    CATEGORY:INDUSTRY- MULTIDISCIPLINARYCOLLABORATION

    TEAMS NAME: INNO-BIM 2(WH)

    TEAMS MEMBERS: ANG KOOI FUNG, TAM SOOK MENG, ROMMEL BERNAL,

    JIM DUPITAS, SOFIA ELARMO, SU MON SOE, JEEVARATHINAM,

    FRANCO LOBRIGO, TRAN DINH BAC & MADHANAGOPAL

    THE MAXWELL

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    2/16

    INNO-BIM 2BIM WORKFLOW OVERVIEW

    BIM Model

    Architect

    Structure Engineer

    MEP EngineerContractor

    Fabricator

    Quantity Surveyor

    Owner

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    3/16

    INNO-BIM 2

    DESIGNCONCEPT

    DESIGNANALYSIS

    BUILDABILITY&

    GREENMARK

    DESIGNDOCUMENTDRAWINGS

    ARCHITECTURALRENDERING/ANIMATIONS

    ARCHITECTURALTAKE-OFF

    STRUCTURALDESIGN MODEL

    MEP DESIGNMODEL

    DESIGNDEVELOPMENT ARCHITECTURAL DESIGN

    SOLAR RADIATION SUN PATH ANALYSIS DAYLIGHTING ANALYSIS WIND ANALYSIS SITE ORIENTATION THERMAL ANALYSIS ARTIFICIAL LIGHTINGANALYSIS

    ARCHITECTURALDESIGN MODEL

    BIM WORKFLOW

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    4/16

    INNO-BIM 2

    DESIGNDEVELOPMENT STRUCTURAL DESIGN

    BIM WORKFLOW

    DESIGNANALYSIS

    STRUCTURE PERFORMANCEFOUNDATION DESIGNCOLUMN DESIGNBEAM DESIGNSLAB DESIGN

    DESIGNDOCUMENTDRAWINGS

    STRUCTURALRENDERING/ANIMATIONS

    STRUCTURALTAKE-OFF

    ARCHITECTURALDESIGN MODEL

    MEP DESIGNMODEL

    STRUCTURALDESIGN MODEL

    ARCHITECTURALDESIGN MODEL

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    5/16

    INNO-BIM 2BIM WORKFLOW

    DESIGNDEVELOPMENT MEP DESIGN

    DESIGNANALYSIS

    Energy DataCooling Load Analysis

    DESIGNDOCUMENTDRAWINGS

    MEP RENDERING/ANIMATIONS

    MEP TAKE-OFF

    ARCHITECTURALDESIGN MODEL

    STRUCTURALDESIGN MODEL

    MEPDESIGN MODEL

    STRUCTURALDESIGN MODEL

    ARCHITECTURALDESIGN MODEL

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    6/16

    INNO-BIM 2

    CONSTRUCTIONPHASE

    BIM WORKFLOW

    PLANNING/LOGISTIC

    QUANTITY &COST

    PRE-FABRICATION

    SAFETY

    TECHNICALCOORDINATION

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    7/16

    INNO-BIM 2COLLABORATION OVERVIEW

    DESIGN

    FACILITYMANAGEMENT

    ARCHITECTS

    STRUCTURALENGINEERS

    MEPENGINEERS

    CONSTRUCTION

    PLANNING/LOGISTICS

    QSPRE-

    FABRICATIONSAFETY

    Buzzsaw sysncautomaticallyuploads/downloadsmultiple models fromdifferent firms to/froma central Buzzsawlocation in the cloud

    Server

    View 2D and 3D projectdesigns from the field withBuzzsaw mobile foriPhone, iPad, and Android

    Iphone/ Ipad &

    Android

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    8/16

    INNO-BIM 2FINAL ARCHITECTURAL DESIGN

    SOLAR PANEL/ LOUVERS

    UPN WITH RETAIL LINK TO TANJONGPAGAR MRT

    BUILDING SKIN

    OPEN CONCEPT FOOD COURT ATPODIUM ROOF TOP

    PODIUM ROOFTOP LANDSCAPE

    NATURAL LIGHTING FOR OFFICE SPACE

    1

    2

    3

    4

    5

    6

    1

    1

    1

    2

    3

    54

    6

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    9/16

    INNO-BIM 2FINAL STRUCTURAL DESIGN

    Podium

    1st to 4th storey designed as 300mm thick

    flat slab typical with 600x600mm columnsand 1500x1500x500mm drop panel 800mm diameter CBP wall is provided atbasement The basement designed as 400mm thickslab supporting by 800mm diameter piles

    Office Tower

    Designed as structural column with

    beam-slab framing Beams have been standardized to2000x500mm, 250x500, 750x500 and750x700mm The slab is designed as 250mm thicktypically with 125mm precast prestressedplank and 125mm topping

    Multi Storey Car Park

    Full precast system

    250x800mm precast column 250x500mm precast beam 100mm thick precast slab with 100mmthick topping The columns will be supported by250x250mm precast piles.

