FONCODES / DEPI CALCULO DEL FLETE PROYECTO : AULAS DEL CEO TAPACOCHA OFICINA ZONAL : HUARAZ N. EXPEDIENTE : 1320060 1- DATOS GENERALES A-POR PESO MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTAL CEMENTO BL. 545.00 42.50 23,162.50 FIERRO, CLAV. ETC KG 3,392.17 1.00 3,392.17 MADERA P2 3,623.14 1.50 5,434.71 PERNOS UN 720.00 0.10 72.00 LADRILLO UN 6,421.59 1.20 7,705.91 YESO BL 12.00 25.00 300.00 PINTURA, IMPERM GAL 66.00 4.50 297.00 TRIPLAY KG 19.78 10.00 197.80 CALAMINA KG 146.84 10.00 1,468.40 OTROS KG 300.00 1.00 300.00 PESO TOTAL 42,330.49 B-POR VOLUMEN EN AGREGADOS Y MADERA DESCRIPC. UNIDAD AFECTOS IGV SIN IGV ARENA Y GRAVA M3 36.43 PIEDRA 1/2 M3 23.39 HORMIGÓN M3 41.33 MADERA P2 5.00 VOLUMEN TOTAL 101.16 CAPACIDAD DEL CAMION (M3) 6.00 NUMERO DE VIAJES 16.86 REDONDEO 16.86 EN TUBERIA UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M. CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJES Tub de 3/4 5,040.00 U 100.00 20.00 0.00 . Tub, 1" 3,360.00 U 120.00 24.00 0.01 Tub,1 1/2" 1,690.00 U 90.00 18.00 0.01 Tub 2:" 994.00 U 180.00 36.00 0.04 Tub, 3" 470.00 U 0.00 0.00 0.00 Tub 4": 259.00 U 0.00 0.00 0.00 Tub 6:" U-PVC 110.00 U 0.00 0.00 0.00 Tub 8" U-PVC 65.00 U 0.00 0.00 0.00 Tub 10" U-PVC 50.00 U 0.00 0.00 0.00 Tub 8'; CSN 80.00 U 0.00 0.00 0.00 NUMERO TOTAL DE VIAJES 0.06 REDONDEO 0.00 TUBERIA EN VOLUMEN 1

description

hoja de calculo para calcular el flete terrestre, elaborado para la ciudad de iquitos

Transcript of Calculo de Flete

Page 1: Calculo de Flete

FONCODES / DEPICALCULO DEL FLETE

PROYECTO : AULAS DEL CEO TAPACOCHAOFICINA ZONAL : HUARAZN. EXPEDIENTE : 1320060

1- DATOS GENERALES

A-POR PESO

MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTALCEMENTO BL. 545.00 42.50 23,162.50FIERRO, CLAV. ETC KG 3,392.17 1.00 3,392.17MADERA P2 3,623.14 1.50 5,434.71PERNOS UN 720.00 0.10 72.00LADRILLO UN 6,421.59 1.20 7,705.91YESO BL 12.00 25.00 300.00PINTURA, IMPERM GAL 66.00 4.50 297.00TRIPLAY KG 19.78 10.00 197.80CALAMINA KG 146.84 10.00 1,468.40OTROS KG 300.00 1.00 300.00

PESO TOTAL 42,330.49

B-POR VOLUMEN

EN AGREGADOS Y MADERADESCRIPC. UNIDAD AFECTOS IGV SIN IGVARENA Y GRAVA M3 36.43

PIEDRA 1/2 M3 23.39HORMIGÓN M3 41.33MADERA P2 5.00

VOLUMEN TOTAL 101.16CAPACIDAD DEL CAMION (M3) 6.00NUMERO DE VIAJES 16.86REDONDEO 16.86 EN TUBERIA UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJESTub de 3/4 5,040.00 U 100.00 20.00 0.00

. Tub, 1" 3,360.00 U 120.00 24.00 0.01Tub,1 1/2" 1,690.00 U 90.00 18.00 0.01Tub 2:" 994.00 U 180.00 36.00 0.04Tub, 3" 470.00 U 0.00 0.00 0.00Tub 4": 259.00 U 0.00 0.00 0.00Tub 6:" U-PVC 110.00 U 0.00 0.00 0.00Tub 8" U-PVC 65.00 U 0.00 0.00 0.00Tub 10" U-PVC 50.00 U 0.00 0.00 0.00Tub 8'; CSN 80.00 U 0.00 0.00 0.00

NUMERO TOTAL DE VIAJES 0.06REDONDEO 0.00TUBERIA EN VOLUMEN 1

Page 2: Calculo de Flete

2- FLETE TERRESTRE

UNIDAD DE TRANSPORTE UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTECAPACIDAD DEL CAMION ( M3 ) 6.00 CAPACIDAD DEL CAMION /M3 6.00COSTO POR VIAJE S/. 1,000.00 COSTO POR VIAJE S/. 660.00CAPACIDAD DEL CAMION (KG) 10,000.00 CAPACIDAD DEL CAMION / KG 14,000.00FLETE POR KG 0.10 110.00

