Evaluar el costo de la escalera de un
tramo como se muestra en la figura
f'c=175 kg/cm2
fy=4200kg/cm2
s/c=500
0.10 paso=25 cm
contrapaso=0.18 cm
b=1.0 (ancho)
0.40 0.25
1 x 27.45 x 2400 x (1.2) 79056.00 kg/m
pp= 0.2 x 45 x 2400 x (1.2) 790.56 kg/m
acabado= 100 x 1 x (1.2) 120.00 kg/m
s/c= 500 x 1 x (1.6) 800.00 kg/m
1710.56 kg/m
Wu1 =
pp= 0.15 x 1 x 2400 x (1.2) 435.60 kg/m
acabado= 100 x 1 x (1.2) 120.00 kg/m
s/c= 500 x 1 x (1.6) 800.00 kg/m
1355.60 kg/m
0.4
0
TRABAJO N° 01
Wu1 =
w1= 1710.50 kg/cm
w1= 1711 kg/cm
w2= 1352 kg/cm
2.00 1.20
Trabajo elaborado por: RONALD G. OLIVA CAIRO
t = Ln t= 3.525 t= 0.18
20.00 20.00 t= 0.15
t = Ln t= 3.53 t= 0.14
25.00 25.00
ϴ= C.A ϴ= 0.81 ϴ= 35°71'
H
t h= 18.47
h
hm= h + cp/2 hm= 27.47
Cos ϴ =
Trabajo elaborado por: RONALD G. OLIVA CAIRO
UNIDAD DE MEDIDA (U.M) :
M.L PIES (B)MADERA 10%
(0x1.10)=E
1 Tablones 1 1/2"x8" 1.20 3.94 21 82.74 91.01 7 13.00 1.69
2 Soleras 2"x4" 4.20 13.78 2 18.37 20.21 7 2.89 0.38
3 Bases 3"x3" 1.20 3.94 4 11.82 13.00 7 1.56 0.24
4(a) Pie Derecho 2"x4" 1.55 5.09 4 13.57 14.93 6 2.49 0.32
4(b) Pie Derecho 2"x4" 0.90 2.95 2 3.93 4.32 6 0.72 0.09
4c Pie Derecho 2"x4" 0.30 0.98 2 3.31 4.44 6 0.24 0.03
5(a) Arriostres 1 1/2"x4" 1.50 4.92 4 9.84 10.82 6 1.80 0.23
5(b) Arriostres 1 1/2"x4" 1.20 3.94 4 7.80 8.67 6 1.45 0.19
6 Barrotes 2"x4" 1.20 3.94 4 10.51 11.56 7 1.65 0.21
7 Contrapasos 1 1/2"x8" 1.00 3.28 11 36.08 39.69 4 9.92 1.29
8 Costados 1 1/2"x8" 4.20 13.78 2 27.56 30.32 7 4.33 0.56
9Refuerzo
Contrapasos1"x4" 0.30 0.98 44 14.37 15.81 4 3.95 0.51
TOTAL 5.74
DESPERDICIOSN° DE
USOS
N° DE
USOS
(H=E/G)
U.M
(H/U.M)
(1.0X4.20)+2(4.20X0.18)+(11X1.0X0.18)= 7.69 M2
PIES^2
((AxBxC)/12=D)
ELEMENTO
N°DESCRIPCION SECCCION (A)
LONGITUDCANTIDAD
DE
ELEMENTO
S (C)
IMPRIMIR HOJA 49 DEL LIBRO COSTOS Y
PRESUPUESTOS DE EDIFICACIONES DE
CAPECO PDF
UNIDAD DE MEDIDA (U.M) :
M.L PIES (B)
CLAVOS,
ALAMBRE, ETC
15% (Dx1.15)=F
10ALAMBRE NEGRO N° 16
(0.0017 KG/ML)32.00 0.54 0.62 1.00 0.62 0.08
11CLAVOS 3" (180
UNI/KG)250.00 1.39 1.60 2.00 0.80 0.10
TOTAL 0.18
U.M (H/U.M)
(1.0X4.20)+2(4.20X0.18)+(11X1.0X0.18)= 7.69 M2
ELEMENTO N° DESCRIPCION SECCCION (A)
LONGITUDCANTIDAD DE
