MIRTA VARGAS DE ARGENTINA MEDIA 9 CALZADA Cat B 2° grupo 1ª Actividad
archivo_unido
-
Upload
salexander01 -
Category
Documents
-
view
216 -
download
0
Transcript of archivo_unido
-
8/10/2019 archivo_unido
1/6
always moving forward
With IMPAX upgrades you can easily and continuously
improve quality and reduce costs
IMPAX 6 Upgrade
-
8/10/2019 archivo_unido
2/6
Upgrade your benefits
There are lots of benets to
upgrading your IMPAX with
he latest software version:
Improve efciency.
Reduce service costs.
Improve integration.
Manage end-of-life risks.
Leverage new technologies.
Access new tools and
features.
Everyone wants to reduce the costs associated with healthcare delivery:
hospitals and patients alike. But sacricing quality of care is not an option.
So we need to nd other ways to raise the bar. Technology can play a big role,
supporting efforts everywhere from departmental consolidation to deploying
electronic health records across (sometimes large) distances. To get the
most from the opportunities, you have to keep the technology, tools and
performance up to the minute. And you have to manage end-of-life issues!
Agfa HealthCare is your life-long partner in this journey. We have set the
standard for innovation in radiology IT, and we are dedicated to remaining a
leader in the eld. Our focus is clear: helping healthcare organizations like
yours increase productivity and responsiveness.
How do we achieve this? By listening to you, uncovering your challenges and
problems, and then providing you with the solutions to overcome them. Like
our IMPAX upgrades. We make it easy for you to keep your IMPAX solution
top-of-the-line in usability, security, interoperability and performance, with
minimum investment, regardless of your resource and budget constraints.
Thats our commitment to you, to support you in building a solid path towards
your future.
-
8/10/2019 archivo_unido
3/6
Every improvement makes a difference
When you want to improve quality and reduce costs, even small
changes can add up to a big difference. Thats why every newversion of Agfa HealthCare software focusses on nding new
ways to do this. A single mouse-click to nd what you need? All
applications on a single desktop? Greater efciency can lead to
higher productivity, and the effects can be felt far and wide!
Longer life, less service
To help keep your investment lasts as long as possible, you
need to keep the system up-to-date and use the latest platform.
We can provide you with the tools to reduce the service and
maintenance costs and time:
Centralized system and user management. Centralized monitoring of the entire system.
Centralized deployment for software updates.
By providing one point of interaction and increased up-
time, these tools save you time, money and resources.
Integration efciency
Integrating proprietary interfaces can take up a lot of money and
time. We are an expert in interoperability and integration, and
we continue to enhance these aspects of our solutions, using
methods from Code level (COM), Context Server and Generic
Imaging Integration (GII), to List Area Wizards (Scripting), HL7,EPR integration via URL or .NET, back ofce web services and
APIs. You can trust our heritage.
A springboard to new technologies
Dont be left behind: technology is constantly advancing, and
these days we must all keep up. Our easy upgrades supportyou in creating and following a comprehensive IT strategy
that supports business continuity and protects your existing
investments. Our tried and tested upgrade path minimizes
your downtime, while allowing you to take advantage of
new and innovative applications. It puts the future at your
ngertips.
Safety rst
High availability, disaster recovery and business continuity:
these are important for any organization, and more so in a
healthcare environment. With an IMPAX upgrade, you can
make sure you have the very latest in:
Automated server failover: with multiple application
servers, and multiple curators sharing load and failover.
Load balancing: with optional load sharing among servers.
ODA (Oracle Database Appliance): for industry-proven high
availability of your database.
Resource sharing: with automated load sharing and
multi-threading.
Offsite storage: with a wide variety of disaster recovery
options to suit your specic needs.
W at s new in IMPAX 6?
IMPAX 6 has a whole range of new features that you can put to wor w th a s mple upgrade:
IMPAX RIS worklists that let you:
- Search using RIS-based criteria.
- Sign off reports with automatic viewing of relevant
mages.
- Check RIS exam status.
- See stud es even before mages are ava lable n the
PACS, and create a report.
- Retrieve and review reports created by the user or
by a junior radiologist.
Integration of IMPAX Clinical Applications:
volume viewing opens automatically for each CT study.
Cross-linking of studies with simultaneous
zoom and window levelling.
Support for Digital Breast Tomosynthesis.
Synchronization between IMPAX and ICIS VNA when
certain studies are deleted (supported by CCObjects).