AFECTO IGV SIN IGV FLETE POR PESO =Peso Total * Flete por pesoFLETE POR PESO 4,233.05 FLETE POR VOLUMEN=No viajes*costo por viaje

FLETE POR VOLUMEN AGREGADOS 11,127.60TUBERIA 0.00

COSTO TOTAL FLETE TERR. 4,233.05 11,127.60

4- FLETE EN ACEMILA Piedra

La tubería será transportada por peones costo por m3 0.00

Costos de transporte por viajeAcemila S/. 0.30

Peon S/. 0.00

Cantidad Unidades de Capacidad de Número de Flete no Carga Carga Viajes Afecto a IGV

Peso total tubería de agua 152 2 80 1.90 0.00Peso total tubería desague CSN 2 80Peso total tubería desague PVC 2 80Numero bolsas de cemento 545.00 1 1 545.00 163.50Peso resto de materiales 19,167.99 1 50 383.36 115.01Agregados Total en Kilos 202,320.00 1 61.782 3,274.74 982.42Piedra zona aledaña 0.00 0.00COSTO TOTAL DEL FLETE EN ACEMILA S/. 1,260.93

RESUMEN FLETE TOTAL

AFECTO IGV SIN IGV TOTAL DE FLETEFLETE TERRESTRE 4,233.05 11,127.60FLETE FLUVIAL FLETE EN ACEMILA 1,260.93FLETES TOTALES S/. 4,233.05 12,388.53 16,621.58

Page 3: Calculo de Flete

Cálculo de Flete

PROYECTO PRISE HUATASUBPROYECTO CANAL LUCMAOFICINA ZONAL HUARAZN. EXPEDIENTE 1320050214

1- DATOS GENERALES

A-POR PESO

MATERIALES UNIDAD AFECTO IGV PESO.UNIT. PESO.TOTALCEMENTO BL. 208.00 42.50 8,840.00

FIERRO, CLAV. ETC KG 23.76 1.00 23.76

MADERA P2 443.52 1.50 665.28

ETERNIT UN 10.00

CALAMINA UN 5.00

YESO BL 20.00

PINTURA, ASFALTO GAL 9.36 4.50 42.12

PENDOLA UND 0.70

OTROS KG 300.00 1.00 300.00

PESO TOTAL 9,871.16

B-POR VOLUMEN

EN AGREGADOS Y MADERADESCRIPC. UNIDAD AFECTOS IGV SIN IGVARENA Y GRAVA M3 0.14

PIEDRA M3

HORMIGÓN M3 33.53

MADERA P2

P2 0.00

VOLUMEN TOTAL 33.67

CAPACIDAD DEL CAMION (M3) 10.00

NUMERO DE VIAJES 3.37

REDONDEO 3.37

EN TUBERIA UNIDAD DE (2.20 M. x 3.00 M.) DE CARROCERIA, CON H= 1.50 M.

CAPACIDAD DEL CAMION EN TUBOS / VIAJE ML No de tubos No VIAJES

Tub de 3/4 5,040.00 U 0.00 0.00 0.00

. Tub, 1" 3,360.00 U 0.00 0.00 0.00

Tub,1 1/2" 1,690.00 U 0.00 0.00 0.00

Page 4: Calculo de Flete

Tub 2:" 994.00 U 0.00 0.00 0.00

Tub, 3" 470.00 U 0.00 0.00 0.00

Tub 4": 259.00 U 0.00 0.00 0.00

Tub 6:" U-PVC 110.00 U 0.00 0.00 0.00

Tub 8" U-PVC 65.00 U 0.00 0.00 0.00

Tub 6'; CSN 160.00 U 0.00 0.00 0.00

Tub 8'; CSN 80.00 U 0.00 0.00 0.00

NUMERO TOTAL DE VIAJESREDONDEOTUBERIA EN VOLUMEN

Page 5: Calculo de Flete

2- FLETE TERRESTREHUARAZ - HUATA CANTERA CARAZ O RANRAIRCA

UNIDAD DE TRANSPORTE UNIDAD QUE DA COMPROBANTE UNIDAD QUE NO DA COMPROBANTE

CAPACIDAD DEL CAMION ( M3 ) 10.00 CAPACIDAD DEL CAMION /M3 10.00COSTO POR VIAJE S/. 600.00 COSTO POR VIAJE S/. 500.00CAPACIDAD DEL CAMION (KG) 10,000.00 CAPACIDAD DEL CAMION / KG 10,000.00FLETE POR KG 0.06 50.00

AFECTO IGV SIN IGVFLETE POR PESO 592.27 FLETE POR PESO :

FLETE POR VOLUMEN = Peso Total * Flete por peso

AGREGADOS 1,685.00 FLETE POR VOLUMEN :

