MODELO DE APUS

148
000012 000017 000018 000028 000104 000113 000122 000163 000169 000170 000200 000362 000364 000365 000374 000378 000385 000386 000388 000391 000392 000397 000412 000425 000429 000436 000440 000480 000523 000524 000679 000691 000706 000730 000769 000785 000793 000794 000795 000797 000816 000838 000848 000849 000859 000863 000879 000911 000917 001009

Transcript of MODELO DE APUS

Page 1: MODELO DE APUS

000012000017000018000028000104000113000122000163000169000170000200000362000364000365000374000378000385000386000388000391000392000397000412000425000429000436000440000480000523000524000679000691000706000730000769000785000793000794000795000797000816000838000848000849000859000863000879000911000917001009001013001014001037001048

Page 2: MODELO DE APUS

001052001068001070001071001085001095001103001120001197001198001257001319001321001326001652001664001688001694001710001742001829001852001891001916001980002005002071002090002092002135002136002137002138002153002154002157002161002195002202002203002339002410002458002489002501002504002508002513002609002617002679002712002726002731

Page 3: MODELO DE APUS

002764002775002848002859002866002889002941003013003016003047003107003199003228003382003443003711003731003890003896003901003980003997004108004144004152004365004387004391004392004636004725004745004760004761

Page 4: MODELO DE APUS

DESARMADO ALERO M2 DESALOJO DE MATERIALES - CARGADO MANUAL M3 PICADO Y CORCHADO EN MAMPOSTERIA M3 ACERO DE REFUERZO KG RETIRO CANALES Y BAJANTES M BAJANTE A.LL. PVC-D 110 MM M PINTURA ESMALTE EN PAREDES H= 0 - 4 M M2 RETIRO DE ENLUCIDOS M2 RETIRO DE PINTURA M2 PINTURA DE CAL APV H= 0 - 4 M M2 RETIRO REVOCADO DE PIEDRA M MAMPOSTERIA DE PIEDRA M3 H. S. 210 KG/CM2 M3 H. S. 180 KG/CM2 M3 RETIRO DE CONTRAPISO H.S. - MANUAL M2 MAMPOSTERIA DE LADRILLO MAMBRON M2 RETIRO PISO DE PIEDRA SILLAR M2 EXCAVACION MANUAL 0-2 M DE SUELO NATURAL M3 EXCAVACION MANUAL 3,01-4 M DE SUELO NATURAL M3 LIMPIEZA DE CAJA DE REVISION U CAJA DE REVISION 80*80*80 CM (PAREDES DE LADRILLO MAMBRON) U RELLENO GRANULAR COMPACTADO MECÁNICAMENTE M3 REVOCADO DE PIEDRA M2 CONTRAPISO DE H.S. H= 8 CM + RELLENO GRANULAR H= 15 CM M2 PIEDRA SILLAR INCLUYE REVOCADO M2 MASILLADO PALETEADO GRUESO CON IMPERMEABILIZANTE M2 PINTURA ESMALTE EN METAL (SOPLETE) M2 LIMPIEZA Y NIVELACION DEL TERRENO (PENDIENTE >= 12%) M2 LIMPIEZA Y RETIRO DE ESCOMBROS INTERIOR INMUEBLE M3 RETIRO DE VEGETACION SOBRE CUBIERTA Y/O MUROS (INC. HERBICID M2 TABLA DE MONTE 30CM M REPLANTEO CON EQUIPO TOPOGRAFICO M2 ENCEPADO M2 RELLENO CON SUELO NATURAL COMPACTADO MANUALMENTE M3 MEDIA CANA M RETIRO DE MASILLADO EN PISOS M2 LIMPIEZA GENERAL DE OBRA M2 ENLUCIDO VERTICAL MORTERO 1:3 M2 RESANE DE ENLUCIDOS MORTERO 1:3 M2 PINTURA DE CAUCHO T. PERMALATEX PREP. H= 0 A 6 M M2 PICADO DE HORMIGON SIMPLE - CONTRAPISOS M3 ESTUCADO EXTERIOR EN PAREDES M2 LIMPIEZA DE PISO CON CEPILLO DE ACERO M2 PINTURA ESMALTE EN MADERA (SOPLETE) M2 LIMPIEZA DE PISOS CON ACIDO MURIATICO M2 ADITIVO LIGANTE PARA HORMIGONES Y MORTEROS TIPO BETONCRYL 14 LT LIMPIEZA DE SUMIDEROS DE PLAZAS U RELLENO CON SUELO NATURAL COMPACTADO MECANICAMENTE M3 RETIRO DE GRAFITIS CON SOLVENTES Y CEPILLO PLASTICO M2 GRES 30*30 (COLOMBIANO) M2 RETIRO DE ADOQUIN M2 ENLUCIDO DE FILOS Y FAJAS H=0 - 8,00 M M RIEL DE MADERA RUSTICA (L=2.40 M 3 * 12 CM) M PICADO DE HORMIGON ARMADO M3

Page 5: MODELO DE APUS

RETIRO DE BALDOSA DE PIEDRA M2 MAMPOSTERIA DE BLOQUE DE 10 CM M2 ADOQUIN ORNAMENTAL NATURAL, E=6CM, F'C=300KG/CM2. M2 ADOQUIN ORNAMENTAL COLOR, E=6CM, F'C=300KG/CM2 M2 MARTELINADO DE PIEDRA M2 ADOQUIN EXAGONAL GRIS M2 RECOLOCACION GRADA DE PIEDRA M LIMPIEZA DE VIDRIOS (DOS CARAS) M2 DESRATIZACION (KG) KG DESINFECCION AMBIENTAL (LT) LT PINTURA ESMALTE EN MADERA (BROCHA) M2 LIMPIEZA Y LAVADO DE HORMIGON (AGUA, DETERGENTE, CEPILLO Y Q M2 LIMPIEZA Y LAVADO DE MAMPOSTERIAS H=0.00-4.00 M. M2 CONTRAPISO DE H.S. H= 8 CM (SIN RELLENO GRANULAR) M2 LIMPIEZA REJA METALICA DE PISO M2 ESTRUCTURA DE ACERO (INC. ANTICORROSIVO) KG ADITIVO ACELERANTE PARA FRAGUADO DE HORMIGONES KG REPARACION DE PUERTA METALICA M2 RETIRO DE ASFALTO (CAPA DE 6 CM) M2 RESANE DE ENLUCIDOS CAL BARRO ARENA (1:1:1) H=0 - 3.00M M2 RETIRO DE PINTURA ESMALTE EN PAREDES M2 MALLA PARA ENLUCIDOS M2 BALDOSA DE PIEDRA CORTADA A MAQUINA M2 RETIRO DE BORDILLO DE HORMIGON M COLOCACION DE PIEDRA REUTILIZADA (INCLUYE REVOCADO) M2 LIMPIEZA DE PUERTAS DE MADERA M2 TUBERIA NOVAFORT 250 MM M COLOCACION BORDILLO DE PIEDRA M COLOCACION DE ADOQUIN DE PIEDRA (INC. MORTERO 1:3) M2 COLOCACION DE BORDILLO DE PIEDRA (INC. MORTERO 1:3) M RETIRO DE BORDILLO DE PIEDRA M ESCALON RECTO DE PIEDRA MARTELINADA (HUELLA Y CONTRAHUELLA) M ESCALON CURVO DE PIEDRA MARTELINADA (HUELLA Y CONTRAHUELLA) M COLOCACION DE ADOQUIN TIPO QUITO (ACENTADO CON MORTERO) M2 COLOCACION DE ESCALON DE PIEDRA M ADOQUIN DE GRES TIPO QUITO 26*6*3.5 CM M2 MODULO DE ANDAMIO PARA PLATAFORMA HMAX= 8 M U/DCOLOCACION DE ADOQUIN TIPO EXAGONAL GRIS M2 REJILLA HIERRO FUNDIDO PARA SUMIDERO (55 X 40 CM INC. CERCO) U TAPA DE HIERRO FUNDIDO PARA POZO REVISION (55 X 40 CM INC. C U RETIRO ROTULO M2 COLOCACION DE MOJONES/BOLARDOS DE ALUMINIO/HIERRO U ENLUCIDO HORIZONTAL 1:3 + IMPERMEABILIZANTE M2 PICADO Y CORCHADO DE ACERAS A=0.20M. E=0.12M. M LIMPIEZA Y LAVADO DE MAMPOSTERIAS H=4.01-8.00 M. M2 RETIRO DE CONTRAPISO H.S. (EQUIPO HIDRAULICO) M2 MARTELINADO DE HORMIGON M2 CORTADO DE PIEDRA CON AMOLADORA M DERROCAMIENTO DE MURO DE H. CICLOPEO M3 RELLENO GRANULAR COMPACTADO MANUALMENTE M3 COLOCACION DE HOJAS DE ZINC ANTIGUO M2 TRANSPORTE DE MATERIALES (CAMION/TRAILER) VJERETIRO DE ASFALTO (CAPA DE 15 CM) M2 COLOCACION DE PISO DE PIEDRA SILLAR M2

