1 Página : S10 Precios y cantidades de recursos requeridos por tipo Obra MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JIRON FRANCISCO BOLOGNESI 1201002 Subpresupuesto 001 MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JIRON FRANCISCO BOLOGNESI Fecha 17/03/2015 PUNO - AZANGARO - AZANGARO Lugar 210201 Código Cantidad Unidad Recurso Parcial S/. resupuestado S/. Precio S/. MANO DE OBRA 1,030.0085 10,300.08 10,369.35 10.00 OPERADOR DE EQUIPO PESADO 0147000023 hh 207.2692 2,072.69 2,059.20 10.00 TOPOGRAFO 0147000032 hh 11,367.4072 97,191.33 97,152.03 8.55 OPERARIO 0147010002 hh 8,206.9955 56,792.41 56,787.40 6.92 OFICIAL 0147010003 hh 35,354.1033 206,114.42 206,072.76 5.83 PEON 0147010004 hh 257.9514 1,785.02 1,774.86 6.92 CONTROLADOR OFICIAL 0147010023 hh 374,215.60 374,255.95 MATERIALES 294.0650 1,529.14 1,529.25 5.20 ALAMBRE NEGRO RECOCIDO # 16 0202000007 kg 38.6660 201.06 201.06 5.20 CLAVOS PARA MADERA C/C 3" 0202010005 kg 349.7100 1,818.49 1,818.49 5.20 CLAVOS PARA MADERA C/C 2 1/2 ", 3" Y 4" 0202010061 kg 153.6640 799.05 799.05 5.20 CLAVOS Fo No C/C 3" 0202020004 kg 387.3780 2,014.37 2,014.37 5.20 ALAMBRE NEGRO N°16 0202040009 kg 129.1260 671.46 671.46 5.20 ALAMBRE NEGRO N°8 0202040010 kg 26.0000 26.00 26.00 1.00 PERNOS 1/4" X 2 1/2" 0202140001 und 93.9330 338.16 338.16 3.60 FIERRO CORRUGADO PROMEDIO 0203000032 kg 123.5000 308.75 308.88 2.50 FIERRO CORRUGADO DE 3/8" 0203000033 m 6,484.9680 23,345.88 23,370.72 3.60 FIERRO CORRUGADO DE 1/2" 0203030100 kg 270.3492 973.26 970.69 3.60 FIERRO CORRUGADO DE 1/2" P/ESTACAS 0203030101 kg 1,281.1157 32,027.89 32,059.37 25.00 ARENA FINA 0204000000 m3 10.4682 314.05 314.05 30.00 ARENA FINA PARA CAMA Y SELLO DE ADOQUINES 0204000008 m3 165.7180 4,142.95 4,142.96 25.00 TIERRA DE CHACRA O VEGETAL 0204010003 m3 380.0000 17,100.00 17,100.00 45.00 PIEDRA SELECCIONADA Y HABILITADA 0205000033 m2 1,098.5304 10,985.30 10,985.30 10.00 AFIRMADO PARA BASE 0205010001 m3 2,112.6406 52,816.02 52,837.98 25.00 ARENA GRUESA 0205010004 m3 4,984.0800 24,920.40 24,920.40 5.00 MATERIAL DE RELLENO (DERECHO DE EXTRACCION) 0205010014 m3 226.6632 5,666.58 5,666.58 25.00 AFIRMADO PARA VEREDAS 0205010035 m3 183.1935 9,159.67 9,159.68 50.00 ADOQUINES DE CONCRETO DE 10x20CM, E=4CM 0205030078 m2 439.4517 6,591.78 6,614.78 15.00 ASFALTO RC-250 0213000006 gln 20,981.2536 503,550.09 503,544.15 24.00 CEMENTO PORTLAND TIPO IP (42.5KG) 0221000000 bol 2,815.9365 67,582.48 67,582.48 24.00 CEMENTO PORTLAND TIPO IP (42.5KG) APORTE BENEFICIARIO 0221000093 bol 420.0000 420.00 420.00 1.00 CINTA DE SEGURIDAD COLOR AMARILLO 0229040091 m 7.0000 455.00 455.00 65.00 CONO COLOR NARANJA P/SEÑALIZACION 0229040092 pza 2,002.8900 30,043.35 30,043.35 15.00 OCRE NEGRO 0229150004 kg 1,145.5350 17,183.03 17,183.03 15.00 OCRE DE COLOR 0229150099 kg 2.0800 37.44 37.44 18.00 ELECTRODO E-6010 0229550093 kg 150.0000 600.00 600.00 4.00 ACCESORIOS P/REPARACION INSTALACION DOMICILIARIA DE AGUA 0229720002 est 150.0000 450.00 450.00 3.00 ACCESORIOS P/REPARACION INSTALACION DOMICILIARIA DE DESAGUE 0229720003 est 73.7362 442.42 442.42 6.00 YESO DE 28 Kg 0230020001 bol 46.0992 3,918.43 3,918.43 85.00 LACA DESMOLDEADORA 0230200005 gln 52.0000 936.00 936.00 18.00 LAMINA REFLECTORIZANTE 0230670002 p2 1.8889 94.45 94.44 50.00 WINCHA 0230990080 und 5.4000 135.00 135.00 25.00 HORMIGON 0238000000 m3 4.0000 600.00 600.00 150.00 ALQUILER DE ALMACEN, GUARDIANIA Y OFICINA DE RESIDENCIA 0239010100 mes 43.4581 5,214.97 5,214.97 120.00 DISCO DIAMANTADO DE CORTE D=14" 0239020103 pza 14.2044 426.13 426.14 30.00 GUANO VACUNO 0239070000 m3 14.2044 142.04 142.04 10.00 FERTILIZANTES 0239070002 kg 1.0000 1,250.00 1,250.00 1,250.00 CARTEL DE OBRA DE BANNER I/INSTALACION Y TRANSP 0239900102 glb 700.0000 2,800.00 2,800.00 4.00 MALLA DE PLASTICO PARA PROTECCION DE OBRA C/NARANJA 0239900103 m 7,061.2600 35,306.30 35,306.30 5.00 MADERA NACIONAL P/ENCOFRADO-CARP 0243000025 p2 22.0990 662.97 662.97 30.00 GRASS 0243160053 kg 115.0000 2,300.00 2,300.00 20.00 PLANTA ORNAMENTAL 0243160054 und 12.5924 25.18 25.18 2.00 ESTACA DE MADERA 0244010000 p2 161.3472 3,226.94 3,226.94 20.00 TRIPLAY DE 8 MM 0244030024 m2 4.5000 202.50 202.50 45.00 TRIPLAY 4 X 8 X 6 MM. 0245010007 pln 19.2278 480.69 480.70 25.00 MALLA DE ACERO PARA ZARANDA 1/4" 0246240018 m 8.8400 574.60 574.60 65.00 ANGULO 2"x2"x1/8" x6m. AREQUIPA 0251010005 pza

