HUACEContents

Ⅰ. COMPANY OVERVIEWⅡ. PRODUCTION PROCESS Ⅲ. CORE COMPETENCIES-TQRDCⅣ. FACTORY REVIEW

2016-8-25 2

Page 3: Huace Presentation in 2017

HUACE

2016-8-25 3

1. COMPANY REVIEW HUACE

PROFILE

Company HANGZHOU HUACE MANUFACTURE & TRADE CO.,LTD C.E.O LINGHUA, BAO Established date DEC. 22th 2012 Main product Cycling helmets, ski helmets, skateboard helmets Homepage www.sino-huace.com

1. COMPANY REVIEW HUACE

Page 4: Huace Presentation in 2017

HUACE

2016-8-25 4

1. COMPANY REVIEW HUACE

ORGANIZATION CHART

1. COMPANY REVIEW HUACE

Page 5: Huace Presentation in 2017

HUACE

2016-8-25 5

1. COMPANY REVIEW HUACE

EQUIPMENTS

Germany Kurtz X1.5 EPS Pre-forming machine 1

Specified Helmet EPS Forming machines 9

Automatic Printing machines 2

Shell Therforming machines 3

Injection machines 5

Painting machines 2

Cutting padding machine 1

Straps assembling machines 2

Testing machines 3 (Will be ready on 11/2016)

1. COMPANY REVIEW HUACE

Page 6: Huace Presentation in 2017

HUACE

2016-8-256

1. COMPANY REVIEW HUACE 2. PRODUCTION PROCESS HUACE

Page 7: Huace Presentation in 2017

HUACE

2016-8-25 7

1. COMPANY REVIEW HUACE

TECHNOLOGY QUALITY

RESPONSE

DELIVERY TIME MODERATE COST

- Owned Tooling factory - R&D team with 10 years in helmet industry- The lead time from design to first samples is 40 days

- Fully Quality control management

- Reply in high speed

- MID SEASON: 40-45DAYS- OFF SEASON: 35-40DAYS

- High quality, moderate price

3. CORE COMPETENCIES- TQRDC HUACE

TECHNOLOGY

QUALITY

RESPONSE

DELIVERY TIME

COST

Page 8: Huace Presentation in 2017

HUACE

2016-8-25 8

1. COMPANY REVIEW HUACE

Data segmentation Try runassembleCasting modelClay Clay model 3D

3D Printing: for plastic components prototype.

1. Improve the precision.

2. Control the risk.

3. Guarantee the lead-time

4. Control the cost

Huace helmets CNC lead-time from design to real sample is 40 days.

TECHNOLOGY

2. CORE COMPETENCIES- TQRDC HUACE

Page 9: Huace Presentation in 2017

HUACE

2016-8-25 9

1. COMPANY REVIEW HUACE

Huace testing machines will be ready on Nov. 2016

TESTING MACHINES

IMPACTING TESTING MACHINE RETENTION SYSTEM MACHINE ROLLOFF MACHINE FIELD OF VISION

3. CORE COMPETENCIES- TQRDC HUACE

Page 10: Huace Presentation in 2017

HUACE

2016-8-25 10

1. COMPANY REVIEW HUACE

Huace helmets CNC lead-time from design to real sample is 40 days.

QUALITY

3. CORE COMPETENCIES- TQRDC HUACE

Page 11: Huace Presentation in 2017

首件检验报告

First piece inspection Report

2016-8-25 11

3. CORE COMPETENCIES- TQRDC HUACE

Page 12: Huace Presentation in 2017

过程检验报告

in-process inspection Report

2016-8-25 12

3. CORE COMPETENCIES- TQRDC HUACE

Page 13: Huace Presentation in 2017

不合格评审流程

Non-conforming procedures纠正预防措施报告

Corrective and preventive action Report

2016-8-25 13

3. CORE COMPETENCIES- TQRDC HUACE

Page 14: Huace Presentation in 2017

作业指导书Work instructions

2016-8-25 14

3. CORE COMPETENCIES- TQRDC HUACE

Page 15: Huace Presentation in 2017

Inspection Standard Inspection Report

2016-8-25 15

3. CORE COMPETENCIES- TQRDC HUACE

Page 16: Huace Presentation in 2017

CIP of quality project in Huace

1. EPS shell 2. Fitting system 3. Buckles 4. Printing 5. Color aberration.Helmets quality defects top5:

EPS shell quality report

Defects description

Bad-Syncretized:EPS particals do not syncretize together well, fall off easily

1/ Heating time or stream presure lower than tolerance;2/ Steam hole distance is too big;3/ Steam hole blocked;4/ The mold slider is too thick

1/ Adjust the heating time or pressure to meet the standard; Or re define the standard2/ Check the EPS mold, and open more steam hole to make the steam hole distance around 15mm;3/ Check the mold steam hole, and clear the blocked holes.4/ Drill holes to improve the steam transfer.

Photos Root cause CAP

Turgescence:

Part of whole EPS shell apprears bigger than actually volume

1/ Steam holes are not uniformed; some part of the mould have extensive steam hole, while some part don't have;2/ After EPS shell process, Cooling not uniformed;

1/ Check the mould to see if the steam holes are well uniformed, if so, modified the steam holes to be more unformed;2/ Aviod any possible tough by foreign tough for cooling process EPS shell;

Feed-in Deficiency:

There is sunken due to lack of feed-in material on the surface

1/ Materials are not enough or used up2/ Injection tube blocked3/ Steam hole not enough or not uniformed

1/ Input more pre-expanded raw materials2/ Change the injection tube3/ modified the steam hole distribution of the mould

Injection Point Higher:

The injection point is higher than the flat surface. The higher EPS part will hurt customers

1/ Well fix the injection tube2/ Change to good injection tube, make sure the good situation of the mouth of injection tube;3/ Change the injection tube and make sure the length meet to the mould

1/ Injection tube not well fixed2/ The mounth of Injection tube damaged3/ Injection tube length cannot meet the mold

2016-8-25 16

3. CORE COMPETENCIES- TQRDC HUACE

Page 17: Huace Presentation in 2017

HUACE

2016-8-25 17

1. COMPANY REVIEW HUACE

MACHINARY SETTING

4. FACTORY REVIEW HUACE

Page 18: Huace Presentation in 2017

HUACE

2016-8-25 18

1. COMPANY REVIEW HUACE

DEFECTIVE PRODUCTS ON SITE

BARCORD, TRACIBILITY

PROTECTIVE RODUCTS

4. FACTORY REVIEW HUACE

Page 19: Huace Presentation in 2017

HUACE

2016-8-25 19

1. COMPANY REVIEW HUACE

Warning sign

Quality checking staff on-site

First sample confirmed on-site

4. FACTORY REVIEW HUACE

Page 20: Huace Presentation in 2017

HUACE

2016-8-25 20

1. COMPANY REVIEW HUACE

Measurement tools

separate operation areas and transit path

Warehouse

4. FACTORY REVIEW HUACE

Page 21: Huace Presentation in 2017

OEM BRANDS

4. FACTORY REVIEW HUACE

Page 22: Huace Presentation in 2017

HUACE2016-8-25 22

HUACE