ITEM: UNIDAD:
UN
I. MATERIALES
DESCRIPCIN UNIDAD CANTIDAD VR. UNITARIO SUBTOTAL
Amarre Plstico para cable trenzado UN 2.00 $417 $834
Conector de tornillo con chaqueta aislante, tipo 2 UN 4.00 $9,775 $39,100
Grapa de Suspencion aislada para cable trenzado de B.T. UN 2.00 $26,115 $52,230
Perno de ojo tipo 2 de 5/8" x 10", completo UN 1.00 $5,676 $5,676
SUB TOTAL: $97,840
II. EQUIPO Y HERRAMIENTA
DESCRIPCIN TIPO TARIFA/DIA RENDIMIENTO SUBTOTAL
Herramienta menor linieros $17,408 7.000 $2,487
SUB TOTAL: $2,487
III. TRANSPORTE
DESCRIPCIN UNIDAD TARIFA/DIA RENDIMIENTO SUBTOTAL
campero $125,062 23.57 $5,306
SUB TOTAL: $5,306
IV. MANO DE OBRA
DESCRIPCIN JORNAL FAC. PRES. RENDIMIENTO SUBTOTAL
Capataz $53,727 1.70 7.00 $13,048
Electricista $54,299 1.70 7.00 $13,187
Ayudante $25,132 1.70 7.00 $6,103
SUB TOTAL: $32,338
$137,971
Suministro e Instalacin de estructura norma LA 324-1 sin caja de acometidas
ANALISIS DE PRECIOS UNITARIOS
LISTADO PRECIOS DE REFERENCIA 2014
TOTAL COSTO DIRECTO:
-
ANALISIS DE PRECIOS UNITARIOS
UNIDAD :
UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Recebo Comun M 0.135 10,000 1,350
Concreto bsico 1:3:3 o 2000 Psi (5%
desperdicio) M 0.39 314,129 122,510
Ladrillo tolete comun Un 260 380 98,800
Mortero 1:4 M 0.18 268,171 48,271
Marco y tapa en ngulo segn norma
Codensa CS-274 Un 1 200,000 200,000
Placa para identificacion en Tapas (Aluminio) Un 1 9,500 9,500
Triturado M 0.03 39,440 1,183
481,614
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor 17,408 3.75 4,642
4,642
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 6 91,676
91,676
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 1 91,336
Electricista 54,299 1.7 1 92,308
Ayudante 25,132 1.7 1 42,724
226,368
TOTAL COSTOS DIRECTOS 804,300
LISTADO PRECIOS DE REFERENCIA 2014
ITEM: Suministro e instalacin de caja de inspeccin segn norma CODENSA CS-275, incluye
marco y tapa.
-
ANALISIS DE PRECIOS UNITARIOS
UNIDAD :
UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Recebo Comun M 0.27 10,000 2,700
Concreto bsico 1:3:3 o 2000 Psi (5%
desperdicio) M 0.57 314,129 179,054
Ladrillo tolete comun Un 374 380 142,120
Mortero 1:4 M 0.13 268,171 34,862
Marco y tapa en ngulo segn norma
Codensa CS-274 Un 1 270,000 270,000
Placa para identificacion en Tapas (Aluminio) Un 1 9,500 9,500
Triturado M 0.03 39,440 1,183
639,419
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor 17,408 0.85 20,480
20,480
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 4 137,514
137,514
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 1 91,336
Electricista 54,299 1.7 1 92,308
Ayudante 25,132 1.7 1 42,724
226,368
TOTAL COSTOS DIRECTOS 1,023,782
LISTADO PRECIOS DE REFERENCIA 2014
ITEM: Suministro e instalacin de caja de inspeccin segn norma CODENSA CS-276, incluye
marco y tapa.
-
ANALISIS DE PRECIOS UNITARIOS
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
kit sistema de puesta a tierra para neutro en el secundario
en acero inoxidable. UN 1 87,153 87,153
Electrodo tipo varilla en acero inoxidable 10 mm x 1.8 mUN 1 50,164 50,164
137,317
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17408 8 2,176
2,176
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 0.0318 17,492
17,492
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 8 11,417
Electricista 54,299 1.7 8 11,539
Ayudante 25,132 1.7 8 5,341
28,297
TOTAL COSTOS DIRECTOS 185,282
LISTADO PRECIOS DE REFERENCIA 2014
TEM No 26: Suministro e instalacin de puesta a tierra para Terminal de ramal en baja tensin en acero inoxidable
-
ANALISIS DE PRECIOS UNITARIOS
ITEMS 1 : SUMINISTRO E INSTALACION DE BARRAJE DE BAJA TENSION 175 A UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Barrajes de baja tension 175 A alumbrado Un 1 210,959.00 210,959.00
Elementos de fijacion Un 1 35,405.00 35,405.00
Terminales de compresion tipo pala N 8 Un 8 2,425.00 19,400.00
Terminales de compresion tipo pala N 4 AWG Un 3 4,365.00 13,095.00
Terminales de compresion tipo pala N 2 AWG Un 9 5,820.00 52,380.00
331,239
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor liniero 17,408 10 1,741
1,741
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camion 350 550,054 10 55,005
55,005
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Electricista 54,299 1.95 10 10,588
Ayudante 25,132 1.95 10 4,901
15,489
TOTAL COSTOS DIRECTOS 403,474
LISTADO PRECIOS DE REFERENCIA 2014
-
ANALISIS DE PRECIOS UNITARIOS
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Barrajes BT. Capacidad 500 A 6 Salidas 6 V Un 4 210,959.00 843,836.00
Soporte para barraje de 500 Amp 6 Salidas Un 1 35,405.00 35,405.00
Terminales de compresion tipo pala N 2 AWG Un 3 2,425.00 7,275.00
Terminales de compresion tipo pala N 1/0 AWG Un 9 4,365.00 39,285.00
925,801
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor liniero 17,408 10 1,741
1,741
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camion 350 550,054 10 55,005
55,005
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 10 9,134
Electricista 54,299 1.7 10 9,231
Ayudante 25,132 1.7 10 4,272
22,637
TOTAL COSTOS DIRECTOS 1,005,184
LISTADO PRECIOS DE REFERENCIA 2014
ITEMS 2 : SUMINISTRO E INSTALACION DE BARRAJE DE BAJA TENSION PARA DISTRIBUCION SUBTERRANEA DE
CAPACIDAD 500 A 6 SALIDAS 600 V CON BASE
-
ANALISIS DE PRECIOS UNITARIOS
ITEMS 1 : SUMINISTRO E INSTALACION DE EMPALME RECTO DE RESINA SCOCK DE B.T. UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Empalme recto de resima scock Ref: 82A Un 1 85,302.00 85,302.00
0.00
0.00
0.00
0.00
85,302
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor liniero 17,408 50 348
348
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camion 350 550,054 50 11,001
11,001
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Electricista 54,299 1.7 50 1,846
Ayudante 25,132 1.7 50 854
2,700
TOTAL COSTOS DIRECTOS 99,351
LISTADO PRECIOS DE REFERENCIA 2014
-
ITEM: ACOMETIDA EN CABLE CU 2X14 AISLADO, 600V UNIDAD: ML
I. MATERIALES
DESCRIPCIN UNIDAD CANTIDAD VR. UNITARIO VR. PARCIAL
Cable de Cu 2x14 aislado con neutro concentrico ML 1.00 $2,568 $2,568
SUB TOTAL: $2,568
II. EQUIPO Y HERRAMIENTA
DESCRIPCIN TIPO TARIFA/DIA RENDIMIENTO VR. PARCIAL
Herramienta menor linieros $17,408 35.00 $497
SUB TOTAL: $497
III. TRANSPORTE
DESCRIPCIN UNIDAD TARIFA/DIA RENDIMIENTO VR. PARCIAL
Camin 350 $550,054 400.00 $1,375
SUB TOTAL: $1,375
IV. MANO DE OBRA
DESCRIPCIN JORNAL FAC. PRES. RENDIMIENTO VR. PARCIAL
Capataz $53,727 1.70 35.00 $2,610
Electricista $54,299 1.70 40.00 $2,308
Pareja de Ayudantes $50,264 1.70 40.00 $2,136
SUB TOTAL: $7,054
$11,494
ANALISIS DE PRECIOS UNITARIOS
LISTADO PRECIOS DE REFERENCIA 2014
TOTAL COSTO DIRECTO:
-
ANALISIS DE PRECIOS UNITARIOS
ITEMS : REVISIN DE CONFORMIDAD RETIE PARA LA RED DE MEDIA Y BAJA TENSIN EN ZONA RURAL
UNIDAD : KM
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
0
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor 17,408 1 17,408
17,408