description

insumos

Transcript of In Sumos

  • 1Pgina :S10

    Precios y cantidades de recursos requeridos por tipoObra MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JIRON FRANCISCO

    BOLOGNESI

    1201002

    Subpresupuesto 001 MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JIRON FRANCISCO BOLOGNESI

    Fecha 17/03/2015PUNO - AZANGARO - AZANGAROLugar 210201

    Cdigo CantidadUnidadRecurso Parcial S/.Presupuestado S/.Precio S/.

    MANO DE OBRA1,030.0085 10,300.08 10,369.3510.00OPERADOR DE EQUIPO PESADO0147000023 hh

    207.2692 2,072.69 2,059.2010.00TOPOGRAFO0147000032 hh11,367.4072 97,191.33 97,152.038.55OPERARIO0147010002 hh

    8,206.9955 56,792.41 56,787.406.92OFICIAL0147010003 hh35,354.1033 206,114.42 206,072.765.83PEON0147010004 hh

    257.9514 1,785.02 1,774.866.92CONTROLADOR OFICIAL0147010023 hh

    374,215.60374,255.95

    MATERIALES294.0650 1,529.14 1,529.255.20ALAMBRE NEGRO RECOCIDO # 160202000007 kg

    38.6660 201.06 201.065.20CLAVOS PARA MADERA C/C 3"0202010005 kg349.7100 1,818.49 1,818.495.20CLAVOS PARA MADERA C/C 2 1/2 ", 3" Y 4"0202010061 kg153.6640 799.05 799.055.20CLAVOS Fo No C/C 3"0202020004 kg387.3780 2,014.37 2,014.375.20ALAMBRE NEGRO N160202040009 kg129.1260 671.46 671.465.20ALAMBRE NEGRO N80202040010 kg