Page 6: MODELO DE APUS

RETIRO DE BASURERO METALICO U LIMPIEZA Y DESBROCE (M2) (H=2 M) M2 ADITIVO ADHESIVO EPOX. HORMIG. NUEVO A VIEJO TIPO SIKADUR 32 KG COLOCACION DE ADOQUIN TIPO CONCHA PAVE M2 MANGUERA POLIETILENO REFORZ. 1 1/2 (INST. ELECT.) M RETIRO Y RECOLOCACION DE SUMIDERO DE PIEDRA M2 MOJON DE HORMIGON D=0.30 M. H=0.45 M. U REUBICACION DE SUMIDERO DE CALZADA U DERROCAMIENTO DE MURO DE H. ARMADO M3 SUJECION CABLES ELECTRICOS M CANASTILLA DE HIERRO PARA BASE DE POSTES 50 CM U REPLANTEO A CINTA M2 COLOCACION DE ADOQUIN DE CEMENTO M2 COLOCACION DE BASURERO METALICO 0.40X0.40X1.00 U DESENCHAMBADO M2 RETIRO ESCALON DE PIEDRA (REUTILIZACION) M TUBERIA NOVAFORT 160 MM M BORDILLO HORMIGON PREFABRICADO 50 * 50 * 15 CM 210 KG/CM2 U BORDILLO HORMIGON PREFABRICADO 50 * 27 * 7 CM 210 KG/CM2 U RETIRO DE VERJA DE HIERRO 50 CM M PINTURA ESMALTE EN METAL (A BROCHA) M2 TAPA DE HIERRO FUNDIDO PARA POZO REVISION (80 X 80 CM INC. C U ADITIVO IMPERMEABILIZANTE PARA HORMIGONES Y MORTEROS TIPO SI KG RETIRO DE VEGETACION ENTRE MATERIALES INSTALADOS EN ACABADOS M2 CERCO Y TAPA DE H.F. PARA POZO DE REVISION D=0,60M U ADOQUIN VARIOS MODELOS, GRIS 400 KG/CM2, E=8CM M2 ADOQUIN VARIOS MODELOS, COLOR 400 KG/CM2, E=8CM M2 POZO DE REVISION H.S. 210 KG/CM2 H=1,00M - 1.75M, E=0,20M, E U POZO DE REVISION H.S. 210 KG/CM2 H=1,76M - 2.25M, E=0,20M, E U DERROCAMIENTO DE HORMIGON SIMPLE M3 POZO DE REVISION H.S. 210 KG/CM2 H=2.26M - 2.75M, E=0,20M, E U TUBERIA NOVAFORT 110 MM M LIMPIEZA DE PISO DE PIEDRA CON MAQUINA INDUSTRIAL A VAPOR, I M2 BORDILLO HORMIGON PREFABRICADO 50 * 35 * 8 CM 210 KG/CM2 M

Page 7: MODELO DE APUS

40 2.23 1.94 0 1.700761 0.2371293 0160 10.66 9.27 0 2.029429 7.244329 0

10 205.82 178.97 60.08195 110.05 8.835834 01500 1.5 1.3 0.8908199 0.386 0.0193 0

40 1.13 0.98 0 0.8946001 0.08473001 040 6.99 6.08 3.62965 2.2365 0.211825 0

400 4.31 3.75 1.95925 1.6008 0.1867067 0160 1.08 0.94 0 0.8520001 0.0926 0600 1.64 1.43 0 1.278 0.1496143 0600 3.04 2.64 0.43665 2.001 0.20005 0780 1.23 1.07 0 0.8875001 0.1777083 0

40 60.71 52.79 37.1369 14.91 0.7455 012 103.68 90.16 63.31225 21.442 5.405434 024 113.82 98.97 60.6206 30.63143 7.722048 040 5.38 4.68 0 4.453637 0.2226818 0

7 14.26 12.4 11.81719 0.559125 0.02795625 0110 6.34 5.51 0 5.243078 0.2621539 0120 7.2 6.26 0 5.964 0.2982 0

4 10.8 9.39 0 8.946 0.4473 040 3.73 3.24 0 3.088 0.1544 020 52.62 45.76 36.37159 8.946 0.4473 0

150 22.85 19.87 15.78125 3.221625 0.8710812 0600 4.37 3.8 1.449722 2.2365 0.111825 0

20 15.13 13.16 7.366132 4.12368 1.674984 070 48.59 42.25 32.86156 8.946 0.4473 0

300 5.13 4.46 1.777972 2.556 0.1278 0240 5.27 4.58 2.87175 1.2006 0.5100301 0

40 1.08 0.94 0 0.8946001 0.04473001 025 10.76 9.36 0 8.915571 0.4457786 0

150 2.31 2.01 0.18 1.7092 1.25E-01 030 2.91 2.53 0.69261 1.704 1.35E-01 030 0.74 0.64 0.2125 0.39665 0.0335 0

400 3.34 2.9 1.515 1.3206 0.06603001 0120 3.89 3.38 0 3.221625 0.1610813 0

50 1.99 1.73 0.132815 1.491 0.1078833 0250 2.4 2.09 0 1.988 0.09940001 0790 0.86 0.75 0 0.7156801 3.58E-02 0

17 5.43 4.72 1.592972 2.982 1.49E-01 080 6.15 5.35 1.592972 3.5784 0.17892 0

3000 4.75 4.13 1.484498 2.4012 0.24006 03 33.43 29.07 0 27.69 1.3845 0

600 3.31 2.88 0.43632 2.2365 0.211825 025 1.39 1.21 0 1.152239 0.05761194 060 5.76 5.01 2.87175 1.50075 0.6375376 0

420 1.73 1.5 0.4375 1.015 0.05075 060 7.35 6.39 6 0.37488 0.018744 060 2.67 2.32 0 2.205714 0.1102857 0

150 4.7 4.09 0 3.221625 0.8710812 0500 5.68 4.94 1.1971 3.408 0.3304 0

20 20 17.39 15.04602 2.2365 0.111825 0950 2.61 2.27 0 1.988 0.2771778 0

40 5.01 4.36 0.1707234 3.408954 0.7831461 020 1.44 1.25 0.88 0.3541739 0.0177087 018 187.39 162.95 0 155.1857 7.759287 0

Page 8: MODELO DE APUS

200 2.9 2.52 0 2.272 2.47E-01 080 8.54 7.43 4.2955 2.982 0.1491 0

400 16.02 13.93 10.14515 3.607258 0.1803629 0300 18.4 16 13.6554 2.2365 0.111825 0

34 6.88 5.98 0 5.697334 0.2848667 0400 12.33 10.72 7.591022 2.982 0.1491 0

30 7.08 6.16 1.002122 4.912 0.2456 080 3.32 2.89 0 2.757143 0.1378571 010 7.56 6.57 4.7 1.785143 0.08925715 0

100 8.89 7.73 1.33 5.964 0.4315334 020 5.5 4.78 3.09935 1.50075 0.1750375 0

320 2.89 2.51 1.0625 1.378571 0.06892857 0250 0.54 0.47 0.039 0.4073 0.020365 0100 10.97 9.54 5.093632 3.746076 0.6960247 0

8 3.32 2.89 0 2.757143 0.1378571 020 2.78 2.42 1.385414 0.750375 0.2875188 0

180 2.17 1.89 1.5 0.37488 0.018744 04 20.76 18.05 6.753814 8.165699 3.128285 0

140 6.44 5.6 0 4.899 0.7049501 0200 8.29 7.21 2.313822 4.473 0.4236501 0

35 3.34 2.9 0.778 1.93 0.1965 012 7.13 6.2 3.85 2.2365 0.111825 0

100 44.77 38.93 32.66477 5.964 0.2982 020 2.16 1.88 0 1.7892 0.08946001 0

400 5.18 4.5 0 4.286 0.2143 030 1.55 1.35 0 1.286667 0.06433334 0

200 23.75 20.65 19.63605 0.965 0.04825 0160 6.28 5.46 0.764772 4.473 0.22365 0

1000 7.54 6.56 1.002122 5.2928 0.26464 0180 6.28 5.46 0.764772 4.473 0.22365 0180 1.29 1.12 0 1.065 0.05325001 0

40 64.58 56.16 51.00212 4.912 0.2456 05 81.83 71.16 66.00212 4.912 0.2456 0

170 6.08 5.29 0.5213334 4.540529 0.2270264 0120 7.74 6.73 1.002122 5.457778 0.2728889 0150 33.7 29.3 25.54602 3.5784 0.17892 0

