COEF. HARMON

Page 2: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

TABLA DE CALCULO HIDRAULICO GEOMETRICO DE ALCANTARILLADO SANITARIO

Página 2

ANÁLISIS HIDRÁULICO-GEOMETRICO

COTAS TERRENO(m) PENDIENTE(m/km) DIAMETRO TUBO LLENO RELACION DE GASTOS RELACION VELOCIDAD

Final Terreno Propuesta Cálculo (cm) Pulg. Qll (lps) Vll (m/s) Qmin/Qll Qmax/Qll Vmin/Vll Vmax/Vll

154.79 380 380 5 20 8" 0.010 262.919 8.369 0.006 0.033 0.273 0.459

153.15 86 40 8 20 8" 0.010 85.744 2.729 0.017 0.100 0.380 0.640

153.15 -46 4 12 20 8" 0.010 26.967 0.858 0.056 0.317 0.540 0.887

141.58 368 269 5 20 8" 0.010 221.001 7.035 0.007 0.039 0.286 0.484

127.05 391 391 5 20 8" 0.010 266.623 8.487 0.006 0.032 0.270 0.457

121.90 57 57 7 20 8" 0.010 101.791 3.240 0.015 0.084 0.362 0.608

127.52 21 21 9 20 8" 0.010 61.452 1.956 0.024 0.139 0.421 0.704

Coef. Rug. ManningADS N-12

Efectivo ADS N-12 (cm)

Page 3: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

TABLA DE CALCULO HIDRAULICO GEOMETRICO DE ALCANTARILLADO SANITARIO

Página 3

RELACION TIRANTES VELOCIDAD (m/s) TIRANTE (cm) COTA CLAVE (m) COTA ARRASTRE (m) PROFUNDIDAD (m)

ymin/D ymax/D Vmin Vmax ymin ymax Inicial Final Inicial Final Caida Inicial

0.055 0.124 2.287 3.844 1.100 2.48 161.08 153.89 160.88 153.69 2.00 1.10

0.092 0.214 1.038 1.747 1.840 4.28 151.89 151.12 151.69 150.92 2.00 3.10

0.161 0.387 0.463 0.762 3.220 7.74 149.37 149.12 149.17 148.92 1.10

0.059 0.135 2.012 3.406 1.180 2.70 149.12 140.68 148.92 140.48 4.23

0.054 0.123 2.292 3.878 1.080 2.46 140.68 126.15 140.48 125.95 1.10

0.085 0.196 1.172 1.969 1.700 3.92 126.15 121.00 125.95 120.80 0.27 1.10

0.108 0.252 0.824 1.377 2.160 5.04 128.18 126.62 127.98 126.42 0.30 1.10

Page 4: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

TABLA DE CALCULO HIDRAULICO GEOMETRICO DE ALCANTARILLADO SANITARIO

Página 4

PROFUNDIDAD (m)

OBSERVACIONES

1.10 3.10 ###

2.23 4.23 ###

4.23 ###

1.10 ###

1.10 ###1.10 1.37 POZO 6 EXISTENTE

1.10 1.40 POZO 9 EXISTENTE

Final entrada

Finalsalida

Page 5: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFICACIÓN DE VOLUMENES DE OBRA