TUBERIA = Nº viajes * costo por viaje

COSTO TOTAL FLETE TERR. 592.27 1,685.00

4- FLETE EN ACEMILA Piedra

La tubería será transportada por peones costo por m3 0.00

Costos de transporte por viaje

Acemila S/. 1.50

Peon S/. 0.00

Cantidad Unidades de Capacidad de Número de Flete no

Carga Carga Viajes Afecto a IGV

Peso total tubería de agua 2 80

Peso total tubería desague CSN 2 80

Peso total tubería desague PVC 2 80

Numero bolsas de cemento 208.00 1 1 208.00 312.00

Peso resto de materiales 1,031.16 1 50 20.62 30.93

Agregados Total en Kilos 67,340.00 1 40 1,683.50 2,525.25

Piedra zona aledaña 0.00 0.00

COSTO TOTAL DEL FLETE EN ACEMILA S/. 2,868.18

RESUMEN FLETE TOTAL

AFECTO IGV SIN IGV TOTAL DE FLETE

FLETE TERRESTRE 592.27 1,685.00

FLETE FLUVIAL

FLETE EN ACEMILA 2,868.18

FLETES TOTALES S/. 592.27 4,553.18 5,145.45

Page 6: Calculo de Flete

Cálculo de Flete Terrestre AD - 1Obra : 8601002 “MEJORAMIENTO, AMPLIACIÓN DEL SISTEMA DE DRENAJE PLUVIAL DE LA CIUDAD DE IQUITOS"Subpresupuesto : 011 AREA DE DRENAJE (AD - 1)Fecha : 10/12/2013Lugar : 160101 LORETO - MAYNAS - IQUITOS

A.- POR PESO AD - 1

Código Material Unidad Cantidad

0202020002 ALAMBRE NEGRO Nº 8 kg 10,717.16 1.00 10,717.16

0202020006 ALAMBRE NEGRO Nº 16 kg 10,114.58 1.00 10,114.58

0202050056 CLAVOS CON CABEZA DE 2" A 4" kg 3,508.75 1.00 3,508.75

0203030002 ACERO CORRUGADO FY=4200 (GR-60) kg 210,903.24 1.00 210,903.24

0211900098 LAMPARA INTERMITENTE P/ILUMINACION pza 31.12 1.50 46.68

0213060003 EMULSION ASFALTICA gal 773.72 3.75 2,901.45

0221010010 CEMENTO PORTLAND TIPO I (BLS.:42.5 KG.) bls 81,055.47 42.50 3,444,857.48

0230330095 VALVULA TIPO FLAP PARA TUB. DE 500 MM. pza 0.00 80.00 0.00

02306600S4 ANILLO DE JEBE DN 160MM pza 579.00 0.20 115.80

0230720011 JUNTA WATER STOP NEOPRENE 150MM ml 267.57 1.00 267.57

02309800A3 ADITIVO IMPERMEABILIZANTE kg 1,761.86 1.00 1,761.86

0230C10001 PEGAMENTO P/TUBO PVC gal 0.82 3.75 3.08

0230E10002 YESO (BLS. 20 KG) bls 56.39 20.00 1,127.80

0230F10052 CONO DE FIBRA DE VIDRIO und 8.00 3.50 28.00

0239000041 MALLA PLASTICA SEÑALIZADORA m 4,084.89 0.80 3,267.91

0239010100 SANITARIO PORTATIL STANDARD und 1.00 120.00 120.00

0239010101 DETERGENTE QUIMICO kg 1.00 1.00 1.00

0348010096 CONTENEDOR METALICO V= 2 M3 und 5,600.00 60.00 336,000.00

0250040004 MARCO DE Fº Fº PAPA TAPA DE BUZON D=0.60m. pza 473.30 35.00 16,565.50

0250440006 MARCO F°F° Y TAPA CONCRETO ARMADO DE 0.60 M. P/BUZON und 473.30 60.00 28,398.00

0254010002 PINTURA LATEX CALIDAD ECONOMICA gal 5.25 3.75 19.69

0259010002 PLANCHA A.C. PERFIL GRAN ONDA 2.44 M. pza 820.00 2.50 2,050.00

0265900097 Rejilla Metálica 0.60x0.90m. de Sumidero Tipo-01 und 394.00 10.00 3,940.00

02721500S2 Codo PVC de 45º Espiga campana 200mm. pza 394.00 4.50 1,773.00

0272540008 CODO PVC DESAGUE UF (H-M) DN 200MM X 45° pza 157.76 4.50 709.92

0272540031 CODO PVC DESAGUE UF (H-M) DN 160MM X 45° pza 164.32 3.50 575.12

0272890029 SILLA TEE PVC DN 400MM X 160MM pza 126.86 4.00 507.44

0272890041 CACHIMBA PVC ALCANT. DN PROM. X 200MM 90º pza 127.75 6.00 766.50

02729A0001 LUBRICANTE PARA TUBERIA PVC gal 43.53 3.75 163.24

0272A30014 MANGA DE PVC D=40CM, L=100M, CON 15 CONEXIONES DE D=10CM, L=3.0 und 800.00 12.00 9,600.00

94 VARIOS Kg 4,000.00 1.00 4,000.00

4,094,810.77 Kg

A.1) CALCULO DE PRECIO DE FLETE Und

COSTO DE FLETE TERRESTRE LIMA - IQUITOS S/. 0.85 4,094,810.77 S/. 3,480,589.15

COSTO DE FLETE TERRESTRE LOCAL S/. 0.09 4,094,810.77 S/. 368,532.97

Peso Unit.(Kg)

Peso Total(Kg)

Precio por (Kg)

Peso Total(Kg)

Precio Total(S/.)