ELEMENTOS
(C)
CLAVOS,
ALAMBRS, ETC
KG (D)
DESPERDICIOS
N° DE USOS
(G)
MATERIAL DE
USOS (H=F/G)
Obra : CONSTRUCCIION DE UNA VIVIENDA UNIFAMILIAR DE UN PISO (PERSONA NATURAL)
Form. : 01 PRESUPUESTO GENERAL CONTRATISTA: ROGI SAC
Cliente : ASTER LAURO PINEDO NAVARRO INSPECTOR: ING. FLAVIO CASTAÑON
Ubicac. : TAMBOPATA - TAMBOPATA - MADRE DE DIOS. FACTOR DE RELACION:
ELABORADO POR: RONALD GIOVANNE OLIVA CAIRO
PARTIDA 01.01.01 AGUA PARA LA CONSTRUCCION
RENDIMIENTO GLB/DIA MO. 10.00 EQ. 10.00 GLB 300.00
DESCRIPCION DEL RECURSO UND CUADRILLA CANTIDAD PRECIO S/. PARCIAL S/. TOTAL S/.
AGUA PARA LA CONSTRUCCION GLB 1.0000000 300.00 300.00
PARTIDA 02.01.00 LIMPIEZA DE TERRENO
RENDIMIENTO M3/DIA 500.00 M2 0.76
DESCRIPCION DEL RECURSO UND CUADRILLA CANTIDAD PRECIO S/. PARCIAL S/. TOTAL S/.
0.73
OFICIAL HH 1.0000 0.0160000 16.12 0.26
PEON HH 2.0000 0.0320000 14.65 0.47
0.04
HERRAMIENTAS MANUALES %MO 5.0000000 0.73 0.04
PARTIDA 02.01.00 TRAZO, NIVELES Y REPLANTEO PRELIMINAR
RENDIMIENTO M2/DIA 500.00 M2 3.76
DESCRIPCION DEL RECURSO UND CUADRILLA CANTIDAD PRECIO S/. PARCIAL S/. TOTAL S/.
1.30
TOPOGRAFO HH 1.0000 0.0160000 18.76 0.30
CAPATAZ HH 1.0000 0.0160000 18.76 0.30
PEON HH 3.0000 0.0480000 14.65 0.70
0.70
CAL DE CONSSTRUCCION KG 0.1000000 3.50 0.35
MADERA TORNILLO KG 0.1000000 3.50 0.35
1.76
HERRAMIENTAS MANUALES %MO 3.0000000 1.30 0.04
TEODOLITO HM 1.0000 0.0160000 100.00 1.60
WINCHA UND 0.0240 0.0003840 1.30 0.12
PARTIDA 02.01.03 REPLANTEO DURANTE EL PROCESO
RENDIMIENTO M2/DIA 500.00 M2 3.66
DESCRIPCION DEL RECURSO UND CUADRILLA CANTIDAD PRECIO S/. PARCIAL S/. TOTAL S/.
1.30
TOPOGRAFO HH 1.0000 0.0160000 18.76 0.30
CAPATAZ HH 1.0000 0.0160000 18.76 0.30
PEON HH 3.0000 0.0480000 14.65 0.70
0.70
CAL DE CONSSTRUCCION KG 0.1000000 3.50 0.35
MADERA TORNILLO KG 0.1000000 3.50 0.35
1.66
HERRAMIENTAS MANUALES %MO 3.0000000 1.30 0.04
TEODOLITO HM 1.0000 0.0160000 100.00 1.60
WINCHA UND 0.0240 0.0003840 50.00 0.02
PARTIDA 02.01.02 NIVELACION DE TERRENO (HASTA 30 CM)
RENDIMIENTO M2/DIA 120.00 COSTO UNITARIO DIRECTO POR : M2 2.43
DESCRIPCION DEL RECURSO UND CUADRILLA CANTIDAD PRECIO S/. PARCIAL S/. TOTAL S/.