Página 5

NOMBRE DE LA CALLE

TRAMO PROFUNDIDAD

MATERIAL

De A Inicial Final Caidas

ALLE GUILLERMO PRIETO 1 2 1.10 1.10 2.00 1.10 18.90 17.70 PEAD 20.000 0.233

ALLE GUILLERMO PRIETO 2 3 3.10 2.23 2.00 2.66 19.07 17.87 PEAD 20.000 0.233

ALLE GUILLERMO PRIETO 7 3 1.10 4.23 0.00 2.66 62.28 61.08 PEAD 20.000 0.233

ALLE GUILLERMO PRIETO 3 4 4.23 1.10 0.00 2.66 31.40 30.20 PEAD 20.000 0.233

ALLE GUILLERMO PRIETO 4 5 1.10 1.10 0.00 1.10 37.18 35.98 PEAD 20.000 0.233

ALLE GUILLERMO PRIETO 5 6 1.10 1.10 0.27 1.10 90.22 89.02 PEAD 20.000 0.233

CALLE 5 DE MAYO 8 9 1.10 1.10 0.30 1.10 75.10 73.90 PEAD 20.000 0.233

CALLE 5 DE MAYO 10 11 1.10 1.10 0.47 1.10 52.08 50.88 PEAD 20.000 0.233

CALLA FRANCISCO VILLA 12 13 1.10 1.10 1.74 1.10 60.60 59.40 PEAD 20.000 0.233

CALLA FRANCISCO VILLA 14 13 1.10 2.19 0.65 1.64 54.86 53.66 PEAD 20.000 0.233

CALLE EMILIANO ZAPATA 16 15 1.10 1.10 0.27 1.10 70.63 69.43 PEAD 20.000 0.233

CALLE EMILIANO ZAPATA 18 17 1.10 1.10 0.98 1.10 80.43 79.23 PEAD 20.000 0.233

CALLE MARIANO ABASOLO 20 19 1.10 1.10 0.56 1.10 74.40 73.20 PEAD 20.000 0.233

CALLE MARIANO ABASOLO 22 21 1.10 1.10 1.36 1.10 81.80 80.60 PEAD 20.000 0.233

CALLE MARIANO ABASOLO 24 23 1.10 1.10 0.45 1.10 51.66 50.46 PEAD 20.000 0.233

PROFUNDIDAD

PROMEDIO(m)

LONGITUDDE POZO A

POZO (m)

LONGITUDDE TUBERIA

(m)

DIÁMETRO INTERIOR

TUBO(cm)

DIÁMETRO EXTERIOR

TUBO(m)

Page 6: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFICACIÓN DE VOLUMENES DE OBRA

Página 6

CUANTIFICACIÓN DE VOLUMENES DE OBRAIngresar % de Material Tipo C

100% 80% 20%

EXCAVACION (m3) MATERIALES DE RELLENO (M3)

Total ENCAMADO

0.630 0.100 1.200 0.000 13.38 10.70 2.68 1.115 5.189 0.755 6.323 6.323

0.630 0.100 1.200 0.000 31.10 24.88 6.22 1.126 5.238 0.762 23.975 23.975

0.630 0.100 1.200 0.000 106.31 85.05 21.26 3.848 17.905 2.604 81.958 81.958

0.630 0.100 1.200 0.000 52.58 42.06 10.52 1.903 8.855 1.288 40.531 40.531

0.630 0.100 1.200 0.000 27.20 21.76 5.44 2.267 10.547 1.534 12.851 12.851

0.630 0.100 1.200 0.000 67.30 53.84 13.46 5.608 26.096 3.796 31.798 31.798

0.630 0.100 1.200 0.000 55.87 44.69 11.17 4.656 21.664 3.151 26.398 26.398

0.630 0.100 1.200 0.000 38.47 30.77 7.69 3.205 14.916 2.169 18.175 18.175

0.630 0.100 1.200 0.000 44.91 35.93 8.98 3.742 17.413 2.533 21.218 21.218

0.630 0.100 1.200 0.000 58.99 47.19 11.80 3.381 15.731 2.288 37.592 37.592

0.630 0.100 1.200 0.000 52.49 41.99 10.50 4.374 20.354 2.960 24.801 24.801

0.630 0.100 1.200 0.000 59.90 47.92 11.98 4.991 23.226 3.378 28.302 28.302

0.630 0.100 1.200 0.000 55.34 44.27 11.07 4.612 21.459 3.121 26.148 26.148

0.630 0.100 1.200 0.000 60.93 48.75 12.19 5.078 23.628 3.437 28.791 28.791

0.630 0.100 1.200 0.000 38.15 30.52 7.63 3.179 14.792 2.152 18.025 30.518

EXCAVACION (m3) MATERIALES DE RELLENO (M3)

Total ENCAMADO

RED PRINCIPAL 860.602 762.907 610.325 152.581 53.084 247.010 35.927 426.885 439.379

DESC. DOMICILIARIAS 434.749 347.799 86.950 40.687 178.231 17.066 200.392 209.952

POZOS DE VISITA 150.486 120.388 30.097 84.003 84.003

ANCHO DE ZANJA

(m)

ALTURA D ENCAMDO

(m)

DIAMETRO INTERIOR DE

POZOS(m)

ESPESOR DE SUP. DE

RODAMIENTO (m) Mat. Tipo

COMUN"B"

Mat. Tipo ROCA

"C"

ACOSTILLADO

Y RELLENO INICIAL

VOLUMEN DE TUBO

RELLENOCOMPLEMENTARI

O

RELLENO C/MAT. LUGAR

COMPAC.

