Rol, estrategia y objetivo final de las empresas junior exploradoras
OBM:TSX
-
Agenda
Definicin de una empresa junior
Rol y estrategia de una empresa junior
Financiamiento en el mercado de capitales
Caso de una empresa junior exitosa
2
-
Definicin de una Empresa Junior
3
Valorizacin= Market Cap o Nivel de Produccin
Empresa Junior
Exploracin
Etapa Inicial/Conceptual
Pre DDH (Perforacin)
Perforacin y Descubrimiento
Recursos
Estudio Econmico
Construccin
Produccin
Rie
sgo
-
Rol, Estrategia y Objetivo Final
4
Maximizar el valor de los
Socios
Activo o Idea
Financia-miento
Gerencia, Directorio,
Fundadores
-
$7.1
$17.3
$10.5$6.2 $5.1 $5.1
$1.5
169
284
377324
210
8651
2008 2009 2010 2011 2012 2013 2014 YTD
Total Proceeds (C$Bn) Number of Financings
El Financiamiento
El financiamiento en el mercado de capitales en los ltimos tiempos ha sido
complicado
Las empresas de exploracin en particuar han tenido muchos problemas para
obtener fondos
El factor de xito parece ser gerencias estables y directorios con buena
reputacin
5
Canadian Mining Equity Issuances Since 2008
Source: FP Infomart. Note: Includes transactions with proceeds >C$1.5MM.
-
$0.00
$2.00
$4.00
$6.00
$8.00
$10.00
$12.00
$14.00
$16.00
$18.00
2004 2006 2008 2010 2012 2014
Pre
cio
po
r ac
ci
n(C
$)
Caso de Estudio - Osisko Mining
Corporation
6
Descubrimiento de Malartic
Recursos
Construccin y Financiamiento
Inicio de Produccin
Oferta Hostil, Adquisicin Amigable por ~$3.9Bn & Nuevo Osisko Royalty Co.
Crisis Financiera Crisis Au
Crisis Financiera Crisis Au
Source: FactSet and company disclosure.
Adquisicin de Brett Resources (Hammond Reef
Project)
Adquisicin de Queenston Mining
(Upper Beaver Project)
-
Ciclo Minero-Caso General
Feasibility Construction/Development
Commercial Production
Pre-Feasibility Feasibility
Construction/Development
Commercial Production
OBAN
TMM
Torex
Dalradian
RIO
Source: TD Bank Capital Markets, adjusted by JAVB
-
150 York Street, Suite 410
Toronto, Ontario M5H 3K6
416.848.9504
www.obanmining.com
For further information on the Companys Material projects Please see NI 43 101
Antamayo Copper Skarn Project Department of Ancash, Peru 15th January 2014 by Stewart
Redwood
Huancavelica Lithocaps Project Department of Huancavelica Peru 14th January 2013 Stewart
Redwood (A copy may be found on sedar www.sedar.com under the companys profile or on our web site www.braevalmining.com)
-
APENDICE
-
OBAN MINING CORPORATION
Directores y Gerencia Gerencia
Jose Vizquerra. President and CEO
Blair Zaritsky. CFO
Gernot Wober. Vice President of Exploration
Directores
John Burzynski
Patrick F.N. Anderson
Keith MacKay
Bernardo Alvarez Calderon
Robert Wares
Consultores Senior Talisker Exploration
Chris Lodder, Ruben Padilla y Terry Harbort
10
-
OBAN MINING CORPORATION
11
Antamayo 4,043 m drilled by Oban, world class skarn potential, plus regional
play of approx. 16,000 ha.
Chosicano Conceptual Cu, Sn porphyry Ready to Drill
Arcopunco Conceptual large Gold Porphyry Ready to Drill (subject to weather and community)
Marcahui 25% (after Teck invests C$6M)
Bermejo Magnetics looks very promising
Cevichito Old DDH CPMC (100m @ 0.4% to be twinned)
16 prospects at or approaching drill stage
Oban Mining Exploration Projects
Phase 1 generative Phase 2 geochem +
geophys Phase 3 DDH ready
Au Mines Polymetallic Mines
Magdalena Optioned to
Promesa
Chosicano
Antamayo
Arcopunco
Marcahui Optioned to Teck
Bermejo
Cevichito
-
ANTAMAYO Cu-(Zn-Mo-Ag) Skarn Project Antamina type
12
Antamayo: good chances for the discovery of a large skarn system based on: geological setting, deposit style, level of erosion, district and local geology, alteration-geochemical footprint, and current drilling results.
A A A
24.5m @ 0.65% Cu
8.77m @ 0.54% Cu
7.75m @ 5.36% Cu
24.3m @ 0.92% Cu & 34.0m @ 0.39% Cu
41.5m @ 0.52% Cu
Parihuanca
DH5 DH4
ENDOSKARN
EXOSKARN
Chequiacocha Huinchos
Moraine Gravels
Pre and Inter mineral Composite
Diorite to Qz-Diorite Stock
553.4
980.5
A
A
A A
25km
-
Posibilidades de Financiamiento
Years 1 2 3 4 5 6 7 8 9 10
Asset Value
Project Stage Exploration Scoping Study
Pre- Feasibility
BFS Construction Ramp-Up Production
Cash Flow
Financing Alternatives
Asset Sales or JV
Equity Public / Private
Convertible Bond
Royalty Financing
Off-take Financing
Structured Loan
Project Finance
ECA Financing
High Yield Bond
Corporate Loan
Source: TD Bank Capital Markets, adjusted by JAVB
-
1.0MM oz Au -2.5MM oz Au
40%
2.5MM oz Au -5.0MM oz Au
27%
5.0MM oz Au -7.5MM oz Au
11%
> 7.5MM oz Au22%
El Activo: Cuan raro es un deposito de oro
de 1M oz? La exploracion es una de las etapas mas importantes en la industria minera
Debemos de continuar remplazando los depositos que se van consumiendo
Las empresas Majors en momentos de crisis lo primero que hacen es cortar la
exploracion Es acaso esto una solucion en el corto plazo!
Existen 439 depositos en el mundo que contienen mas de 1MM oz of gold, de
los cuales 250 no han sido desarrollados y 164 se encuantran en las Americas.
14
Depositos globales de oro por oz
Source: Natural Resource Holdings: Global Gold Mines & Deposits 2012 Ranking.
Depositos globales por juridiccion
Americas 56%
Rest of the World 44%