2.18
OPERARIO HH 0.1000 0.0066667 18.76 0.13
OFICIAL HH 1.0000 0.0666667 16.12 1.07
PEON HH 1.0000 0.0666667 14.65 0.98
0.26
HERRAMIENTAS MANUALES %MO 3.0000000 2.18 0.07
REGLA DE MADERA P2 0.0300000 4.50 0.14
CLAVOS DE 3" KG 0.0100000 5.50 0.06
PARTIDA 03.02.01 EXCAVACIONES SIMPLES
RENDIMIENTO M3/DIA 3.50 M3 0.82
DESCRIPCION DEL RECURSO UND CUADRILLA CANTIDAD PRECIO S/. PARCIAL S/. TOTAL S/.
0.79
OPERARIO HH 0.1000 0.0160000 18.76 0.30
OFICIAL HH 1.0000 0.0160000 16.12 0.26
PEON HH 1.0000 0.0160000 14.65 0.23
0.02
HERRAMIENTAS MANUALES %MO 3.0000000 0.79 0.02
PARTIDA 04.01.01 CONCRETO
RENDIMIENTO M3/DIA 12.00 M3 430.99
DESCRIPCION DEL RECURSO UND CUADRILLA CANTIDAD PRECIO S/. PARCIAL S/. TOTAL S/.
146.67
CAPATAZ HH 0.2000 0.1333333 18.76 2.50
OPERARIO HH 2.0000 1.3333333 18.76 25.01
OFICIAL HH 2.0000 1.3333333 16.12 21.49
PEON HH 10.0000 6.6666667 14.65 97.67
RENDIMIENTO M3/DIA 30.00 M3 8.31
CAPATAZ HH 0.1000 0.0266667 18.76 0.50
PEON HH 1.0000 0.2666667 14.65 3.91
OPERADOR DE EQUIPO LIVIANO HH 1.0000 0.2666667 14.65 3.91
269.70
CEMENTO PORTLAND TIPO I BLS 8.4300000 26.50 223.40
ARENA GRUESA M3 0.5400000 45.00 24.30
PIEDRA CHANCADA DE 1/2" M3 0.5500000 40.00 22.00
6.31
MEZCLADORA DE 9-11 P3 (1) HM 0.6700000 1.30 0.04
VIBRADOR DE 2.0", 4HP (1) HM 0.6700000 100.00 1.60
WINCHE ELECTRICO DE DOS TAMBORES HM 0.6700000 50.00 0.02
HERRAMIENTAS %MO 3.0000000 154.99 4.65
PARTIDA 04.01.02 ENCOFRADO Y DESENCOFRADO
RENDIMIENTO M2/DIA 28.00 M2 57.60
DESCRIPCION DEL RECURSO UND CUADRILLA CANTIDAD PRECIO S/. PARCIAL S/. TOTAL S/.
