H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
EQUIPOS Y APLICACIONES PARA MINERIA
HERRENKNECHT
Santiago, Mayo 2012
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
HERRENKNECHT AG
SCHWANAU HEADQUARTERS.
3,300 Empleados mundial
2,000 Empleados Alemania
227 Practicantes / Trainees
Herrenknecht en cifras (por ao):
60 TBM gran dimetro
90 TBM Micro (< 4m de diametro)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
ALL AROUND TUNNELLING SOLUTIONS.
PORTFOLIO DE PRODUCTOS Y SERVICIOS
HERRENKNECHT
CORE PRODUCT AND SERVICE UNITS
Machines for the construction of sustainable underground infrastructure
HERRENKNECHT BRANDS
ADDITIONAL EQUIPMENT SERVICES
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
GRUPO HERRENKNECHT EN CIFRAS (2011)Facturacin 1.000 millones - 3.900 empleados ms de 50% de participacin en el mercado
Geologas:
Arcilla (Clay)
Limo (Silt)
Arena (Sand)
Grava (Gravel)
Roca (Rock)
Agua subterrnea
(Ground water)
Tipos de Tneles:
Agua Potable
Aguas
Residuales
Electricidad
Petrleo / Gas
Viales
Rerroviarios
Metro
Hidrulicos
Minera
Minera
Subterrnea
Proveedor integral:
MSD: Equipos de transporte
H+E: Bandas transportadoras
UTS: Personal especializado
y servicios de consultora
Encofrados: Dovelas
Herrenknecht Vertical:
Equipos de perforacin
vertical hasta 6000m de
profundidad
VMT: Sistema de gua para
TBM
Mineria
Tipo de Maquinas:
TBM EPB Suelo Blando
TBM Escudo Mixto
TBM Gripper Roca
TBM Escudo Simple Roca
TBM Escudo Doble Roca
TBM Convertibles
TBM para microtuneles
Pipe Jacking
Perforacin horizontal dirigida
(HDD)
Mquinas para perforacin
vertical de Piques
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Subsidiarias
Distribuidores
ChileArgentina
Brazil
Mexico
USA
gypten
FranceSpain
UK
NetherlandsSwitzerlandGermany
Poland Russia
Kuwait
Iran
Singapore
Thailand
Korea
Taiwan
China
Australia
ItalyTurkey
Seattle
Venezuela
LA RED MUNDIAL.
CERCA Y A RPIDA DISPOSICIN DE LOS CLIENTES.
Pg.6 22.05.2012 BU TT PM1.6 MINING
Panama
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
AGENDA
1. OVERVIEW - APLICACIONES PARA MINERIA HERRENKNECHT
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
3. EQUIPOS PARA EXCAVACIONES VERTICALES
Boxhole Borer Machine (BBM)
Raise Borer Machine (RBR)
4. EQUIPOS Y APLICACIONES PARA EXCAVACIONES VERTICALES DE GRAN DIAMETRO
Shaft Boring System (SBS)
Shaft Boring Roadheader (SBR)
Shaft Sinking Jumbos
5. PERFORACION HORIZONTAL DIRIGIDA Y DIRECT PIPE
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
Profile Management System
Positioning and Communication System
SLS para Roadheader, Excavator y Bolter
7. SISTEMAS DE TRANSPORTE Y EXTRACCION.
Bandas Transportadoras (Conveyor Systems)
Bandas Transportadoras para Perforacion & Tronadura (Drill & Blast)
8. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
Equipos Utilitarios / Multiservicio
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
AGENDA
1. OVERVIEW - APLICACIONES PARA MINERIA HERRENKNECHT
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
3. EQUIPOS PARA EXCAVACIONES VERTICALES
Boxhole Borer Machine (BBM)
Raise Borer Machine (RBR)
4. EQUIPOS Y APLICACIONES PARA EXCAVACIONES VERTICALES DE GRAN DIAMETRO
Shaft Boring System (SBS)
Shaft Boring Roadheader (SBR)