5 0.81 0.7 0.25 0.4286 0.02143 040 3.57 3.1 0 2.951344 0.1475672 010 103.41 89.92 85 4.686001 0.2343 010 97.14 84.47 80 4.26 0.213 0

3.5 2.38 2.07 0 1.908615 0.1569692 070 4.17 3.63 0.27775 3.195 0.15975 0

9 6.16 5.36 2.138372 3.002014 0.2172148 060 10.67 9.28 6.971223 2.201 0.11005 020 1.45 1.26 0.039 1.163714 0.05818572 060 3.77 3.28 0 3.124 0.1562 015 6.45 5.61 0 5.341251 0.2670625 070 5.89 5.12 0 4.26 0.863 020 87.52 76.1 0 70.23257 5.871629 010 23.33 20.29 15.78125 4.295501 0.214775 030 2.6 2.26 1.40255 0.8146 0.04073 020 123.07 107.02 0 20.29429 86.72899 020 12.89 11.21 0 9.798001 1.41E+00 0

100 7.31 6.36 0.764772 5.325001 0.26625 0

Page 9: MODELO DE APUS

8 6.11 5.31 0 4.707317 0.6012196 0500 1.81 1.57 0 1.491 0.07455 0

80 22.37 19.45 14.53 4.686001 0.2343 0300 13.34 11.6 8.5 2.951344 0.1475672 0

70 1.77 1.54 1.3335 0.193 0.009649999 05 42.77 37.19 0 33.83333 3.358333 0

40 20.44 17.77 2.135503 14.89064 0.7445319 010 28.51 24.79 0 22.55556 2.238889 012 171.06 148.75 0 137.2882 11.46441 070 1.06 0.92 0.4352 0.4473 0.04236501 040 8.14 7.08 3.03 3.86 0.193 020 0.38 0.33 0.03 0.2968667 0.003333334 0

170 4.16 3.62 0.5213334 2.951344 0.1475672 04 8.59 7.47 0.764772 6.390001 0.3195 0

40 0.26 0.23 0 0.213 0.02065 020 5.37 4.67 0 4.26 0.413 060 14.71 12.79 12.11605 0.6433333 0.03216667 0

200 11.1 9.65 7.27775 2.259091 0.1129546 0120 9.09 7.9 5.52775 2.259091 0.1129546 0

15 0.81 0.7 0 0.5413334 0.1604 040 5.11 4.44 3.09935 1.2006 1.40E-01 0

6 166.14 144.47 140 4.26 0.213 070 3.07 2.67 1.85 0.781 0.03905 0

1800 0.74 0.64 0.18 0.4273 0.031365 010 114.44 99.51 98.5 0.965 0.04825 040 18 15.65 11.89602 3.5784 0.17892 050 18.35 15.96 13.59177 2.259091 0.1129546 0

6 336.87 292.93 134.3993 112.89 45.6445 02 382.58 332.68 172.2854 114.8172 45.58213 05 39.78 34.59 0 31.9239 2.668922 04 367.39 319.47 165.1915 109.1372 45.1394 0

320 6.68 5.81 5.136047 0.6433333 0.03216667 05 1.45 1.26 0 1.06825 0.1909125 0

60 9.95 8.65 6.27775 2.259091 0.1129546 0

Page 10: MODELO DE APUS

Formulario No. 2NOMBRE DEL OFERENTE: ING. HECTOR GUERREROPROYECTO: MANTENIMIENTO EN BARRIOS EMBLEMATICO BARRIO: SAN MARCOS

Hoja de

PRESUPUESTO PRECIO PRECIO

No. DESCRIPCION UNIDAD CANTIDAD UNITARIO TOTALPRELIMINARESDESINFESTACION Y DESRATIZACION

1197 DESRATIZACION (KG) KG 10.00 #VALUE! #VALUE!1198 DESINFECCION AMBIENTAL (LT) LT 100.00 #VALUE! #VALUE!

RETIROS, DERROCAMIENTOS, LIBERACIONES Y DESALOJOS 0.0017 DESALOJO DE MATERIALES - CARGADO MANUAL M3 160.00 #VALUE! #VALUE!

163 RETIRO DE ENLUCIDOS M2 160.00 #VALUE! #VALUE!374 RETIRO DE CONTRAPISO H.S. - MANUAL M2 40.00 #VALUE! #VALUE!523 LIMPIEZA Y RETIRO DE ESCOMBROS INTERIOR INMUEBLE M3 25.00 #VALUE! #VALUE!524 RETIRO DE VEGETACION SOBRE CUBIERTA Y/O MUROS (INC. HERBICIDA) M2 150.00 #VALUE! #VALUE!785 RETIRO DE MASILLADO EN PISOS M2 250.00 #VALUE! #VALUE!793 LIMPIEZA GENERAL DE OBRA M2 790.00 #VALUE! #VALUE!816 PICADO DE HORMIGON SIMPLE - CONTRAPISOS M3 3.00 #VALUE! #VALUE!848 LIMPIEZA DE PISO CON CEPILLO DE ACERO M2 25.00 #VALUE! #VALUE!

1048 PICADO DE HORMIGON ARMADO M3 18.00 #VALUE! #VALUE!1052 RETIRO DE BALDOSA DE PIEDRA M2 200.00 #VALUE! #VALUE!1710 RETIRO DE ASFALTO (CAPA DE 6 CM) M2 140.00 #VALUE! #VALUE!2339 RETIRO ROTULO M2 3.50 #VALUE! #VALUE!2504 RETIRO DE CONTRAPISO H.S. (EQUIPO HIDRAULICO) M2 60.00 #VALUE! #VALUE!2609 DERROCAMIENTO DE MURO DE H. CICLOPEO M3 20.00 #VALUE! #VALUE!2712 TRANSPORTE DE MATERIALES (CAMION/TRAILER) VIAJE 20.00 #VALUE! #VALUE!2726 RETIRO DE ASFALTO (CAPA DE 15 CM) M2 20.00 #VALUE! #VALUE!2764 RETIRO DE BASURERO METALICO U 8.00 #VALUE! #VALUE!3016 DERROCAMIENTO DE MURO DE H. ARMADO M3 12.00 #VALUE! #VALUE!3443 DESENCHAMBADO M2 40.00 #VALUE! #VALUE!3901 RETIRO DE VERJA DE HIERRO 50 CM M 15.00 #VALUE! #VALUE!4144 M2 1,800.00 #VALUE! #VALUE!4636 DERROCAMIENTO DE HORMIGON SIMPLE M3 5.00 #VALUE! #VALUE!

APUNTALAMIENTO O ENTIBAMIENTOS 0.00679 TABLA DE MONTE 30CM M 30.00 #VALUE! #VALUE!

1037 RIEL DE MADERA RUSTICA (L=2.40 M 3 * 12 CM) M 20.00 #VALUE! #VALUE!REPLANTEO Y NIVELACION 0.00

480 LIMPIEZA Y NIVELACION DEL TERRENO (PENDIENTE >= 12%) M2 40.00 #VALUE! #VALUE!691 REPLANTEO CON EQUIPO TOPOGRAFICO M2 30.00 #VALUE! #VALUE!

2775 LIMPIEZA Y DESBROCE (M2) (H=2 M) M2 500.00 #VALUE! #VALUE!3199 REPLANTEO A CINTA M2 20.00 #VALUE! #VALUE!

EXCAVACIONES 0.00386 EXCAVACION MANUAL 0-2 M DE SUELO NATURAL M3 120.00 #VALUE! #VALUE!388 EXCAVACION MANUAL 3,01-4 M DE SUELO NATURAL M3 4.00 #VALUE! #VALUE!

RELLENOS 0.00397 RELLENO GRANULAR COMPACTADO MECÁNICAMENTE M3 150.00 #VALUE! #VALUE!730 RELLENO CON SUELO NATURAL COMPACTADO MANUALMENTE M3 120.00 #VALUE! #VALUE!911 RELLENO CON SUELO NATURAL COMPACTADO MECANICAMENTE M3 150.00 #VALUE! #VALUE!

2617 RELLENO GRANULAR COMPACTADO MANUALMENTE M3 10.00 #VALUE! #VALUE!ESTRUCTURAREPARACIONES ESTRUCTURALES 0.00

2458 ENLUCIDO HORIZONTAL 1:3 + IMPERMEABILIZANTE M2 9.00 #VALUE! #VALUE!HORMIGONES Y ADITIVOS 0.00

364 H. S. 210 KG/CM2 M3 12.00 #VALUE! #VALUE!365 H. S. 180 KG/CM2 M3 24.00 #VALUE! #VALUE!863 ADITIVO LIGANTE PARA HORMIGONES Y MORTEROS TIPO BETONCRYL 14 LT 60.00 #VALUE! #VALUE!

