COMPARATIVE ANALYSIS
OF DCF AND NON – DCFTECHNIQUES
Presented to : Dr. Paresh Shah
Presented by:
Sonal Nagpal (23)Nikita Porwal (27)
Bhawana Pokharna (36)
Priyanka Chaturvedi (38)
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 2/36
CAPITAL BUDGETING DECISIONS
Should webuild this
plant?
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 3/36
CAPITAL BUDGETING DECISIONS
The investment decisions of a firm are generallyknown as the capital budgeting, or capitalexpenditure decisions.
The firm’s investment decisions would generallyinclude expansion, acquisition, modernisation andreplacement of the long-term assets. Sale of adivision or business (divestment) is also aninvestment decision.
Decisions like the change in the methods of salesdistribution, or an advertisement campaign or aresearch and development programme have long-term implications for the firm’s expenditures and
benefits, and therefore, they should also be evaluatedas investment decisions.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 4/36
TYPES OF INVESTMENT DECISIONS
One classification is as follows:
Expansion of existing business
Expansion of new business
Replacement and modernisationYet another useful way to classify investments is asfollows:
Mutually exclusive investments
Independent investments
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 5/36
AN EXAMPLE OF MUTUALLY EXCLUSIVEPROJECTS
BRIDGE vs. BOAT to getproducts across a river.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 6/36
CAPITAL BUDGETING DECISIONS
These are generally:
Long-term decisions; involving large
expenditures.
Have long term consequences.
Difficult or expensive to reverse.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 7/36
Capital BudgetingMethods
Discounting Criteria
NPV IRR PBP ARR
Non Discounting Criteria
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 8/36
NET PRESENT VALUE
NPV of a project is the sum of the present values ofall the cash flows positive as well as negative thatare expected to occur over the life of the project.
The formula for NPV is:
31 202 3
0
1
NPV(1 ) (1 ) (1 ) (1 )
NPV(1 )
nn
n
t
t
t
C C C C C
k k k k
C C
k
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 9/36
NET PRESENT VALUE
Where,
Ct = cash flow at the end of year t n = Life of the project
k = discount rate (given by the projects opportunitycost of capital which is equal to the required rate of
return expected by investors on investments ofequivalent risk).
C0 = Initial investment
1 / (1 + k )t = known as discounting factor or PVIF
i.e present value interest factor.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 10/36
CALCULATING NET PRESENT
VALUE
Assume that Project X costs Rs 2,500 now and isexpected to generate year-end cash inflows of Rs900, Rs 800, Rs 700, Rs 600 and Rs 500 in years 1
through 5. The opportunity cost of the capital may beassumed to be 10 per cent.
2 3 4 5
1, 0.10 2, 0.10 3, 0.10
4, 0.10 5, 0.
Rs 900 Rs 800 Rs 700 Rs 600 Rs 500NPV Rs 2,500
(1+0.10) (1+0.10) (1+0.10) (1+0.10) (1+0.10)
NPV [Rs 900(PVF ) + Rs 800(PVF ) + Rs 700(PVF )
+ Rs 600(PVF ) + Rs 500(PVF
10)] Rs 2,500
NPV [Rs 900 0.909 + Rs 800 0.826 + Rs 700 0.751 + Rs 600 0.683
+ Rs 500 0.620] Rs 2,500
NPV Rs 2,725 Rs 2,500 = + Rs 225
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 11/36
ACCEPTANCE RULE OF NPV
Accept the project when NPV is positiveNPV > 0
Reject the project when NPV is negative
NPV < 0May accept or reject the project when NPV is zero
NPV = 0
( A project will have NPV = 0, only when the project generates cash inflows at a rate just equal to the opportunity cost of
capital )The NPV method can be used to select betweenmutually exclusive projects; the one with the higherNPV should be selected.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 12/36
ADVANTAGES OF NPV METHOD
It considers time value of money.
It is a true measure of profitability as it uses the presentvalues of all cash flows (both outflows & inflows) &
opportunity cost as discount rate rather than any otherarbitrary assumption or subjective consideration.
The NPVs of individual projects can be simply added tocalculate the value of the firm . This is known as“Principle of value additivity ”.