Page 7: Calculo de Flete

Nº Material

0272A30019 TUBERIA POLIETILENO HDPE 80 PN6 NTP ISO 4427 DE 400mm. 23 0.00 0.00 0.00

0272A30020 TUBERIA POLIETILENO HDPE 80 PN6 NTP ISO 4427 DE 500mm. 15 0.00 0.00 0.00

0272A30021 TUBERIA POLIETILENO HDPE 80 PN6 NTP ISO 4427 DE 630mm. 9 0.00 0.00 0.00

0

A.2) CALCULO DE PRECIO DE FLETE Und

COSTO DE FLETE TERRESTRE EXTRANJERO - LIMA S/. 25,000.00 0.00 0.00

B.- POR VOLUMEN

Tipo de VehiculoDimención de Carroceria

Largo Ancho AltoVehiculo de Transporte Tipo 01 8.00 2.40 1.50 3.60 28.80 17,000.00 Lima - Iquitos

2,592.00 Local

Código TUBERIAS

I).- TUBERIAS DE AGUA POTABLE0272030001 TUBO PVC SP P/AGUA C-10 DN 21MM X 5M 6756 0.00 0.00 0.00

0272030002 TUBO PVC SP P/AGUA C-10 DN 26.5MM X 5M 4243 349.50 69.90 0.02

II).- TUBERIAS DE ALCANTARILLADO

0272500065 TUBO PVC UF ISO 4435, SN2, DN 110MM 303 0.00 0.00 0.00

0272500102 TUBERÍA PVC SAL 12" SEMIPESADA 39 0.00 0.00 0.00

0272500103 TUBERÍA PVC SAL 14" SEMIPESADA 29 0.00 0.00 0.00

0272500104 TUBERÍA PVC SAL 16" SEMIPESADA 22 0.00 0.00 0.00

0272500105 TUBERÍA PVC SAL 24" SEMIPESADA 22 0.00 0.00 0.00

0272500106 TUBERÍA PVC-U NTP 399.163, SN4, DN 160mm 143 2,380.90 396.82 2.77

0272500109 TUBERÍA PVC-U NTP 399.163, SN4, DN 200mm 92 1,553.20 258.87 2.81

0272500111 TUBERIA PVC-U NTP 399.163, SN4, DN 400mm (Incluye Anillo) 23 5,320.22 886.70 38.55

0272500112 TUBERIA PVC-U NTP 399.163, SN4, DN 500mm (Incluye Anillo) 15 1,893.26 315.54 21.04

0272500113 TUBERIA PVC-U NTP ISO 4435, SN4, DN 630mm (INC. ANILLO) 9 216.33 36.06 4.01

Nº TOTAL DE VIAJES 69

B.1) CALCULO DE PRECIO DE FLETE Und

COSTO DE FLETE TERRESTRE LIMA - PUCALLPA S/. 17,000.00 69.00 1,173,000.00COSTO DE FLETE TERRESTRE LOCAL S/. 2,592.00 69.00 178,848.00

1,351,848.00

RESUMENCOSTO DE FLETE EXTRANJERO - LIMA S/. 0.00COSTO DE FLETE LIMA - IQUITOS S/. 4,653,589.00

COSTO DE FLETE LOCAL S/. 547,381.00

Capacidad de Camión en Tubos/Viaje

Cantidad(ml)

Numero de Tubos

Numero de Viajes

Precio por Viaje

Nº Total de Viajes

Precio Total(S/.)

Area(m2)

Volumen(m3)

Costo por Viaje

Capacidad de Camión en Tubos/Viaje

Cantidad(ml)

Numero de Tubos

Numero de Viajes

Precio por Viaje

Nº Total de Viajes

Precio Total(S/.)

