Insumos

2
MANO DE OBRA MATERIALES 408,652.46 GLN 6,699.60 45.00 148.88 M3 38 00006 GASOLINA 3,078.15 8.98 227.17 GLB 34 01511 YESO DE 28 Kg 127.25 14.17 13.55 24.00 950.00 9.50 100.00 UND 39 03489 COMEDOR PROVISIONAL P/PERSONAL HORMIGON 950.00 39 03726 M2 39 03722 CAPACITACIÓN EN SEGURIDAD Y SALUD 980.00 980.00 1.00 SIKAFLEX 11 FC PLUS O SIMILAR 22,800.00 CEMENTO PORTLAND TIPO IP (42.5KG) BOL 30 00830 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" 169.50 22.60 7.50 110.87 26 03449 45.00 98,629.99 20.30 4,858.62 BOL 21 00004 LADRILLO K.K. DE ARCILLA 9X14X24 CM PAR 4,989.15 30 00718 1.00 219.47 62.35 3.52 UND GLN ADITIVO DESMOLDANTE DE MADERA CORTAVIENTOS P/CASCO 45.00 110.87 GLN 30 01358 ADITIVO CURADOR DE CONCRETO 4,989.15 30 03437 580.00 1,850.00 LIJA PARA MADERA 1,043.23 1.90 549.07 HJA mes FRANELA 5.00 5.80 100.00 M2 39 03488 ESTUDIO DE SUELOS 39 03889 39 01390 500.00 UND 39 03721 SERVICIO ENERGIA ELECTRICA 2,250.00 450.00 5.00 39 01543 39 03844 1.00 1.00 UND 39 03892 PAGO DE SERVICIO DE AGUA 1,400.00 280.00 EST GLB 1,850.00 UND 39 03891 PLAN DE SEG. ELABORACIÓN, IMPLEMENTACIÓN Y ADM. DEL 985.00 55.00 1.00 1,100.00 39 03845 DISEÑO DE MEZCLA DE CONCRETO 450.00 450.00 UND UND 985.00 ENSAYO DE ROTURA DE BRIQUETAS DE CONCRETO UND 39 03888 ESTUDIO DE IMPACTO AMBIENTAL 2,300.00 2,300.00 1.00 20.00 39 03887 34,161.00 240.00 12.00 20.00 UND 39 03890 ENSAYO DE DENSIDAD DE CAMPO GLB 59.70 8,650.00 ALAMBRE NEGRO RECOCIDO # 16 14,211.83 4.10 3,466.30 KG KG ACEITE PARA MOTOR SAE 520.92 30.00 1.99 GLN 01 03432 SERVICIO CAMA BAJA (AREQUIPA - ISPACAS) 0.98 02 00714 16.90 CLAVOS PARA CALAMINA 226.50 7.55 30.00 KG 02 00384 02 00708 573.08 1.00 33.91 PLN 02 00381 ALAMBRE NEGRO RECOCIDO # 8 2,135.77 4.10 CALAMINA 0.18 MM X 1.80 X 0.81 M 47 00032 8,650.00 HH 47 00008 TOPOGRAFO 272.59 15.22 16.68 HH 166,032.89 CAPATAZ 21,966.23 18.35 1,197.07 HH 47 00007 17.91 OFICIAL est 00 02603 PEON 146,216.00 13.25 11,035.17 9,954.01 47 00010 0.30 74,164.75 14.65 5,062.44 HH 47 00009 OPERARIO HH M3 02 01349 67.03 M3 05 01356 PIEDRA CHANCADA DE 1/2" Y 3/4" 36,014.56 5,496.46 339.76 PIEDRA GRANDE DE 8" 05 01013 AGUA 968.65 4.20 230.63 M3 106.00 05 00710 34,858.16 PRUEBA HIDRAULICA 17 00749 PIEDRA MEDIANA DE 4" 6.56 82.00 82.00 M3 15,328.95 PIEDRA MEDIANA (MÁX 3") 792.94 82.00 9.67 M3 05 00725 0.08 710.88 0.74 4.10 0.18 KG 02 00709 CLAVOS PARA MADERA C/C 3" 05 00003 4.10 KG KG 02 00703 CLAVOS PARA MADERA C/C 2" 1.23 4.10 4.00 2,914.61 49.37 KG 65.00 235.83 M3 04 00044 ARENA FINA CLAVOS PARA MADERA C/C 4" 83.00 03 02371 M3 04 00055 ACERO CORRUGADO FY=4200 KG/CM2 (GRADO 60) 177,948.19 2.95 60,321.42 ARENA GRUESA 4,097.71 600.00 PINTURA LATEX 131.54 29.23 4.50 GLN 54 03648 PETROLEO 1,008.00 15.00 109.81 GLN 53 01353 59,240.39 13,618.48 P2 45 00706 TRIPLAY DE 4'x8'x 6 mm 9,000.00 4,639.70 1,080.00 500.00 TEKNOPOR DE 1" x 4' x 8' 20.63 16.50 1.25 PLN 54 00125 SELLADOR DE PARED GLN 13.00 356.90 GLN 54 03433 PINTURA LATEX SAT 1GL 5,929.74 54.00 4.35 60 01481 VESTUARIOS PROVISIONALES P/PERSONAL 2.00 UND 43 00711 BANNER DE 3.60x2.40 m 350.00 42.00 1.00 23.00 43 03843 350.00 16,800.00 1,050.00 16.00 M2 39 03723 P/PERSONAL SERVICIOS HIGIENICOS PROVISIONALES 4,320.00 MADERA TORNILLO INC.CORTE P/ENCOFRADO 53.46 24.00 PLN UND MADERA TORNILLO CEPILLADA 46.00 4.86 11.00 P2 44 00713 PALO DE EUCALIPTO DE 5" x 4 m ESTACA DE MADERA 63.60 3.36 18.93 P2 44 00719 44 00705 MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA INSTITUCIÓN EDUCATIVA ANDRES AVELINO YANAQUIHUA - CONDESUYOS - AREQUIPA GOBIERNO REGIONAL DE AREQUIPA CACERES - ISPACAS - YANAQUIHUA - CONDESUYOS - AREQUIPA 01 - CERCO PERIMETRICO INCLUIDO MUROS DE CONTENCION Junio - 2013 Consorcio: Ing YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES Sub Presupuesto Cliente Ubicacion Costo a : Obra Cantidad Parcial Precio Descripción IU Código Unidad Listado de Insumos P.1/2