It is consistent with the shareholders wealthmaximization principle as whenever a project withpositive NPV is undertaken, it results in positive cashflows and hence the increase in the value of the firm.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 13/36
DISADVANTAGES OF NPV METHOD
It is difficult to estimate the expected cash flowsfrom a project.
Discount rate to be used is very difficult todetermine.
Since this method does not consider the life of theprojects, in case of mutually exclusive projects withdifferent life, the NPV rule, tends to be biased in
favour of the longer term project.
Since NPV is expressed in absolute terms ratherthan relative terms it does not consider the scale ofinvestment.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 14/36
Profitability Index
An index that attempts to identify therelationship between the costs and benefits ofa proposed project through the use of a ratio
calculated as:
PI = Net Present Value * 100Cost of Asset
Asset with the highest PI is selected.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 15/36
Acceptance rule
A ratio of 1.0 is logically the lowest acceptablemeasure on the index.
Any value lower than 1.0 would indicate that
the project's PV is less than the initialinvestment.
As values on the profitability index increase,
so does the financial attractiveness of theproposed project
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 16/36
INTERNAL RATE OF RETURN
METHOD
The internal rate of return (IRR) is the rate at which thediscounted net returns equal to the original investmenton the project.
This also implies that the rate of return is the discountrate which makes NPV = 0.
The formula for calculating IRR is:
31 2
0 2 3
0
1
0
1
(1 ) (1 ) (1 ) (1 )
(1 )
0
(1 )
n
n
n
t
t
t
n
t
t
t
C C C C C
r r r r
C C
r
C C
r
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 17/36
INTERNAL RATE OF RETURN
METHOD
Where,
Ct
= cash flow at the end of year t
n = Life of the project
r = discount rate
C0 = Initial investment
1 / (1 + r )t = known as discounting factor or PVIFi.e present value interest factor.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 18/36
CALCULATION OF IRR
Uneven or non –normal Cash Flows:
Calculating IRR by Trial and Error
The approach is to select any discount rate tocompute the present value of cash inflows.
If the calculated present value of the expected cashinflow is lower than the present value of cashoutflows, a lower rate should be tried.
On the other hand, a higher value should be tried if
the present value of inflows is higher than the presentvalue of outflows.
This process will be repeated unless the net presentvalue becomes zero.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 19/36
ACCEPTANCE RULE FOR IRR
Accept the project when r (IRR) > k (WACC).
Reject the project when r (IRR) < k (WACC).
May accept the project when r = k.
In case of independent projects, IRR and NPV rules willgive the same results if the firm has no shortage offunds.
In case of projects with equal IRR & different NPV,
select project with higher NPV as it is consistent withfirm’s wealth maximisation objective.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 20/36
ADVANTAGES OF IRR METHOD
It considers time value of money.
It is a true measure of profitability as it uses thepresent values of all cash flows rather than any
other arbitrary assumption or subjectiveconsideration.
Whenever a project with higher IRR than WACCis undertaken, it results in the increase in the
shareholder’s return. Hence, the value of the firmalso increases.
The percentage figure generally allows a sound,uniform ranking of project.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 21/36
PROBLEMS WITH IRR
It is not easy to understand and calculate the IRR as itinvolves complex and tedious computational problems.
There may be some investment projects on which noreal value of IRR can be computed, e.g. Socialprojects.The result shown by NPV and IRR may differ ifprojects are different in terms of
Expected life of project
Cash outlaysThe use of multiple rates might create confusion.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 22/36
PAY BACK PERIOD
It is the number of years required to recover a project’s
cost, or how long does it take to get the business’s
money back?
10 8060
0 1 2 3
-100
=
CF
Cumulative -100 -90 50
Payback 2 + 30/80 = 2.375 years
0
100
2.4
-30
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 23/36
Strengths of Payback:
1. Provides an indication of a project’s risk and
liquidity.
2. Easy to calculate and understand.
Weaknesses of Payback:
1. Ignores the time value of money.
2. Ignores CFs occurring after the payback period.
3. It is a measure of capital recovery & not
profitability.
PAY BACK PERIOD
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 24/36
DISCOUNTED PAYBACK PERIOD(DPBP)
10 8060
0 1 2 3
CFt
Cumulative -100 -90.91 -41.32 18.79
Discountedpayback 2 + 41.32/60.11 = 2.7 yrs
Discounted Payback: Uses discountedrather than raw CFs.