1319 M2 320.00 #VALUE! #VALUE!1688 ADITIVO ACELERANTE PARA FRAGUADO DE HORMIGONES KG 180.00 #VALUE! #VALUE!2848 ADITIVO ADHESIVO EPOX. HORMIG. NUEVO A VIEJO TIPO SIKADUR 32 PRIMER KG 80.00 #VALUE! #VALUE!

ACERO ESTRUCTURAL 0.0028 ACERO DE REFUERZO KG 1,500.00 #VALUE! #VALUE!

1664 ESTRUCTURA DE ACERO (INC. ANTICORROSIVO) KG 20.00 #VALUE! #VALUE!CUBIERTASRETIROS 0.00

12 DESARMADO ALERO M2 40.00 #VALUE! #VALUE!ALTERNATIVAS DE BASE PARA IMPERMEABILIZACION 0.00

4108 KG 70.00 #VALUE! #VALUE!CUBIERTAS DE MADERA Y ZINC 0.00

2679 COLOCACION DE HOJAS DE ZINC ANTIGUO M2 30.00 #VALUE! #VALUE!RECOLECCION DE AGUAS LLUVIAS 0.00

104 RETIRO CANALES Y BAJANTES M 40.00 #VALUE! #VALUE!113 BAJANTE A.LL. PVC-D 110 MM M 40.00 #VALUE! #VALUE!

MUROS Y TABIQUESMAMPOSTERIAS 0.00

18 PICADO Y CORCHADO EN MAMPOSTERIA M3 10.00 #VALUE! #VALUE!362 MAMPOSTERIA DE PIEDRA M3 40.00 #VALUE! #VALUE!

RETIRO DE VEGETACION ENTRE MATERIALES INSTALADOS EN ACABADOS DE PISOS

LIMPIEZA Y LAVADO DE HORMIGON (AGUA, DETERGENTE, CEPILLO Y QUIMICO TIPO C

ADITIVO IMPERMEABILIZANTE PARA HORMIGONES Y MORTEROS TIPO SIKA FILL ( GRIS

Page 11: MODELO DE APUS

Formulario No. 2NOMBRE DEL OFERENTE: ING. HECTOR GUERREROPROYECTO: MANTENIMIENTO EN BARRIOS EMBLEMATICO BARRIO: SAN MARCOS

Hoja de

PRESUPUESTO PRECIO PRECIO

No. DESCRIPCION UNIDAD CANTIDAD UNITARIO TOTAL378 MAMPOSTERIA DE LADRILLO MAMBRON M2 7.00 #VALUE! #VALUE!

1068 MAMPOSTERIA DE BLOQUE DE 10 CM M2 80.00 #VALUE! #VALUE!ENLUCIDOS DE MATERIALES TRADICIONALES 0.00

1742 RESANE DE ENLUCIDOS CAL BARRO ARENA (1:1:1) H=0 - 3.00M M2 200.00 #VALUE! #VALUE!ENLUCIDOS DE CEMENTO 0.00

769 MEDIA CAÑA M 50.00 #VALUE! #VALUE!794 ENLUCIDO VERTICAL MORTERO 1:3 M2 17.00 #VALUE! #VALUE!795 RESANE DE ENLUCIDOS MORTERO 1:3 M2 80.00 #VALUE! #VALUE!

1014 ENLUCIDO DE FILOS Y FAJAS H=0 - 8,00 M M 40.00 #VALUE! #VALUE!OTROS ACABADOS EN PAREDES 0.00

1852 MALLA PARA ENLUCIDOS M2 12.00 #VALUE! #VALUE!LIMPIEZA Y PROTECCION 0.00

1321 LIMPIEZA Y LAVADO DE MAMPOSTERIAS H=0.00-4.00 M. M2 250.00 #VALUE! #VALUE!2501 LIMPIEZA Y LAVADO DE MAMPOSTERIAS H=4.01-8.00 M. M2 20.00 #VALUE! #VALUE!

CONTRAPISOS Y PISOSCONTRAPISOS 0.00

425 CONTRAPISO DE H.S. H= 8 CM + RELLENO GRANULAR H= 15 CM M2 20.00 #VALUE! #VALUE!1326 CONTRAPISO DE H.S. H= 8 CM (SIN RELLENO GRANULAR) M2 100.00 #VALUE! #VALUE!1916 RETIRO DE BORDILLO DE HORMIGON M 20.00 #VALUE! #VALUE!2489 PICADO Y CORCHADO DE ACERAS A=0.20M. E=0.12M. M 60.00 #VALUE! #VALUE!

INTERVENCION EN PISOS Y FACHADAS DE PIEDRA 0.00200 RETIRO REVOCADO DE PIEDRA M 780.00 #VALUE! #VALUE!385 RETIRO PISO DE PIEDRA SILLAR M2 110.00 #VALUE! #VALUE!412 REVOCADO DE PIEDRA M2 600.00 #VALUE! #VALUE!429 PIEDRA SILLAR INCLUYE REVOCADO M2 70.00 #VALUE! #VALUE!

1085 MARTELINADO DE PIEDRA M2 34.00 #VALUE! #VALUE!1103 RECOLOCACION GRADA DE PIEDRA M 30.00 #VALUE! #VALUE!1891 BALDOSA DE PIEDRA CORTADA A MAQUINA M2 100.00 #VALUE! #VALUE!2135 COLOCACION DE BORDILLO DE PIEDRA (INC. MORTERO 1:3) M 180.00 #VALUE! #VALUE!2136 RETIRO DE BORDILLO DE PIEDRA M 180.00 #VALUE! #VALUE!2137 ESCALON RECTO DE PIEDRA MARTELINADA (HUELLA Y CONTRAHUELLA) M 40.00 #VALUE! #VALUE!2138 ESCALON CURVO DE PIEDRA MARTELINADA (HUELLA Y CONTRAHUELLA) M 5.00 #VALUE! #VALUE!2508 MARTELINADO DE HORMIGON M2 15.00 #VALUE! #VALUE!3711 RETIRO ESCALON DE PIEDRA (REUTILIZACION) M 20.00 #VALUE! #VALUE!4760 M2 5.00 #VALUE! #VALUE!

PISOS CERAMICOS Y OTROS 0.00859 LIMPIEZA DE PISOS CON ACIDO MURIATICO M2 420.00 #VALUE! #VALUE!

1009 GRES 30*30 (COLOMBIANO) M2 20.00 #VALUE! #VALUE!2153 COLOCACION DE ADOQUIN TIPO QUITO (ACENTADO CON MORTERO) M2 170.00 #VALUE! #VALUE!2195 COLOCACION DE ADOQUIN TIPO EXAGONAL GRIS M2 40.00 #VALUE! #VALUE!2513 CORTADO DE PIEDRA CON AMOLADORA M 70.00 #VALUE! #VALUE!2731 COLOCACION DE PISO DE PIEDRA SILLAR M2 100.00 #VALUE! #VALUE!3228 COLOCACION DE ADOQUIN DE CEMENTO M2 170.00 #VALUE! #VALUE!

OTROS PISOS 0.00706 ENCEPADO M2 400.00 #VALUE! #VALUE!

1013 RETIRO DE ADOQUIN M2 950.00 #VALUE! #VALUE!1070 ADOQUIN ORNAMENTAL NATURAL, E=6CM, F'C=300KG/CM2. M2 400.00 #VALUE! #VALUE!1071 ADOQUIN ORNAMENTAL COLOR, E=6CM, F'C=300KG/CM2 M2 300.00 #VALUE! #VALUE!1095 ADOQUIN EXAGONAL GRIS M2 400.00 #VALUE! #VALUE!1652 LIMPIEZA REJA METALICA DE PISO M2 8.00 #VALUE! #VALUE!1980 COLOCACION DE PIEDRA REUTILIZADA (INCLUYE REVOCADO) M2 400.00 #VALUE! #VALUE!2090 COLOCACION BORDILLO DE PIEDRA M 160.00 #VALUE! #VALUE!2092 COLOCACION DE ADOQUIN DE PIEDRA (INC. MORTERO 1:3) M2 1,000.00 #VALUE! #VALUE!2154 COLOCACION DE ESCALON DE PIEDRA M 120.00 #VALUE! #VALUE!2157 ADOQUIN DE GRES TIPO QUITO 26*6*3.5 CM M2 150.00 #VALUE! #VALUE!2859 COLOCACION DE ADOQUIN TIPO CONCHA PAVE M2 300.00 #VALUE! #VALUE!3890 BORDILLO HORMIGON PREFABRICADO 50 * 50 * 15 CM 210 KG/CM2 U 200.00 #VALUE! #VALUE!3896 BORDILLO HORMIGON PREFABRICADO 50 * 27 * 7 CM 210 KG/CM2 U 120.00 #VALUE! #VALUE!4365 ADOQUIN VARIOS MODELOS, GRIS 400 KG/CM2, E=8CM M2 40.00 #VALUE! #VALUE!4387 ADOQUIN VARIOS MODELOS, COLOR 400 KG/CM2, E=8CM M2 50.00 #VALUE! #VALUE!4761 BORDILLO HORMIGON PREFABRICADO 50 * 35 * 8 CM 210 KG/CM2 M 60.00 #VALUE! #VALUE!