Longitud de red (m)

Mat. Tipo COMUN

"B"

Mat. Tipo ROCA

"C"

ACOSTILLADO

Y RELLENO INICIAL

VOLUMEN DE TUBO

RELLENOCOMPLEMENTARI

OTOTAL

RELLENO C/MAT. LUGAR

COMPAC.

Page 7: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFICACIÓN DE VOLUMENES DE OBRA

Página 7

MATERIALES DE RELLENO (M3) CUANTIFICACION DE TUBERIA ADS N-12 RED DE ATARJEAS (m)

10.0 15.2 20.0 25.1 30.8 38.0 45.9

"DE BANCO: O

5.189 11.907 6.304 7.059 0 0.00 0.00 17.70 0.00 0.00 0.00 0.00

5.238 12.012 6.363 7.125 0 0.00 0.00 17.87 0.00 0.00 0.00 0.00

17.905 39.234 21.752 24.357 0 0.00 0.00 61.08 0.00 0.00 0.00 0.00

8.855 19.785 10.757 12.045 0 0.00 0.00 30.20 0.00 0.00 0.00 0.00

10.547 23.421 12.813 14.347 0 0.00 0.00 35.98 0.00 0.00 0.00 0.00

26.096 56.837 31.704 35.499 0 0.00 0.00 89.02 0.00 0.00 0.00 0.00

21.664 47.313 26.320 29.471 0 0.00 0.00 73.90 0.00 0.00 0.00 0.00

14.916 32.810 18.121 20.290 0 0.00 0.00 50.88 0.00 0.00 0.00 0.00

17.413 38.178 21.155 23.688 0 0.00 0.00 59.40 0.00 0.00 0.00 0.00

15.731 34.562 19.111 21.399 0 0.00 0.00 53.66 0.00 0.00 0.00 0.00

20.354 44.497 24.728 27.688 0 0.00 0.00 69.43 0.00 0.00 0.00 0.00

23.226 50.671 28.218 31.596 0 0.00 0.00 79.23 0.00 0.00 0.00 0.00

21.459 46.872 26.070 29.191 0 0.00 0.00 73.20 0.00 0.00 0.00 0.00

23.628 51.534 28.706 32.142 0 0.00 0.00 80.60 0.00 0.00 0.00 0.00

2.299 32.546 5.478 7.630 1 0.00 0.00 50.46 0.00 0.00 0.00 0.00

MATERIALES DE RELLENO (M3) CUANTIFICACION DE TUBERIA ADS N-12 RED DE ATARJEAS (m)

234.517 542.179 287.600 323.528 0.000 0.000 842.602 0.000 0.000 0.000 0.000

168.671 554.185 209.358 224.797 701.500

0.000 0.000 66.482

LIMPIEZA(M2)

MATERIALDE BANCO

(m3)

ACARREODE TIRO SIN

ABUNDAMIENTO (m3)

ACOSTILLADO Y RELLENO INICIAL CON:

MAT. COMUN=1

OMAT.

BANCO=0

RELLENO C/MAT. BANCO

COMPAC.

LIMPIEZA(M2)

MATERIALDE BANCO

(m3)

ACARREODE TIRO

(m3)RELLENO C/MAT. BANCO

COMPAC. ADS N-12 4"

ADS N-12 6"

ADS N-12 8"

ADS N-12 10"

ADS N-12 12"

ADS N-12 15"

ADS N-12 18"

Page 8: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFICACIÓN DE VOLUMENES DE OBRA

Página 8

CUANTIFICACION DE TUBERIA ADS N-12 RED DE ATARJEAS (m)

61.2 76.2 91.4 105.4 120.9 151.4

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 101.55

0.00 0.00 0.00 0.00 0.00 0.00 331.68

0.00 0.00 0.00 0.00 0.00 0.00 167.26

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 0.44 0.44 0.88

0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 0.50 0.50 1.01

600.49 30.00 0.95 0.95 1.89

CUANTIFICACION DE TUBERIA ADS N-12 RED DE ATARJEAS (m)

0.000 0.000 0.000 0.000 0.000 0.000

ANDAME DE MADERA

CORTE CON CORTADORA

A CONCRETO(

M)

RUPTURA Y DEMOLICION CONCRETO

HID M3

CONST. CONCRETO

HIDRAULICO(M3)