Shaft Sinking Jumbos
5. PERFORACION HORIZONTAL DIRIGIDA Y DIRECT PIPE
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
Profile Management System
Positioning and Communication System
SLS para Roadheader, Excavator y Bolter
7. SISTEMAS DE TRANSPORTE Y EXTRACCION.
Bandas Transportadoras (Conveyor Systems)
Bandas Transportadoras para Perforacion & Tronadura (Drill & Blast)
8. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
Equipos Utilitarios / Multiservicio
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
SBS
BBM
RBR
TBM
TBM
Drilling
VSMSBR
1. OVERVIEW - APLICACIONES PARA MINERIA HERRENKNECHT
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
AGENDA
1. OVERVIEW - APLICACIONES PARA MINERIA HERRENKNECHT
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
3. EQUIPOS PARA EXCAVACIONES VERTICALES
Boxhole Borer Machine (BBM)
Raise Borer Machine (RBR)
4. EQUIPOS Y APLICACIONES PARA EXCAVACIONES VERTICALES DE GRAN DIAMETRO
Shaft Boring System (SBS)
Shaft Boring Roadheader (SBR)
Shaft Sinking Jumbos
5. PERFORACION HORIZONTAL DIRIGIDA Y DIRECT PIPE
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
Profile Management System
Positioning and Communication System
SLS para Roadheader, Excavator y Bolter
7. SISTEMAS DE TRANSPORTE Y EXTRACCION.
Bandas Transportadoras (Conveyor Systems)
Bandas Transportadoras para Perforacion & Tronadura (Drill & Blast)
8. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
Equipos Utilitarios / Multiservicio
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Tneles para rampas de acceso y desarrollos para
produccin
Rendimientos promedio de 400 500 m/mes
Pendientes de +/- 18% (Standard)
Radios de Giro 200m (90 m sin Conveyor)
Pg.11 22.05.2012 BU TT PM1.6 MINING
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.15 22.05.2012 BU TT PM1.6 MINING
TBM Gripper
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Comparacion de Avances TBM D&BTunel L= 5.000 m
Pg.30 22.05.2012 BU TT PM1.6 MINING
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Instalacin de Sostenimiento
Pg.31 22.05.2012 BU TT PM1.6 MINING
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Dispositivo instalacin de Malla
Pg.32 22.05.2012 BU TT PM1.6 MINING
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Roboshot ( Dispositivo colocacin hormign proyectado )
Pg.33 22.05.2012 BU TT PM1.6 MINING
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Sostenimiento ( Marcos, Mlla y Shotcrete )
Pg.34 22.05.2012 BU TT PM1.6 MINING
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Cabezal de corte / Cortadores
Pg.35 22.05.2012 BU TT PM1.6 MINING
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Instalacin elementos prefabricados de hormign
Pg.38 22.05.2012 BU TT PM1.6 MINING
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.39 22.05.2012 BU TT PM1.6 MINING
Instalacin elementos prefabricados de hormign
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.40 22.05.2012 BU TT PM1.6 MINING
Instalacin elementos prefabricados de hormign
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.41 22.05.2012 BU TT PM1.6 MINING
Instalacin elementos prefabricados de hormign
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Dimetro: 5.200 mm.
Pendiente: 85% / 40
Longitud Tnel : 2.100m.
Geologa: Calizas, Areniscas,
120 Mpa
Tipo de Maquina: TBM Gripper
Proyectos Ejecutados ( Case Studies )
Proyecto: Limmern / Suiza
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.46 22.05.2012 BU TT PM1.6 MINING
Dimetro: 5.030 mm.
Pendiente: 11,7%
Longitud Tnel : 7.524 m.
Geologa: Caliza
Tipo de Maquina: TBM Gripper
Mejor Rend. Semanal: 275 m
Rendimiento promedio: 145 m / semana
Proyectos Ejecutados ( Case Studies )
Proyecto: Glendoe S-351
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.47 22.05.2012 BU TT PM1.6 MINING
Proyectos Ejecutados ( Case Studies )
Proyecto: Glendoe S-351
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.48 22.05.2012 BU TT PM1.6 MINING
Dimetro: 10.160 mm.
Pendiente: 7,0%
Longitud Tnel : 5.390 + 4.400m.
Geologa: Calizas, Areniscas,
Tipo de Maquina: TBM Doble Escudo
Mejor Rend. Semanal: 225 m
Rendimiento promedio: 93,5 m / semana
Proyectos Ejecutados ( Case Studies )
Proyecto: Pajares Lote 2 / Espaa
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.50 22.05.2012 BU TT PM1.6 MINING
Dimetro: 9.450 mm.
Pendiente: 12%
Longitud Tnel : 7.000m.