RECUBRIMIENTOS DE CONTRAPISOS Y LOSAS436 MASILLADO PALETEADO GRUESO CON IMPERMEABILIZANTE M2 300.00 #VALUE! #VALUE!

CARPINTERIA DE MADERAPUERTAS

2005 LIMPIEZA DE PUERTAS DE MADERA M2 30.00 #VALUE! #VALUE!CARPINTERIA METALICAPUERTAS EN METAL 0.00

1694 REPARACION DE PUERTA METALICA M2 4.00 #VALUE! #VALUE!OTROS ELEMENTOS METALICOS 0.00

2410 COLOCACION DE MOJONES/BOLARDOS DE ALUMINIO/HIERRO U 70.00 #VALUE! #VALUE!

LIMPIEZA DE PISO DE PIEDRA CON MAQUINA INDUSTRIAL A VAPOR, INC. REMOCIÓN D

Page 12: MODELO DE APUS

Formulario No. 2NOMBRE DEL OFERENTE: ING. HECTOR GUERREROPROYECTO: MANTENIMIENTO EN BARRIOS EMBLEMATICO BARRIO: SAN MARCOS

Hoja de

PRESUPUESTO PRECIO PRECIO

No. DESCRIPCION UNIDAD CANTIDAD UNITARIO TOTAL3382 COLOCACION DE BASURERO METALICO 0.40X0.40X1.00 U 4.00 #VALUE! #VALUE!4152 CERCO Y TAPA DE H.F. PARA POZO DE REVISION D=0,60M U 10.00 #VALUE! #VALUE!

ANDAMIAJE2161 MODULO DE ANDAMIO PARA PLATAFORMA HMAX= 8 M U/DIA 5.00 #VALUE! #VALUE!

VIDRIOS Y ESPEJOSVIDRIOS

1120 LIMPIEZA DE VIDRIOS (DOS CARAS) M2 80.00 #VALUE! #VALUE!PINTURAS 0.00PINTURA EN PAREDES Y CIELOS RASOS 0.00

122 PINTURA ESMALTE EN PAREDES H= 0 - 4 M M2 400.00 #VALUE! #VALUE!169 RETIRO DE PINTURA M2 600.00 #VALUE! #VALUE!170 PINTURA DE CAL APV H= 0 - 4 M M2 600.00 #VALUE! #VALUE!797 PINTURA DE CAUCHO T. PERMALATEX PREP. H= 0 A 6 M M2 3,000.00 #VALUE! #VALUE!838 ESTUCADO EXTERIOR EN PAREDES M2 600.00 #VALUE! #VALUE!917 RETIRO DE GRAFITIS CON SOLVENTES Y CEPILLO PLASTICO M2 500.00 #VALUE! #VALUE!

1829 RETIRO DE PINTURA ESMALTE EN PAREDES M2 35.00 #VALUE! #VALUE!PINTURA EN MADERA

849 PINTURA ESMALTE EN MADERA (SOPLETE) M2 60.00 #VALUE! #VALUE!1257 PINTURA ESMALTE EN MADERA (BROCHA) M2 20.00 #VALUE! #VALUE!

PINTURA EN METAL440 PINTURA ESMALTE EN METAL (SOPLETE) M2 240.00 #VALUE! #VALUE!

3980 PINTURA ESMALTE EN METAL (A BROCHA) M2 40.00 #VALUE! #VALUE!INSTALACIONES HIDROSANITARIAS 0.00INSTALACION SANITARIA 0.00

391 LIMPIEZA DE CAJA DE REVISION U 40.00 #VALUE! #VALUE!392 CAJA DE REVISION 80*80*80 CM (PAREDES DE LADRILLO MAMBRON) U 20.00 #VALUE! #VALUE!879 LIMPIEZA DE SUMIDEROS DE PLAZAS U 60.00 #VALUE! #VALUE!

2071 TUBERIA NOVAFORT 250 MM M 200.00 #VALUE! #VALUE!2202 REJILLA HIERRO FUNDIDO PARA SUMIDERO (55 X 40 CM INC. CERCO) U 10.00 #VALUE! #VALUE!2203 TAPA DE HIERRO FUNDIDO PARA POZO REVISION (55 X 40 CM INC. CERCO) U 10.00 #VALUE! #VALUE!2889 RETIRO Y RECOLOCACION DE SUMIDERO DE PIEDRA M2 5.00 #VALUE! #VALUE!3013 REUBICACION DE SUMIDERO DE CALZADA U 10.00 #VALUE! #VALUE!3731 TUBERIA NOVAFORT 160 MM M 60.00 #VALUE! #VALUE!3997 TAPA DE HIERRO FUNDIDO PARA POZO REVISION (80 X 80 CM INC. CERCO) U 6.00 #VALUE! #VALUE!4391 POZO DE REVISION H.S. 210 KG/CM2 H=1,00M - 1.75M, E=0,20M, ENCOF. METAL. U 6.00 #VALUE! #VALUE!4392 POZO DE REVISION H.S. 210 KG/CM2 H=1,76M - 2.25M, E=0,20M, ENCOF. METAL. U 2.00 #VALUE! #VALUE!4725 POZO DE REVISION H.S. 210 KG/CM2 H=2.26M - 2.75M, E=0,20M, ENCOF. METAL. U 4.00 #VALUE! #VALUE!4745 TUBERIA NOVAFORT 110 MM M 320.00 #VALUE! #VALUE!

INSTALACIONES ELECTRICAS Y TELEFONICAS 0.00FUERZA E ILUMINACION

2866 MANGUERA POLIETILENO REFORZ. 1 1/2" (INST. ELECT.) M 70.00 #VALUE! #VALUE!3047 SUJECION CABLES ELECTRICOS M 70.00 #VALUE! #VALUE!

ILUMINACION EXTERIOR3107 CANASTILLA DE HIERRO PARA BASE DE POSTES 50 CM U 40.00 #VALUE! #VALUE!

VARIOSOTROS TRABAJOS COMPLEMENTARIOS 0.00

2941 MOJON DE HORMIGON D=0.30 M. H=0.45 M. U 40.00 #VALUE! #VALUE!

TOTAL PRESUPUESTO PROYECTO #VALUE!

SON: CIENTO SESENTA Y UN MIL TRESCIENTOS TREINTA Y DOS 32/100 DÓLARES

QUITO, 30 DE ABRIL DE 2010 ING. HECTOR GUERRERO

Page 13: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: DESARMADO ALERO UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.09ANDAMIOS 4.00 0.10 0.40 0.38 0.15

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.24MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.38 0.81ALBANIL 1.00 2.13 2.13 0.38 0.81MAESTRO MAYOR 0.10 2.13 0.21 0.38 0.08

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.70MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.94INDIRECTOS Y UTILIDADES 15 % 0.29OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 2.23

QUITO, ABRIL DE 2010 VALOR OFERTADO 2.23

000012 FIRMA DEL PREPRESENTANTE LEGAL

Page 14: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: DESALOJO DE MATERIALES - CARGADO MANUAL UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.10VOLQUETA 1.00 25.00 25.00 0.29 7.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 7.24MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 0.29 1.22CHOFER TIPO D 1.00 2.63 2.63 0.29 0.75MAESTRO MAYOR 0.10 2.13 0.21 0.29 0.06

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.03MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 9.27INDIRECTOS Y UTILIDADES 15 % 1.39OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 10.66

QUITO, ABRIL DE 2010 VALOR OFERTADO 10.66

000017 FIRMA DEL PREPRESENTANTE LEGAL

Page 15: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: PICADO Y CORCHADO EN MAMPOSTERIA UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 5.50ANDAMIOS 2.00 0.10 0.20 16.67 3.33

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 8.84MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 16.67 71.00ALBANIL 1.00 2.13 2.13 16.67 35.50MAESTRO MAYOR 0.10 2.13 0.21 16.67 3.55

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 110.05MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 2.70 6.57 17.73CAL KG 60.00 0.15 9.09ARENA M3 0.40 10.61 4.24AGUA M3 0.11 0.22 0.02LADRILLO MAMBRON U 145.00 0.20 29.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 60.08TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 178.97INDIRECTOS Y UTILIDADES 15 % 26.85OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 205.82