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camioneta doble cabina 4x4 156,245 1 156,245
156,245
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Ingeniero Inspector 74,061 1.95 1 144,419
Ayudante 25,132 1.95 1 49,007
193,426
TOTAL COSTOS DIRECTOS 367,079
LISTADO PRECIOS DE REFERENCIA 2014
-
ANALISIS DE PRECIOS UNITARIOS
ITEMS : REVISIN DE CONFORMIDAD RETIE PARA LA RED DE MEDIA Y BAJA TENSIN EN ZONA URBANA
UNIDAD : KM
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
0
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor 17,408 1.3 22,630
22,630
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camioneta doble cabina 4x4 156,245 1.3 120,188
120,188
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Ingeniero Inspector 74,061 1.95 1.3 111,092
Ayudante 25,132 1.95 1.3 37,698
148,790
TOTAL COSTOS DIRECTOS 291,608
LISTADO PRECIOS DE REFERENCIA 2014
-
ANALISIS DE PRECIOS UNITARIOS
ITEMS : MEDIDA DE PUESTA A TIERRA (CUANDO SOLO SE REQUIERE DE UNA MEDIDA)
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
0
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Medidor de Puesta a tierra 120,000 1.1 109,091
Herramienta menor 17,411 1.1 15,828
124,919
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camioneta doble cabina 4x4 156,245 1.1 142,041
142,041
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Ingeniero Inspector 74,061 1.95 1.1 131,290
Electricista 54,309 1.95 1.1 96,275
Ayudante 25,136 1.95 1.1 44,559
272,124
TOTAL COSTOS DIRECTOS 539,084
LISTADO PRECIOS DE REFERENCIA 2014
-
ANALISIS DE PRECIOS UNITARIOS
ITEMS : MEDIDA DE PUESTA A TIERRA (DOS MEDIDAS)
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
0
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Medidor de Puesta a tierra 120,000 0.725 165,517
Herramienta menor 17,411 0.725 24,015
189,532
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camioneta doble cabina 4x4 156,245 0.725 215,510
215,510
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Ingeniero Inspector 74,061 1.95 0.725 199,199
Electricista 54,309 1.95 0.725 146,072
Ayudante 25,136 1.95 0.725 67,607
412,878
TOTAL COSTOS DIRECTOS 817,920
LISTADO PRECIOS DE REFERENCIA 2014
-
ANALISIS DE PRECIOS UNITARIOS
ITEMS : MEDIDA DE UNA PUESTA A TIERRA (CUANDO SE DEBE REALIZAR MAS DE DOS MEDIDAS)
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
0
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Medidor de Puesta a tierra 120,000 1.7 70,588
Herramienta menor 17,411 1.7 10,242
80,830
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camioneta doble cabina 4x4 156,245 1.7 91,909
91,909
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Ingeniero Inspector 74,061 1.95 1.7 84,952
Electricista 54,309 1.95 1.7 62,296
Ayudante 25,136 1.95 1.7 28,832
176,080
TOTAL COSTOS DIRECTOS 348,819
LISTADO PRECIOS DE REFERENCIA 2014
-
ANALISIS DE PRECIOS UNITARIOS
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTALLuminaria de vapor de sodio. Con
protector en vidrio de 70W, 208V;
altura de montaje (7-9), IP op (66), IP
el (66). UN 1 220,106 220,106Bombillo vapor de Sodio de 70 W,
208V UN 1 20,738 20,738
Brazo metlico luminaria de 1.5 mts. UN 1 34,910 34,910
Fotocelda 208 V UN 1 35,548 35,548Perno de mquina de 5/8" x 8"
completo UN 1 3,200 3,200
Conector bimetlico de 1 perno UN 2 2,258 4,516
Alambre de cobre THW N 12 ML 8 1,636 13,088
Arandela redonda de 5/8" UN 1 605 605
Arandela de presin de 5/8" UN 1 226 226
332,937
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 8 2,176
2,176
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 91 6,045
6,045
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 8 11,417
Electricista 54,299 1.7 8 11,539
Pareja de ayudantes 50,264 1.7 8 10,681
33,637
TOTAL COSTOS DIRECTOS 374,796
LISTADO PRECIOS DE REFERENCIA 2014
UNIDAD : UN
ITEM N 28: SUMINISTRO E INSTALACIN DE LUMINARIA DE SODIO DE 70 W, 208V PARA ALUMBRADO PUBLICO
-
ITEM: UNIDAD:
UN
I. MATERIALES
DESCRIPCIN UNIDAD CANTIDAD VR. UNITARIO VR. PARCIALAmarre Plstico para cable trenzado UN 4.00 $417 $1,668
Grapa de retencin para cable trenzado de B.T. UN 1.00 $26,115 $26,115
Perno de ojo tipo 2 de 5/8" x 10" completo UN 1.00 $5,676 $5,676
Conector de tornillo con chaqueta aislante, tipo 2 UN 4.00 $9,775 $39,100
Conector de tornillo con chaqueta aislante, tipo 1 UN 1.00 $11,017 $11,017
Tapon sellador de cable 4/0 AWG UN 4.00 $5,240 $20,960
Caja trifsica tipo intemperie de derivacion 8 acometidas UN 0.00 $137,772 $0
Cable de cobre trenzado para derivacin 3 x 2 + 1 N 4 AWGML 2.00 $18,758 $37,516
Hebilla de acero inoxidable 5/8" UN 3.00 $1,122 $3,366
Cinta de acero inoxidable 5/8" x 0,03" ML 3.00 $3,806 $11,418
tubo galvanizado 3" x 6 m UN 1.00 $210,275 $210,275
SUB TOTAL: $367,111
II. EQUIPO Y HERRAMIENTA
DESCRIPCIN TIPO TARIFA/DIA RENDIMIENTO VR. PARCIALHerramienta menor linieros $17,408 6.00 $2,901
SUB TOTAL: $2,901
III. TRANSPORTE
DESCRIPCIN UNIDAD TARIFA/DIA RENDIMIENTO VR. PARCIALcampero $125,062 22.54 $5,548
SUB TOTAL: $5,548
IV. MANO DE OBRA
DESCRIPCIN JORNAL FAC. PRES. RENDIMIENTO VR. PARCIALCapataz $53,727 1.70 6.00 $15,223
Electricista $54,299 1.70 6.00 $15,385
Ayudante $25,132 1.70 6.00 $7,121
SUB TOTAL: $37,729
$413,288
LISTA PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
Suministro e Instalacin de estructura norma LA 326
TOTAL COSTO DIRECTO:
-
ITEM: UNIDAD:
Suministro, tendida y tensionada de red trenzada de baja tensin 3, 4 H
en cable aluminio XLPE (3 x 95 mm2 + 1 x 50 mm2)
I. MATERIALES
DESCRIPCIN UNIDAD CANTIDAD VR. UNITARIO VR. PARCIAL
cable aluminio XLPE (3 x 95 mm2 + 1 x 50 mm2) ML 1.05 $23,376 $24,545
SUB TOTAL: $24,545
II. EQUIPO Y HERRAMIENTA
DESCRIPCIN TIPO TARIFA/DIA RENDIMIENTO VR. PARCIAL
Herramienta menor linieros $17,408 70.00 $249
Herramienta tensionado linea $43,518 70.00 $622
SUB TOTAL: $871
III. TRANSPORTE
DESCRIPCIN UNIDAD TARIFA/DIA RENDIMIENTO VR. PARCIAL
Transporte Bogot Yopal $550,054 100.00 $5,501
Camin 350 $550,054 70.00 $7,858
SUB TOTAL: $13,359
IV. MANO DE OBRA
DESCRIPCIN JORNAL FAC. PRES. RENDIMIENTO VR. PARCIAL
Capataz $53,727 1.70 70.00 $1,305
Electricista $108,598 1.70 70.00 $2,637
Pareja de Ayudantes $50,264 1.70 70.00 $1,221
SUB TOTAL: $5,163
TOTAL COSTO DIRECTO: $43,938
ANALISIS DE PRECIOS UNITARIOS
LISTADO PRECIOS DE REFERENCIA 2014
-
ITEM: UNIDAD:
UN
I. MATERIALES
DESCRIPCIN UNIDAD CANTIDAD VR. UNITARIO VR. PARCIAL
Amarre Plstico para cable trenzado UN 2.00 $417 $834
Grapa de suspensin para cable trenzado de B.T. UN 1.00 $16,634 $16,634
Perno de ojo abierto de 5/8" x 10", completo UN 1.00 $5,676 $5,676
SUB TOTAL: $23,144
II. EQUIPO Y HERRAMIENTA
DESCRIPCIN TIPO TARIFA/DIA RENDIMIENTO VR. PARCIAL
Herramienta menor linieros $17,408 8.00 $2,176
SUB TOTAL: $2,176
III. TRANSPORTE
DESCRIPCIN UNIDAD TARIFA/DIA RENDIMIENTO VR. PARCIAL
SUB TOTAL: $0
IV. MANO DE OBRA
DESCRIPCIN JORNAL FAC. PRES. RENDIMIENTO VR. PARCIAL
Electricista $54,299 1.70 8.00 $11,539
Pareja de ayudantes $50,264 1.70 8.00 $10,681