Geologa: Granito
220 Mpa
Tipo de Maquina: TBM Gripper
Mejor Rend. Semanal: -
Rendimiento promedio: -
Proyectos Ejecutados ( Case Studies )
Proyecto: HEPP Nant De Drance / Suiza
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.51 22.05.2012 BU TT PM1.6 MINING
Proyectos Ejecutados ( Case Studies )
Proyecto: HEPP Nant De Drance / Suiza
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.55 22.05.2012 BU TT PM1.6 MINING
Dimetro: 10.720 mm.
Pendiente: 30
Longitud Tnel : 200m.
Geologa: Limos, Arcillas
Tipo de Maquina: TBM EPB
Mejor Rend. Semanal:
Rendimiento promedio:
Proyectos Ejecutados ( Case Studies )
Proyecto: Saint Petersburgo / Russia
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.56 22.05.2012 BU TT PM1.6 MINING
Proyectos Ejecutados ( Case Studies )
Proyecto: Saint Petersburgo / Russia
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
AGENDA
1. OVERVIEW - APLICACIONES PARA MINERIA HERRENKNECHT
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
3. EQUIPOS PARA EXCAVACIONES VERTICALES
Boxhole Borer Machine (BBM)
Raise Borer Machine (RBR)
4. EQUIPOS Y APLICACIONES PARA EXCAVACIONES VERTICALES DE GRAN DIAMETRO
Shaft Boring System (SBS)
Shaft Boring Roadheader (SBR)
Shaft Sinking Jumbos
5. PERFORACION HORIZONTAL DIRIGIDA Y DIRECT PIPE
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
Profile Management System
Positioning and Communication System
SLS para Roadheader, Excavator y Bolter
7. SISTEMAS DE TRANSPORTE Y EXTRACCION.
Bandas Transportadoras (Conveyor Systems)
Bandas Transportadoras para Perforacion & Tronadura (Drill & Blast)
8. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
Equipos Utilitarios / Multiservicio
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Cadia East Mine de Oro Australia
Transport to MineExcavation in 1000m depth
110 vertical drills/year
Diameter .1,1m, Length 18m
Project Type
MI-002 BBM1100
MI-006 BBM1500
Prueba exitosa en Mina Clara (Black Forest)
Mina de Oro en Australia
Mas de 110 perforaciones /ao
18 perforaciones realiyadas hasta la fecha
1,5- 2 turnos por perforacion
Rendimientos de hasta 100mm/min
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
PRODUCT STRATEGY
Adaptar tecnologias probadas de Herrenknecht al mercado de la
mineria (Nuevas aplicaciones para
mineria)
Potenciar el desarrollo de masproductos para el mercado de la
Mineria
Mejorar tiempos y costos de perforacion
Aumentar la seguridad del personal y medio ambiente
Mayor automatizacion
Cambio de Drill and Blast a excavacion mecanizada
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Adaptado de la tecnologia probada de pipe jacking
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.64 22.05.2012 BU TT PM1.6 MINING
CONCEPTOS GENERALES DEL PIPE JACKING.
Tecnologia utilizada desde 1988
No de Maquinas construidas hasta la fecha 1,500
Total de kilometros excavados 5.000 km
Diametros 0.6 m 4.0 m
Longitudes maximas 50 m 2,535 m
Adaptado de la tecnologia probada de pipe jacking
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
D+B
Filling
Ore PassManway
Transport Drift
Ramp
Raises for fill,
transport,
ventilation, etc.
Aplicaciones
Slots / Caras libres
Piques de traspaso
Chimeneas de
ventilacion
Piques de rescate
Otras aplicaciones
Pg.65 22.05.2012 BU TT PM1.6 MINING
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.66 22.05.2012 BU TT PM1.6 MINING
GENERAL BBM 1100 BBM 1500
Diametro de Excavacion 1,100 mm 1,550 mm
Longitud maxima de excavacion 30 m 40 60 m
Inclinacion (con respecto a la vertical) 30 30
Dureza de la roca ~ 180 Mpa
Potencia instalada 160 kW 250 kW
Accionamiento hydraulisch
Fuerzas de empuje 2,000 kN > 2,000 kN
Fuerza de tiro (jalar) 200 kN ~ 400 kN
TRANSPORT UNIT BBM 1100 BBM 1500
Unidad de Transporte Motor Diesel
Velocidad de Traslado 2 km/h
Otros sistemas de transporte Cama baja, trineo,
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
4
3
1
2
1 JACKING FRAME & MACHINE
TRANSPORT UNIT2
3
4
CABLE & HOSE REEL UNIT
POWER UNIT CONTAINER
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
CADIA UNDERGROUND PROJECT.