    26.0000 26.00 26.001.00PERNOS 1/4" X 2 1/2"0202140001 und93.9330 338.16 338.163.60FIERRO CORRUGADO PROMEDIO0203000032 kg

    123.5000 308.75 308.882.50FIERRO CORRUGADO DE 3/8"0203000033 m6,484.9680 23,345.88 23,370.723.60FIERRO CORRUGADO DE 1/2"0203030100 kg

    270.3492 973.26 970.693.60FIERRO CORRUGADO DE 1/2" P/ESTACAS0203030101 kg1,281.1157 32,027.89 32,059.3725.00ARENA FINA0204000000 m3

    10.4682 314.05 314.0530.00ARENA FINA PARA CAMA Y SELLO DE ADOQUINES

    0204000008 m3

    165.7180 4,142.95 4,142.9625.00TIERRA DE CHACRA O VEGETAL0204010003 m3380.0000 17,100.00 17,100.0045.00PIEDRA SELECCIONADA Y HABILITADA0205000033 m2

    1,098.5304 10,985.30 10,985.3010.00AFIRMADO PARA BASE0205010001 m32,112.6406 52,816.02 52,837.9825.00ARENA GRUESA0205010004 m34,984.0800 24,920.40 24,920.405.00MATERIAL DE RELLENO (DERECHO DE

    EXTRACCION)0205010014 m3

    226.6632 5,666.58 5,666.5825.00AFIRMADO PARA VEREDAS0205010035 m3183.1935 9,159.67 9,159.6850.00ADOQUINES DE CONCRETO DE 10x20CM,

    E=4CM0205030078 m2

    439.4517 6,591.78 6,614.7815.00ASFALTO RC-2500213000006 gln20,981.2536 503,550.09 503,544.1524.00CEMENTO PORTLAND TIPO IP (42.5KG)0221000000 bol

    2,815.9365 67,582.48 67,582.4824.00CEMENTO PORTLAND TIPO IP (42.5KG) APORTE BENEFICIARIO

    0221000093 bol

    420.0000 420.00 420.001.00CINTA DE SEGURIDAD COLOR AMARILLO0229040091 m7.0000 455.00 455.0065.00CONO COLOR NARANJA P/SEALIZACION0229040092 pza

    2,002.8900 30,043.35 30,043.3515.00OCRE NEGRO0229150004 kg1,145.5350 17,183.03 17,183.0315.00OCRE DE COLOR0229150099 kg

    2.0800 37.44 37.4418.00ELECTRODO E-60100229550093 kg150.0000 600.00 600.004.00ACCESORIOS P/REPARACION INSTALACION

    DOMICILIARIA DE AGUA0229720002 est

    150.0000 450.00 450.003.00ACCESORIOS P/REPARACION INSTALACION DOMICILIARIA DE DESAGUE

    0229720003 est

    73.7362 442.42 442.426.00YESO DE 28 Kg0230020001 bol46.0992 3,918.43 3,918.4385.00LACA DESMOLDEADORA0230200005 gln52.0000 936.00 936.0018.00LAMINA REFLECTORIZANTE0230670002 p2

    1.8889 94.45 94.4450.00WINCHA0230990080 und5.4000 135.00 135.0025.00HORMIGON0238000000 m34.0000 600.00 600.00150.00ALQUILER DE ALMACEN, GUARDIANIA Y

    OFICINA DE RESIDENCIA0239010100 mes

    43.4581 5,214.97 5,214.97120.00DISCO DIAMANTADO DE CORTE D=14"0239020103 pza14.2044 426.13 426.1430.00GUANO VACUNO0239070000 m314.2044 142.04 142.0410.00FERTILIZANTES0239070002 kg

    1.0000 1,250.00 1,250.001,250.00CARTEL DE OBRA DE BANNER I/INSTALACION Y TRANSP

    0239900102 glb

    700.0000 2,800.00 2,800.004.00MALLA DE PLASTICO PARA PROTECCION DE OBRA C/NARANJA

    0239900103 m

    7,061.2600 35,306.30 35,306.305.00MADERA NACIONAL P/ENCOFRADO-CARP0243000025 p222.0990 662.97 662.9730.00GRASS0243160053 kg

    115.0000 2,300.00 2,300.0020.00PLANTA ORNAMENTAL0243160054 und12.5924 25.18 25.182.00ESTACA DE MADERA0244010000 p2

    161.3472 3,226.94 3,226.9420.00TRIPLAY DE 8 MM0244030024 m24.5000 202.50 202.5045.00TRIPLAY 4 X 8 X 6 MM.0245010007 pln

    19.2278 480.69 480.7025.00MALLA DE ACERO PARA ZARANDA 1/4"0246240018 m8.8400 574.60 574.6065.00ANGULO 2"x2"x1/8" x6m. AREQUIPA0251010005 pza