SUB TOTAL: $22,220
$47,540
Suministro e Instalacin de estructura norma LA 329
ANALISIS DE PRECIOS UNITARIOS
LISTADO PRECIOS DE REFERENCIA 2014
TOTAL COSTO DIRECTO:
-
ITEM: UNIDAD:
UN
I. MATERIALES
DESCRIPCIN UNIDAD CANTIDAD VR. UNITARIO VR. PARCIAL
Seccionador portafusibles norma LA 336,
con fusible NH00 125AUN 1.00 $357,363 $357,363
SUB TOTAL: $357,363
II. EQUIPO Y HERRAMIENTA
DESCRIPCIN TIPO TARIFA/DIA RENDIMIENTO VR. PARCIAL
Herramienta menor obreros $17,408 3.00 $5,803
SUB TOTAL: $5,803
III. TRANSPORTE
DESCRIPCIN UNIDAD TARIFA/DIA RENDIMIENTO VR. PARCIAL
campero $125,062 50.00 $2,501
SUB TOTAL: $2,501
IV. MANO DE OBRA
DESCRIPCIN JORNAL FAC. PRES. RENDIMIENTO VR. PARCIAL
Capataz $53,727 1.70 3.00 $30,445
Electricista $54,299 1.70 3.00 $30,769
Pareja de Ayudantes $50,264 1.70 3.00 $28,483
SUB TOTAL: $89,697
$455,364
Fusible tipo NH00-125A norma LA 336, incluye base portafusibles y accesorios de conexin
ANALISIS DE PRECIOS UNITARIOS
LISTADO PRECIOS DE REFERENCIA 2014
TOTAL COSTO DIRECTO:
-
ITEM: UNIDAD: ml
I. MATERIALES
DESCRIPCIN UNIDAD CANTIDAD VR. UNITARIO VR. PARCIAL
CABLE ALUMINIO XLPE (3 x 35 mm2 + 1 x 50 mm2) ML 1.05 $12,078 $12,682
SUB TOTAL: $12,682
II. EQUIPO Y HERRAMIENTA
DESCRIPCIN TIPO TARIFA/DIA RENDIMIENTO VR. PARCIAL
Herramienta menor linieros $17,408 85.00 $205
Herramienta tensionado lnea $43,518 85.00 $512
SUB TOTAL: $717
III. TRANSPORTE
DESCRIPCIN UNIDAD TARIFA/DIA RENDIMIENTO VR. PARCIAL
Transporte Bogot a Yopal $550,054 150.00 $3,667
Camion 350 $550,054 85.00 $6,471
SUB TOTAL: $10,138
IV. MANO DE OBRA
DESCRIPCIN JORNAL FAC. PRES. RENDIMIENTO VR. PARCIAL
Capataz $53,727 1.70 85.00 $1,075
Electricista $108,598 1.70 85.00 $2,172
Pareja de Ayudantes $50,264 1.70 85.00 $1,005
SUB TOTAL: $4,252
$27,789
ITEM 32 : RED DE BAJA TENSION 3 - 4 HILOS TRENZADA CABLE ALUMINIO XLPE (3 x 35 mm2 + 1 x 50 mm2)
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
TOTAL COSTO DIRECTO:
-
ITEM : RED DE BAJA TENSION 3 - 4 HILOS TRENZADA CABLE ALUMINIO XLPE (3 x 70 mm2 + 1 x 50 mm2)
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTALCABLE ALUMINIO XLPE (3 x 70 mm2 +
1 x 50 mm2) ML 1.05 15,270 16,034
16,034
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 80 218
Herramienta tensionado lnea 43,518 80 544
762
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Transporte Bogot a Yopal 550,054 150 3,667
Camion 350 550,054 80 6,876
10,543
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 80 1,142
Pareja de Electricistas 108,598 1.7 80 2,308
Pareja de Ayudantes 50,264 1.7 80 1,068
4,518
TOTAL COSTOS DIRECTOS 31,857
PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
-
ITEM: Acometida en cable trenzado AL 3x2 + 1x4 ACSR UNIDAD:
ML
I. MATERIALES
DESCRIPCIN UNIDAD CANTIDAD VR. UNITARIO VR. PARCIAL
Cable de Aluminio 3x2 + 1x4 trenzado XLPE ML 1.05 $14,363 $15,081
SUB TOTAL: $15,081
II. EQUIPO Y HERRAMIENTA
DESCRIPCIN TIPO TARIFA/DIA RENDIMIENTO VR. PARCIAL
Herramienta menor linieros $17,408 200.00 $87
Herramienta tensionado lnea $43,518 200.00 $218
SUB TOTAL: $305
III. TRANSPORTE
DESCRIPCIN UNIDAD TARIFA/DIA RENDIMIENTO VR. PARCIAL
campero $125,062 239.00 $523
SUB TOTAL: $523
IV. MANO DE OBRA
DESCRIPCIN JORNAL FAC. PRES. RENDIMIENTO VR. PARCIAL
Capataz $53,727 1.70 200.00 $457
Electricista $54,299 1.70 200.00 $462
Pareja de Ayudantes $50,264 1.70 200.00 $427
SUB TOTAL: $1,346
$17,255
ANALISIS DE PRECIOS UNITARIOS
LISTADO PRECIOS DE REFERENCIA 2014
TOTAL COSTO DIRECTO:
-
ITEM: Acometida en cable Cu antifraude 2x8 norma LA 363-1 UNIDAD:
ML
I. MATERIALES
DESCRIPCIN UNIDAD CANTIDAD VR. UNITARIO VR. PARCIAL
Cable de Cu 2x8 aislado con neutro concentrico antifraude ML 1.00 $7,818 $7,818
SUB TOTAL: $7,818
II. EQUIPO Y HERRAMIENTA
DESCRIPCIN TIPO TARIFA/DIA RENDIMIENTO VR. PARCIAL
Herramienta menor linieros $17,408 40.00 $340
SUB TOTAL: $340
III. TRANSPORTE
DESCRIPCIN UNIDAD TARIFA/DIA RENDIMIENTO VR. PARCIAL
Camin 350 $550,054 600.00 $717
SUB TOTAL: $717
IV. MANO DE OBRA
DESCRIPCIN JORNAL FAC. PRES. RENDIMIENTO VR. PARCIAL
Capataz $53,727 1.70 40.00 $2,027
Electricista $54,299 1.70 40.00 $1,490
Pareja de Ayudantes $50,264 1.70 40.00 $1,916
SUB TOTAL: $5,433
$14,308
ANALISIS DE PRECIOS UNITARIOS
LISTADO PRECIOS DE REFERENCIA 2014
TOTAL COSTO DIRECTO:
-
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Recebo Comun M 0.2 10,000 2,000
Concreto bsico 1:3:3 o 2000 Psi (5%
desperdicio) M 0.05 314,129 15,706
Ladrillo tolete comun Un 23 380 8,740
Mortero 1:4 M 0.1 268,171 26,817
Marco y tapa en ngulo segn norma
Codensa AP-280 Un 1 65,000 65,000
Placa para identificacion en Tapas (Aluminio) Un 1 9,500 9,500
Triturado M 0.02 39,440 789
128,552
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor 17,408 0.85 20,480
20,480
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 9 61,117
61,117
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 3 30,445
Electricista 54,299 1.7 3 30,769
Ayudante 25,132 1.7 3 14,241
75,455
TOTAL COSTOS DIRECTOS 285,605
LISTADO PRECIOS DE REFERENCIA 2014
ITEM:Suministro e instalacin de caja de inspeccin segn norma CODENSA AP-280, incluye marco y tapa.
UNIDAD : UN
ANALISIS DE PRECIOS UNITARIOS
-
ANALISIS DE PRECIOS UNITARIOS
UNIDAD :
UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Recebo Comun M 0.08 10,000 800
Concreto bsico 1:3:3 o 2000 Psi (5%
desperdicio) M 0.313 314,129 98,322
Ladrillo tolete comun Un 135 380 51,300
Mortero 1:4 M 0.15 268,171 40,226
Marco y tapa en ngulo segn norma
Codensa CS-274 Un 1 125,000 125,000
Placa para identificacion en Tapas (Aluminio) Un 1 9,500 9,500
Triturado M 0.015 39,440 592
325,740
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor 17,408 0.85 20,480
20,480
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 8 68,757
68,757
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 2.75 33,213
Electricista 54,299 1.7 2.75 33,567
Ayudante 25,132 1.7 2.75 15,536
82,316
TOTAL COSTOS DIRECTOS 497,294
LISTADO PRECIOS DE REFERENCIA 2014
ITEM: Suministro e instalacin de caja de inspeccin segn norma CODENSA CS-274, incluye
marco y tapa.
-
ITEM
REPLANTEO RED DE SUBTRANSMISIN
UNIDAD : KM
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALComisin de Topografa 345,383 1.7 3 195,717
Capataz 53,727 1.7 3 30,445
SUBTOTAL MANO DE OBRA 226,162
TOTAL COSTOS DIRECTOS 226,162
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
APERTURA HUECO PARA POSTE DE 14 MT
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
SUBTOTAL MATERIALES 0
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor obreros 17408 4 4352
SUBTOTAL EQUIPO 4,352
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCampero (Transporte de Herramienta ) 125,063 20.926 5,976
SUBTOTAL TRANSPORTE 5,976
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 4 22,834
Obreros x 2 41,888 1.7 4 17,802
SUBTOTAL MANO DE OBRA 40,636
TOTAL COSTOS DIRECTOS 50,964
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
POSTE DE FERROCONCRETO DE 14 mts. x 1050 kgf.