Mine de Oro mas grande de Australia
One of the largest gold deposits
Cliente: Newcrest
Vida de la Mina >30 years
Profundidad 500m 1,450m
Caras Libres (Slots) para block caving
Chimeneas de Ventilation
Ore Pass
TRABAJOS A EJECUTAR
CADIA HILL
PIT
CADIA EAST PIT
CADIA EAST UNDERGORUND
PROJECT
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
MARKET MINING.
PRODUCT: BOXHOLE BORING MACHINE.
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Tiempo de Excavacion para 18m, 1.1m.
Hasts 5 Caras Libres en 12 Turnos!
Instalacion
Perforacion
Sacar Tubos
Desarmar
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
Rendimientos en la Mina Cadia / Australia
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
May 2011
Test at Mine Clara, Wolfach, Germany
Performance 1m / h
Characteristic BBM - Technology
Tecnologia Probada Altas ratas de avance comprobadas segun la tecnologia Pipe Jacking
Job Site Performance Ahorros de tiempo y espacio en secciones reducidas => trabajo eficiente
Condiciones
Geologicas variadasIdeales para roca dura y formaciones mixtas - No utiliza Grippers
Excavacion Excavacion segura debido a operacion remota y la utilizacion de tuberias de acero
Personal Eficiencia en la operacion ( 1 operador + 1 instalador de tuberias)
Direccion Sistema de direccionamiento para excavaciones largas
Accionamiento Accionamiento principal hidraulico compacto y confiable
Potencia Muy eficiente debido al reducido consumo electrico (160kW/ 250kW)
Transporte Disponibilidad de sistemas flexible de transporte: Crawler, cama baja,, trineo Sled systems,
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
SEGURIDAD
ALTA PRODUCTIVIDAD (ALTAS RATAS DE EXCAVACION)
AUTONOMIA => NO NECESITA EQUIPOS ADICIONALES PARA MONTAJE
SOLO NECESITA ENERGIA PARA PERFORAR
NO NECESITA RED DE AIRE COMPRIMIDO
NO NECESITA NI PISCINAS O TANQUES DE DECANTACION
NO SE NECESITA PLACA DE CONCRETO NI DESQUINCHES EN EL TECHO
REDUCCION DE CONTAMINACION Y REDUCCION DE RUIDOS
OPERACION REMOTA
SIMPLICIDAD EN EL MANEJO DE MATERIAL
SOLO NECESITA UN EQUIPO DE APOYO
Ventajas de la tecnologia Boxhole Boring vs Excavacion Convencional
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
AGENDA
1. OVERVIEW - APLICACIONES PARA MINERIA HERRENKNECHT
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
3. EQUIPOS PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
Raise Borer Machine (RBR)
4. EQUIPOS Y APLICACIONES PARA EXCAVACIONES VERTICALES DE GRAN DIAMETRO
Shaft Boring System (SBS)
Shaft Boring Roadheader (SBR)