7.35
CAPATAZ HH 0.1000 0.0285714 18.76 0.38
OPERARIO HH 1.0000 0.2857143 18.76 3.75
OFICIAL HH 1.0000 0.2857143 16.12 3.22
PARTIDA 04.02.02 ENCOFRADO Y DESENCOFRADO
RENDIMIENTO M2/DIA 18.00 M2 12.98
OFICIAL HH 1.0000 0.2857143 16.12 4.60
PEON HH 2.0000 0.5714286 14.65 8.37
PARTIDA 04.02.02 ENCOFRADO Y DESENCOFRADO
RENDIMIENTO M2/DIA 6.00 M2 11.79
CAPATAZ HH 0.1000 0.0571429 18.76 1.07
OPERARIO HH 1.0000 0.5714286 18.76 10.72
OFICIAL HH 1.0000 0.5714286 16.12 9.21
23.88
MADERA TORNILLO P2 4.8300000 4.50 21.74
PREPARACION Y
VACIADO
CURADO
COSTO UNITARIO DIRECTO POR :
MATEREIALES
EQUIPOS Y HERRAMIENTAS
ANALISIS DE PRECIOS UNITARIOS
EQUIPOS
COSTO UNITARIO DIRECTO POR :
MATEREIALES
EQUIPOS
EQUIPOS
MANO DE OBRA
COSTO UNITARIO DIRECTO POR :
MANO DE OBRA
MATEREIALES
HABILITACION
ENCOFRADO
DESENCOFRADO
ENCOFRADO
MANO DE OBRA
MATEREIALES
COSTO UNITARIO DIRECTO POR :
COSTO UNITARIO DIRECTO POR :
COSTO UNITARIO DIRECTO POR :
MANO DE OBRA
EQUIPOS
MATERIALES
COSTO UNITARIO DIRECTO POR :
1.0000000000
COSTO UNITARIO DIRECTO POR :
MANO DE OBRA
COSTO UNITARIO DIRECTO POR :
MANO DE OBRA
EQUIPOS
COSTO UNITARIO DIRECTO POR :
MANO DE OBRA
CLAVOS DE 3" KG 0.1300000 5.50 0.72
ALAMBRE NEGRO RECOGIDO #8 KG 0.2600000 5.50 1.43
1.61
HERRAMIENTAS MANUALES %MO 5.0000000 32.12 1.61
PARTIDA 04.01.03 ACERO
RENDIMIENTO KG/DIA 250.00 KG 15.67
DESCRIPCION DEL RECURSO UND CUADRILLA CANTIDAD PRECIO S/. PARCIAL S/. TOTAL S/.
1.18
CAPATAZ HH 0.1000 0.0032000 18.76 0.06
OPERARIO HH 1.0000 0.0320000 18.76 0.60
OFICIAL HH 1.0000 0.0320000 16.12 0.52
PARTIDA 05.02.00 ACERO
RENDIMIENTO KG/DIA 250.00 KG 1.18
CAPATAZ HH 0.1000 0.0032000 18.76 0.06
OPERARIO HH 1.0000 0.0320000 18.76 0.60
OFICIAL HH 1.0000 0.0320000 16.12 0.52
5.15
FIERRO CORRUGADO DE 1/2" (PROMEDIO) KG 1.0700000 4.50 4.82
ALAMBRE NEGRO RECOGIDO #8 KG 0.0600000 5.50 0.33
8.18
HERRAMIENTAS MANUALES %MO 3.0000000 2.35 7.06
CIZALLA HM 1.0000 0.0320000 35.00 1.12
EQUIPOS
MATEREIALES
EQUIPOS
MANO DE OBRA
HABILITACION
COLOCACION
COSTO UNITARIO DIRECTO POR :
COSTO UNITARIO DIRECTO POR :
Obra : CONSTRUCCION DE UNA VIVIENDA UNIFAMILIAR DE UN PISO (PERSONA NATURAL)
Form. : 01 PRESUPUESTO GENERAL CONTRATISTA: ROGI SAC
Cliente : ANGELO PINEDO CORAL INSPECTOR: ING. FLAVIO CASTAÑON
Ubicac. : TAMBOPATA - TAMBOPATA - MADRE DE DIOS. FACTOR DE RELACION: 1.0000000000
ELABORADO POR: RONALD GIOVANNE OLIVA CAIRO