Improvement resulting in images loading much faster in
the IMPAX Image Area.
Support for WADO: prior images can be viewed ad hoc
from the archive.
Un ed report layout through IMPAX Cl ent, ICIS v ew,
IMPAX CD Viewer and IMPAX RIS, as a DICOM
encapsulated PDF report.
H gh ava lab l ty w th ODA (Oracle Database Appl ance)
and disaster recovery with ODG (Oracle Data Guard) and
FSFO (Fast Start Failover).
-
8/10/2019 archivo_unido
4/6
Agfa, the Agfa rhombus are trademarks of Agfa-Gevaert N.V., Belgium, or its afliates. All other trademarks are held by their
respective owners and are used in an editorial fashion with no intention of infringement. All information contained herein is
intended for guidance purposes only, and characteristics of the products and services can be changed at any time without notice.
Please contact your local sales representative for availability information.
2014 Agfa HealthCare NV
All rights reserved
Published by Agfa HealthCare NV
B-2640 Mortsel Belgium
516C5 GB 00201406
Contact your Agfa HealthCare sales representative
to discuss the options that can help you keep movingalong on your digital journey. Whichever Agfa HealthCare
solution you select, you can rely on the experience of our
Sales and Service professionals for expertise and guidance.
Do more, see more, know more
In addition to upgrading your IMPAX with the latest software version, its easy to add on additional services
and features with Agfa HealthCare solutions.
ICIS View:Zero-footprint viewing technology that
provides enhanced viewing, sharing, and integration
across platforms, with all images from all sources
accessible on a single browser-based viewer.
IMPAX EPS (Enterprise Productivity Suite):
Assignment based workow orchestration offering
workload balancing and automated Priority Manage-
ment.
IMPAX for Womens Care:Integrating digital breast
tomosynthesis in womens care to provide a 3D imag-
ing capability that enhances evaluation of lesions,
answering some of the specic challenges of mam-mography.
IMPAX REM (Radiation Exposure Monitoring):
Facilitates dose management in patients,
with a single solution for collecting, tracking and
analyzing a patients radiation exposure.
IMPAX BI (Business Intelligence):Management
decisions driven by insight, from a web-based health-
care business intelligence and analytics platform.
GRIP (Global Remote Incident Prevention):
24/7 global remote monitoring identies and helps
prevent incidents before they occur.
IMPAX for Nuclear Medicine:Optimizes efciencyby processing, displaying and reporting all images
from a single workstation and increases personalized
care via interdepartmental communication.
-
8/10/2019 archivo_unido
5/6
UNIVERSIDAD DE EL SALVADORFACULTAD DE INGENIERA Y ARQUITECTURAESCUELA DE INGENIERA DE SISTEMAS INFORMTICOS
SISTEMA INFORMTICO DE GESTIN DE IMAGENOLOGA DIGITAL DEL MINISTERIO DE SALUDSIMAGDGRUPO 16
A continuacin se presenta una lista consolidada de las diversas problemticas surgidas a lo largo
del desarrollo del proyecto de Imagenologa Digital y que han provocado un retraso considerable en
la evolucin del desarrollo del proyecto:
Citas fuera de tiempo.
Uno de los principales problemas que afect seriamente la evolucin del proyecto; dichas visitas
fueron solicitadas con anterioridad previendo cumplir de forma adecuada los tiempos
establecidos para el proyecto. De estas las nicas visitas proporcionadas fueron 3, con gran
diferencia de tiempo entre ellas siendo de la siguiente manera:
o
Hospital Zacamil el da 7 de abril del 2014, obtencin del proceso de funcionamiento para
el rea de imagenologa, cabe destacar que dicho hospital no cumple con las condiciones
necesarias solicitadas, ya que no posee implementado el sistema SIAP ni tampoco la
tecnologa requerida para conocer el funcionamiento necesario del proyecto a realizar. Se
realiz un reporte con la informacin obtenida y se envi a las partes involucradas en el
proyecto para hacer del conocimiento de lo obtenido.