Page 8: Calculo de Flete

S10

Precios y cantidades de recursos requeridos por tipoObra 8601002 “MEJORAMIENTO, AMPLIACIÓN DEL SISTEMA DE DRENAJE PLUVIAL DE LA CIUDAD DE IQUITOS"

Subpresupuesto 011 AREA DE DRENAJE - 10 (AD-10)

Fecha 12/07/2013Lugar 160101 LORETO - MAYNAS - IQUITOS

Código Recurso Unidad Cantidad

1 2 3 4 5 6 7 8### 10MANO DE OBRA0147010001 CAPATAZ hh 8,263.40430147010002 OPERARIO hh 49,503.51190147010003 OFICIAL hh 39,634.05740147010004 PEON hh 140,990.11710147010074 BANDERILLERO hh 2,240.00000147020005 OPERADOR EQUIPO LIVIANO hh 935.41340147150001 TOPOGRAFO hh 114.8019

MATERIALES0202020002 ALAMBRE NEGRO Nº 8 kg 10,717.15700202020006 ALAMBRE NEGRO Nº 16 kg 10,114.57850202050056 CLAVOS CON CABEZA DE 2" A 4" kg 3,508.74930202850002 ESTRUCTURA METALICA P/CARTEL S/DETALLE, INC. ACCESORIOS und 1.0000

0203030002 ACERO CORRUGADO FY=4200 (GR-60) kg 210,903.24230204020001 ARENA m3 9,770.76170204410001 TIERRA DE CHACRA m3 408.48910205150052 GRAVA P/FILTRO m3 0.00000205910001 MATERIAL DE PRESTAMO m3 20,858.50250211900098 LAMPARA INTERMITENTE P/ILUMINACION pza 31.12000213060003 EMULSION ASFALTICA gal 773.72100221010010 CEMENTO PORTLAND TIPO I (BLS.:42.5 KG.) bls 81,055.46930221510025 Adoquin de Concreto 6x12.5x25 cm m2 0.00000221920001 CRUCES ESPECIALES TIPO I S/DETALLE, INC. M.O., MAT. Y ACCES. und 15.0000

0221920002 CRUCES ESPECIALES TIPO II S/DETALLE, INC. M.O., MAT. Y ACCES. und 15.0000

0221920003 CRUCES ESPECIALES TIPO III S/DETALLE, INC. M.O., MAT. Y ACCES. und 5.0000

0221920004 CRUCES ESPECIALES TIPO IV S/DETALLE, INC. M.O., MAT. Y ACCES. und 5.0000

0226380005 BISAGRA DE FIERRO DE 2 1/2" PAR 42.00000230330095 VALVULA TIPO FLAP PARA TUB. DE 500 MM. pza 0.00000230460051 CORDEL ml 735.000002306600S4 ANILLO DE JEBE DN 160MM pza 579.00000230700006 NEOPRENO 1.00 x 0.60 m. , e=1/4" und 0.00000230720011 JUNTA WATER STOP NEOPRENE 150MM ml 267.571502308E0063 JUEGO DE VARILLAS DE ACERO INOXIDABLE CON ACOPLAMIENTO ROSC. JGO 0.0000

02308E0064 Disco de Corte P/Concreto Diamantado de 7 1/2" und 0.000002309800A3 ADITIVO IMPERMEABILIZANTE kg 1,761.86380230A90011 PERFIL "I" ALA ANCHA 2 1/2" x 2 1/2" x 1/4" ml 924.00000230B50005 GEOTEXTIL NO TEJIDO DE 280 gr/m2, ASTM D 5261 m2 0.0000

0230C10001 PEGAMENTO P/TUBO PVC gal 0.81550230E10002 YESO (BLS. 20 KG) bls 56.39390230F10052 CONO DE FIBRA DE VIDRIO und 8.00000230I10001 SOLDADURA CELLOCORD 1/8" kg 16.00000230I100F6 SOLDADURA SUPERCITO 5/32" kg 21.00000230J20008 Flete Lima - Iquitos AD-01 glb 1.00000230J20032 Flete Local AD-01 glb 1.00000230J20056 Flete Extranjero - Lima AD-01 glb 1.00000231110094 CAJA DE REGISTRO DE MORTERO (INC. MARCO Y TAPA) und 7,416.0000

Page 9: Calculo de Flete

0231110097 Caja de Sumidero 0.60x0.90m. Tipo-01 und 394.00000239000041 MALLA PLASTICA SEÑALIZADORA m 4,084.88850239000042 GRASS POR BLOQUES und 65,358.24000239000043 PLANTAS ORNAMENTALES und 50.00000239010001 AGUA m3 4,381.01880239010100 SANITARIO PORTATIL STANDARD und 1.00000239010101 DETERGENTE QUIMICO kg 1.00000239010102 CORTE DE SERVICIO ELECTRICO MT und 0.00000239010103 CORTE DE SERVICIO ELECTRICO BT und 0.00000239010104 CORTE DE SERVICIO TELEFONICO und 0.00000239200001 HOJA DE SIERRA pza 0.00000239970010 Movilización y Desmovilización de Maquinas y Equipos Extranjero - Obra glb 1.0000

0239970011 Movilización y Desmovilización de Maquinas y Equipos Lima - Obra glb 2.0000

0243020034 MADERA TORNILLO O SIMILAR p2 130,063.891602430200M3 MADERA (2" X 3") TORNILLO O SIMILAR p2 0.000002430201M3 MADERA HUACAPU (SHUNGO) Ø= 4" p2 0.00000243150001 ESTACA DE MADERA p2 15.57550243910012 Chaleco Reflectante und 56.00000243910013 Lentes de Seguridad und 56.00000243910014 Luces Preventivas de Mano und 56.00000244010003 TRIPLAY 4 X 8 X 6MM pln 764.00000248990096 ANDAMIO METAL C/TABLAS ALQUILER est 159.61470249810002 CINCEL PARA CORTE-DEMOLICION est 0.00000250040004 MARCO DE Fº Fº PAPA TAPA DE BUZON D=0.60m. pza 473.3000