Shaft Sinking Jumbos
5. PERFORACION HORIZONTAL DIRIGIDA Y DIRECT PIPE
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
Profile Management System
Positioning and Communication System
SLS para Roadheader, Excavator y Bolter
7. SISTEMAS DE TRANSPORTE Y EXTRACCION.
Bandas Transportadoras (Conveyor Systems)
Bandas Transportadoras para Perforacion & Tronadura (Drill & Blast)
8. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
Equipos Utilitarios / Multiservicio
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Project Type
MI-001 RBR600VF
MI-005 RBR600VF
MI-007 RBR900VF
MI-008 RBR400VF
Exitosa operacion de RBR
RBR Gama de Productos (400-600/800-900)
A fines de 2012 todas las maquinas en
operacion
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Raise Borer Machine (RBR)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Raise Boring Overview
Pg.79 22.05.2012 BU TT PM1.6 MINING
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Raise Borer Machine (RBR)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Description RBR 400 VF RBR 600 VF RBR 800 VF RBR 900 VF
Main Drive 2x 200 kW 3x 200 kW 4x 200 kW 4x 200 kW
Torque (Reaming) 452 kNm 550 kNm 775 kNm 900 kNm
Torque (Make up) 550 kNm 750 kNm 1100 kNm 1125kNm
Thrust force 9.200 kN 10.000 kN 12.000 kN 22.000 kN
Rotational Speed 0 50 1/min 0 50 1/min 0 50 1/min 0 50 1/min
Drill Rod diameter 12 7/8 12 7/8-14 14-15 15
Drill Rod length 1524mm 1524mm 1524mm 2100 mm
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Raise Borer Machine (RBR)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Raise Borer Machine (RBR)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Drilling of a vertical pressure shaft
Reaming Diameter: 5.46m
Depth: 280m
Rock Strength: 150-180MPa
Proyectos Ejecutados ( Case Studies )
Proyecto: Vianden Pump Storage Plant, Luxembourg
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Raise Borer Machine (RBR)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Raise Borer Machine (RBR)
Proyectos Ejecutados ( Case Studies )
Proyecto: Vianden Pump Storage Plant, Luxembourg
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Drilling of two vertical pressure shaft
Reaming Diameter: 2.44m
Depth: 424m
Rock Strength: approx. 150MPa
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Raise Borer Machine (RBR)
Proyectos Ejecutados ( Case Studies )
Proyecto: Nant de Drance, Suiza
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Shaft 4,76 m
Pilote drilling 15 = 381mm
Depth 280m
Shaft type Ventilation shaft
BU TT PM 16 Mining
3. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Raise Borer Machine (RBR)
Proyectos Ejecutados ( Case Studies )
Proyecto: Bolzano, Italia
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
AGENDA
1. OVERVIEW - APLICACIONES PARA MINERIA HERRENKNECHT
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
3. EQUIPOS PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
Raise Borer Machine (RBR)
4. EQUIPOS Y APLICACIONES PARA EXCAVACIONES VERTICALES DE GRAN DIAMETRO
Shaft Boring System (SBS)
Shaft Boring Roadheader (SBR)
Shaft Sinking Jumbos
5. PERFORACION HORIZONTAL DIRIGIDA Y DIRECT PIPE
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
Profile Management System
Positioning and Communication System
SLS para Roadheader, Excavator y Bolter
7. SISTEMAS DE TRANSPORTE Y EXTRACCION.
Bandas Transportadoras (Conveyor Systems)
Bandas Transportadoras para Perforacion & Tronadura (Drill & Blast)
8. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
Equipos Utilitarios / Multiservicio
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Projekt Type
D-600 SBS
Inicio de excavacion 2014/2015
Pique para Resolution Copper Mine (Arizona)
4. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Shaft Boring System (SBS)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Piques Verticales (Produccion y Ventilacion)
Profundidad: 2.000m (mayores segunrequerimientos)
Diametro de Excavacion: 10,0m a 12,0m
Peso (basic set up): ~2.800t
Geologia: Roca dura
SBS se soporta mediante la tecnologia de Gripper
Parte inferior equipada con escudo contra polvo
Cabeza de Corte equipada con Disco de Corte
Cambio de discos de corte en posicion segura Cabeza de corte accesible totalmente
Remocion de marina a traves de Conveyor vertical
4. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Shaft Boring System (SBS)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
(1) Cutterhead
(2) Dust shield
(3) Rock bolters
(4) Gripper system
(5) Vertical conveyor
1
2
4
3
54. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Shaft Boring System (SBS)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
S1: Trabajo bajo el escudo de polvo
Permanente: ninguno
Solamente durante mantenimiento y pre-excavation drilling
S2: Main beam area
Permanente: colocacion de pernos
Solo durante cambio de cortadores
S3: Plataformas de Infraestructura
Permanente: SBS operador
Infrastructura
4. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Shaft Boring System (SBS)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
MARKET MINING.
PRODUCT: SHAFT BORING SYSTEM.
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
AGENDA
1. OVERVIEW - APLICACIONES PARA MINERIA HERRENKNECHT
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
3. EQUIPOS PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
Raise Borer Machine (RBR)
4. EQUIPOS Y APLICACIONES PARA EXCAVACIONES VERTICALES DE GRAN DIAMETRO
Shaft Boring System (SBS)
Shaft Boring Roadheader (SBR)
