LOSA ALIGERADA F´C 175 KG/CM2 COSTO UNITARIO M3 25 M3/ DIA DESCRIPCION UNIDAD CUADRILLA CANTIDAD PRECIO PARCIAL MANO DE OBRA CAPATAZ HH 0.1200 14.27 1.71 OPERARIO HH 0.9600 11.80 11.33 OFICIAL HH 0.6400 10.64 6.81 PEON HH 3.5200 9.61 33.83 OPERADOR EQUIPOLIV HH 0.6400 10.64 6.81 60.49 MATERIALES ARENA GRUESA M3 0.57 30.00 17.10 PIEDRA CHANCADA M3 0.58 75.00 43.50 CEMENTO BLS 8.85 19.80 175.23 235.83 EQUIPO HERRAMIENTAS MANUAL %MO 0.03 60.49 1.81 MEZCLADORA HM 0.3200 10.00 3.20 VIBRADOR HN 0.3200 10.00 3.20 8.21 TOTAL 304.53 LOSA ALIGERADA F´C 210 KG/CM2 COSTO UNITARIO M3 25 M3/ DIA DESCRIPCION UNIDAD CUADRILLA CANTIDAD PRECIO PARCIAL MANO DE OBRA CAPATAZ HH 0.1200 14.27 1.71 OPERARIO HH 0.9600 11.80 11.33 OFICIAL HH 0.6400 10.64 6.81 PEON HH 3.5200 9.61 33.83 OPERADOR EQUIPOLIV HH 0.6400 10.64 6.81 60.49 MATERIALES ARENA GRUESA M3 0.55 30.00 16.50 PIEDRA CHANCADA M3 0.56 75.00 42.00 CEMENTO BLS 10.21 19.80 202.16 260.66 EQUIPO HERRAMIENTAS MANUAL %MO 0.03 60.49 1.81 MEZCLADORA HM 0.3200 10.00 3.20 VIBRADOR HN 0.3200 10.00 3.20 8.21 TOTAL 329.36 ALIGERADO ENCOFRADO Y DESENCOFRADO COSTO UNITARIO M2 15 M2 DIA DESCRIPCION UNIDAD CUADRILLA CANTIDAD PRECIO PARCIAL MANO DE OBRA CAPATAZ HH 0.1000 0.05 14.27 0.76 OPERARIO HH 1.0000 0.53 11.80 6.25 OFICIAL HH 1.0000 0.53 10.64 5.64 PEON HH 1.0000 0.53 9.61 5.09

Transcript of COSTOS finales 2008.xls

Page 1: COSTOS finales 2008.xls

LOSA ALIGERADA F´C 175 KG/CM2 COSTO UNITARIO M325 M3/ DIADESCRIPCION UNIDAD CUADRILLA CANTIDAD PRECIO PARCIALMANO DE OBRA CAPATAZ HH 0.1200 14.27 1.71 6.88OPERARIO HH 0.9600 11.80 11.33 6.25OFICIAL HH 0.6400 10.64 6.81 4.38PEON HH 3.5200 9.61 33.83 3.75OPERADOR EQUIPOLIV HH 0.6400 10.64 6.81 6.25 60.49MATERIALESARENA GRUESA M3 0.57 30.00 17.10PIEDRA CHANCADA M3 0.58 75.00 43.50CEMENTO BLS 8.85 19.80 175.23 235.83EQUIPOHERRAMIENTAS MANUAL %MO 0.03 60.49 1.81MEZCLADORA HM 0.3200 10.00 3.20VIBRADOR HN 0.3200 10.00 3.20

8.21TOTAL 304.53

LOSA ALIGERADA F´C 210 KG/CM2 COSTO UNITARIO M325 M3/ DIADESCRIPCION UNIDAD CUADRILLA CANTIDAD PRECIO PARCIALMANO DE OBRA CAPATAZ HH 0.1200 14.27 1.71 6.88OPERARIO HH 0.9600 11.80 11.33 6.25OFICIAL HH 0.6400 10.64 6.81 4.38PEON HH 3.5200 9.61 33.83 3.75OPERADOR EQUIPOLIV HH 0.6400 10.64 6.81 6.25 60.49MATERIALESARENA GRUESA M3 0.55 30.00 16.50PIEDRA CHANCADA M3 0.56 75.00 42.00CEMENTO BLS 10.21 19.80 202.16 260.66EQUIPOHERRAMIENTAS MANUAL %MO 0.03 60.49 1.81MEZCLADORA HM 0.3200 10.00 3.20VIBRADOR HN 0.3200 10.00 3.20