0250440006 MARCO F°F° Y TAPA CONCRETO ARMADO DE 0.60 M. P/BUZON und 473.3000

02511000A3 m 231.0000

0254010002 PINTURA LATEX CALIDAD ECONOMICA gal 5.25000254110011 PINTURA ESMALTE SINTETICO gal 0.07260254810001 PINTURA DE TRAFICO gal 0.33000254920002 GIGANTOGRAFÍA DE 5.40 x 3.60 m. SEGÚN DISEÑO m2 19.4400

0256100015 PLANCHA ACERO INOX. 1/8"x4'x8' pln 0.12500259010002 PLANCHA A.C. PERFIL GRAN ONDA 2.44 M. pza 820.00000260100010 PLANCHA TEKNOPORT E= 19MM m2 725.87430265080033 TUBO DE FIERRO GDO. 1" ml 1.60000265900097 Rejilla Metálica 0.60x0.90m. de Sumidero Tipo-01 und 394.00000272030001 TUBO PVC SP P/AGUA C-10 DN 21MM X 5M ml 0.00000272030002 TUBO PVC SP P/AGUA C-10 DN 26.5MM X 5M ml 349.500002721500S2 Codo PVC de 45º Espiga campana 200mm. pza 394.00000272500002 TUBERÍA PVC-U NTP ISO 4435, SN4, DN 200mm ml 0.0000

0272500065 TUBO PVC UF ISO 4435, SN2, DN 110MM ml 0.00000272500102 TUBERÍA PVC SAL 12" SEMIPESADA ml 0.00000272500103 TUBERÍA PVC SAL 14" SEMIPESADA ml 0.00000272500104 TUBERÍA PVC SAL 16" SEMIPESADA ml 0.00000272500105 TUBERÍA PVC SAL 24" SEMIPESADA ml 0.00000272500106 TUBERÍA PVC-U NTP 399.163, SN4, DN 160mm ml 2,380.90000272500109 TUBERÍA PVC-U NTP 399.163, SN4, DN 200mm ml 1,553.20000272500111 TUBERIA PVC-U NTP 399.163, SN4, DN 400mm (Incluye Anillo) ml 5,320.2178

0272500112 TUBERIA PVC-U NTP 399.163, SN4, DN 500mm (Incluye Anillo) ml 1,893.2636

0272500113 TUBERIA PVC-U NTP ISO 4435, SN4, DN 630mm (INC. ANILLO) ml 216.3309

0272540008 CODO PVC DESAGUE UF (H-M) DN 200MM X 45° pza 157.7616

0272540031 CODO PVC DESAGUE UF (H-M) DN 160MM X 45° pza 164.3202

0272890029 SILLA TEE PVC DN 400MM X 160MM pza 126.85860272890041 CACHIMBA PVC ALCANT. DN PROM. X 200MM 90º pza 127.7526

ANGULO ACERO PESADO DE LADOS IGUALES DE 2" x 2" x 3/16"ANGULO ACERO PESADO DE LADOS IGUALES DE 2" X 2" X 3/16"

Page 10: Calculo de Flete

02729A0001 LUBRICANTE PARA TUBERIA PVC gal 43.53160272A30014 MANGA DE PVC D=40CM, L=100M, CON 15 CONEXIONES DE D=10CM, L=3.00ML und 800.0000

0272A30019 TUBERIA POLIETILENO HDPE 80 PN6 NTP ISO 4427 DE 400mm. ml 0.0000

0272A30020 TUBERIA POLIETILENO HDPE 80 PN6 NTP ISO 4427 DE 500mm. ml 0.0000

0272A30021 TUBERIA POLIETILENO HDPE 80 PN6 NTP ISO 4427 DE 630mm. ml 0.0000

EQUIPOS0337010001 HERRAMIENTA MANUAL %MO0337020001 AMOLADORA ELECTRICA hm 0.00000337020002 Amoladora Electrica Corte Concreto hm 0.00000337030001 DISCOS DE CORTE DIAMANTADOS DE 8" und 0.00000337150003 MOLDE METALICO PARA CANAL TIPO CAJÓN hm 1,895.79620337490051 CIZALLA hm 6,699.53510337600051 WINCHA H-E 52.50000348010005 MEZCLADORA DE CONCRETO 18HP 11P3 hm 3,985.47040348010096 Contenedor Metalico V=2 m3. hm 5,600.00000348020100 MOTOBOMBA 8", INC. ACCESORIOS hm 3,673.17520348040002 CAMION CISTERNA 4X2 AGUA 122 HP 2000 GAL hm 929.2505