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Poste ferroconcreto 14 mts. x 1050 Kgf. UN 1 1144591.101 1144591.101
SUBTOTAL MATERIALES 1,144,591
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17408 2 8704
Gra 358175 2 179088
SUBTOTAL EQUIPO 187,792
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamabaja 1 700,000 6 116,667
Zorro 1 55,485 1 55,485
SUBTOTAL TRANSPORTE 172,152
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 2 45,668
Pareja de Electricistas 108,598 1.7 2 92,308
Pareja de Ayudantes 50,264 1.7 2 42,724
SUBTOTAL MANO DE OBRA 180,700
TOTAL COSTOS DIRECTOS 1,685,235
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
VESTIDA DE ESTRUCTURA DE PASO A 34.5 KV, PH - 202
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cruceta metlica de 1/4" x 3" x 4 m. UN 1 192972 192972
Bayoneta metal. sencilla 1/4" x 3" x 2 m. UN 2 150434 300868
Espiga para cruceta metlica - 34,5 KV UN 3 17824 53472
Aislador espiga de 34.5 KV ANSI 56-3 UN 3 76987 230961
Eslabn de 1/2" UN 2 5800 11600
Arandela de presin de 5/8" UN 6 605 3630
Arandela redonda de 5/8" UN 6 605 3630
Grapa de suspensin para cable guarda UN 2 19500 39000
Perno de mquina 5/8" x 8" UN 6 3200 19200
Perno en U de 1/2" UN 2 1800 3600
SUBTOTAL MATERIALES 858,933
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17408 4 4352
SUBTOTAL EQUIPO 4,352
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamin 350 550,054 46.95 11,716
SUBTOTAL TRANSPORTE 11,716
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC.
Capataz 53,727 1.7 4 22,834
Pareja de Electricistas 108,598 1.7 4 46,154
Ayudante 25,132 1.7 4 10,681
SUBTOTAL MANO DE OBRA 79,669
TOTAL COSTOS DIRECTOS 954,670
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
VESTIDA DE ESTRUCTURA DE PASO A 34.5 KV, P - 103
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cruceta metlica de 1/4" x 3" x 2 m. UN 1 94168 94168
Diagonal recta de 1,2 m. UN 1 12977 12977
Bayoneta metal. sencilla 1/4" x 3" x 2 m. UN 1 150434 150434
Espiga para cruceta metlica - 34,5 KV UN 3 17824 53472
Aislador espiga de 34.5 KV ANSI 56-3 UN 3 76987 230961
Eslabn de 1/2" UN 1 5800 5800
Grapa de suspensin para cable guarda UN 1 19500 19500
Perno en U de 1/2" UN 1 1800 1800
perno de mquina 1/2" x 2" UN 1 1124 1124
Perno de mquina 5/8" x 8" UN 6 3200 19200
Arandela de presin de 1/2" UN 1 100 100
Arandela de presin de 5/8" UN 6 605 3630
Arandela redonda de 1/2" UN 1 100 100
Arandela redonda de 5/8" UN 6 605 3630
SUBTOTAL MATERIALES 596,896
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17408 4 4352
SUBTOTAL EQUIPO 4,352
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamin 350 550,054 46.95 11,716
SUBTOTAL TRANSPORTE 11,716
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 4 22,834
Pareja de Electricistas 108,598 1.7 4 46,154
Ayudante 25,132 1.7 4 10,681
SUBTOTAL MANO DE OBRA 79,669
TOTAL COSTOS DIRECTOS 692,633
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
VESTIDA DE ESTRUCTURA DE PASO A 34.5 KV, LAR 116
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cruceta metlica de 2 1/2" x 3/16" x 0,7 mts. UN 3 18000 54000
Diagonal recta de 1,2 m. UN 3 12977 38931
Bayoneta metal. sencilla 1/4" x 3" x 2 m. UN 1 150434 150434
Espiga para cruceta metlica - 34,5 KV UN 3 17824 53472
Aislador espiga de 34.5 KV ANSI 56-3 UN 3 76987 230961
Eslabn de 1/2" UN 1 5800 5800
Grapa de suspensin para cable guarda UN 1 19500 19500
Perno en U de 1/2" UN 1 1800 1800
perno de mquina 1/2" x 2" UN 3 1124 3372
Perno de mquina 5/8" x 8" UN 6 3200 19200
Arandela redonda de 1/2" UN 3 100 300
Arandela de presin de 1/2" UN 3 100 300
Arandela de presin de 5/8" UN 6 605 3630
Arandela redonda de 5/8" UN 6 605 3630
SUBTOTAL MATERIALES 585,330
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17408 4 4352
SUBTOTAL EQUIPO 4,352
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamin 350 550,054 46.95 11,716
SUBTOTAL TRANSPORTE 11,716
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 4 22,834
Pareja de Electricistas 108,598 1.7 4 46,154
Ayudante 25,132 1.7 4 10,681
SUBTOTAL MANO DE OBRA 79,669
TOTAL COSTOS DIRECTOS 681,067
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
VESTIDA DE ESTRUCTURA DE RETENCIN A 34.5 KV, R -130A
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cruceta metlica de 1/4" x 3" x 2 m. UN 2 94168 188336
Diagonal recta de 1,2m UN 2 26237 52474
Bayoneta metlica doble 1/4" x 3" x 2 m. UN 1 226259 226259
Aislador de suspensin de 10" ANSI 52-4" UN 18 80418 1447524
Grapa de retencin ACSR N 4 - 2/0 UN 6 18981 113886
Grapa de retencin para cable de guarda UN 2 18480 36960
Grapa prensahilos RL 11 UN 2 8188 16376
Tuerca de ojo de 5/8" alargada UN 6 6610 39660
Perno de ojo de 5/8" x 4" UN 2 4386 8772
Perno de mquina 1/2" X 2" UN 4 1124 4496
Arandela redonda de 1/2" UN 4 100 400
Arandela de presin de 1/2" UN 4 100 400
Perno de mquina 5/8" x 8" UN 5 3200 16000
Esprrago de 5/8" x 10" UN 3 5574 16722
Arandela redonda de 5/8" UN 18 605 10890
Arandela de presin de 5/8" UN 18 605 10,890
SUBTOTAL MATERIALES 2,168,265
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17408 2 8704
SUBTOTAL EQUIPO 8,704
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamin 350 550,054 23.47 23,436
SUBTOTAL TRANSPORTE 23,436
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 2 45,668
Pareja de Electricistas 108,598 1.7 2 92,308
Ayudante 25,132 1.7 2 21,362
SUBTOTAL MANO DE OBRA 159,338
TOTAL COSTOS DIRECTOS 2,359,743
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
VESTIDA DE ESTRUCTURA DE RETENCIN A 34.5 KV, LAR 114
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Bayoneta metlica doble 1/4" x 3" x 2 m. UN 1 226259 226259
Aislador de suspensin de 10" ANSI 52-4" UN 9 80418 723762
Grapa de retencin ACSR N 4 - 2/0 UN 3 18981 56943
Grapa de retencin para cable de guarda UN 2 18480 36960
Grapa prensahilos RL 11 UN 2 8188 16376
Arandela de presin de 5/8" UN 6 605 3630
Arandela redonda de 5/8" UN 6 605 3630
Esprrago de 5/8" x 10" UN 3 5574 16722
Tuerca de ojo de 5/8" alargada UN 3 6610 19830
SUBTOTAL MATERIALES 1,104,112
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17408 3 5803
SUBTOTAL EQUIPO 5,803
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamin 350 550,054 30.00 18,335
SUBTOTAL TRANSPORTE 18,335
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 3 30,445
Pareja de Electricistas 108,598 1.7 3 61,539
Ayudante 25,132 1.7 3 14,241
SUBTOTAL MANO DE OBRA 106,225
TOTAL COSTOS DIRECTOS 1,234,475
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
VESTIDA DE ESTRUCTURA DE RETENCIN A 34.5 KV, LAR 115
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Bayoneta metlica doble 1/4" x 3" x 2 m. UN 1 226259 226259
Aislador de suspensin de 10" ANSI 52-4" UN 18 80418 1447524
Grapa de retencin ACSR N 4 - 2/0 UN 6 18981 113886
Grapa de retencin para cable de guarda UN 2 18480 36960
Grapa prensahilos RL 11 UN 2 8188 16376
Arandela de presin de 5/8" UN 12 605 7260
Arandela redonda de 5/8" UN 12 605 7260
Esprrago de 5/8" x 10" UN 6 5574 33444
Tuerca de ojo de 5/8" alargada UN 6 6610 39660
SUBTOTAL MATERIALES 1,928,629
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17408 3 5803
SUBTOTAL EQUIPO 5,803
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamin 350 550,054 30.00 18,335
SUBTOTAL TRANSPORTE 18,335
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 3 30,445
Pareja de Electricistas 108,598 1.7 3 61,539
Ayudante 25,132 1.7 3 14,241
SUBTOTAL MANO DE OBRA 106,225
2,058,992TOTAL COSTOS DIRECTOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
VESTIDA DE ESTRUCTURA DE RETENCIN A 34.5 KV, RH - 231 o LAR 123
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cruceta metlica de 1/4" x 3" x 4 m. UN 2 192972 385944
Bayoneta metlica doble 1/4" x 3" x 2 m. UN 2 226259 452518
Aislador de suspensin de 10" ANSI 52-4" UN 18 80418 1447524
Grapa de retencin ACSR N 4 - 2/0 UN 6 18981 113886
Grapa de retencin para cable de guarda UN 4 18480 73920
Grapa prensahilos RL 11 UN 2 8188 16376
Tuerca de ojo de 5/8" alargada UN 8 6610 52880
Perno de ojo de 5/8" x 4" UN 2 4386 8772
Perno de mquina 5/8" x 8" UN 8 3200 25600
Esprrago de 5/8" x 10" UN 3 5574 16722
Arandela redonda de 5/8" UN 20 605 12100
Arandela de presin de 5/8" UN 20 605 12100
SUBTOTAL MATERIALES 2,618,342
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17408 2 8704
SUBTOTAL EQUIPO 8,704
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamin 350 550,054 30.00 18,335
SUBTOTAL TRANSPORTE 18,335
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 2 45,668
