Program briefing for Deutsche Bank Tom Williams EVP Programs June 2010 Program overview for DB

Transcript of Db presentation1

Page 1: Db presentation1

Program briefing for Deutsche BankTom Williams

EVP Programs

June 2010 Program overview for DB

Page 2: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

Single Aisle Family

June 2010 Program overview for DB

Page 3: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A320 Family - Main Highlights

• 4291 A320 Family aircraft delivered224 customers and 246 operators

• 4000th A320 Family aircraft delivered to TAM on August 2009• A backlog of >2200 aircraft, representing more than 5 years of

production• Production rate will be increased from 34 to 36 aircraft per month in

December 2010 (Toulouse 15, Hamburg 18, Tianjin 3)• First delivery from Final Assembly Line in Tianjin China in June 2009• 50 Million revenue take-offs since 1988

June 2010 Program overview for DB

Page 4: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

Page 4

A320 Family major improvements

• Passenger to FreighterDevelopment of Passenger Aircraft to Freighter Conversion ongoing with Russian Partner Irkut and EADS- EFWConcept phase concludedMock up tests started

• Fuel Tank Inerting SystemFirst embodiment on serial aircraft done11 aircraft expected for FTIS delivery in 2010

• Life Time Extension project (ESG)ESG1 with 60000 FC/ 120000 FH as new Limit of Validity (LoV) For ESG2 all fatigue tests are ahead of schedule with very encouraging results so far -between 139000 and 170000 simulated flights are achieved.Parallel system and structure justification activities are in progress

June 2010 Program overview for DB

Page 5: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A320 Family major improvements

June 2010 Program overview for DB

• Continuous weight reduction development in progress

• Re-design of around 40 computers & systems to bring them to the most enhanced technology standard

• Several Aerostructure redesign and Weight saving projects running in 2010

• Cabin innovations projects under investigationo Cabin Efficiency & Earning Capacity improvements

(e.g. Cabin furnishing redesign to increase seat count)o Airbus Productivity optimisation→ Opportunity for A380 Design Language application

Continuously improving a successful product Family

Page 6: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A320 Family major improvements

• Sharklet developmentDevelopment launched for EIS end 2012Fuel savings of up to 3.5%

• Feasibility study to Re-enginingInvestigation with engine and nacelles suppliers on-goingResults ready for decision in 2010

• Wing equipping FAL China: 1st wing delivery in February 2010

June 2010 Program overview for DB

Page 7: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A330/A340 Programme

June 2010 Program overview for DB

Page 8: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A330/A340 Programme Main Highlights

• 1,068 A330/A340 aircraft delivered by end of May 2010116 customers and 111 operators

• 86 A330/A340 aircraft delivered in 200938 A330-200, 38 A330-300, 8 A340-600, 2 A340-500

• A healthy backlog of around 400 aircraft, representing almost five years of production

• Production rate capped at 8.5 aircraft per month

June 2010 Program overview for DB Page 8

1000th A330/A340 delivered to Thai Airways in July 2009

Page 9: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A330 Dispatch reliability

A330 Operational Reliability (%)

• A330 Operational Dispatch reliability :99.64% for A330-300 SIA with first FHS contract

June 2010 Program overview for DB

Page 10: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A330 : an increasingly versatile Family

June 2010 Program overview for DB

• A330-200 MRTT : 28 commitments with four customersFuel transfer tests successfully achievedEASA civil certification granted on 17 Mar 2010Military certification planned by the end of 2010

• KC 45 for US Air Force:Final RFP released on 24 Feb 2010

Northrop Grumman Corporation decision to not bid on 8 Mar 2010EADS NA intends to submit proposal to US Air Force as a prime contractor

Proposal submission (with 60 days extension) to be made latest 9 July 2010

A330 MRTT has won five competitions in a rowPage 10

Page 11: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A330 : an increasingly versatile Family

• A330-200 Freighter: 64 orders from 10 customersFirst flight on 5 Nov 2009EASA certification granted on 9 Apr 2010 First delivery to Etihad in Summer 2010Five aircraft to be delivered in 2010

June 2010 Program overview for DB Page 11

Page 12: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A330-200: More Range, More Payload

June 2010 Program overview for DB

London

Santiago

Manilla

Singapore

Jakarta

Buenos Aires

Brunei

A330-200, CF6-80E1-A4JAR 3%, ISA +0, 200nm Alternate

95kg Pax & Bags, Typical Airline Rules

MTOW 233 tMTOW 238 t

EIS : September 2010 with Korean AirlinesPage 12

Page 13: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A330/A340 Family Innovations

June 2010 Program overview for DB

GSM on-board and Live Internet for passengers certified and in operation

since February 2010

Electronic Flight Bag certified and in operation

allowing “paperless” cockpit

Page 13

Page 14: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

Page 14

Continuous A330/A340 Improvements

• A330 ETOPS 240 minute certification granted on 14 Oct 2009 by EASA• New PW 4000 Advantage70 engine:

EIS in June 2009, basic on A330 Freighter• Enhanced Trent 700 engine:

EIS in 2009, basic on A330 Freighter• Design Service Goal extension

Intermediate Service Goals (ISG) granted by EASA on 15 Dec 2009Extended Service Goals (ESG) in preparation for 2012

• Maintenance programme improvementCheck A: now 800 Flight hours (was 600 hours)Check C: 21/24 months (was 18 months)

June 2010 Program overview for DB

The right aircraft, right now

Page 15: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A330/A340 Programme – Main challenges in 2010

• Deliver ~ 8 aircraft per month while managing customers base and suppliers (e.g BFE seats)continuing to maintain quality

• Reduce costs with implementation of Power 8 Lean, smart buying, leadtime reduction, Cabin Business model, ROC.

• Deliver the first A330-200 Freighter in Summer 2010 Deliver four more by end 2010Support Freighter business strategy to capture additional orders.

• Continue to improve the performance of the A330e.g lower fuel consumption, weight savings, MTOW increase, ESG, FHS

• Support military derivatives business and the bid for the KC-45

June 2010 Program overview for DB

Page 16: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A380 industrialisation

June 2010 Program overview for DB

Page 17: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

Market validation

All 3 alliances represented

234 firm orders from 17 Customers

6 A380

15 A380

10 A380

5 A380

10 A3804 a/c

5 A380

12 A380

19 A380

5 A380

6 A380

1 A380

20 A380

6 A380

12 A380

10 A380

90 A380

2 A3802 A380

Page 18: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A380 Moving Forward

• Major challenges behind us• Out of sequence work decreasing constantly• Focus is on stabilising production

Page 18June 2010 Program overview for DB

Page 19: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A380: Brake to Vacate (BTV)

• Certified in October 2009 for Air France delivery• Optimizes braking energy and Turn Around Time• Guarantee to vacate at the assigned exit• Optimize Runway Occupancy Time

Page 19June 2010 Program overview for DB

Page 20: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A380: Runway Overrun Protection System

• Certified in October 2009 for Air France delivery• Runway Overrun Warning (ROW):

Provides an early real time warning in case of anticipated runway overrun situation

• Runway Overrun Protection (ROP): Provides a real time auto max braking and crew alert in case of detected runwayoverrun situation at landing

Page 20June 2010 Program overview for DB

Page 21: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A380: Head Up Display

• Certified in dual configuration (Captain & First Officer) in July 2009 for Air France deliveryIncrease approach stabilityLower visibility take-off minima Lower approach minima

Page 21June 2010 Program overview for DB

Page 22: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A380: Connectivity

• ALNAv2 with High Speed Satcom Swift 64 certified in August 2009 for Qantas delivery in November 2009

• Swift BroadBand (SBB) Certified in November 2009Provides passenger in flight webmail, webchat service with OnairSupports telemedecine data transmissionSupports Electronic Flight Folder data transmission

Page 22June 2010 Program overview for DB

Page 23: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A380 New Design Weights Option

• From 2013 onwards for new aircraft deliveries, airlines will be able to select increased design weights:Current variant : 569 t / 391 t / 366 t for MTOW/MLW/MZFW Increased Variant : 573 t / 393 t / 368 t

• Adds ~100nm range on MTOW-limited missionsRange capability increased to 8,300nm

Adds ~ 1.5t (3300lb) max. structural payload on MZFW-limited missions• Leveraging output from more than 45,000 Flight Cycles (end April 2010) of full-

scale fatigue test so far That is 2.4 DSG (“aircraft lives”) and test continuing to > 2.5 aircraft lives

• Achieved through loads reductions (Partly through flight control laws optimisation) and minor local modifications

Page 23

The new A380 design weights option bringsincreased revenue generation potential

June 2010 Program overview for DB

Page 24: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

A380 Program… To Conclude

• Significant and measurable improvements achieved

• Strong convergence in all industrial phases

• Strong measures deployed

• High reactivity implemented to address and fix any problem (Stop & Fix)

• A380 Continuous development

Page 24June 2010 Program overview for DB

Page 25: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

… to conclude

• Significant and measurable improvements achieved• Strong convergence in all industrial phases• Strong measures deployed to secure all success critical

actions• Strict discipline in adhering to each milestone• High reactivity implemented to address and fix any

problem

June 2010 Program overview for DB

Page 26: Db presentation1

©AI

RB

US

S.A.

S. A

ll rig

hts

rese

rved

. Con

fiden

tial a

nd p

ropr

ieta

rydo

cum

ent.

June 2010 Program overview for DB

© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

This document and all information contained herein is the sole property of AIRBUS S.A.S.. No intellectual property rights are granted by the delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS S.A.S. This document and its content shall not be used for any purpose other than that for which it is supplied.

The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting grounds for these statements are not shown, AIRBUS S.A.S. will be pleased to explain the basis thereof.

AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.