QUITO, ABRIL DE 2010 VALOR OFERTADO 205.82

000018 FIRMA DEL PREPRESENTANTE LEGAL

Page 16: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ACERO DE REFUERZO UNIDAD: KG DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.02

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.02MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 0.10 0.19FIERRERO 1.00 1.93 1.93 0.10 0.19

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.39MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOACERO REFUERZO KG 1.05 0.85 0.89

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.89TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.30INDIRECTOS Y UTILIDADES 15 % 0.20OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.50

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.50

000028 FIRMA DEL PREPRESENTANTE LEGAL

Page 17: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO CANALES Y BAJANTES UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.04ANDAMIOS 2.00 0.10 0.20 0.20 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.08MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.20 0.43ALBANIL 1.00 2.13 2.13 0.20 0.43MAESTRO MAYOR 0.10 2.13 0.21 0.20 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.89MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 0.98INDIRECTOS Y UTILIDADES 15 % 0.15OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.13

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.13

000104 FIRMA DEL PREPRESENTANTE LEGAL

Page 18: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: BAJANTE A.LL. PVC-D 110 MM UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.11ANDAMIOS 2.00 0.10 0.20 0.50 0.10

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.21MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.50 1.07ALBANIL 1.00 2.13 2.13 0.50 1.07MAESTRO MAYOR 0.10 2.13 0.21 0.50 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.24MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOTORNILLOS 1 A 2 PLG U 1.00 0.08 0.08SUJETADOR DE BAJANTE U 0.50 0.27 0.14TUBO PVC 110 MM M 1.05 3.25 3.41

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 3.63TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 6.08INDIRECTOS Y UTILIDADES 15 % 0.91OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 6.99

QUITO, ABRIL DE 2010 VALOR OFERTADO 6.99

000113 FIRMA DEL PREPRESENTANTE LEGAL

Page 19: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: PINTURA ESMALTE EN PAREDES H= 0 - 4 M UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.08ANDAMIOS 4.00 0.10 0.40 0.27 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.19MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.27 1.03PINTOR 1.00 1.93 1.93 0.27 0.51MAESTRO MAYOR 0.10 2.13 0.21 0.27 0.06

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.60MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOTINHER GLN 0.05 9.60 0.48LIJA HJA 0.20 1.01 0.20ESMALTE GLN 0.07 18.25 1.28

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.96TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 3.75INDIRECTOS Y UTILIDADES 15 % 0.56OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 4.31

QUITO, ABRIL DE 2010 VALOR OFERTADO 4.31

000122 FIRMA DEL PREPRESENTANTE LEGAL

Page 20: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE ENLUCIDOS UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.04ANDAMIOS 2.00 0.10 0.20 0.25 0.05

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.09MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.25 0.53ALBANIL 0.50 2.13 1.07 0.25 0.27MAESTRO MAYOR 0.10 2.13 0.21 0.25 0.05

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.85MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 0.94INDIRECTOS Y UTILIDADES 15 % 0.14OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.08

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.08

000163 FIRMA DEL PREPRESENTANTE LEGAL

Page 21: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE PINTURA UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.06ANDAMIOS 3.00 0.10 0.30 0.29 0.09

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.15MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.29 0.61ALBANIL 1.00 2.13 2.13 0.29 0.61MAESTRO MAYOR 0.10 2.13 0.21 0.29 0.06

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.28MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.43INDIRECTOS Y UTILIDADES 15 % 0.21OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.64

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.64

000169 FIRMA DEL PREPRESENTANTE LEGAL

Page 22: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: PINTURA DE CAL APV H= 0 - 4 M UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.10ANDAMIOS 3.00 0.10 0.30 0.33 0.10

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.20MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.33 1.29PINTOR 1.00 1.93 1.93 0.33 0.64MAESTRO MAYOR 0.10 2.13 0.21 0.33 0.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.00MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOLIJA HJA 0.20 1.01 0.20YESO KG 0.05 0.51 0.03CAL/ALBALUX KG 0.08 0.18 0.01A.P.V. LT 0.10 1.95 0.20

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.44TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.64INDIRECTOS Y UTILIDADES 15 % 0.40OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 3.04

QUITO, ABRIL DE 2010 VALOR OFERTADO 3.04

000170 FIRMA DEL PREPRESENTANTE LEGAL

Page 23: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO REVOCADO DE PIEDRA UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.04ANDAMIOS 4.00 0.10 0.40 0.33 0.13

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.18MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.33 0.71ALBANIL 0.15 2.13 0.32 0.33 0.11MAESTRO MAYOR 0.10 2.13 0.21 0.33 0.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.89MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.07INDIRECTOS Y UTILIDADES 15 % 0.16OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.23

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.23

000200 FIRMA DEL PREPRESENTANTE LEGAL

Page 24: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: MAMPOSTERIA DE PIEDRA UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.75

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.75MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 3.33 7.10ALBANIL 1.00 2.13 2.13 3.33 7.10MAESTRO MAYOR 0.10 2.13 0.21 3.33 0.71

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 14.91MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 3.10 6.57 20.35ARENA M3 0.39 10.61 4.14AGUA M3 0.11 0.22 0.02PIEDRA BOLA M3 1.00 12.63 12.63

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 37.14TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 52.79INDIRECTOS Y UTILIDADES 15 % 7.92OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 60.71

QUITO, ABRIL DE 2010 VALOR OFERTADO 60.71

000362 FIRMA DEL PREPRESENTANTE LEGAL

Page 25: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: H. S. 210 KG/CM2 UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 1.07CONCRETERA 1SAC 1.00 3.50 3.50 0.67 2.33VIBRADOR 1.00 3.00 3.00 0.67 2.00

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 5.41MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 10.00 2.13 21.30 0.67 14.20ALBANIL 5.00 2.13 10.65 0.67 7.10MAESTRO MAYOR 0.10 2.13 0.21 0.67 0.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 21.44MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 7.21 6.57 47.33ARENA M3 0.55 10.61 5.83AGUA M3 0.32 0.22 0.07RIPIO M3 0.95 10.61 10.07

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 63.31TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 90.16INDIRECTOS Y UTILIDADES 15 % 13.52OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 103.68

QUITO, ABRIL DE 2010 VALOR OFERTADO 103.68

000364 FIRMA DEL PREPRESENTANTE LEGAL

Page 26: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: H. S. 180 KG/CM2 UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 1.53CONCRETERA 1SAC 1.00 3.50 3.50 0.95 3.33VIBRADOR 1.00 3.00 3.00 0.95 2.86

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 7.72MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 10.00 2.13 21.30 0.95 20.29ALBANIL 5.00 2.13 10.65 0.95 10.14MAESTRO MAYOR 0.10 2.13 0.21 0.95 0.20

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 30.63MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 6.80 6.57 44.64ARENA M3 0.55 10.61 5.83AGUA M3 0.32 0.22 0.07RIPIO M3 0.95 10.61 10.07

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 60.62TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 98.97INDIRECTOS Y UTILIDADES 15 % 14.85OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 113.82

QUITO, ABRIL DE 2010 VALOR OFERTADO 113.82

000365 FIRMA DEL PREPRESENTANTE LEGAL

Page 27: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE CONTRAPISO H.S. - MANUAL UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.22

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.22MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 0.91 3.87ALBANIL 0.20 2.13 0.43 0.91 0.39MAESTRO MAYOR 0.10 2.13 0.21 0.91 0.19

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.45MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 4.68INDIRECTOS Y UTILIDADES 15 % 0.70OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 5.38

QUITO, ABRIL DE 2010 VALOR OFERTADO 5.38

000374 FIRMA DEL PREPRESENTANTE LEGAL

Page 28: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: MAMPOSTERIA DE LADRILLO MAMBRON UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.03MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.13 0.27ALBANIL 1.00 2.13 2.13 0.13 0.27MAESTRO MAYOR 0.10 2.13 0.21 0.13 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.56MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.50 6.57 3.28ARENA M3 0.05 10.61 0.53AGUA M3 0.02 0.22 0.00LADRILLO MAMBRON U 40.00 0.20 8.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 11.82TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 12.40INDIRECTOS Y UTILIDADES 15 % 1.86OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 14.26

QUITO, ABRIL DE 2010 VALOR OFERTADO 14.26

000378 FIRMA DEL PREPRESENTANTE LEGAL

Page 29: MODELO DE APUS

Formulario No. 3NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO PISO DE PIEDRA SILLAR UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.26

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.26MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 1.54 3.28ALBANIL 0.50 2.13 1.07 1.54 1.64MAESTRO MAYOR 0.10 2.13 0.21 1.54 0.33