Pareja de Electricistas 108,598 1.7 2 92,308
Ayudante 25,132 1.7 2 21,362
SUBTOTAL MANO DE OBRA 159,338
TOTAL COSTOS DIRECTOS 2,804,719
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
INSTALACIN DE TEMPLETE DE SUBTRANSMISIN
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTALAislador tipo tensor de 6 3/4" UN 1 25330 25330
Arandela cuadrada de 4" x 4" x 1/4" UN 1 3637 3637
Cable de acero extraresistente de 1/4" ML 20 1628 32560
Grapa prensahilos RL 11 UN 4 11111 44444
Guardacabo de 1/2" UN 1 1458 1458
Varilla de anclaje de 5/8" x 1.8 mts. UN 1 21380 21380
Vigueta de ferroconcreto UN 1 16192 16192
SUBTOTAL MATERIALES 145,001
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17,408 8 2176
Herramienta tensionado de lnea 43,518 8 5440
SUBTOTAL EQUIPO 7,616
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamin 350 550,054 54.69 10,058
SUBTOTAL TRANSPORTE 10,058
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 4 22,834
Electricista 54,299 1.7 4 23,077
Ayudante 25,132 1.7 4 10,681
SUBTOTAL MANO DE OBRA 56,592
TOTAL COSTOS DIRECTOS 219,267
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
INSTALACIN DE TEMPLETE PARA CABLE DE GUARDA
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTALAislador tipo tensor de 6 3/4" UN 1 25330 25330
Cable de acero extraresistente de 1/4" ML 22 1628 35816
Grapa prensahilos RL 11 UN 4 11111 44444
Guardacabo de 1/2" UN 1 1458 1458
SUBTOTAL MATERIALES 107,048
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17,408 8 2176
Herramienta tensionado de lnea 43,518 8 5440
SUBTOTAL EQUIPO 7,616
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamin 350 550,054 252.78 2,176
SUBTOTAL TRANSPORTE 2,176
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 8 11,417
Electricista 54,299 1.7 8 11,539
Ayudante 25,132 1.7 8 5,341
SUBTOTAL MANO DE OBRA 28,297
TOTAL COSTOS DIRECTOS 145,137
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
RED DE SUBTRANSMISIN 3 EN CABLE ACSR ( 3 x n 336.4 mcm )
UNIDAD : ML
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTALCable ACSR N 336.4 MCM ML 3.15 13625 42919
SUBTOTAL MATERIALES 42,919
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17,408 120 145
Herramienta tensionado lnea 43,518 120 363
SUBTOTAL EQUIPO 508
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamion 350 550,054 1000 550
Zorro 53,727 500 107
SUBTOTAL TRANSPORTE 550
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 120 761
Pareja de Electricistas 54,299 1.7 120 769
Pareja de Ayudantes 25,132 1.7 120 356
SUBTOTAL MANO DE OBRA 1,886
TOTAL COSTOS DIRECTOS 45,863
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
CABLE DE GUARDA EN ACERO EXTRARESISTENTE de 1/4"
UNIDAD : ML
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTALCable de acero extraresistente de 1/4" ML 1.05 1628 1709
SUBTOTAL MATERIALES 1,709
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17408 700 25
Herramienta tensionado lnea 43518 700 62
SUBTOTAL EQUIPO 87
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamion 350 550,054 1500 367
Zorro 53,727 386 139
SUBTOTAL TRANSPORTE 506
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.95 700 150
Pareja de Electricistas 108,598 1.95 700 303
Pareja de Ayudantes 50,264 1.95 700 140
SUBTOTAL MANO DE OBRA 593
TOTAL COSTOS DIRECTOS 2,895
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
CIMENTACIN DE POSTE DE CONCRETO DE 14 mts.
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTALConcreto bsico 1:2:3 o 2000 Psi (5% desperdicio) M3 0.4 312,000 124800
SUBTOTAL MATERIALES 124,800
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor obreros 17,408 7 2487
SUBTOTAL EQUIPO 2,487
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamion 350 550,054 30 18,335
SUBTOTAL TRANSPORTE 18,335
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 7 13,048
Pareja de Obreros 41,888 1.7 7 10,173
23,221
TOTAL COSTOS DIRECTOS 168,843
SUBTOTAL MANO DE OBRA
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
CIMENTACIN TEMPLETE
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTALConcreto bsico 1:2:3 o 2000 Psi (5% desperdicio) M3 0.3 312,000 93600
SUBTOTAL MATERIALES 93,600
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor obreros 17408 12 1451
SUBTOTAL EQUIPO 1,451
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamion 350 550,054 100 5,501
Zorro 53,727 5 10,745
SUBTOTAL TRANSPORTE 16,246
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 12 7,611
Pareja de Obreros 41,888 1.7 12 5,934
13,545
TOTAL COSTOS DIRECTOS 124,842
SUBTOTAL MANO DE OBRA
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
INSTALACIN DE PUESTA A TIERRA PARA CABLE DE GUARDA
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
kit sistema de puesta a tierra para cable de guarda
bayoneta en acero inoxidable un 1 227,117 227117
SUBTOTAL MATERIALES 227,117
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17,408 10 1741
Herramienta tensionado de lnea 43,518 10 4352
SUBTOTAL EQUIPO 6,093
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamion 350 550,054 36.107 15,234
SUBTOTAL TRANSPORTE 15,234
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 38,500 1.7 10 6,545
Electricista 27,500 1.7 10 4,675
Ayudante 18,700 1.7 10 3,179
14,399
TOTAL COSTOS DIRECTOS 262,843
SUBTOTAL MANO DE OBRA
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
SUMINISTRO E INSTALACIN DE SECCIONAMIENTO DE 3
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Perno carruaje de 5/8" x 2" UN 4 1820 7280
Fusible de 34.5 KV, 6 A, tipo T UN 3 8950 26850
Esprrago de 5/8" x 12" UN 3 6178 18534
Cruceta metlica de 1/4" x 3" x 4 m. UN 2 192972 385944
Cortacircuito de 36 KV, 100 A UN 3 310582 931746
Collarn de 6" a 8" - 2 salidas UN 2 17182 34364
Arandela redonda de 5/8" UN 16 100 1600
Arandela de presin de 5/8" UN 16 100 1600
SUBTOTAL MATERIALES 1,407,918
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor linieros 17,408 1 17408
SUBTOTAL EQUIPO 17,408
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamion 350 550,054 23.666 23,242
SUBTOTAL TRANSPORTE 23,242
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 38,500 1.7 1 65,450
Pareja de Electricistas 55,000 1.7 1 93,500
Ayudante 18,700 1.7 1 31,790
190,740
TOTAL COSTOS DIRECTOS 1,639,308
SUBTOTAL MANO DE OBRA
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
AMORTIGUADORES LINEA
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTALAmortiguador UN 1 21257 21257
SUBTOTAL MATERIALES 21,257
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor obreros 17408 6 2901
SUBTOTAL EQUIPO 2,901
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamion 350 550,054 214.7 2,562
SUBTOTAL TRANSPORTE 2,562
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 6 15,223
electricista 54,299 1.7 6 15,385
30,608
TOTAL COSTOS DIRECTOS 57,328
SUBTOTAL MANO DE OBRA
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM
AMORTIGUADORES CABLE DE GUARDA
UNIDAD : UN
I - MATERIALES DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTALAmortiguador UN 1 19956.39 19956.39
SUBTOTAL MATERIALES 19,956
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALHerramienta menor obreros 17408 70 249
SUBTOTAL EQUIPO 249
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTALCamion 350 550,054 1000 550
SUBTOTAL TRANSPORTE 550
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTALCapataz 53,727 1.7 70 1,305
electricista 54,299 1.7 70 1,319
2,624
TOTAL COSTOS DIRECTOS 23,379
SUBTOTAL MANO DE OBRA
-
ANALISIS DE PRECIOS UNITARIOS
ITEMS 13 : REPLANTEO RED DE MEDIA Y BAJA TENSION
UNIDAD : KM
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
0
0
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Equipo de Topografa 350,652 3 116,884
116,884
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Campero 125,063 2 62,532
62,532
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Comisin de Topografa 345,383 1.7 3 195,717
Capataz 53,727 1.7 3 30,445
226,162
TOTAL COSTOS DIRECTOS 405,578
LISTADO PRECIOS DE REFERENCIA 2014
-
LISTADO PRECIOS DE REFERENCIA 2014
ITEM 3.2 : APERTURA HUECO PARA POSTE O TEMPLETE DE BAJA TENSIN
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
0
0
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor obreros 17,408 6 2,901
2,901
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Campero 0 125063 31.39 3,984
3,984
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 6 15,223
Obrero 1 20,944 1.7 6 5,934
Obrero 2 20,944 1.7 6 5,934
27,091
TOTAL COSTOS DIRECTOS 33,976
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ITEM 3.3 : APERTURA HUECO PARA TORRECILLA METLICA DE 8 MTS.