BASE DE GRAVA

CEMENTADA 20 CM(M3)

ADS N-12 24"

ADS N-12 30"

ADS N-12 36"

ADS N-12 42"

ADS N-12 48"

ADS N-12 60"

Page 9: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFICACIÓN DE VOLUMENES DE OBRA

Página 9

Ingresar Longitud de Descargas (m)

6.10

EXCAVACION (m3) MATERIALES DE RELLENO (M3)

Total ENCAMADO

MAT. LUGAR3.00 18.30 10.08 8.07 2.02 1.061 4.650 0.445 3.970 3.970 4.650 14.457 5.711

3.00 18.30 18.38 14.70 3.68 1.061 4.650 0.445 12.264 12.264 4.650 14.457 5.711

8.00 48.80 49.01 39.21 9.80 2.830 12.399 1.187 32.705 32.705 12.399 38.552 15.229

4.00 24.40 24.50 19.60 4.90 1.415 6.199 0.594 16.352 16.352 6.199 19.276 7.615

5.00 30.50 16.81 13.44 3.36 1.769 7.749 0.742 6.616 6.616 7.749 24.095 9.518

12.00 73.20 40.33 32.27 8.07 4.246 18.598 1.781 15.879 15.879 18.598 57.828 22.844

10.00 61.00 33.61 26.89 6.72 3.538 15.498 1.484 13.232 13.232 15.498 48.190 19.036

7.00 42.70 23.53 18.82 4.71 2.477 10.849 1.039 9.262 9.262 10.849 33.733 13.325

8.00 48.80 26.89 21.51 5.38 2.830 12.399 1.187 10.586 10.586 12.399 38.552 15.229

7.00 42.70 30.28 24.22 6.06 2.477 10.849 1.039 16.011 16.011 10.849 33.733 13.325

9.00 54.90 30.25 24.20 6.05 3.184 13.949 1.336 11.909 11.909 13.949 43.371 17.133

11.00 67.10 36.97 29.58 7.39 3.892 17.048 1.632 14.555 14.555 17.048 53.009 20.940

10.00 61.00 33.61 26.89 6.72 3.538 15.498 1.484 13.232 13.232 15.498 48.190 19.036

11.00 67.10 36.97 29.58 7.39 3.892 17.048 1.632 14.555 14.555 17.048 53.009 20.940

7.00 42.70 23.53 18.82 4.71 2.477 10.849 1.039 9.262 18.822 1.289 33.733 3.766

DESCARGAS DOMICILIARIAS (ALBAÑALES)

LIMPIEZA(M2)

MATERIALDE BANCO

(m3)UnidadesDrenadas

Longitud de Descarga 15.1 cm (6")

Mat. Tipo COMUN "B"

Mat. TipoROCA "C"

ACOSTILLADO

Y RELLENO INICIAL

VOLUMEN DE TUBO

RELLENOCOMPLEMEN

TARIO

RELLENO C/MAT. LUGAR

COMPAC.

RELLENO C/MAT. BANCO

COMPAC.

Page 10: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFICACIÓN DE VOLUMENES DE OBRA

Página 10

20.0 25.1 30.8 38.0 45.9 61.2

6.114 0 3.00 0.00 0.00 0.00 0.00 0.00

6.114 0 3.00 0.00 0.00 0.00 0.00 0.00

16.303 0 8.00 0.00 0.00 0.00 0.00 0.00

8.152 0 4.00 0.00 0.00 0.00 0.00 0.00

10.189 0 5.00 0.00 0.00 0.00 0.00 0.00

24.455 0 12.00 0.00 0.00 0.00 0.00 0.00

20.379 0 10.00 0.00 0.00 0.00 0.00 0.00

14.265 0 7.00 0.00 0.00 0.00 0.00 0.00

16.303 0 8.00 0.00 0.00 0.00 0.00 0.00

14.265 0 7.00 0.00 0.00 0.00 0.00 0.00

18.341 0 9.00 0.00 0.00 0.00 0.00 0.00

22.417 0 11.00 0.00 0.00 0.00 0.00 0.00

20.379 0 10.00 0.00 0.00 0.00 0.00 0.00

22.417 0 11.00 0.00 0.00 0.00 0.00 0.00

4.706 1 7.00 0.00 0.00 0.00 0.00 0.00

CONEXIONES SANITARIAS (piezas)

115.000 0.000 0.000 0.000 0.000 0.000

115.00

ACARREODE TIRO

(m3)

ACOSTILLADO Y RELLENO INICIAL CON:

MAT. COMUN=1

OMAT.