Shaft Sinking Jumbos
5. PERFORACION HORIZONTAL DIRIGIDA Y DIRECT PIPE
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
Profile Management System
Positioning and Communication System
SLS para Roadheader, Excavator y Bolter
7. SISTEMAS DE TRANSPORTE Y EXTRACCION.
Bandas Transportadoras (Conveyor Systems)
Bandas Transportadoras para Perforacion & Tronadura (Drill & Blast)
8. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
Equipos Utilitarios / Multiservicio
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Profundidad : 2.000m (segun requerimiento & headframe setup)
Diametro de Excavacion: 7,0m a 12,0m
Peso (basic set up): ~300t
Geologia: Roca medianamente dura & suelocongelado
Diametros variables en un solo pique => es posible
SBR suspendida desde el headframe (cables)
Lower Section equipped with stabilizing shield
Cabeza cortadora con picas
Remosion de marina mediante PNM pneumatic mucking system
Instalacion de revestimiento bajo el escudo de polvoes posible
4. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Shaft Boring Roadheader (SBR)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Projekt Type
MI-003 SBR
MI-004 SBR
Mina de Potasio en Canada (fertilizer production)
Piques ciegos de Servicio y Produccion
Profundidad 1.000m y diametro 10.6m
Geologia: Roca medianamente dura y suelocongelado
Maquina de prueba en Fabrica hasta May 2012
4. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Shaft Boring Roadheader (SBR)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
III. Machine Sinking/ Lifting Unit
II. Shaft Lining Platforms
I. Excavation Unit
Pre- hole
Tunnel
Pg.110 22.05.2012 BU TT PM1.6 MINING
4. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Shaft Boring Roadheader (SBR)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.111 22.05.2012 BU TT PM1.6 MINING
4. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Shaft Boring Roadheader (SBR)
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
AGENDA
1. OVERVIEW - APLICACIONES PARA MINERIA HERRENKNECHT
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
3. EQUIPOS PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
Raise Borer Machine (RBR)
4. EQUIPOS Y APLICACIONES PARA EXCAVACIONES VERTICALES DE GRAN DIAMETRO
Shaft Boring System (SBS)
Shaft Boring Roadheader (SBR)
Shaft Sinking Jumbos
5. PERFORACION HORIZONTAL DIRIGIDA Y DIRECT PIPE
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
Profile Management System
Positioning and Communication System
SLS para Roadheader, Excavator y Bolter
7. SISTEMAS DE TRANSPORTE Y EXTRACCION.
Bandas Transportadoras (Conveyor Systems)
Bandas Transportadoras para Perforacion & Tronadura (Drill & Blast)
8. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
Equipos Utilitarios / Multiservicio
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Projekt Type
MI-009 Drilling Jumbo
4. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Shaft Sinking Jumbo
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
20 of overlapping
4. EQUIPOS PARA PARA EXCAVACIONES VERICALES
Shaft Sinking Jumbo
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
AGENDA
1. OVERVIEW - APLICACIONES PARA MINERIA HERRENKNECHT
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
3. EQUIPOS PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
Raise Borer Machine (RBR)
4. EQUIPOS Y APLICACIONES PARA EXCAVACIONES VERTICALES DE GRAN DIAMETRO
Shaft Boring System (SBS)
Shaft Boring Roadheader (SBR)
Shaft Sinking Jumbos
5. PERFORACION HORIZONTAL DIRIGIDA Y DIRECT PIPE
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
Profile Management System
Positioning and Communication System
SLS para Roadheader, Excavator y Bolter
7. SISTEMAS DE TRANSPORTE Y EXTRACCION.
Bandas Transportadoras (Conveyor Systems)
Bandas Transportadoras para Perforacion & Tronadura (Drill & Blast)
8. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
Equipos Utilitarios / Multiservicio
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pipeline
Pg.123 22.05.2012 BU TT PM1.6 MINING
5. EQUIPOS PERFORACION HORIZONTAL DIRIGIDA Y DIRECT PIPE
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Exit PointEntry Point
Survey
Cable
Drill Line
Direction of Operation
Survey
ToolNone-Magnetic
Drill StemJet BitDrill Pipe
Entry Point Exit Point
Direction of Operation
ReamerDrill Pipe Drill Pipe
Entry Point Exit Point
PipelineDrill Pipe
Direction of Operation
SwivelReamer
5. EQUIPOS PERFORACION HORIZONTAL DIRIGIDA
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.125 22.05.2012 BU TT PM1.6 MINING
APLICACIONES
Tiros de Drenaje
Shafts de Ventilacion
Ductos de Electricidad
Conexiones entre niveles
Shafts para Degasificacionde Minas
5. EQUIPOS PERFORACION HORIZONTAL DIRIGIDA
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Asiago Plateau | Italy
Challenging Projects
Upwards Drilling for Small Hydro Power Plants (SHPP)
Valdastico valley, Italy. Italian Alps.