ITEM DESCRIPCION UND METRADO P. UNITARIO P. PARCIAL
01.00.00 OBRAS PROVISIONALES 300.00
01.01.00 INSTALACIONES PROVISIONALES 300.00
01.01.01 AGUA PARA LA CONSTRUCCION GLB 1.00 300.00 300.00
02.00.00 TRABAJOS PRELIMINARES 2.94
02.01.00 LIMPIEZA DE TERRENO M2 3.85 0.76 2.94
02.01.01 TRAZOS, NIVELES Y REPLANTEO 28.58
02.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 3.85 3.76 14.49
02.01.03 REPLANTEO DURANTE EL PROCESO M2 3.85 3.66 14.10
03.00.00 ESTRUCTURAS 3,074.27
03.01.01 MOVIEMIENTO DE TIERRAS 9.36
02.01.02 NIVELACION DE TERRENO (HASTA 30 CM) M2 3.85 2.43 9.36
03.02.01 EXCAVACIONES 0.13
03.02.01 EXCAVACIONES SIMPLES M3 0.16 0.82 0.13
04.00.00 CONCRETO ARMADO 3,064.77
04.01.00 ESCALERA 3,064.77
04.01.01 CONCRETO M3 0.96 430.99 412.03
04.01.02 ENCOFRADO Y DESENCOFRADO M2 7.69 57.60 442.95
04.01.03 ACERO KG 141.00 15.67 2,209.79
COSTO DIRECTO 6,470.56
GASTOS GENERALES 7.85% 7.850000% 507.94
UTILIDAD 7.5% 7.500000% 485.29
SUB TOTAL 7,463.79
IGV 18% 1,343.48
TOTAL 8,807.28
Obra : CONSTRUCCION DE UNA VIVIENDA UNIFAMILIAR DE UN PISO (PERSONA NATURAL)
Form. : 01 PRESUPUESTO GENERAL
Cliente : ANGELO PINEDO CORAL
Ubicac. : TAMBOPATA - TAMBOPATA - MADRE DE DIOS.
METROS
Ø N° de N° Long. 1/4"
Diam. Veces Piezas Pieza 0.25
05.02.00 ACERO
Longitudinal 3/8"
1/2" 6 4 2.9
Transversal 1/4" 6 24 1.2 172.80
1/2"
05.02.00 VIGAS
VIGA 1
Longitudinal 3/8"
1/2" 3 4 5.3
Transversal 1/4" 2 24 1.2 57.60
1/2"
VIGA 2
Longitudinal 3/8"
1/2" 2 4 5.3
Transversal 1/4" 2 34 1.2 81.60
1/2"
05.03.03 ACERO
Longitudinal 1/4" 1 20 5 100.00
Losa aligerada 1/2" 1 15 6
412.00
PLANILLA DE FIERROS
LONGITUD (m) por Ø
Nº DESCRIPCION
: CONSTRUCCION DE UNA VIVIENDA UNIFAMILIAR DE UN PISO (PERSONA NATURAL)
CONTRATISTA: ROGI SAC
INSPECTOR: ING. FLAVIO CASTAÑON
FACTOR DE RELACION:
3/8" 1/2" 5/8" 3/4" 1" Peso TOTAL
0.56 1.02 1.56 2.26 4.04 Kg kg
114.19
0.00 0.00
69.60 70.99
43.20
0.00 0.00
79.27
0.00 0.00
63.60 64.87
14.40
0.00 0.00
63.65
0.00 0.00
42.40 43.25
20.40
0.00 0.00
116.80
25.00
90.00 91.80
0.00 265.60 0.00 0.00 0.00 373.91 373.91
DIAMETRO L total LongNro.
varrillasTotal Kg
ø 1/4" 412.00 9.00 45.78 103.00
ø 3/8" 0.00 9.00 0.00 0.00
ø 1/2" 265.60 9.00 29.51 270.91
ø 5/8" 0.00 9.00 0.00 0.00
ø 3/4" 0.00 9.00 0.00 0.00
ø 1" 0.00 9.00 0.00 0.00
TOTAL
CANTIDAD DE VARILLAS DE FIERRO
373.91
PLANILLA DE FIERROS
1.0000000000
LONGITUD (m) por Ø
1/4"
3/8"
1/2"
5/8"
3/4"
1"