8.21TOTAL 329.36

ALIGERADO ENCOFRADO Y DESENCOFRADO COSTO UNITARIO M215 M2 DIADESCRIPCION UNIDAD CUADRILLA CANTIDAD PRECIO PARCIALMANO DE OBRA CAPATAZ HH 0.1000 0.05 14.27 0.76 6.88OPERARIO HH 1.0000 0.53 11.80 6.25 6.25OFICIAL HH 1.0000 0.53 10.64 5.64 4.38PEON HH 1.0000 0.53 9.61 5.09 3.75

Page 2: COSTOS finales 2008.xls

17.74MATERIALESCLAVOS PARA MADERA 0.25 3.50 0.88ALAMBRE NEGRO N 8 0.40 3.50 1.40MADERA TORNILLO 5.10 3.50 17.85 20.12EQUIPOHERRAMIENAS MANUALES %MO 0.03 17.74 0.53

0.53TOTAL 38.40

Page 3: COSTOS finales 2008.xls

0.836.002.80

13.204.00

26.83

235.83

0.803.203.207.20

269.86

0.836.002.80

13.204.00

26.83

260.66

0.803.203.207.20

294.69

0.363.312.321.99

Page 4: COSTOS finales 2008.xls

7.98

20.12

0.24

28.35

Page 5: COSTOS finales 2008.xls

costos unitarios ELECTRICAS

INSTALACIONES ELECTRICAS

SALIDA PARA TECHO C/CABLE AWG TW 2.5 MM (14) + DUCTO PVC SEL 18 MM(5/8)

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.16OPERARIO HH 1.0000 1.60PEON HH 1.0000 1.60

MATERIALESCABLE TW # 14 AWG 2.5 MM M 9.00CAJA RECTANGULAR GALV. 4" x 2 1/8" UNID 0.50CAJA OCTOGONAL GALV. 4" x 2 1/8" UNID 1.00INTERRUPTOR DE BAQUELITA 25OV-15 AM M3 1.00CINTA AISLANTE UNID 0.10TUB. PVC SEL P/INST. ELECTRICA 5/8" X 3 M PZA 1.50CURVA LIVIANO PVC SAP P/INST. ELEC. 5/8" UNID 3.00CONEXIÓN CAJA PVC SEL P/INS ELECT 5/8" UNID 2.00

EQUIPOSHERRAMIENTAS %MO 3.00

TOTAL

SALIDA DE PARED C/CABLE AWG TW 4.0 MM (12) + DUCTO PVC SEL 1 MM(3/4)

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.20OPERARIO HH 1.0000 2.00PEON HH 0.7500 1.50

MATERIALESCABLE TW # 12 AWG 4.0 MM M 9.00CAJA RECTANGULAR GALV. 4" x 2 1/8" UNID 0.50CAJA OCTOGONAL GALV. 4" x 2 1/8" UNID 1.00CINTA AISLANTE UNID 0.10TUB. PVC SAP P/INST. ELECTRICA 3/4" X 3 M PZA 1.50CURVA PESADO PVC SAP P/INST. ELEC. 3/4" UNID 1.00CURVA LIVIANO PVC SEL P/INST. ELEC. 3/4" UNID 1.00

Page 6: COSTOS finales 2008.xls

EQUIPOSHERRAMIENTAS %MO 3.00

TOTAL

SALIDA PARA SPOT LIGHT CON PVC

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.16OPERARIO HH 1.0000 1.60PEON HH 0.7500 1.20