PVCFt -100
-100
9.09 49.59 60.11
=
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 25/36
ACCOUNTING RATE OF RETURNACCOUNTING RATE OF RETURN
The accounting rate of return is the ratio of the averageprofit after-tax divided by the average investment.
ARR = Average Profit After Tax *100
Average Investment
Where;
Average Investment = Initial Investment + Scrap Value
2A variation of the ARR method is to divide averageearnings after taxes by the original cost of the projectinstead of the average cost.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 26/36
ACCEPTANCE RULE OF ARR
This method will accept all those projects whose ARR ishigher than the minimum rate established by themanagement and reject those projects which have ARRless than the minimum rate.
Accept if ARR > minimum rate.
Reject if ARR < minimum rate
This method would rank a project as number one if ithas highest ARR and lowest rank would be assigned tothe project with lowest ARR.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 27/36
ACCOUNTING RATE OF RETURN
The ARR method has certain advantages as:
It is very simple to understand. This method takes into account all the profits
during the life time of the project, whereas payback period ignores the profits accruing afterthe pay back period .
Dependency on accounting data which isreadily available.
Shows the profitability of the project.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 28/36
ACCOUNTING RATE OF RETURN
The disadvantages of ARR include: It is based on accounting profit rather than cash flows.
Time value of money is ignored.
This method does not account for the profits arising onsale of profit on old machinery on replacement.
ARR method does not consider the sizeof investment for each project.
It may be time that the competing ARR of two projectsmay be the same but they may require differentaverage investments. It becomes difficult for themanagement to decide which project should beimplemented.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 29/36
CASE STUDY OF TREE HOUSE
EDUCATION IPO 2011
ASSUMPTIONS:
Cost of capital i.e. discount rate is 15%
Inflation rate for calculating future cash flows is
taken as 55%
Initial investment is assumed to be Rs 50million
The cash flow of year 2007 is taken as cashflow of 2012 and cash flow of year 2008 as2013 and so on....
C C O O
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 30/36
CALCULATION OF NET
PRESENT VALUE
YEAR NET CASH FLOW INFLATED CASH
FLOWS
DIS
FACTOR@15%
P.V OF C.F
2012 2.8 4.34 0.87 3.7758
2013 -1 -1.55 0.756 -1.1718
2014 19.66 30.47 0.657 20.01879
2015 81.98 127.06 0.571 72.55126
2016 175.27 271.67 0.497 135.01999
(Rs. In millions)
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 31/36
NPV OF CASH FLOW=230.19404(Rsmillion)
Therefore NPV of the project
= NPV Of Cashflow - Initial Investment
= 230.19404 – 50
=180.19404(Rs million)
CALCULATING THE
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 32/36
CALCULATING THE
PROFITABILITY INDEX
Profitability index= NPV/cost of assets * 100
=180.19/50 * 100
=360.38(%)
The NPV is positive and the profitability indexis more than unity. Hence the project may be
accepted.
CALCULATION OF THE
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 33/36
CALCULATION OF THE
PAYBACK PERIOD
YEAR INFLATED CASH
FLOWS
2012 4.34 2013 -1.55 2014 30.47 2015 127.06 2016 271.67
Payback period= 4.34 + (-1.55) + 30.47 + 16.47
= 50million.
That is 3 years + (16.47*12)/127.06
= 3years + 48 days
=36 months and 48 days.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 34/36
CONCLUSION
From the above study, we can conclude thatDCF is a better technique than NON DCF.
As DCF technique considers the time value of
money which is a very important factor. On the basis of time value you can consider
the future value and discount them and judge
whether to invest or not on the basis of NPV ofa project.
8/3/2019 DCF n Non DCF
http://slidepdf.com/reader/full/dcf-n-non-dcf 35/36
While in NON-DCF, time value factor is nottaken which is a disadvantage.
It does not take into account any discount
factor. On the basis of payback period also youcannot judge the value of firm.
Cashflows after the payback period are not
taken into consideration which does not let youknow the over all return on investment and theprofitability.
8/3/2019 DCF n Non DCF