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 5.24MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 5.51INDIRECTOS Y UTILIDADES 15 % 0.83OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 6.34

QUITO, ABRIL DE 2010 VALOR OFERTADO 6.34

000385 FIRMA DEL PREPRESENTANTE LEGAL

Page 30: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: EXCAVACION MANUAL 0-2 M DE SUELO NATURAL UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.30

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.30MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 1.33 5.68MAESTRO MAYOR 0.10 2.13 0.21 1.33 0.28

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 5.96MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 6.26INDIRECTOS Y UTILIDADES 15 % 0.94OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 7.20

QUITO, ABRIL DE 2010 VALOR OFERTADO 7.20

000386 FIRMA DEL PREPRESENTANTE LEGAL

Page 31: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: EXCAVACION MANUAL 3,01-4 M DE SUELO NATURAL UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.45

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.45MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 2.00 8.52MAESTRO MAYOR 0.10 2.13 0.21 2.00 0.43

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 8.95MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 9.39INDIRECTOS Y UTILIDADES 15 % 1.41OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 10.80

QUITO, ABRIL DE 2010 VALOR OFERTADO 10.80

000388 FIRMA DEL PREPRESENTANTE LEGAL

Page 32: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA DE CAJA DE REVISION UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.15

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.15MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.80 3.09

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.09MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 3.24INDIRECTOS Y UTILIDADES 15 % 0.49OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 3.73

QUITO, ABRIL DE 2010 VALOR OFERTADO 3.73

000391 FIRMA DEL PREPRESENTANTE LEGAL

Page 33: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: CAJA DE REVISION 80*80*80 CM (PAREDES DE LADRILLO MAMBRON) UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.45

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.45MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 2.00 4.26ALBANIL 1.00 2.13 2.13 2.00 4.26MAESTRO MAYOR 0.10 2.13 0.21 2.00 0.43

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 8.95MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 1.20 6.57 7.88ARENA M3 0.14 10.61 1.48AGUA M3 0.04 0.22 0.01LADRILLO MAMBRON U 135.00 0.20 27.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 36.37TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 45.76INDIRECTOS Y UTILIDADES 15 % 6.86OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 52.62

QUITO, ABRIL DE 2010 VALOR OFERTADO 52.62

000392 FIRMA DEL PREPRESENTANTE LEGAL

Page 34: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RELLENO GRANULAR COMPACTADO MEC┴NICAMENTE UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.16COMPACTADORA 2.00 2.84 5.68 0.13 0.71

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.87MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 8.00 2.13 17.04 0.13 2.13ALBANIL 4.00 2.13 8.52 0.13 1.07MAESTRO MAYOR 0.10 2.13 0.21 0.13 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.22MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOLASTRE M3 1.25 12.63 15.78

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 15.78TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 19.87INDIRECTOS Y UTILIDADES 15 % 2.98OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 22.85

QUITO, ABRIL DE 2010 VALOR OFERTADO 22.85

000397 FIRMA DEL PREPRESENTANTE LEGAL

Page 35: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: REVOCADO DE PIEDRA UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.11MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.50 1.07ALBANIL 1.00 2.13 2.13 0.50 1.07MAESTRO MAYOR 0.10 2.13 0.21 0.50 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.24MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.16 6.57 1.05ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00IMPERMEABILIZANTE KG 0.10 1.85 0.19

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.45TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 3.80INDIRECTOS Y UTILIDADES 15 % 0.57OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 4.37

QUITO, ABRIL DE 2010 VALOR OFERTADO 4.37

000412 FIRMA DEL PREPRESENTANTE LEGAL

Page 36: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: CONTRAPISO DE H.S. H= 8 CM + RELLENO GRANULAR H= 15 CM UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.21CONCRETERA 1SAC 1.00 3.50 3.50 0.16 0.56COMPACTADORA 2.00 2.84 5.68 0.16 0.91

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 1.67MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 8.00 2.13 17.04 0.16 2.73ALBANIL 4.00 2.13 8.52 0.16 1.36MAESTRO MAYOR 0.10 2.13 0.21 0.16 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.12MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.58 6.57 3.81ARENA M3 0.04 10.61 0.42AGUA M3 0.06 0.22 0.01RIPIO M3 0.08 10.61 0.85LASTRE M3 0.18 12.63 2.27

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 7.37TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 13.16INDIRECTOS Y UTILIDADES 15 % 1.97OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 15.13

QUITO, ABRIL DE 2010 VALOR OFERTADO 15.13

000425 FIRMA DEL PREPRESENTANTE LEGAL

Page 37: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: PIEDRA SILLAR INCLUYE REVOCADO UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.45

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.45MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 2.00 4.26ALBANIL 1.00 2.13 2.13 2.00 4.26MAESTRO MAYOR 0.10 2.13 0.21 2.00 0.43

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 8.95MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.10 6.57 0.66ARENA M3 0.01 10.61 0.11AGUA M3 0.01 0.22 0.00PIEDRA SILLAR M2 1.10 29.18 32.10

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 32.86TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 42.25INDIRECTOS Y UTILIDADES 15 % 6.34OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 48.59

QUITO, ABRIL DE 2010 VALOR OFERTADO 48.59

000429 FIRMA DEL PREPRESENTANTE LEGAL

Page 38: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: MASILLADO PALETEADO GRUESO CON IMPERMEABILIZANTE UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.13

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.13MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.57 1.22ALBANIL 1.00 2.13 2.13 0.57 1.22MAESTRO MAYOR 0.10 2.13 0.21 0.57 0.12

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.56MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.21 6.57 1.38ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00IMPERMEABILIZANTE KG 0.10 1.85 0.19

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.78TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 4.46INDIRECTOS Y UTILIDADES 15 % 0.67OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 5.13

QUITO, ABRIL DE 2010 VALOR OFERTADO 5.13

000436 FIRMA DEL PREPRESENTANTE LEGAL

Page 39: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: PINTURA ESMALTE EN METAL (SOPLETE) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.06ANDAMIOS 4.00 0.10 0.40 0.20 0.08COMPRESOR 250 1.00 1.85 1.85 0.20 0.37

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.51MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.20 0.77PINTOR 1.00 1.93 1.93 0.20 0.39MAESTRO MAYOR 0.10 2.13 0.21 0.20 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.20MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOTINHER GLN 0.05 9.60 0.48LIJA HJA 0.20 1.01 0.20ESMALTE GLN 0.12 18.25 2.19

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 2.87TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 4.58INDIRECTOS Y UTILIDADES 15 % 0.69OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 5.27

QUITO, ABRIL DE 2010 VALOR OFERTADO 5.27

000440 FIRMA DEL PREPRESENTANTE LEGAL

Page 40: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA Y NIVELACION DEL TERRENO (PENDIENTE >= 12%) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.04MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 0.20 0.85MAESTRO MAYOR 0.10 2.13 0.21 0.20 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.89MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 0.94INDIRECTOS Y UTILIDADES 15 % 0.14OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.08

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.08

000480 FIRMA DEL PREPRESENTANTE LEGAL

Page 41: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA Y RETIRO DE ESCOMBROS INTERIOR INMUEBLE UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.45

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.45MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.25 2.13 4.79 1.43 6.85ALBANIL 0.45 2.13 0.96 1.43 1.37MAESTRO MAYOR 0.23 2.13 0.49 1.43 0.70

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 8.92MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 9.36INDIRECTOS Y UTILIDADES 15 % 1.40OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 10.76

QUITO, ABRIL DE 2010 VALOR OFERTADO 10.76

000523 FIRMA DEL PREPRESENTANTE LEGAL

Page 42: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE VEGETACION SOBRE CUBIERTA Y/O MUROS (INC. HERBICID UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.09ANDAMIOS 1.00 0.10 0.10 0.40 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.13MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 0.40 0.77ALBANIL 1.00 2.13 2.13 0.40 0.85MAESTRO MAYOR 0.10 2.13 0.21 0.40 0.09

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.71MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOQUIMICO MATAMALEZA LTR 0.10 1.80 0.18

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.18TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.01INDIRECTOS Y UTILIDADES 15 % 0.30OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 2.31

QUITO, ABRIL DE 2010 VALOR OFERTADO 2.31

000524 FIRMA DEL PREPRESENTANTE LEGAL

Page 43: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: TABLA DE MONTE 30CM UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.09ANDAMIOS 1.00 0.10 0.10 0.50 0.05

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.14MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 0.50 2.13 1.07 0.50 0.53ALBANIL 1.00 2.13 2.13 0.50 1.07MAESTRO MAYOR 0.10 2.13 0.21 0.50 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.70MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCLAVOS 2 A 4 PULG KG 0.05 2.24 0.11TABLA DE MONTE U 0.43 1.35 0.58