MATERIALESCABLE TW # 14 AWG 2.5 MM M 9.00INTERRUPTOR SIMPLE BIPOLAR BAKELITA UNID 0.90SPOT LIGHT CROMADO UNID 1.00CAJA OCTOGONAL GALV. LIVIANA 4" x 4" X 2 1/2 UNID 1.43CINTA AISLANTE PZA 0.10TUB PVC SEL P/INST ELECT DE 5/8" X 3 M UNID 1.32

EQUIPOSHERRAMIENTAS %MO 3.00

TOTAL

SALIDA PARA CENTROS DE LUZ C/ INTERRUPTOR DE CONMUTACION

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.20OPERARIO HH 1.0000 2.00PEON HH 0.7500 1.50

MATERIALESCABLE TW # 14 AWG 2.5 MM M 9.00CAJA RECTANGULAR GALV. 4" x 2 1/8" UNID 1.00CAJA OCTOGONAL GALV. 4" x 2 1/8" UNID 1.00INTERRUPTOR DE CONMUTACION UNID 1.00CINTA AISLANTE UNID 0.10TUB. PVC SEL P/INST. ELECTRICA 3/4" X 3 M PZA 1.50CURVA LIVIANO PVC SAP P/INST. ELEC. 3/4" UNID 3.00CONEXIÓN CAJA PVC SEL P/INS ELECT 3/4" UNID 3.00

Page 7: COSTOS finales 2008.xls

EQUIPOSHERRAMIENTAS %MO 3.00

TOTAL

SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLE CON PVC

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.16OPERARIO HH 1.0000 1.60PEON HH 0.7500 1.20

MATERIALESCABLE TW # 14 AWG 2.5 MM M 8.15CAJA RECTANGULAR GALV. 4" x 2 1/8" UNID 1.00TOMACORRIENTE SIMPLE PLANO BAKELITA UNID 1.00CINTA AISLANTE UNID 0.10TUB. PVC SEL P/INST. ELECTRICA 3/4" X 3 M PZA 1.50UNION PVC SEL 3/4" UNID 1.00CONEXIÓN CAJA PVC SEL P/INS ELECT 3/4" UNID 2.00

EQUIPOSHERRAMIENTAS %MO 3.00

TOTAL

SALIDA PARA TOMACORRIENTES BIPOLARES DOBLE CON PVC

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.16OPERARIO HH 1.0000 1.60PEON HH 0.7500 1.20

MATERIALESCABLE TW # 14 AWG 2.5 MM M 8.15CAJA RECTANGULAR GALV. 4" x 2 1/8" UNID 1.00TOMACORRIENTE DOBLE PLANO BAKELITA UNID 1.00CINTA AISLANTE UNID 0.10TUB. PVC SEL P/INST. ELECTRICA 3/4" X 3 M PZA 1.50UNION PVC SEL 3/4" UNID 1.00CONEXIÓN CAJA PVC SEL P/INS ELECT 3/4" UNID 2.00

Page 8: COSTOS finales 2008.xls

EQUIPOSHERRAMIENTAS %MO 3.00

TOTAL

SALIDA PARA TERMA CON PVC

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.16OPERARIO HH 1.0000 1.60PEON HH 0.7500 1.20

MATERIALESCABLE TW # 12 AWG 2.5 MM M 1.70CAJA OCTOGONAL GALV. 4" x 2 1/8" UNID 1.00PLACA SALIDA THERMA UNID 1.00CINTA AISLANTE UNID 0.10TUB. PVC SEL P/INST. ELECTRICA 5/8" X 3 M PZA 1.50CURVA LIVIANO PVC SAP P/INST. ELEC. 5/8" UNID 3.00

EQUIPOSHERRAMIENTAS %MO 3.00

TOTAL

SALIDA DE FUERZA PARA COCINA CON PVC

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.10OPERARIO HH 1.0000 1.00PEON HH 1.0000 1.00

MATERIALESCABLE TW # 10 AWG M 10.50CAJA OCTOGONAL GALV. 4" x 2 1/8" UNID 1.00CINTA AISLANTE UNID 0.10TUB. PVC SAP P/INST. ELECTRICA 1" X 3 M PZA 1.20CURVA LIVIANO PVC SEL P/INST. ELEC. 1" UNID 1.00