BANCO=0

CUANTIFICACIÓN DE DESCARGAS DOMICILIARIASADS N-12 6"x diam

Tee Wye 8 x 6

sencilla

Tee Wye 10 x 6 sencilla

Tee Wye 12 x 6 sencilla

Tee insercion

15 x 6

Tee insercion 18

x 6

Tee insercion 24

x 6

Page 11: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFICACIÓN DE VOLUMENES DE OBRA

Página 11

CUANTIFICACIÓN DE VOLUMENES DE OBRA860.602 1348.141 1078.513 269.628 93.771 425.241 52.994 711.280 733.333

EXCAVACION

1348.141

MATERIAL COMUN "B"

80.00%

1078.51 m3

A MANO CON EQUIPO

50.00% 50.00%

EN SECO EN AGUA EN SECO EN AGUA

100.00% 0.00% 100.00% 0.00%

PROF 0-2 M PROF 2-4 M PROF 0-2 M PROF 2-4 M PROF 0-6 M PROF 0-6 M

100.00% 0.00% 100.00% 0.00% 100.00% 100.00%

40.00% 0.00% 0.00% 0.00% 40.00% 0.00%

EXCAVACION M3 539.256 0.000 0.000 0.000 539.256 0.000

CODIGO CONAGUA 1010 02 1010 04 1040 02 1040 04 1100 02 1101 02

Page 12: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFICACIÓN DE VOLUMENES DE OBRA

Página 12

403.188 1096.364 496.959 614.808 0.000 701.500 842.602 0.000 0.000 0.000 0.000

MATERIAL "C", ROCA

20.00%

269.63 m3

CON EQUIPO

100.00%

EN SECO EN AGUA

100.00% 0.00%

PROF 0-6 M PROF 0-6 M

100.00% 100.00%

20.00% 0.00%

269.628 0.000 1348.141

1020 02 1042 02

Page 13: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFICACIÓN DE VOLUMENES DE OBRA

Página 13

0.000 0.000 0.000 0.000 0.000 0.000

Page 14: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFCICACIÓN DE POZOS DE VISITA

Página 14

NOMBRE DE LA CALLE

TRAMO PROFUNDIDAD CLASIFICACION DE POZOS DE VISITA POR PROFUNDIDAD

De A Inicial Final Caidas 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75

1 2 1.10 1.10 2.00 1 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00

2 3 3.10 2.23 2.00 2 3.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7 3 1.10 4.23 0.00 7 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00

3 4 4.23 1.10 0.00 3 4.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4 5 1.10 1.10 0.00 4 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00

5 6 1.10 1.10 0.27 5 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00

8 9 1.10 1.10 0.30 8 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00

10 11 1.10 1.10 0.47 10 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00

12 13 1.10 1.10 1.74 12 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00

14 13 1.10 2.19 0.65 14 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00

16 15 1.10 1.10 0.27 16 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00

18 17 1.10 1.10 0.98 18 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00

20 19 1.10 1.10 0.56 20 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00

22 21 1.10 1.10 1.36 22 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00

24 23 1.10 1.10 0.45 24 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00

0.000 13.000 0.000 0.000 0.000 0.000 0.000 0.000

PozoInicial

No

Prof.

(m)

Page 15: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFCICACIÓN DE POZOS DE VISITA

Página 15

CUANTIFICACIÓN DE POZOS DE VISITA Y CAIDAS ADOSADAS

100%

CLASIFICACION DE POZOS DE VISITA POR PROFUNDIDAD VOLUMEN (m3)

3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50 5.75 6.00 6.25 6.50 6.75 7.00 7.25 7.50 7.75 8.00 Total

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06

0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 19.58

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06

0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 26.07

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06

0.000 1.000 0.000 0.000 0.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 15.000 150.486

POZOS DE VISITA

Profundidad

De

0.51

1.01

1.26

EXCAVACION

Page 16: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFCICACIÓN DE POZOS DE VISITA

Página 16

Ingresar % de Material Tipo C

80% 20%

VOLUMEN (m3) CLASIFICACIÓN DE CAIDAS ADOSADAS POR PROFUNDIDAD ( m )