o Hospital Saldaa el da 28 de mayo del 2014 , esta visita fue lograda por medio de la
intervencin directa del Ing. Carlos Martin siendo su principal objetivo visualizar el
funcionamiento del equipo de imagenologa digital sin embargo no se pudo obtener mayor
informacin relevante al proyecto sobre dicha visita ya que era una reunin agendada para
los proveedores de los equipos digitales y cmo grupo de tesis estbamos en calidad de
observadores.o Hospital Saldaa el da 24 de junio del 2014, refinamiento de procesos - requerimientos
funcionales, con esta visita se logr definir los requerimientos funcionales y los diversos
procesos que se ven involucrados concernientes al funcionamiento adecuado del rea de
imagenologa digital, en dicha visita se solicit la obtencin de un archivo DICOM real
generado por dichos equipos, sin embargo no se nos concedi ninguno y se nos dijo que
se solicitaran por medio de las autoridades del MINSAL, se envi dicha solicitud para la
obtencin del archivo, el Ing. Carlos Martin notifico de dicha solicitud a las instancias
correspondientes sin embargo a la fecha nunca se nos proporcion dicho archivo. Es
importante destacar que en los periodos comprendidos entre dichas fechas, como grupo
de tesis se logr obtener visitas al hospital Bloom por medios propios y que sirvieron de
forma crucial e importantsima para obtener la informacin necesaria de los
requerimientos, procesos, flujos de trabajo, entre otros.
-
8/10/2019 archivo_unido
6/6
Atrasos debido a tratar de llevar todos los grupos de tesis al mismo tiempo
o
Para la etapa de Diseo se solicit con anterioridad que se nos proporcionase la informacin
necesaria para la elaboracin de la BD y los diferentes elementos que se ven involucrados
en la elaboracin del diseo del sistema, sin embargo se nos notific que se atendera a
todos los grupos de tesis al mismo tiempo para la explicacin de la base de datos y los
elementos de diseo necesario, sin embargo esto signific un retraso para el grupo ya quese tuvo que esperar a que todos estuvieran listos para llevar a cabo la explicacin de la
base de datos del SIAP y de los estndares a seguir.
Notificacin de la utilizacin de un framework de desarrollo complejo de manipular, con un
retraso considerable.
o Inicialmente se nos notific de las herramientas y lenguajes de desarrollo a utilizar; entre
esto se hizo mencin a que el lenguaje de programacin a utilizar seria php con un
framework de desarrollo llamado Symfony2 sin embargo se nos notific en el mes de julio
del 2014 que el framework a utilizar seria Sonata Project, la escasa informacin necesaria
para la compresin de este framework se public casi a finales de dicho mes y que inclusive
los asesores delegados por parte del MINSAL no saben manipular a su totalidad.
Cambios de requerimientos tcnicos de ltimo momento.
o La presentacin de la segunda defensa del grupo de tesis (etapa1: anlisis y diseo) se llev
a cabo el da 21 de agosto del 2014, y se crea que ya se tena todo adecuado para avanzar
con la etapa de programacin del sistema, sin embargo el da 15 de agosto del 2015, se nos
notific que se necesitaba tener una reunin urgente con el grupo de tesis, para sorpresa
nuestra fue que se solicitaba la modificacin de la base de datos enviada a finales del mes
de julio del 2014, en dicha reunin se nos hizo nfasis en que las modificaciones que se
deban de llevar a cabo eran de carcter obligatorio y que de no hacerse se podra ver
afectado seriamente el proceso de desarrollo del sistema, por tanto se tom a bien llevar a
cabo dichas correcciones, sin embargo al llevar a cabo dicho proceso se vio afectado
seriamente el planteamiento inicial de la base de datos ya que al final de dicho proceso se
tuvo un agregado de aproximadamente 10 tablas ms adicionales a las consideradas para el
desarrollo.
Plantilla proporcionada fuera de tiempo y archivos necesarios faltantes.
o
Este aspecto tambin es importante destacarlo, ya que se pidi con anticipacin los archivos
necesarios para comprender la funcin y estructuracin del sistema SIAP ya que el sistema
a desarrollar depende completamente del que este se encuentre funcionando, pero pese a
las constantes notificaciones de proporcionar dicha informacin solo se nos responda queeste sera proporcionado hasta que todos los grupos de tesis hubieran terminado la
presentacin de la segunda defensa, razn que tambin afecto seriamente el desarrollo del
sistema ya que no todos los grupos de tesis tenan fechas similares para la presentacin de
las defensa; la plantilla fue proporcionada a mediados de septiembre, 17 septiembre 2014,
sin embargo al momento de empezar a adaptarnos a dicho sistema, este presentaba una
serie de errores debido a que no existan una serie de elementos necesarios para nuestro
sistema.