0348060011 VOLQUETE CAPAC. 15M3 hm 1,748.66270348140001 EQUIPO DE CORTE hm 0.00000348140003 CORTADORA DE PAVIMENTO hm 41.36750348150009 MAQUINA DE EMPALME POR TERMOFUSIÓN hm 0.00000348990093 ENCOFRADO METALICO P/BUZON HM. 2,143.945003489900Z4 ENTIBADO METÁLICO + ACCESORIOS hm 611.00980349040003 CAMION IMPRIMADOR 210 HP - 2,000 gal hm 0.00000349050003 CAMION PLATAFORMA 6X4 260-300HP,19 TN. hm 1,134.30500349110008 CARGADOR S/LLANTA 80 -95HP,1.5-1.75Y3 hm 882.33140349180003 COMPACTADOR VIBRADOR TIPO PLANCHA 7 HP HM. 5,137.6900

0349210002 COMPRESORA NEUMATICA 87 HP,250-330 PCM hm 0.0000

0349210003 COMPRESORA NEUMATICA 93 HP hm 41.36750349220009 GENERADOR ELECTRICO 1500 WATTS hm 0.00000349350002 BARREDORA MECANICA 10-20HP, 7 P LON hm 0.00000349370002 NIVEL TOPOGRAFICO hm 114.80190349370003 TEODOLITO hm 114.80190349450009 GRUA HIAB 9 TN. S/CAMION hm 578.77500349500001 MARTILLO NEUMATICO 24 KGS hm 41.36750349530003 MOTONIVELADORA 125HP hm 525.84610349550001 MOTOSOLDADORA 250 AMP. hm 84.25000349620002 RETROEXCAVADORA S/LLANTA hm 429.98900349660003 RODILLO VIB. LISO AUTOP. 101-135HP,10-12 TN. hm 417.3885

0349680009 TRACTOR DE TIRO 80 HP hm 0.00000349690004 TRACTOR SOBRE ORUGAS 140-160HP hm 301.09600349730091 VIBRADOR CONCRETO 3/4" - 2" hm 2,852.12340349730092 ANDAMIO DE METAL C/TABLAS ALQUILER hm 2,804.1215

SUBCONTRATOS0403010001 ALQUILER DE LOCAL PARA ALMACEN mes 21.00000403010005 Alquiler de Area P/instalación de Fabrica mes 1.00000403010006 Alquiler de Area P/Curado mes 1.00000403010007 Alquiler de Area P/Almacenamiento mes 1.00000403010008 Alquiler de Local Para Almacen Principal mes 7.00000403010009 Instalacion de Insercion Previo Doblado de Tuberia de Polietileno m 0.0000

0406010001 MATERIAL PARTICULADO PM-10 (µg/L) mtra 8.00000406010002 PARTICULAS EN SUSPENSION (µg/L) mtra 8.00000406020001 OXIDO DE AZUFRE (µg/L) mtra 10.00000406020002 OXIDO DE NITROGENOS (µg/L) mtra 10.00000406020003 MONOXIDO DE CARBONO (mg/L) mtra 10.00000406030001 MONITOREO EMISION SONORA (dB) mtra 8.0000

Page 11: Calculo de Flete

0406030001 MONITOREO EMISION SONORA (dB) mtra 15.00000403010007 Alquiler de Area P/Almacenamiento mes 26.00000403010008 Alquiler de Local Para Almacen Principal mes 27.00000403010009 Instalacion de Insercion Previo Doblado de Tuberia de Polietileno m 0.0000

0406010001 MATERIAL PARTICULADO PM-10 (µg/L) mtra 12.00000406010002 PARTICULAS EN SUSPENSION (µg/L) mtra 12.00000406020001 OXIDO DE AZUFRE (µg/L) mtra 12.00000406020002 OXIDO DE NITROGENOS (µg/L) mtra 12.00000406020003 MONOXIDO DE CARBONO (mg/L) mtra 12.00000406030001 MONITOREO EMISION SONORA (dB) mtra 12.0000

Page 12: Calculo de Flete

Página : 1

“MEJORAMIENTO, AMPLIACIÓN DEL SISTEMA DE DRENAJE PLUVIAL DE LA CIUDAD DE IQUITOS"

Precio S/. Parcial S/. Presupuestado S/.

18.26 150,889.76 151,455.9415.22 753,443.45 752,772.5913.23 524,358.58 524,238.9611.93 1,682,012.10 1,681,878.4411.93 26,723.20 26,723.2013.23 12,375.52 12,374.8915.22 1,747.28 1,722.03

3,151,549.89 3,151,166.05

3.94 42,225.60 42,182.163.94 39,851.44 40,400.035.00 17,543.75 17,609.02

2,671.87 2,671.87 2,671.87

3.94 830,958.77 831,491.1625.00 244,269.04 244,303.5120.00 8,169.78 8,169.79

135.00 0.00 0.0025.00 521,462.56 521,462.5745.50 1,415.96 1,415.9614.00 10,832.09 10,832.0915.46 1,253,117.56 1,253,077.7642.50 0.00 0.00