description

Insumos

Transcript of Insumos

  • MANO DE OBRA

    MATERIALES

    408,652.46

    GLN6,699.6045.00148.88M3 38 00006

    GASOLINA 3,078.158.98

    227.17

    GLB

    34 01511YESO DE 28 Kg 127.2514.17

    13.55

    24.00950.009.50100.00UND 39 03489

    COMEDOR PROVISIONAL P/PERSONAL

    HORMIGON

    950.00 39 03726

    M2 39 03722CAPACITACIN EN SEGURIDAD Y SALUD 980.00980.001.00

    SIKAFLEX 11 FC PLUS O SIMILAR

    22,800.00

    CEMENTO PORTLAND TIPO IP (42.5KG)

    BOL

    30 00830BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" 169.5022.607.50

    110.87 26 03449

    45.00

    98,629.9920.304,858.62BOL 21 00004LADRILLO K.K. DE ARCILLA 9X14X24 CM

    PAR

    4,989.15

    30 00718

    1.00

    219.4762.353.52UND

    GLNADITIVO DESMOLDANTE DE MADERA

    CORTAVIENTOS P/CASCO

    45.00110.87GLN 30 01358ADITIVO CURADOR DE CONCRETO 4,989.15

    30 03437

    580.001,850.00

    LIJA PARA MADERA 1,043.231.90549.07HJAmes

    FRANELA

    5.00

    5.80100.00M2 39 03488ESTUDIO DE SUELOS

    39 03889

    39 01390

    500.00

    UND 39 03721SERVICIO ENERGIA ELECTRICA 2,250.00450.005.00

    39 01543

    39 03844

    1.00

    1.00UND 39 03892PAGO DE SERVICIO DE AGUA 1,400.00280.00

    EST

    GLB

    1,850.00

    UND 39 03891PLAN DE SEG.ELABORACIN, IMPLEMENTACIN Y ADM. DEL 985.00

    55.00

    1.00

    1,100.00

    39 03845DISEO DE MEZCLA DE CONCRETO 450.00450.00

    UND

    UND985.00

    ENSAYO DE ROTURA DE BRIQUETAS DE CONCRETO

    UND 39 03888ESTUDIO DE IMPACTO AMBIENTAL 2,300.002,300.001.00

    20.00

    39 03887

    34,161.00

    240.0012.0020.00UND 39 03890ENSAYO DE DENSIDAD DE CAMPO

    GLB

    59.708,650.00

    ALAMBRE NEGRO RECOCIDO # 16 14,211.834.103,466.30KGKG

    ACEITE PARA MOTOR SAE

    520.92

    30.001.99GLN 01 03432SERVICIO CAMA BAJA (AREQUIPA - ISPACAS)