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    10/16

    INNO-BIM 2FINAL MEP DESIGN

    Group of wash basins connected in seriesGroup of urinals connected in seriesLoop ventilating pipe provided

    AHU and 177 kw Cooling tower placed on the roofWSHP (Water Source Heat Pumps) are used to coolthe building which is very effective.

    Cooling system designed based on the heating &cooling load calculated using Revit MEP

    Piping System HVAC System

    Electrical System

    Use of lifts with AC variable voltage andvariable frequency (VVVF) motor driveand energy efficient features such as sleepmode features are used.

    Fire Protection System

    Both Dry & Wet fire protectionsystems are used

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    11/16

    GBS(Energy Analysis

    Software)

    INNO-BIM 2BIM FOR SUSTAINABILITY & BUILDABILITY

    BUILDABILITY SCORE COMPUTATION

    BS Score Structural

    System = 40

    BS Score of differencestructural systemgenerated directly fromStructural Model

    Total GFA = 123,000 m2

    Required Buildable Score = 77

    SUSTAINABILITY ANALYSIS

    Ecotect(Sustainable

    Building DesignSoftware)

    Site Analysis

    OrientationAnalysis

    Wind Analysis

    Sun Path &Shadow Analysis

    Thermal Analysis

    BS Score of differencewall system generateddirectly fromArchitectural Model

    Carpark NV= 2593/4112=63% > 20%

    BS Score Wall System =To be further verifiedby Revit Archi model

    CARPARK NATURAL VENTILATION

    Car park & NV area generated

    directly from Revit Structure.

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    12/16

    INNO-BIM 2BIM FOR 2D SHOP DRAWINGS

    The precast connection details can be better understandby including 3D view generated automatically from RevitStructure

    M&E combined services drawings generated directlyfrom Revit MEP

    Structure shop drawings generated directly from RevitStructure

    Architecture shop drawings generated directly fromRevit Architectural

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    13/16

    INNO-BIM 2BIM FOR QUALITY COORDINATION

    Set conflict rule forclash checking

    Run clash check and

    the clash points will behighlightedautomatically

    Export Architectural, Structureand MEP Revit Model to IFCformat

    Import Architectural,Structure and MEP RevitModel in IFC format toTekla BIMSight

    The Architectural,Structure and MEP modelsare highlighted in differentcolor for easyidentification

    Zoom in to the clasharea to study the clash indetail

    The clash point can bemarked up and capturedas picture and send outtogether in a file to therelevant party.

    The pictures captured canbe used to generate

    walkthrough inside the file.

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    14/16

    INNO-BIM 2BIM FOR CONSTRUCTION PLANNING

    3D visualization for carpark construction sequence.Useful for training to the site staff/ subcon.

    4D schedule simulation useful for Productionteam players to foresee and anticipate thework flow on site

    Study the Underground Pedestrain Walkway(UPN) with better visualization

    To Tanjong PagarMRT Exit G

    Proposed UPN

    Study the interface/ PC connectiondetails with better visualization

    3D visualization make the decisioneasier for temporary facilities

    and tower crane location

    planning, etc.

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    15/16

    INNO-BIM 2BIM FOR QUANTITY SURVEY

    Precast Quantity generated directly from Structuralmodel is useful for mould and logistic planning.

    Precast Quantity

    Car Park Lot QuantityM&E Quantity

    Mechanical equipment quantity, plumbingfixture quantities and space schedulegenerated directly from Revit MEP

    Total Concrete Quantity

    Total car park quantity generated directly

    from Revit Architecture.

    Required CP Lot = 400

    Total Normal CP Lot =417

    Total HandicappedCP Lot = 26

    Total = 443, OK!

    Total concrete Volume= 65880 m3

    Total concrete quantitygenerated directly from RevitArchitecture.

  • 7/31/2019 BIMCompetition2012Presentation WH INNO-BIM2

    16/16