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
0
0
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor obreros 17,408 4 4,352
4,352
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Campero 0 125063 20.928 5,976
5,976
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 4 22,834
obrero 1 20,944 1.7 4 8,901
obrero 2 20,944 1.7 4 8,901
40,636
TOTAL COSTOS DIRECTOS 50,964
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.4 : POSTE DE FERROCONCRETO DE 8 MTS. x 510 KGF.
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Poste ferroconcreto 8 mts. x 510 Kgf. UN 1 289,815 289,815
289,815
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 5 3,482
Gra 358,175 5 71,635
75,117
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Tractocamion para transporte de
postes por vias primarias y
secundarias con puentes con
capacidad maxima de 30 toneladas 1 1,200,000 23 52,174
Carromacho para transporte de postes
por vias terciarias con puentes con
capacidad maxima de 15 toneladas1 580,000 10 58,000
Tractor para transporte de postes por
sabana abierta sin vias, maxima
capacidad de transporte un poste por
vez 1 153,059 6 25,510
135,684
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 5 18,267
Electricista 54,299 1.7 5 18,462
Pareja de Ayudantes 50,264 1.7 5 17,090
53,819
TOTAL COSTOS DIRECTOS 554,435
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Poste metalico tronco conico
seccionado (3) de 8 mts X 510
galvanizado en caliente
UN 1 1,025,440 1,025,440
1,025,440
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 1 17,408
17,408
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camabaja 1 700,000 15 46,667
Zorro 1 55,485 3 18,495
65,162
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 4 22,834
Electricista 54,299 1.7 4 23,077
Pareja de Ayudantes 50,264 1.7 4 21,362
67,273
TOTAL COSTOS DIRECTOS 1,175,283
ITEM 2.6 : POSTE METALICO TRONCO CONICO SECCIONADO (3) DE 8 mts X 510 GALVANIZADO EN CALIENTE
/ DIAMETRO POSTE BASE= 0,25mts, TOPE 0,14 mts /ACERO A36/PESO 119 Kg/NORMA GALVANIZADO ASTM A
123-NTC 2076
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.5 : POSTE DE FERROCONCRETO DE 8 MTS. x 1.050 KGF.
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Poste ferroconcreto 8 mts. x 1.050 Kgf. UN 1 350,000 350,000
350,000
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 4 4,352
Gra 358,175 4 89,544
93,896
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camabaja 1 700,000 8 87,500
Zorro 1 55,485 1.7 32,638
120,138
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 4 22,834
Electricista 54,299 1.7 4 23,077
Pareja de Ayudantes 50,264 1.7 4 21,362
67,273
TOTAL COSTOS DIRECTOS 631,307
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.6 : POSTE DE FERROCONCRETO DE 10 MTS. x 510 KGF.
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Poste ferroconcreto 10 mts. x 510 Kgf. UN 1 421,440 421,440
421,440
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 3 5,803
Gra 410,000 3 136,667
142,470
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camabaja 1 700,000 12 58,333
Zorro 1 55,485 1 55,485
113,818
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 4 22,834
Pareja Electriciatas 54,299 1.7 4 23,077
Pareja de Ayudantes 50,264 1.7 4 21,362
67,273
TOTAL COSTOS DIRECTOS 745,001
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Poste metalico tronco conico
seccionado (3) de 10 mts X 510
galvanizado en caliente
UN 1 1,366,664 1,366,664
1,366,664
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 4 4,352
4,352
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 650 818,685 40 20,467
mula y arriero 45,000 1 45,000
65,467
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 4 22,834
Electricista 54,299 1.7 4 23,077
Pareja de Ayudantes 50,264 1.7 4 21,362
67,273
TOTAL COSTOS DIRECTOS 1,503,756
ITEM 2.6 : POSTE METALICO TRONCO CONICO SECCIONADO (3) DE 10 mts X 510 GALVANIZADO EN
CALIENTE/ DIAMETRO POSTE BASE= 0,26mts, TOPE 0,14 mts / ACERO A36/ PESO 170 Kg/ NORMA
GALVANIZADO ASTM A 123-NTC 2077
-
LISTADO PRECIOS DE REFERENCIA 2014
ITEM 3.7 : POSTE DE FERROCONCRETO DE 10 MTS. x 1.050 KGF.
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Poste ferroconcreto 10 mts. x 1.050 Kgf. UN 1 576,660 576,660
576,660
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 3 5,803
Gra 358,175 3 119,392
125,195
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camabaja 1 700,000 8 87,500
Zorro 1 55,485 3 18,495
105,995
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 3 30,445
Electricista 54,299 1.7 3 30,769
Pareja de Ayudantes 50,264 1.7 3 28,483
89,697
TOTAL COSTOS DIRECTOS 897,547
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ITEM 3.8 : TORRECILLA METLICA GALVANIZADA DE 8 MTS. X 510 KGF.
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Torrecilla metlica galvanizada de 8 m.
x 510 Kgf.UN 1 1,015,580 1,015,580
1,015,580
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 3.5 4,974
4,974
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./viaje RENDIMIEN. VR. PARC. SUBTOTAL
Camin 650 818,685 30 27,290
mula y arriero 45,000 7.469 6,025
33,315
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 1 91,336
Electricista 54,299 1.7 1 92,308
Pareja de Ayudantes 50,264 1.7 1 85,449
269,093
TOTAL COSTOS DIRECTOS 1,322,962
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.9 : VESTIDA DE PERCHA DE 1 PUESTO
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Percha de 1 puesto UN 1 7,556 7,556
Aislador carrete de 3 1/2" ANSI 53-3 UN 1 4,102 4,102
Perno de mquina 5/8" X 8" UN 1 3,200 3,200
Arandela redonda de 5/8" UN 1 605 605
Arandela de presin de 5/8" UN 1 226 226
15,689
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 20 870
870
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 206.5 2,664
2,664
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 20 4,567
Electricista 54,299 1.7 20 4,615
Ayudante 25,132 1.7 20 2,136
11,318
TOTAL COSTOS DIRECTOS 30,541
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.10 : VESTIDA DE PERCHA DE 2 PUESTOS
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Percha de 2 puestos UN 1 16,246 16,246
Aislador carrete de 3 1/2" ANSI 53-3 UN 2 4,102 8,204
Perno de mquina 5/8" X 8" UN 2 3,200 6,400
Arandela redonda de 5/8" UN 2 605 1,210
Arandela de presin de 5/8" UN 2 226 452
32,512
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 18 967
967
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 186.5 2,949
2,949
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 18 5,074
Electricista 54,299 1.7 18 5,128
Ayudante 25,132 1.7 18 2,374
12,576
TOTAL COSTOS DIRECTOS 49,004
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.11 : VESTIDA DE PERCHA DE 3 PUESTOS
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Percha de 3 puestos UN 1 22,073 22,073
Aislador carrete de 3 1/2" ANSI 53-3 UN 3 4,102 12,306
Perno de mquina 5/8" X 8" UN 2 3,200 6,400
Arandela redonda de 5/8" UN 2 605 1,210
Arandela de presin de 5/8" UN 2 226 452
42,441
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 16 1,088
1,088
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 166.5 3,304
3,304
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 16 5,708
Electricista 54,299 1.7 16 5,769
Ayudante 25,132 1.7 16 2,670
14,147
TOTAL COSTOS DIRECTOS 60,980
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.12 : VESTIDA DE PERCHA DE 4 PUESTOS
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Percha de 4 puestos UN 1 32,722 32,722
Aislador carrete de 3 1/2" ANSI 53-3 UN 4 4,102 16,408
Perno de mquina 5/8" X 8" UN 2 3,200 6,400
Arandela redonda de 5/8" UN 2 605 1,210
Arandela de presin de 5/8" UN 2 226 452
57,192
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 14 1,243
1,243
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 152.8 3,600
3,600
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 14 6,524
Electricista 54,299 1.7 14 6,593
Ayudante 25,132 1.7 14 3,052
16,169
TOTAL COSTOS DIRECTOS 78,204
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.13 : VESTIDA DE PERCHA DE 5 PUESTOS
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Percha de 5 puestos UN 1 36,584 36,584
Aislador carrete de 3 1/2" ANSI 53-3 UN 5 4,102 20,510
Perno de mquina 5/8" X 8" UN 3 3,200 9,600
Arandela redonda de 5/8" UN 3 605 1,815
Arandela de presin de 5/8" UN 3 226 678
69,187
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 12 1,451
1,451
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camion 350 550,054 132.5 4,151
4,151
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 12 7,611
Electricista 54,299 1.7 12 7,692
Ayudante 25,132 1.7 12 3,560
18,863
TOTAL COSTOS DIRECTOS 93,652
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.14 : INSTALACIN DE TEMPLETE DE BAJA TENSIN
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Varilla de anclaje de 5/8" x 1.5 mts. UN 1 18,297 18,297
Arandela cuadrada de 4" x 4" x 1/4" UN 1 3,637 3,637
Vigueta de ferroconcreto UN 1 16,192 16,192
Grapa prensahilos RL 11 UN 2 11,111 22,222