    0.98

    02 00714

    16.90CLAVOS PARA CALAMINA 226.507.5530.00KG 02 00384

    02 00708573.08

    1.00

    33.91PLN 02 00381ALAMBRE NEGRO RECOCIDO # 8 2,135.774.10CALAMINA 0.18 MM X 1.80 X 0.81 M

    47 00032

    8,650.00

    HH 47 00008TOPOGRAFO 272.5915.22

    16.68HH

    166,032.89

    CAPATAZ 21,966.2318.351,197.07HH 47 0000717.91

    OFICIAL

    est 00 02603

    PEON 146,216.0013.2511,035.17

    9,954.01

    47 00010

    0.30

    74,164.7514.655,062.44HH 47 00009OPERARIO

    HH

    M3

    02 01349

    67.03M3 05 01356PIEDRA CHANCADA DE 1/2" Y 3/4" 36,014.56

    5,496.46339.76

    PIEDRA GRANDE DE 8" 05 01013

    AGUA 968.654.20230.63M3106.00

    05 0071034,858.16

    PRUEBA HIDRAULICA

    17 00749PIEDRA MEDIANA DE 4" 6.5682.00

    82.00

    M3

    15,328.95

    PIEDRA MEDIANA (MX 3") 792.9482.009.67M3 05 007250.08

    710.880.744.100.18KG 02 00709

    CLAVOS PARA MADERA C/C 3"

    05 00003

    4.10

    KG

    KG 02 00703CLAVOS PARA MADERA C/C 2" 1.234.10

    4.00

    2,914.61

    49.37

    KG

    65.00235.83M3 04 00044ARENA FINA

    CLAVOS PARA MADERA C/C 4"

    83.00 03 02371

    M3 04 00055ACERO CORRUGADO FY=4200 KG/CM2 (GRADO 60) 177,948.192.9560,321.42

    ARENA GRUESA4,097.71

    600.00PINTURA LATEX 131.5429.234.50GLN 54 03648PETROLEO

    1,008.00

    15.00

    109.81

    GLN 53 0135359,240.3913,618.48P2 45 00706

    TRIPLAY DE 4'x8'x 6 mm

    9,000.00

    4,639.70

    1,080.00

    500.00

    TEKNOPOR DE 1" x 4' x 8' 20.6316.501.25PLN

    54 00125SELLADOR DE PARED

    GLN13.00356.90GLN 54 03433

    PINTURA LATEX SAT 1GL 5,929.7454.00

    4.35

    60 01481

    VESTUARIOS PROVISIONALES P/PERSONAL

    2.00UND 43 00711BANNER DE 3.60x2.40 m 350.00

    42.00

    1.0023.00

    43 03843 350.0016,800.001,050.0016.00M2 39 03723

    P/PERSONALSERVICIOS HIGIENICOS PROVISIONALES 4,320.00

    MADERA TORNILLO INC.CORTE P/ENCOFRADO

    53.4624.00PLN

    UND

    MADERA TORNILLO CEPILLADA

    46.00

    4.8611.00P2 44 00713

    PALO DE EUCALIPTO DE 5" x 4 mESTACA DE MADERA 63.603.3618.93P2 44 00719

    44 00705

    MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA INSTITUCIN EDUCATIVA ANDRES AVELINO

    YANAQUIHUA - CONDESUYOS - AREQUIPAGOBIERNO REGIONAL DE AREQUIPA

    CACERES - ISPACAS - YANAQUIHUA - CONDESUYOS - AREQUIPA

    01 - CERCO PERIMETRICO INCLUIDO MUROS DE CONTENCION

    Junio - 2013

    Consorcio: Ing YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

    Sub PresupuestoClienteUbicacion Costo a :