Pozo Tramo 0.5 1.0

6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 1-2 2.00 0.00 0.00

15.67 3.92 8.65 10.93 10.932 0.000 0.000 8.652 2-3 2.00 0.00 0.00

6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 7-3 0.00 0.00 0.00

20.86 5.21 11.52 14.55 14.552 0.000 0.000 11.517 3-4 0.00 0.00 0.00

6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 4-5 0.00 0.00 0.00

6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 5-6 0.27 1.00 0.00

6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 8-9 0.30 1.00 0.00

6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 10-11 0.47 1.00 0.00

6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 12-13 1.74 0.00 0.00

6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 14-13 0.65 0.00 1.00

6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 16-15 0.27 1.00 0.00

6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 18-17 0.98 0.00 1.00

6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 20-19 0.56 0.00 1.00

6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 22-21 1.36 0.00 0.00

6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 24-23 0.45 1.00 0.00

120.388 30.097 66.482 84.003 84.003 0.000 0.000 66.482 5.000 3.000

POZOS DE VISITA

Profundidad Piezas Piezas

A

1.00 0.000

1.25 13.000

1.50 0.000 13.000

MATERIALDE BANCO

(m3)

ACARREODE TIRO

(m3)Mat. Tipo COMUN

"B"

Mat. Tipo ROCA

"C"

RELLENO TOTAL

RELLENO C/ MAT. LUGAR

RELLENO FINAL C/ MAT

BANCO

Prof.De Caida

al finald el tramo

Page 17: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFCICACIÓN DE POZOS DE VISITA

Página 17

CLASIFICACIÓN DE CAIDAS ADOSADAS POR PROFUNDIDAD ( m )

1.5 2.0 2.5 3.0 3.5 4.0

0.00 1.00 0.00 0.00 0.00 0.00

0.00 1.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 1.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

1.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

1.000 3.000 0.000 0.000 0.000 0.000

ProfundidadPiezas

De A

0.500 1.000 3.000

1.010 1.500 1.000

1.510 2.000 3.000

CAIDA ADOSADA CON TUBERIA ADS

Page 18: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFCICACIÓN DE POZOS DE VISITA

Página 18

1.51

1.76

2.01

2.26

2.51

2.76

3.01

3.26

3.51

3.76

4.01

4.26

4.51

4.76

5.01

5.26

5.51

5.76

6.01

6.26

6.51

6.76

7.01

7.26

7.51

7.76

Tapas y Brocales

Page 19: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFCICACIÓN DE POZOS DE VISITA

Página 19

1.75 0.000

2.00 0.000 0.000

2.25 0.000

2.50 0.000 0.000

2.75 0.000

3.00 0.000 0.000

3.25 1.000

3.50 0.000 1.000

3.75 0.000

4.00 0.000 0.000

4.25 1.000

4.50 0.000 1.000

4.75 0.000

5.00 0.000 0.000

5.25 0.000

5.50 0.000 0.000

5.75 0.000

6.00 0.000 0.000

6.25 0.000

6.50 0.000 0.000

6.75 0.000

7.00 0.000 0.000

7.25 0.000

7.50 0.000 0.000

7.75 0.000

8.00 0.000 0.000

Tapas y Brocales 15.000

Page 20: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFCICACIÓN DE POZOS DE VISITA

Página 20

2.010 2.500 0.000

2.510 3.000 0.000

3.010 3.500 0.000

3.510 4.000 0.000

7.000

Page 21: Mem Calc y Volumenes de Obras Alcantarillado Sanitario

CUANTIFCICACIÓN DE POZOS DE VISITA

Página 21

ADS N-12

1 2 3 4 5 6Diámetro DiámetroEspesordiamteroAncho deEspesor de

efectivo nominal pared exterior zanja plantilla

10.4 4 0.01 0.12 0.53 0.1

15.2 6 0.01 0.18 0.58 0.1

20 8 0.02 0.23 0.63 0.1

25.1 10 0.02 0.29 0.71 0.1

30.8 12 0.03 0.37 0.79 0.1

38 15 0.04 0.45 0.86 0.1

45.9 18 0.04 0.54 0.99 0.1

61.2 24 0.05 0.72 1.22 0.1

76.2 30 0.07 0.89 1.68 0.1

91.4 36 0.07 1.06 1.98 0.1

105.4 42 0.08 1.21 2.11 0.1

120.9 48 0.08 1.36 2.26 0.1

151.4 60 0.08 1.664 2.59 0.15