EQUIPOSHERRAMIENTAS %MO 3.00

TOTAL

Page 9: COSTOS finales 2008.xls

SALIDA PARA TELEFONO DIRECTO( DE SERVICIO PUBLICO)

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.27OPERARIO HH 1.0000 2.67PEON HH 0.7500 2.00

MATERIALESCAJA RECTANGULAR. LIVIANA 4" X 2 1/2 UNID 1.00PLACA DE SALIDA TELEVISION Y TELEFONO UNID 1.00TUB PVC SEL P/INST ELECT DE 5/8" X 3 M UNID 1.40CURVA LIVIANO PVC SEL P/INST. ELEC. 5/8" UNID 1.00

EQUIPOSHERRAMIENTAS %MO 3.00

TOTALSALIDA PARA ANTENA DE TELEVISION CON PVCDESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.20OPERARIO HH 1.0000 2.00PEON HH 0.7500 1.50

MATERIALESCAJA RECTANGULAR. LIVIANA 4" X 2 1/2 UNID 1.00PLACA DE SALIDA TELEVISION Y TELEFONO UNID 1.00TUB PVC SEL P/INST ELECT DE 5/8" X 3 M UNID 1.50CURVA LIVIANO PVC SEL P/INST. ELEC. 5/8" UNID 1.00

EQUIPOSHERRAMIENTAS %MO 3.00

TOTALSALIDA PARA TIMBRE TIPO GONG CON PVC

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.20OPERARIO HH 1.0000 2.00PEON HH 0.7500 3.00

MATERIALES

Page 10: COSTOS finales 2008.xls

CABLE TW # 8 M 9.00PULSADOR UNIPOLAR SIMPLE UNID 1.00CAJA RECTANGULAR GALV. 4" x 2 1/8" UNID 2.00TIMBRE DING GONG UNID 1.00CINTA AISLANTE UNID 0.10TUB. PVC SEL P/INST. ELECTRICA 5/8" X 3 M PZA 2.00CURVA LIVIANO PVC SAP P/INST. ELEC. 1/2" UNID 2.00

EQUIPOSHERRAMIENTAS %MO 5.00

TOTAL

TUBERIA PVC SAP (ELECTRICAS) D=3/4"

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.03OPERARIO HH 1.0000 0.27PEON HH 1.0000 0.27

MATERIALESPEGAMENTO PARA TUBRIA FORDUIT GL 8.15TUB. PVC SEL P/INST. ELECTRICA 3/4" X 3 M UNIDCURVA PVC SAP LUZ 3/4" UNID 1.00UNION PVC SEL 3/4" UNID 1.00

EQUIPOSHERRAMIENTAS %MO 3.00

TOTAL

TUBERIA PVC SAP (ELECTRICAS) 1"

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.03OPERARIO HH 1.0000 0.32PEON HH 1.0000 0.32

MATERIALESPEGAMENTO PARA TUBERIA FORDUIT GL 8.15TUB. PVC SEL P/INST. ELECTRICA 1" X 3 M UNID 1.00CURVA PVC SAP LUZ 1" UNID 1.00

Page 11: COSTOS finales 2008.xls

UNION PVC SEL 1" UNID 0.10 EQUIPOSHERRAMIENTAS %MO 3.00

TOTALTABLERO DE DISTRIBUCION 12 POLOS

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.40OPERARIO HH 1.0000 4.00PEON HH 0.5000 2.00

MATERIALESTABLERO DE DISTRIBUCION DE 12 POLOS UNID 1.00 EQUIPOSHERRAMIENTAS %MO 3.00

TABLERO DE DISTRIBUCION 2 X 30 AMP

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.05OPERARIO HH 1.0000 0.50PEON HH 0.5000 0.25

MATERIALESTABLERO DE MONOFASICO 2 X 30 AMP UNID 1.00 EQUIPOSHERRAMIENTAS %MO 3.00

TABLERO DE DISTRIBUCION TRIFASICO 3 X 30 AMP

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.05OPERARIO HH 1.0000 0.50PEON HH 0.5000 0.25