    Obra

    Cantidad ParcialPrecioDescripcinIU Cdigo Unidad

    Listado de Insumos

    P.1/2

  • 122,519.15

    561,522.03

    EQUIPO

    HM

    130.00 260.00ZAPATOS DE SEGURIDAD P/ELECTRICISTA 48 01482 EST 558.37 0.46 256.85

    37 00005

    2.00

    48 03893

    ZAPATOS DE SEGURIDAD CON PUNTA DE ACERO

    48.00 165.00 7,920.00CAMION VOLQUETE 15 ton.ANDAMIO METAL TABLAS-ALQUILER

    5,000.00 37 03477 UND 100.00 3.00 300.00RESPIRADOR CONTRA POLVO 37 03486 PAR

    37 03491

    50.00

    PAR

    ZAPATOS DE SEGURIDAD CON PUNTA DE ACERO 37 03492 PAR 8.00 350.00 2,800.00

    5,121.71

    (P.TECNICO)

    48 00828

    100.00

    181.70HM 99.46 142.50 14,173.05RETROEXCAVADOR S/LLANTAS 58 HP 1 YD3.

    49 00383 HM

    1,903.98

    10.00

    11,742.89

    TEODOLITO 49 01357 HM 308.69 7.00 2,160.83VIBRADOR DE CONCRETO 4 HP 2.40"

    PROTECCION DE OIDOS TIPO TAPON

    18.17

    366.93

    2.69CIZALLA P/CORTE DE FIERRO 49 00039 HM 381.28 100.84 38,448.28CAMION VOLQUETE 4x2 140-210 HP 6 M3.

    49 02923

    HMPLANCHA COMPACTADORA VIBRAT. 4.0 HP

    10.00 3,669.30MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 49 00036 HM 995.16 11.80

    HM

    49 01512

    CHALECO REFLECTIVO

    100.00

    250.00

    1,200.00CASCOS TIPO JOCKEY DE PLASTICO 37 03485 UND 100.00

    11,991.74

    4,700.00 37 03476

    37 03493 UND 8.00 65.00 520.00CHALECO REFLECTIVO (P.TECNICO) 37 03481 UND

    47.00

    18.00 37 03483 UND 100.00 26.00 2,600.00CAMISA MANGA LARGA DENIM 37 03478

    100.00

    100.00

    12.00

    1,800.00CARETA TRANSPARENTE PARA ESMERILAR 37 03490 PZA 8.00 16.00 128.00CASCOS BLANCO (P.TECNICO)

    UND

    100.00

    LENTES DE SEGURIDAD (P.TECNICO) 37 03487 RLL 4.00 85.00 340.00MALLA DE SEGURIDAD X 1.00 MTS

    364.80

    UND100.00

    38.00 3,800.00PANTALON DENIM 37 03480 UND

    9.90

    2.50

    PZA

    37 03484

    10.50

    45.60

    990.00GUANTES DE CUERO REFORZADO 37 03482 100.00 1,050.00GUANTES DE JEBE

    %MOHERRAMIENTAS MANUALES

    UNDUND 100.00 7.50 750.00LENTES DE SEGURIDAD

    37 03494 37 03479

    8.00

    UND

    1,208,519.16COSTO TOTAL PRESUPUESTAL

    Son : UN MILLON DOSCIENTOS OCHO MIL QUINIENTOS DIECINUEVE CON 16/100 NUEVOS SOLES

    YANAQUIHUA - CONDESUYOS - AREQUIPAGOBIERNO REGIONAL DE AREQUIPA

    CACERES - ISPACAS - YANAQUIHUA - CONDESUYOS - AREQUIPA

    GASTOS DE LIQUIDACION 25,131.95

    MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA INSTITUCIN EDUCATIVA ANDRES AVELINO

    78,673.941,092,693.64

    GASTOS DE SUPERVISION

    COSTO DIRECTO

    1.10 % 12,019.63

    7.20 %GASTOS GENERALES2.30 %

    01 - CERCO PERIMETRICO INCLUIDO MUROS DE CONTENCION

    Junio - 2013

    Consorcio: Ing YURI WILBER RUELAS CASTILLO & Arq. ALBERTO ANTONIO ROJAS TORRES

    Obra

    UbicacionCliente

    Costo a :

    Sub Presupuesto

    Cantidad ParcialIU Cdigo Descripcin Unidad Precio

    Listado de Insumos

    P.2/2