Guardacabo de 1/2" UN 1 1,458 1,458
Cable de acero extrarreforzado de 1/4" ML 12 1,628 19,536
81,342
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 6 2,901
2,901
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camion 350 550,054 66.299 8,297
8,297
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 6 15,223
Electricista 54,299 1.7 6 15,385
Ayudante 25,132 1.7 6 7,121
37,729
TOTAL COSTOS DIRECTOS 130,269
-
LISTADO PRECIOS DE REFERENCIA 2014
ITEM 3.15 : RED DE BAJA TENSION 1 - 2 HILOS EN CABLE ACSR ( 1 x N 2 + 1 x N 4 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable ACSR N 4 ML 1.05 1,231 1,293
Cable ACSR N 2 ML 1.05 1,700 1,785
3,078
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 234 74
Herramienta tensionado lnea 43,518 234 186
260
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camion 350 550,054 1000 550
Zorro 55,485 187.6 296
846
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 234 390
Electricista 54,299 1.7 234 394
Pareja de Ayudantes 50,264 1.7 234 365
1,149
TOTAL COSTOS DIRECTOS 5,333
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ITEM 3.16 : RED DE BAJA TENSION 1 - 2 HILOS EN CABLE ACSR ( 2 x N 2 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable ACSR N 2 ML 2.1 1,700 3,570
3,570
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 157 111
Herramienta tensionado lnea 43,518 157 277
388
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camion 350 550,054 1000 550
Zorro 55,485 525 106
656
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 157 582
Electricista 54,299 1.7 157 588
Pareja de Ayudantes 50,264 1.7 157 544
1,714
TOTAL COSTOS DIRECTOS 6,328
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ITEM 3.17 : RED DE BAJA TENSION 1 - 2 HILOS EN CABLE ACSR ( 1 x N 1/0 + 1 x N 2 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable ACSR N 1/0 ML 1.05 2,872 3,016
Cable ACSR N 2 ML 1.05 1,814 1,905
4,921
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 160 109
Herramienta tensionado lnea 43,518 160 272
381
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 1000 550
Zorrro 55,485 118.97 466
1,016
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 160 571
Electricistas 54,299 1.7 160 577
Pareja de Ayudantes 50,264 1.7 160 534
1,682
TOTAL COSTOS DIRECTOS 8,000
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ITEM 3.18 : RED DE BAJA TENSION 1 - 2 HILOS EN CABLE ACSR ( 2 x N 1/0 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable ACSR N 1/0 ML 2.1 2,872 6,031
6,031
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 140 124
Herramienta tensionado lnea 43,518 140 311
435
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 800 688
Zorrro 55,485 175 317
1,005
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 140 652
Electricista 54,299 1.7 140 659
Pareja de Ayudantes 50,264 1.7 140 610
1,921
TOTAL COSTOS DIRECTOS 9,392
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ITEM 3.19 : RED DE BAJA TENSION 1 - 3 HILOS EN CABLE ACSR ( 2 x N 2 + 1 x N 4 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable ACSR N 4 ML 1.05 1,231 1,293
Cable ACSR N 2 ML 2.1 1,814 3,809
5,102
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 136 128
Herramienta tensionado lnea 43,518 136 320
448
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 800 688
Zorro 55,485 202.5 274
962
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 136 672
Electricista 54,299 1.7 136 679
Pareja de Ayudantes 50,264 1.7 136 628
1,979
TOTAL COSTOS DIRECTOS 8,491
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ITEM 3.20 : RED DE BAJA TENSION 1 - 3 HILOS EN CABLE ACSR ( 3 x N 2 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable ACSR N 2 ML 3.15 1,814 5,714
5,714
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 134 130
Herramienta tensionado lnea 43,518 134 325
455
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 1000 550
Zorro 55,485 292.5 190
740
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 134 682
Electricista 108,598 1.7 134 1,378
Pareja de Ayudantes 50,264 1.7 134 638
2,698
TOTAL COSTOS DIRECTOS 9,607
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.21 : RED DE BAJA TENSION 1 - 3 HILOS EN CABLE ACSR ( 2 x N 1/0 + 1 x N 2 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable ACSR N 1/0 ML 2.1 2,872 6,031
Cable ACSR N 2 ML 1.05 1,814 1,905
7,936
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 115 151
Herramienta tensionado lnea 43,518 115 378
529
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camion 350 550,054 800 688
Zorro 55,485 314 177
865
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 115 794
Electricista 108,598 1.7 115 1,605
Pareja de Ayudantes 50,264 1.7 115 743
3,142
TOTAL COSTOS DIRECTOS 12,472
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.22 : RED DE BAJA TENSION 1 - 3 HILOS EN CABLE ACSR ( 3 x N 1/0 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable ACSR N 1/0 ML 3.15 2,872 9,047
9,047
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 110 158
Herramienta tensionado lnea 43,518 110 396
554
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camion 350 550,054 800 688
Zorro 55,485 190.7 291
979
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 110 830
Electricista 108,598 1.7 110 1,678
Pareja de Ayudantes 50,264 1.7 110 777
3,285
TOTAL COSTOS DIRECTOS 13,865
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.23 : RED DE BAJA TENSION 3 - 4 HILOS EN CABLE ACSR (4 x N 2 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable ACSR N 2 ML 4.2 1,814 7,619
7,619
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 100 174
Herramienta tensionado lnea 43,518 100 435
609
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 800 688
Zorro 55,485 289 192
880
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 100 913
Electricista 108,598 1.7 100 1,846
Pareja de Ayudantes 50,264 1.7 100 854
3,613
TOTAL COSTOS DIRECTOS 12,721
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.24 : RED DE BAJA TENSION 3 - 4 HILOS EN CABLE ACSR ( 3 x N 1/0 + 1 x N 2 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable ACSR N 1/0 ML 3.15 2,872 9,047
Cable ACSR N 2 ML 1.05 1,814 1,905
10,952
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 90 193
Herramienta tensionado lnea 43,518 90 484
677
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 600 917
Zorro 55,485 131.8 421
1,338
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 90 1,015
Electricista 108,598 1.7 90 2,051
Pareja de Ayudantes 50,264 1.7 90 949
4,015
TOTAL COSTOS DIRECTOS 16,982
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.25 : RED DE BAJA TENSION 3 - 5 HILOS EN CABLE ACSR ( 4 x N 2 + 1 x N 4 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable ACSR N 4 ML 1.05 1,231 1,293
Cable ACSR N 2 ML 4.2 1,814 7,619
8,912
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 90 193
Herramienta tensionado lnea 43,518 90 484
677
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 800 688
Zorro 55,485 201 276
964
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 90 1,015
Electricistas 108,598 1.7 90 2,051
Pareja de Ayudantes 50,264 1.7 90 949
4,015
TOTAL COSTOS DIRECTOS 14,568
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.26 : RED DE BAJA TENSION 3 - 5 HILOS EN CABLE ACSR ( 3 x N 1/0 + 2 x N 2 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable ACSR N 1/0 ML 3.15 2,872 9,047
Cable ACSR N 2 ML 2.1 1,814 3,809
12,856
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 80 218
Herramienta tensionado lnea 43,518 80 544
762
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 477 1,153
Zorro 55,485 80 694
1,847
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 80 1,142
Electricista 108,598 1.7 80 2,308
Pareja de Ayudantes 50,264 1.7 80 1,068
4,518
TOTAL COSTOS DIRECTOS 19,983
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.27 : INSTALACIN DE ESTRIBO PARA ACSR N 2 - N 1/0
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Estribo para ACSR N 2 - N 1/0 UN 1 16,526 16,526
16,526
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 30 580
580
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Transformador 3 de 150 KVA 550,054 496 1,109
1,109
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 30 3,045
Electricista 54,299 1.7 30 3,077
Ayudante 25,132 1.7 30 1,424
7,546
TOTAL COSTOS DIRECTOS 25,761
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.28 : CIMENTACIN DE POSTE EXTRAREFORZADO DE 8 MTS.
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Concreto bsico 1:2:3 o 2000 Psi (5%
desperdicio) M3 0.2 312,000 62,400
62,400
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor obreros 17,408 14 1,243
1,243
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 350 550,054 120 4,584
4,584
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 14 6,524
Pareja de Obreros 41,888 1.7 14 5,086
11,610
TOTAL COSTOS DIRECTOS 79,837
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 3.29 : CIMENTACIN DE TORRECILLA DE 8 MTS.