  • 2Pgina :S10

    Precios y cantidades de recursos requeridos por tipoObra MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JIRON FRANCISCO

    BOLOGNESI

    1201002

    Subpresupuesto 001 MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL URBANA DEL JIRON FRANCISCO BOLOGNESI

    Fecha 17/03/2015PUNO - AZANGARO - AZANGAROLugar 210201

    Cdigo CantidadUnidadRecurso Parcial S/.Presupuestado S/.Precio S/.

    5.0000 6,000.00 6,000.001,200.00STAR TECHADO SEGUN DISEO0251990104 glb124.1660 4,345.81 4,345.8135.00GRASA0253910011 kg

    0.4550 20.48 20.5445.00PINTURA ANTICORROSIVA0254060000 gln22.7140 794.99 817.4735.00PINTURA ESMALTE0254110090 gln50.5800 3,034.80 3,034.8060.00PINTURA DE TRAFICO0254450070 gln

    4.6800 421.20 421.2090.00PLANCHA GALVANIZADA DE 1/16"0261000001 m240.3000 2,619.50 2,619.5065.00TUB. FIERRO NEGRO DE 2" x 6.4m0265170063 m84.0000 840.00 840.0010.00POSTES DE MADERA DE 1.20m0265250002 und56.2000 1,967.00 1,967.0035.00TUBERIA PVC DN 200MM ISO-DIS4435-1995

    UF INC/ANILLO0272080030 m

    45.0000 900.00 900.0020.00TUBERIA PVC UF C-10 D=4" (AGUA) ISO 4422 INC/ANILLO

    0272080031 m

    150.0000 3,750.00 3,750.0025.00TUBO PVC SAL 6"0273010010 m450.0000 1,125.00 1,125.002.50TUBO PVC 1/2"0274010092 m993.3280 4,469.98 4,469.984.50TUBO PVC SEL DE 1/2"x3m0274010096 und

    905,214.61905,099.03

    EQUIPOS110.1556 1,101.56 1,115.0410.00TEODOLITO0330550056 hm

    97.5632 975.63 989.1210.00NIVEL0330550057 hm8,355.96 8,355.96HERRAMIENTAS MANUALES0337010001 %MO

    4.0464 202.32 202.3250.00WINCHA DE 50m0337020039 HE5,182.3663 77,735.49 77,690.4115.00MEZCLADORA DE CONCRETO DE 9 -11P30348010011 hm

    58.6118 10,550.12 10,551.12180.00CAMION CISTERNA 4x2 (AGUA) 122 HP 2,0000348040003 hm366.5787 84,313.10 84,330.58230.00CAMION VOLQUETE 6x4 330 HP 10 M3.0348040027 hm

    29.3060 439.59 438.6015.00MOTOBOMBA 10 HP 4"0348080000 hm414.0936 12,422.81 12,416.6030.00CORTADORA DE PAVIMENTOS0348500002 hm486.3344 7,295.02 7,295.0115.00COMPACTADOR VIBR. TIPO PLANCHA 4 HP0349030001 hm

    85.9754 15,475.57 15,475.57180.00RODILLO LISO VIBR AUTOP 101-135HP 10-12T

    0349030007 hm

    163.4777 32,695.54 32,695.54200.00CARGADOR S/LLANTAS 125-155 HP 3 YD3.0349040010 hm182.6665 47,493.29 47,498.25260.00TRACTOR DE ORUGAS DE 190-240 HP0349040034 hm571.8251 5,718.25 5,708.2410.00VIBRADOR DE CONCRETO 4 HP 1.50"0349070003 hm

    77.3214 19,330.35 19,330.35250.00EXCAVADORA SOBRE ORUGAS 115-165HP0349080100 hm172.6984 37,993.65 38,003.61220.00MOTONIVELADORA DE 125 HP0349090000 hm

    12.5924 125.92 125.9210.00NIVEL0349190003 HE1.0000 8,000.00 8,000.008,000.00MOVILIZACION Y DESMOVILIZACION DE

    EQUIPOS Y MAQUINARIA0398010050 glb

    370,222.24370,224.17

    La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizando

    Total S/.

    S/.

    1,649,579.15 1,649,652.45

    1,649,652.45