EXCAVADORAEXCAVADORA
NOMBREPESO OPERATIVO (Kg)POTENCIA (Kw)CONSUMO gal/horaCAPACIDAD (m3)COSTO/HORA (S/.)RENDIMIENTO (m3/hora)INTEGRANTES1EXCAVADORA DE ORUGA210001034.91.695271.1SANCHEZ SILVA DAVID2EXCAVADORA DE ORUGA243001255.71.9107321.9LAMADRID MESONES JOS3EXCAVADORA DE ORUGA2479014062.3116331.2LUCERO DE LA CRUZ ANTONY4EXCAVADORA DE ORUGA3750020092.7145353.5CARMONA BERNILLA CSAR5EXCAVADORA DE ORUGA5800043.42.40.7675156.3DVILA QUISPE FRANKLIN6EXCAVADORA DE ORUGA340001865.11.84100311.77EXCAVADORA DE ORUGA473002808.32.25125324.08EXCAVADORA DE ORUGA220001124186192.09EXCAVADORA SOBRE RUEDAS20500671.940.9665184.310EXCAVADORA SOBRE RUEDAS27000933.471.186211.211EXCAVADORA SOBRE RUEDAS420001466.111.9123321.912EXCAVADORA SOBRE RUEDAS364982008.52.55140333.813EXCAVADORA SOBRE RUEDAS248001335.821.2110230.414EXCAVADORA SOBRE RUEDAS1850014571.5120254.115EXCAVADORA SOBRE RUEDAS225001295.921.1115211.216EXCAVADORA SOBRE RUEDAS2400014061.9110321.917EXCAVADORA HIDRALICA490001587.53.8120456.018EXCAVADORA HIDRALICA360002099.62.4152345.619EXCAVADORA HIDRALICA4000021510.22.7160353.520EXCAVADORA HIDRALICA74000362133.8168456.0
DATOS PARA RENDIMIENTOTIEMPO DE CICLO
VOLUMEN DE CUCHARON (m3)TIEMPO DE LAS FASES DE TRABAJO, EN SEGUNDOSCARGAGIRO CON CARGADESCARGAGIRO VACIOTOTAL
0.765423140.76 - 1.156423151.5 - 1.96434172.37544202.776452237645223.8774624RENDIMIENTO:60min*80%*Volumen cucharn/tiempo de ciclo