5. EQUIPOS PERFORACION HORIZONTAL DIRIGIDA
Machine: HK250T
Geology: Rock
Pipelinelength: 950 m
Pipeline- : 8 Stainless Steel
Medium: Water
Entry angle: 45
Exit point: 450 m height
difference
Customer: P.A.T.O. srl
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
450 m
Rig side
Pipe side
Challenging Projects
Upwards Drilling for Small Hydro Power Plants (SHPP)
Valdastico valley, Italy. Italian Alps.
5. EQUIPOS PERFORACION HORIZONTAL DIRIGIDA
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Mongstad | Norway
Machine: HK250T
Geology: Basalt,
276 MPa
Pipelinelength: 416m
Pipeline- : 14
Medium: Gas
Entry angle: 45
Exit point: 234 m
below sea level
Customer: Visser & Smit Hanab
5. EQUIPOS PERFORACION HORIZONTAL DIRIGIDA
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Slant Directional Drilling (SDD)
Oil Sands in Canada, Venezuela, Russia
Coal Seam Gas in Australia, Canada, Russia, China, Indonesia
Shallow Water in Brazil, Russia, Germany
Gas Cavern Storage in England, Europe
Outfalls / Landfalls
Small Hydro Power Plants
5. EQUIPOS PERFORACION HORIZONTAL DIRIGIDA
Por que SDD?
Llegar rapido a profundidades 800 m, y con la posibilidad de seguir horizontal
Posibilidad de hacer perforaciones degran longitud
Con HDD no es posible llegar a estasprofundidades
SDD is a alternativa de bajo costo paraperforacion vertical
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
HK150C-SDD
Slant Directional Drilling (SDD)
5. EQUIPOS PERFORACION HORIZONTAL DIRIGIDA
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Equipo HK 150-SDD
Especificaciones
Push-/Pull Force 1.500kN
Installed Power 2 x 433kW
Power Transmission rack & pinion
Drilling Angle 45 - 90
Drill Pipe Length Range 2 (10m)
Height of Platform 2.5m
Slant Directional Drilling (SDD)
5. EQUIPOS PERFORACION HORIZONTAL DIRIGIDA
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
AGENDA
1. OVERVIEW - APLICACIONES PARA MINERIA HERRENKNECHT
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
3. EQUIPOS PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
Raise Borer Machine (RBR)
4. EQUIPOS Y APLICACIONES PARA EXCAVACIONES VERTICALES DE GRAN DIAMETRO
Shaft Boring System (SBS)
Shaft Boring Roadheader (SBR)
Shaft Sinking Jumbos
5. PERFORACION HORIZONTAL DIRIGIDA Y DIRECT PIPE
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
Profile Management System
Positioning and Communication System
SLS para Roadheader, Excavator y Bolter
7. SISTEMAS DE TRANSPORTE Y EXTRACCION.
Bandas Transportadoras (Conveyor Systems)
Bandas Transportadoras para Perforacion & Tronadura (Drill & Blast)
8. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
Equipos Utilitarios / Multiservicio
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.139 22.05.2012 BU TT PM1.6 MINING
Profile Management System
Analysis and Archiving of Production Data
Positioning and Communication Systems
Mine Positioning and Communication Systems
SLS Roadheader
Guidance Systems for Roadheaders
SLS Excavator
Guidance Systems for Tunnel Excavators
SLS Bolter
Guidance Systems for Mechanized Bolting Rigs
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.140 22.05.2012 BU TT PM1.6 MINING
Consultora
Diseo de soluciones especiales
Suministro
Puesta en marcha
Entrenamiento
Servicio Tcnico
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
AGENDA
1. OVERVIEW - APLICACIONES PARA MINERIA HERRENKNECHT
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
3. EQUIPOS PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
Raise Borer Machine (RBR)
4. EQUIPOS Y APLICACIONES PARA EXCAVACIONES VERTICALES DE GRAN DIAMETRO
Shaft Boring System (SBS)
Shaft Boring Roadheader (SBR)
Shaft Sinking Jumbos
5. PERFORACION HORIZONTAL DIRIGIDA Y DIRECT PIPE
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
Profile Management System
Positioning and Communication System
SLS para Roadheader, Excavator y Bolter
7. SISTEMAS DE TRANSPORTE Y EXTRACCION.
Bandas Transportadoras (Conveyor Systems)
Bandas Transportadoras para Perforacion & Tronadura (Drill & Blast)
8. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
Equipos Utilitarios / Multiservicio
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.142 22.05.2012 BU TT PM1.6 MINING
Soluciones para Sistemas de Extraccin.