MATERIALESTABLERO DE TRIFASICO 3 X 30 AMP UNID 1.00

Page 12: COSTOS finales 2008.xls

EQUIPOSHERRAMIENTAS %MO 3.00

TABLERO DE DISTRIBUCION TRIFASICO 3 X 60 AMP

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

CAPATAZ HH 0.1000 0.05OPERARIO HH 1.0000 0.50PEON HH 0.5000 0.25

MATERIALESTABLERO DE TRIFASICO 3 X 60 AMP UNID 1.00 EQUIPOSHERRAMIENTAS %MO 3.00

Page 13: COSTOS finales 2008.xls

costos unitarios ELECTRICAS

PRECIO PARCIAL P/REDUC TOTAL

12.65 2.02 6.88 1.1011.50 18.40 6.25 10.00

9.00 14.40 3.75 6.0034.82 17.10

1.20 10.802.00 1.002.00 2.004.50 4.504.00 0.405.00 7.501.50 4.500.50 1.00

31.70 31.70

34.82 1.04 0.05

67.57 48.85

PRECIO PARCIAL P/REDUC TOTAL

12.65 2.53 6.88 1.3811.50 23.00 6.25 12.50

9.00 13.50 6.2539.03 20.13

1.80 16.202.00 1.002.00 2.004.00 0.406.00 9.001.20 1.201.20 1.20

Page 14: COSTOS finales 2008.xls

31.00 31.00

39.03 1.17 0.06

71.20 51.19

PRECIO PARCIAL P/REDUC TOTAL

12.65 2.02 0.00 0.0011.50 18.40 0.00 0.00

9.00 10.80 0.00 31.22 #VALUE!

1.20 10.804.50 4.05

15.00 15.003.00 4.294.00 0.405.00 6.61

41.15 41.15

31.22 0.94 #VALUE!

73.31 #VALUE!

PRECIO PARCIAL P/REDUC TOTAL

12.65 2.53 0.00 0.0011.50 23.00 0.00 0.00

9.00 13.50 0.00 0.0039.03 0.00

1.20 10.802.00 2.002.00 2.005.00 5.004.00 0.405.00 7.501.20 3.600.80 2.40

33.70 33.70

Page 15: COSTOS finales 2008.xls

39.03 1.17 0.00

73.90 33.70

PRECIO PARCIAL P/REDUC TOTAL

12.65 2.02 0.00 0.0011.50 18.40 0.00 0.00

9.00 10.80 0.00 0.0031.22 0.00

1.20 9.782.00 2.005.00 5.004.00 0.405.00 7.501.50 1.500.80 1.60

27.78 27.78

31.22 0.94 0.00

59.94 27.78

PRECIO PARCIAL P/REDUC TOTAL

12.65 2.02 0.00 0.0011.50 18.40 0.00 0.00

9.00 10.80 0.00 0.0031.22 0.00

1.20 9.782.00 2.006.00 6.004.00 0.405.00 7.501.50 1.500.80 1.60

28.78 28.78

Page 16: COSTOS finales 2008.xls

31.22 0.94 0.00

60.94 28.78

PRECIO PARCIAL P/REDUC TOTAL

0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00#REF! #REF!

0.00 0.000.00 0.000.00 0.000.00 0.00

#REF! #REF!

0.00 0.00 0.00

#REF! #REF!

PRECIO PARCIAL P/REDUC TOTAL

0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00#REF! #REF!

0.00 0.000.00 0.00

#REF! #REF!#REF! #REF!

0.00 0.00 0.00

#REF! #REF!

Page 17: COSTOS finales 2008.xls

PRECIO PARCIAL P/REDUC TOTAL

0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00

0.00 0.00

0.00 0.000.00 0.000.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

PRECIO PARCIAL P/REDUC TOTAL

0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00

0.00 0.00

0.00 0.000.00 0.000.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

PRECIO PARCIAL P/REDUC TOTAL

0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00

0.00 0.00

Page 18: COSTOS finales 2008.xls

0.00 0.000.00 0.00

#REF! #REF!0.00 0.000.00 0.000.00 0.00

#REF! #REF!#REF! #REF!