UNIDAD : UN
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Concreto bsico 1:2:3 o 2000 Psi (5%
desperdicio) M3 0.3 312,000 93,600
93,600
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor obreros 17,408 10 1,741
1,741
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
transporte en mula 40,000 0.4 100,000
100,000
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 10 9,134
Pareja de Obreros 41,888 1.7 10 7,121
16,255
TOTAL COSTOS DIRECTOS 211,596
-
LISTADO PRECIOS DE REFERENCIA 2014
ITEM 3.30 : DESPEJE CORREDOR DE LINEA
UNIDAD : KM
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
0
0
II - EQUIPO Y HERRAMIENTA
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Motosierra, hacha y equipo de desmonte 51,168 0.9 56,853
56,853
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Zorro 55,485 1.4673 37,814
37,814
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 1.1 100,469
Cuadrilla de Obreros 83,776 1.7 1.1 156,661
257,130
TOTAL COSTOS DIRECTOS 351,797
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ITEM : RED DE BAJA TENSION 1 - 3 HILOS EN CABLE XLPE SUBTERRANEO 15 KV ( 3 x N 1/0 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable XLPE 15KV pantalla en cinta 100% ML 3 47,813 143,439
143,439
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 70 249
Herramienta tensionado lnea 43,518 70 622
871
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
CAMION 350 550,054 1000 550
Zorro 55,485 500 111
661
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 70 1,305
Electricista 54,299 1.7 70 1,319
Pareja de Ayudantes 50,264 1.7 70 1,221
3,845
TOTAL COSTOS DIRECTOS 148,816
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ITEM : CABLE DE COBRE No. 2 AWG - THW
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable de cobre N 2 - 600V ML 1 14,424 14,424
14,424
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 120 145
145
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
CAMION 350 550,054 3000 183
Zorro 55,485 1664 33
216
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 120 761
Electricista 54,299 1.7 120 769
Pareja de Ayudantes 50,264 1.7 120 712
2,242
TOTAL COSTOS DIRECTOS 17,027
ANALISIS DE PRECIOS UNITARIOS
-
LISTADO PRECIOS DE REFERENCIA 2014
ANALISIS DE PRECIOS UNITARIOS
ITEM 20 : RED DE BAJA TENSION 1 - 1 HILOS EN CABLE ACSR (1 x N 2 )
UNIDAD : ML
I - MATERIALES
DESCRIPCION UNIDAD CANTIDAD VR. UNIT. VR. PARC. SUBTOTAL
Cable ACSR N 2 ML 1.05 1,700 1,785
1,785
II - EQUIPO Y HERRAMIENTA
DESCRIPCION TIPO TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Herramienta menor linieros 17,408 340 51
Herramienta tensionado lnea 43,518 340 128
179
III - TRANSPORTE
DESCRIPCION UNIDAD TARIF./DIA RENDIMIEN. VR. PARC. SUBTOTAL
Camin 550,054 800 688
Zorro 55,485 289 192
880
IV - MANO DE OBRA
DESCRIPCION JORNAL FAC. PRES. RENDIMIEN. VR. PARC. SUBTOTAL
Capataz 53,727 1.7 340 269
Electricista 54,299 1.7 340 271
Pareja de Ayudantes 50,264 1.7 340 251
791
TOTAL COSTOS DIRECTOS 3,635
-
ITEM: UNIDAD:UN
I. MATERIALESDESCRIPCIN UNIDAD CANTIDAD VR. UNITARIO SUBTOTAL
Amarre Plstico para cable trenzado UN 2.00 $417 $834Cable de cobre trenzado para derivacin 3 x 2 + 1 N 4 AWG ML 2.00 $18,758 $37,516Caja trifsica tipo intemperie de derivacion 8 acometidas UN $137,772 $0Cinta de acero inoxidable 5/8" x 0,03" ML $3,806 $0Conector de tornillo con chaqueta aislante, tipo 2 UN $9,775 $0Grapa de suspensin para cable trenzado de B.T. UN 1.00 $16,634 $16,634Hebilla de acero inoxidable 5/8" UN $1,122 $0Perno de ojo abierto de 5/8" x 10", completo UN 1.00 $5,676 $5,676
SUB TOTAL: $60,660
II. EQUIPO Y HERRAMIENTADESCRIPCIN TIPO TARIFA/DIA RENDIMIENTO SUBTOTAL
Herramienta menor linieros $17,408 9.00 $1,934SUB TOTAL: $1,934
III. TRANSPORTEDESCRIPCIN UNIDAD TARIFA/DIA RENDIMIENTO SUBTOTAL
campero $125,063 33.80 $3,700SUB TOTAL: $3,700
IV. MANO DE OBRADESCRIPCIN JORNAL FAC. PRES. RENDIMIENTO SUBTOTAL
Capataz $53,727 1.70 9.00 $10,148Electricista $54,299 1.70 9.00 $10,256Ayudante $25,132 1.70 9.00 $4,747
SUB TOTAL: $25,151
$91,445
ANALISIS DE PRECIOS UNITARIOS
LISTADO PRECIOS DE REFERENCIA 2014
Suministro e Instalacin de estructura norma LA 320 sin lonchera
TOTAL COSTO DIRECTO:
-
ITEM: UNIDAD: UN
I. MATERIALESDESCRIPCIN UNIDAD CANTIDAD VR. UNITARIO SUBTOTAL
Amarre Plstico para cable trenzado UN 2.00 $202 $404Cable de cobre THW N 4 ML 6.00 $4,572 $27,432Caja trifsica tipo intemperie de derivacion 8 acometidas UN 1.00 $120,402 $120,402Cinta de acero inoxidable 5/8" x 0,03" ML 2.00 $2,333 $4,667Conector de tornillo con chaqueta aislante, tipo 2 UN 4.00 $10,560 $42,240Grapa de suspensin para cable trenzado de B.T. UN 1.00 $10,776 $10,776Hebilla de acero inoxidable 5/8" UN 2.00 $876 $1,752Perno de ojo abierto de 5/8" x 2" completo UN 1.00 $2,500 $2,500Collarin de una salida de 4" - 5" UN 1.00 $7,000 $7,000
SUB TOTAL: $217,173
II. EQUIPO Y HERRAMIENTADESCRIPCIN TIPO TARIFA/DIA RENDIMIENTO SUBTOTAL
Herramienta menor linieros $13,608 8.00 $1,701SUB TOTAL: $1,701
III. TRANSPORTEDESCRIPCIN UNIDAD TARIFA/DIA RENDIMIENTO SUBTOTAL
SUB TOTAL: $0
IV. MANO DE OBRADESCRIPCIN JORNAL FAC. PRES. RENDIMIENTO VR. PARCIAL
Capataz $41,580 1.95 8.00 $10,135Electricista $30,562 1.95 8.00 $7,449Pareja de ayudantes $39,294 1.95 8.00 $9,578
SUB TOTAL: $27,162
$246,036
ANALISIS DE PRECIOS UNITARIOS
TOTAL COSTO DIRECTO:
Suministro e instalacion estructura LA 330
LISTADO PRECIOS DE REFERENCIA 2014
-
ANALISIS DE PRECIOS UNITARIOS
ITEM: UNIDAD:
UN
I. MATERIALES
DESCRIPCIN UNIDAD CANTIDAD VR. UNITARIO VR. PARCIAL
Amarre Plstico para cable trenzado UN 2.00 $417 $834
Cable de cobre trenzado para derivacin 3 x 2 + 1 N 4 AWG ML 2.00 $18,758 $37,516
Caja trifsica tipo intemperie de derivacion 8 acometidas UN 1.00 $137,772 $137,772
Cinta de acero inoxidable 5/8" x 0,03" ML 2.00 $3,806 $7,612
Conector de tornillo con chaqueta aislante, tipo 2 UN 4.00 $9,775 $39,100
Grapa de suspensin para cable trenzado de B.T. UN 1.00 $16,634 $16,634
Hebilla de acero inoxidable 5/8" UN 2.00 $1,122 $2,244
Perno de ojo abierto de 5/8" x 10", completo UN 1.00 $5,676 $5,676
SUB TOTAL: $247,388
II. EQUIPO Y HERRAMIENTA
DESCRIPCIN TIPO TARIFA/DIA RENDIMIENTO VR. PARCIAL
Herramienta menor linieros $17,408 7.00 $2,487
SUB TOTAL: $2,487
III. TRANSPORTE
DESCRIPCIN UNIDAD TARIFA/DIA RENDIMIENTO VR. PARCIAL
campero $125,063 27.42 $4,561
SUB TOTAL: $4,561
IV. MANO DE OBRA
DESCRIPCIN JORNAL FAC. PRES. RENDIMIENTO VR. PARCIAL
Capataz $53,727 1.70 7.00 $13,048
Electricista $54,299 1.70 7.00 $13,187
Ayudante $25,132 1.70 7.00 $6,103
SUB TOTAL: $32,338
$286,773
LISTADO PRECIOS DE REFERENCIA 2014
Suministro e Instalacin de estructura norma LA 320
TOTAL COSTO DIRECTO:
-
ITEM: UNIDAD:
I. MATERIALES
DESCRIPCIN UNIDAD CANTIDAD VR. UNITARIO VR. PARCIAL
Amarre Plstico para cable trenzado UN 2.00 $202 $404
Cable de cobre THW N 4 ML 6.00 $4,572 $27,432
Caja trifsica tipo intemperie de derivacion 8 acometidas UN 1.00 $120,402 $120,402
Cinta de acero inoxidable 5/8" x 0,03" ML 2.00 $2,333 $4,667
Conector de tornillo con chaqueta aislante, tipo 2 UN 4.00 $10,560 $42,240
Grapa de suspensin para cable trenzado de B.T. UN 1.00 $10,776 $10,776
Hebilla de acero inoxidable 5/8" UN 2.00 $876 $1,752
Perno de ojo abierto de 5/8" x 2" completo UN 1.00 $2,500 $2,500
Collarin de una salida de 4" - 5" UN 1.00 $7,000 $7,000
SUB TOTAL: $217,173
II. EQUIPO Y HERRAMIENTA
DESCRIPCIN TIPO TARIFA/DIA RENDIMIENTO VR. PARCIAL
Herramienta menor linieros $13,608 8.00 $1,701
SUB TOTAL: $1,701
III. TRANSPORTE
DESCRIPCIN UNIDAD TARIFA/DIA RENDIMIENTO VR. PARCIAL
campero $125,063 30.06 $4,160
SUB TOTAL: $4,160
IV. MANO DE OBRA
DESCRIPCIN JORNAL FAC. PRES. RENDIMIENTO VR. PARCIAL
Capataz $53,727 1.70 8.00 $11,417
Electricista $54,299