Cuantía As

1
VERIFICACIÓN DE CUANTÍA DE ACERO Sección CºAº B = 25.000 cm Secc (cm2) = 625.00 H = 25.000 cm # Nº Var Ø As (cm2) Sub Total Sección As As1 = 5 1/2" 1.290 6.450 As2 = 2 3/8" 0.740 1.480 As3 = 3 1/2" 1.290 3.870 As4 = As5 = As6 = As7 = As8 = As9 = As9 = Total (cm2) = 11.800 Cuantía ρs = 1.888

description

Cuantía As

Transcript of Cuantía As

CuantaVERIFICACIN DE CUANTA DE ACEROFUENTE: ACERO DE REFUERZOSeccin CAB =25.000cmSecc (cm2) =625.00H =25.000cm#db(pulg)db(cm)P(cm)As(cm2)w(kg/m)e(cm)h(cm)c(cm)(*)N VarAs (cm2)Sub Total1Seccin AsAs1 =51/2"1.2906.45021/4"0.63520.3200.250---As2 =23/8"0.7401.48033/8"0.95230.7400.5600.6620.0380.363As3 =31/2"1.2903.87041/2"1.27041.2900.9940.8880.0510.485As4 =55/8"1.58852.0001.5521.1100.0710.608As5 =63/4"1.90562.8402.2351.3350.0960.728As6 =77/8"2.22273.8703.0421.5380.1110.850xAs7 =81"2.54085.1003.9731.7790.1270.973As8 =91 1/8"2.86596.4505.0602.0100.1421.100xAs9 =101 1/4"3.226108.1906.4032.2500.1621.240xAs9 =111 3/8"3.5801110.0607.9062.5000.1801.370Total (cm2) =11.800141 11/16"4.3001414.52011.3843.0200.2151.640x182 1/4"5.7331825.81020.2384.0100.2582.190xCuantas =1.888Leyenda:db: dimetro nominal de la varillaP: permetro de la varillaAs: rea de la seccin transversal de la varillaw: peso lineal de la varillae: mximo espaciamiento entre las corrugaciones de la varillah: altura mnima de las corrugaciones de la varillac: cuerda de las corrugaciones de la varilla(*) No se producen en el PerFuente:Libro: "Diseo de Estructuras de Concreto Armado" 2da Edicin 2000Autor: Ing Teodoro Harmsen / Ing Paola Mayorca