0.00 0.00 0.00

#REF! #REF!

PRECIO PARCIAL P/REDUC TOTAL

0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.000.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

PRECIO PARCIAL P/REDUC TOTAL

0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00

0.00 0.00

0.00 0.000.00 0.000.00 0.00

Page 19: COSTOS finales 2008.xls

0.00 0.00 #VALUE!

0.00 0.00 0.00

#REF! #REF!

PRECIO PARCIAL P/REDUC TOTAL

0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00 0.00

PRECIO PARCIAL P/REDUC TOTAL

0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00 0.00

PRECIO PARCIAL P/REDUC TOTAL

0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00

Page 20: COSTOS finales 2008.xls

0.00 0.00 0.00

PRECIO PARCIAL P/REDUC TOTAL

0.00 0.00 0.00 0.000.00 0.00 0.00 0.000.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00 0.00

Page 21: COSTOS finales 2008.xls

PRECIOS INSUMOS ELECTRICAS salario

CAPATAZ 12.6500 L12 6.875 m12 6.875OPERARIO 11.5000 L13 6.250 m13 6.25OFICIAL 10.0000 L14 4.375 m14 4.375TOPOGRAF 11.5000 L15 6.250 m15 6.25PEON 9.0000 L16 3.750 m16 3.75CABLE # 8, AWG 6.00 MM 3.0000 L17CABLE # 10, AWG 2.5 MM 2.0000 L18CABLE # 12, AWG 4.0 MM 1.8000 L19CABLE # 14, AWG 5.00 MM 1.2000 L20CAJA RECTANGULAR GALV. 4" x 2 1/8" 2.0000 L21CAJA OCTOGONAL GALV. 4" x 2 1/8" 2.0000 L22CAJA GALV. 4" x 4 X 2 1/2" 3.0000 L23TUB. PVC SEL P/INST. ELECT 5/8" X 3 M 5.0000 L24TUB. PVC SEL P/INST. ELECT 3/4" X 3 M 6.0000 L25TUB. PVC SEL P/INST. ELECT 1" X 3 M 8.0000 L26TUB. PVC SAP P/INST. ELECT 3/4" X 3 M 15.0000 L27CURVA PVC SAP P/INST. ELEC. 3/4" 1.2000 L28CURVA PVC SAP P/INST. ELEC. 1" 2.0000 L29CURVA PVC SEL P/INST. ELEC. 5/8" 1.5000 L30CONEXIÓN CAJA PVC SEL P/INS ELECT 3/4" 0.8000 L31CONEXIÓN CAJA PVC SEL P/INS ELECT 5/8" 0.5000 L32CONEXIÓN CAJA PVC SAP P/INS ELECT 3/4" 2.0000 L33INTERRUPTOR DE CONMUTAC 25OV-15 AM 5.0000 L34INTERRUPTOR SIMPLE DE BAQUELITA 4.5000 L35INTERRUPTOR DE BAQUELITA 25OV-15 AM 5.0000 L36INTERRUPTOR TERMOMAGNETICO 2 X 30 A 60.0000 L37INTERRUPTOR TERMOMAGNETICO 2 X 60 A 80.0000 L38TOMACORRIENTE SIMPLE PLANO BAKELITA 5.0000 L39TOMACORRIENTE DOBLE PLANO BAKELITA 6.0000 L30UNION PVC 3/4" 1.5000 L41TABLERO GABINETE 12 POLOS 150.0000 L42 PULSADOR UNIPOLAR SIMPLE 15.0000 L43 TIMBRE DIG DONG 25.0000 L44SPOT LIGTH CROMADO 15.0000 L45 PLACA SALIDA TELEFONO TELEVISION 3.0000 L46PLACA SALIDA TERMA 3.0000 L47CINTA AISLANTE 4.0000 L48PEGAMENTO PVC FORDUIT 15.0000 L49

Page 22: COSTOS finales 2008.xls

O12O13O14O15O16