3,800.00 57,000.00 57,000.00

6,500.00 97,500.00 97,500.00

5,600.00 28,000.00 28,000.00

5,500.00 27,500.00 27,500.00

39.41 1,655.22 1,654.80850.00 0.00 0.00

1.20 882.00 892.5025.00 14,475.00 14,475.0040.00 0.00 0.0014.25 3,812.89 3,812.25

3,400.00 0.00 0.00

35.00 0.00 0.003.60 6,342.71 6,338.07

110.84 102,416.16 102,415.9523.50 0.00 0.00

50.00 40.77 41.945.00 281.97 262.50

24.90 199.20 199.2012.50 200.00 200.5312.50 262.50 262.500.00 0.00 0.000.00 0.00 0.000.00 0.00 0.00

120.00 889,920.00 889,920.00

Page 13: Calculo de Flete

390.00 153,660.00 153,660.008.50 34,721.55 34,741.002.50 163,395.60 163,395.60

10.50 525.00 525.001.50 6,571.53 6,786.79

850.00 850.00 850.0025.00 25.00 25.00

1,500.00 0.00 0.002,000.00 0.00 0.001,500.00 0.00 0.00

8.00 0.00 0.003,550.00 3,550.00 3,550.00

1,100.00 2,200.00 2,200.00

2.20 286,140.56 286,119.462.20 0.00 0.002.20 0.00 0.002.20 34.27 0.00

10.50 588.00 588.006.50 364.00 364.00

18.50 1,036.00 1,036.0036.00 27,504.00 27,500.002.00 319.23 318.412.50 0.00 0.00

165.00 78,094.50 78,094.50

390.00 184,587.00 184,587.00

56.22 12,986.82 12,986.40

32.50 170.63 157.5035.00 2.54 2.5475.00 24.75 24.7820.00 388.80 388.80

95.00 11.88 11.8841.95 34,399.00 34,400.004.50 3,266.43 3,257.58

65.00 104.00 104.00261.68 103,101.92 103,101.92

5.20 0.00 0.007.20 2,516.40 2,516.40

46.50 18,321.00 18,321.0033.90 0.00 0.00

24.16 0.00 0.0090.00 0.00 0.00

155.00 0.00 0.00195.00 0.00 0.00360.00 0.00 0.0012.64 30,094.58 30,092.2619.24 29,883.57 29,881.36

137.47 731,370.34 731,349.16

157.50 298,189.02 298,198.21

305.00 65,980.92 65,980.92

35.00 5,521.66 5,520.00

23.00 3,779.36 3,775.08

85.00 10,782.98 10,781.64220.00 28,105.57 28,107.36

Page 14: Calculo de Flete

51.50 2,241.88 2,229.82360.00 288,000.00 288,000.00

169.67 0.00 0.00

265.00 0.00 0.00

419.30 0.00 0.00

6,816,417.13 6,817,620.53

98,652.37 98,652.372.00 0.00 0.005.00 0.00 0.00

10.00 0.00 0.0045.00 85,310.83 85,316.162.00 13,399.07 12,950.682.00 105.00 105.00

25.00 99,636.76 99,646.812.54 14,224.00 14,224.00

35.00 128,561.13 128,541.43160.00 148,680.08 148,619.37

180.00 314,759.29 314,785.872.00 0.00 0.00

31.15 1,288.60 1,288.4325.42 0.00 0.001.50 3,215.92 3,215.934.50 2,749.54 2,749.20

185.00 0.00 0.00120.00 136,116.60 136,116.60220.00 194,112.91 194,166.0525.00 128,442.25 128,490.40

120.00 0.00 0.00

60.12 2,487.01 2,486.386.00 0.00 0.00

80.00 0.00 0.007.00 803.61 834.768.00 918.42 887.26

101.69 58,855.63 58,861.427.10 293.71 293.15

220.00 115,686.14 115,724.86100.00 8,425.00 8,425.00130.00 55,898.57 55,815.88120.00 50,086.62 50,125.31

120.00 0.00 0.00180.00 54,197.28 54,197.28

5.57 15,886.33 15,873.282.00 5,608.24 5,593.95

1,738,400.91 1,737,986.83

800.00 16,800.00 16,800.001,250.00 1,250.00 1,250.00

850.00 850.00 850.001,350.00 1,350.00 1,350.001,000.00 7,000.00 7,000.00

15.20 0.00 0.00

35.00 280.00 280.0040.00 320.00 320.0030.00 300.00 300.0030.00 300.00 300.0025.00 250.00 250.0020.00 160.00 160.00

Page 15: Calculo de Flete

20.00 300.00 300.001,350.00 35,100.00 35,100.001,000.00 27,000.00 27,000.00

15.20 0.00 0.00

35.00 420.00 420.0040.00 480.00 480.0030.00 360.00 360.0030.00 360.00 360.0025.00 300.00 300.0020.00 240.00 240.00

60,603.89 60,607.58

Total S/. 55,588,836.87 55,585,520.45