Consultora
Ingeniera de Proyecto
Diseo
Suministro
Montaje
Puesta en marcha
Entrenamiento
Servicio Tcnico
Arriendos
7. SISTEMAS DE TRANSPORTE Y EXTRACCION
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.143 22.05.2012 BU TT PM1.6 MINING
Gama de Productos.
Belt Conveyor for TBMs
Belt Conveyor for TBM driven tunnels (Hard Rock, EPB)
Belt Conveyor for Separation Plants
Belt Conveyor for Drill & Blast driven tunnels
Belt Conveyor for Coal Mining
Vertical Conveyor
Stacker Conveyor
Tailor-made solutions for any possible application
7. SISTEMAS DE TRANSPORTE Y EXTRACCION
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.144 22.05.2012 BU TT PM1.6 MINING
Correas / Conveyors para Tneles con TBM
Requerimientos:- Tneles largos y cortos
- Para dimetros entre 5 y 16 m
- Capacidades hasta 3.000 t/h
- Radios de giro < 200 m
Componentes de la Correa:
- Accionamiento Principal
- Estaciones impulsoras intermedias Booster
- Acumuladores Horizontales y Verticales
- Estacin de ensamblaje en el Back Up de la
TBM para rpida extensin de la correa
7. SISTEMAS DE TRANSPORTE Y EXTRACCION
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.151 22.05.2012 BU TT PM1.6 MINING
Conveyor / Correas para Drill & Blast.
Instalados hasta la frente
Retraccin hasta 200 m de la frente
7. SISTEMAS DE TRANSPORTE Y EXTRACCION
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.152 22.05.2012 BU TT PM1.6 MINING
Conveyor / Correas para Drill & Blast.
7. SISTEMAS DE TRANSPORTE Y EXTRACCION
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.153 22.05.2012 BU TT PM1.6 MINING
Conveyor Verticales.
Transporte vertical en diferentes alturas
Para transporte de roca y material de suelo
7. SISTEMAS DE TRANSPORTE Y EXTRACCION
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.154 22.05.2012 BU TT PM1.6 MINING
Estructuras superficiales.
Estructuras con puentes y columnas con vanos entre 6 - 12m de fcil instalacin
7. SISTEMAS DE TRANSPORTE Y EXTRACCION
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
AGENDA
1. OVERVIEW - APLICACIONES PARA MINERIA HERRENKNECHT
2. EQUIPOS PARA EXCAVACION MECANIZADA DE TUNELES (TBM)
3. EQUIPOS PARA EXCAVACIONES VERICALES
Boxhole Borer Machine (BBM)
Raise Borer Machine (RBR)
4. EQUIPOS Y APLICACIONES PARA EXCAVACIONES VERTICALES DE GRAN DIAMETRO
Shaft Boring System (SBS)
Shaft Boring Roadheader (SBR)
Shaft Sinking Jumbos
5. PERFORACION HORIZONTAL DIRIGIDA Y DIRECT PIPE
6. SOLUCIONES ESPECIALES PARA EXCAVACIONES SUBTERANEAS
Profile Management System
Positioning and Communication System
SLS para Roadheader, Excavator y Bolter
7. SISTEMAS DE TRANSPORTE Y EXTRACCION.
Bandas Transportadoras (Conveyor Systems)
Bandas Transportadoras para Perforacion & Tronadura (Drill & Blast)
8. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
Equipos Utilitarios / Multiservicio
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.157 22.05.2012 BU TT PM1.6 MINING
7. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.158 22.05.2012 BU TT PM1.6 MINING
7. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Vigas y Sistemas de Perforacin
Vigas de Perforacin hechas a la medida
Para todo tipo de Equipos
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.159 22.05.2012 BU TT PM1.6 MINING
7. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Equipos Utilitarios Multiservicio
Roof Support Jumbo
Equipos diseados y hechos a la medida
Para todo tipo de Aplicaciones
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.160 22.05.2012 BU TT PM1.6 MINING
7. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Equipos Utilitarios Multiservicio
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.161 22.05.2012 BU TT PM1.6 MINING
7. EQUIPOS ESPECIALES PARA CONSTRUCCION DE TUNELES
Equipos Utilitarios Multiservicio
Rolling Stock / Sistemas de transporte y logistica
-
H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G
Pg.162 22.05.2012 BU TT PM1.6 MINING
GRACIAS POR SU ATENCION
PREGUNTAS ?