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.69TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.53INDIRECTOS Y UTILIDADES 15 % 0.38OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 2.91

QUITO, ABRIL DE 2010 VALOR OFERTADO 2.91

000679 FIRMA DEL PREPRESENTANTE LEGAL

Page 44: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: REPLANTEO CON EQUIPO TOPOGRAFICO UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOTEODOLITO 1.00 0.67 0.67 0.05 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.03MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOTOPOGRAFO 4 2.00 1.93 3.86 0.05 0.19CADENERO 2.00 1.93 3.86 0.05 0.19MAESTRO MAYOR 0.10 2.13 0.21 0.05 0.01

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.40MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOESMALTE GLN 0.01 18.25 0.18ESTACAS U 0.20 0.15 0.03

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.21TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 0.64INDIRECTOS Y UTILIDADES 15 % 0.10OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 0.74

QUITO, ABRIL DE 2010 VALOR OFERTADO 0.74

000691 FIRMA DEL PREPRESENTANTE LEGAL

Page 45: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ENCEPADO UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.07MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 0.20 0.85ALBANIL 1.00 2.13 2.13 0.20 0.43MAESTRO MAYOR 0.10 2.13 0.21 0.20 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.32MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCHAMBA M2 1.00 1.52 1.52

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.52TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.90INDIRECTOS Y UTILIDADES 15 % 0.44OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 3.34

QUITO, ABRIL DE 2010 VALOR OFERTADO 3.34

000706 FIRMA DEL PREPRESENTANTE LEGAL

Page 46: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RELLENO CON SUELO NATURAL COMPACTADO MANUALMENTE UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.16

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.16MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 8.00 2.13 17.04 0.13 2.13ALBANIL 4.00 2.13 8.52 0.13 1.07MAESTRO MAYOR 0.10 2.13 0.21 0.13 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.22MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 3.38INDIRECTOS Y UTILIDADES 15 % 0.51OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 3.89

QUITO, ABRIL DE 2010 VALOR OFERTADO 3.89

000730 FIRMA DEL PREPRESENTANTE LEGAL

Page 47: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: MEDIA CANA UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.07ANDAMIOS 1.00 0.10 0.10 0.33 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.11MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.33 0.71ALBANIL 1.00 2.13 2.13 0.33 0.71MAESTRO MAYOR 0.10 2.13 0.21 0.33 0.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.49MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.02 6.57 0.13CEMENTINA KG 0.01 0.15 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.13TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.73INDIRECTOS Y UTILIDADES 15 % 0.26OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.99

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.99

000769 FIRMA DEL PREPRESENTANTE LEGAL

Page 48: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE MASILLADO EN PISOS UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.10

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.10MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.44 0.95ALBANIL 1.00 2.13 2.13 0.44 0.95MAESTRO MAYOR 0.10 2.13 0.21 0.44 0.09

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.99MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.09INDIRECTOS Y UTILIDADES 15 % 0.31OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 2.40

QUITO, ABRIL DE 2010 VALOR OFERTADO 2.40

000785 FIRMA DEL PREPRESENTANTE LEGAL

Page 49: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA GENERAL DE OBRA UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.04MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 0.16 0.68MAESTRO MAYOR 0.10 2.13 0.21 0.16 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.72MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 0.75INDIRECTOS Y UTILIDADES 15 % 0.11OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 0.86

QUITO, ABRIL DE 2010 VALOR OFERTADO 0.86

000793 FIRMA DEL PREPRESENTANTE LEGAL

Page 50: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ENLUCIDO VERTICAL MORTERO 1:3 UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.15

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.15MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.67 1.42ALBANIL 1.00 2.13 2.13 0.67 1.42MAESTRO MAYOR 0.10 2.13 0.21 0.67 0.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.98MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.21 6.57 1.38ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.59TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 4.72INDIRECTOS Y UTILIDADES 15 % 0.71OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 5.43

QUITO, ABRIL DE 2010 VALOR OFERTADO 5.43

000794 FIRMA DEL PREPRESENTANTE LEGAL

Page 51: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RESANE DE ENLUCIDOS MORTERO 1:3 UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.18

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.18MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.80 1.70ALBANIL 1.00 2.13 2.13 0.80 1.70MAESTRO MAYOR 0.10 2.13 0.21 0.80 0.17

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.58MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.21 6.57 1.38ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.59TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 5.35INDIRECTOS Y UTILIDADES 15 % 0.80OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 6.15

QUITO, ABRIL DE 2010 VALOR OFERTADO 6.15

000795 FIRMA DEL PREPRESENTANTE LEGAL

Page 52: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: PINTURA DE CAUCHO T. PERMALATEX PREP. H= 0 A 6 M UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.12ANDAMIOS 3.00 0.10 0.30 0.40 0.12

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.24MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.40 1.54PINTOR 1.00 1.93 1.93 0.40 0.77MAESTRO MAYOR 0.10 2.13 0.21 0.40 0.09

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.40MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOLIJA HJA 0.20 1.01 0.20YESO KG 0.05 0.51 0.03PINTURA DE CAUCHO PERMALATEX GLN 0.08 15.72 1.26

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.48TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 4.13INDIRECTOS Y UTILIDADES 15 % 0.62OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 4.75

QUITO, ABRIL DE 2010 VALOR OFERTADO 4.75

000797 FIRMA DEL PREPRESENTANTE LEGAL

Page 53: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: PICADO DE HORMIGON SIMPLE - CONTRAPISOS UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 1.38

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 1.38MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 10.00 21.30ALBANIL 0.20 2.13 0.43 10.00 4.26MAESTRO MAYOR 0.10 2.13 0.21 10.00 2.13

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 27.69MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 29.07INDIRECTOS Y UTILIDADES 15 % 4.36OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 33.43

QUITO, ABRIL DE 2010 VALOR OFERTADO 33.43

000816 FIRMA DEL PREPRESENTANTE LEGAL

Page 54: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ESTUCADO EXTERIOR EN PAREDES UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.11ANDAMIOS 2.00 0.10 0.20 0.50 0.10

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.21MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.50 1.07ALBANIL 1.00 2.13 2.13 0.50 1.07MAESTRO MAYOR 0.10 2.13 0.21 0.50 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.24MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOESTUCO PARA INTERIORES GLN 0.08 5.45 0.44

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.44TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.88INDIRECTOS Y UTILIDADES 15 % 0.43OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 3.31

QUITO, ABRIL DE 2010 VALOR OFERTADO 3.31

000838 FIRMA DEL PREPRESENTANTE LEGAL

Page 55: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA DE PISO CON CEPILLO DE ACERO UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.06

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.06MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.30 1.15

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.15MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.21INDIRECTOS Y UTILIDADES 15 % 0.18OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.39

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.39

000848 FIRMA DEL PREPRESENTANTE LEGAL

Page 56: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: PINTURA ESMALTE EN MADERA (SOPLETE) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.08ANDAMIOS 4.00 0.10 0.40 0.25 0.10COMPRESOR 250 1.00 1.85 1.85 0.25 0.46

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.64MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.25 0.97PINTOR 1.00 1.93 1.93 0.25 0.48MAESTRO MAYOR 0.10 2.13 0.21 0.25 0.05

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.50MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOTINHER GLN 0.05 9.60 0.48LIJA HJA 0.20 1.01 0.20ESMALTE GLN 0.12 18.25 2.19

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 2.87TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 5.01INDIRECTOS Y UTILIDADES 15 % 0.75OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 5.76

QUITO, ABRIL DE 2010 VALOR OFERTADO 5.76

000849 FIRMA DEL PREPRESENTANTE LEGAL

Page 57: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA DE PISOS CON ACIDO MURIATICO UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.05

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.05MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.25 0.53AYUDANTE 1.00 1.93 1.93 0.25 0.48

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.02MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOACIDO MURIATICO LT 0.25 1.75 0.44

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.44TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.50INDIRECTOS Y UTILIDADES 15 % 0.23OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.73

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.73

000859 FIRMA DEL PREPRESENTANTE LEGAL

Page 58: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ADITIVO LIGANTE PARA HORMIGONES Y MORTEROS TIPO BETONCRYL 14 UNIDAD: LT DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.02

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.02MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOALBANIL 1.00 2.13 2.13 0.16 0.34MAESTRO MAYOR 0.10 2.13 0.21 0.16 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.37MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOADITIVO LIGANTE BETONIC LT 1.00 6.00 6.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 6.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 6.39INDIRECTOS Y UTILIDADES 15 % 0.96OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 7.35

QUITO, ABRIL DE 2010 VALOR OFERTADO 7.35

000863 FIRMA DEL PREPRESENTANTE LEGAL

Page 59: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA DE SUMIDEROS DE PLAZAS UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.11MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.57 2.21

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.21MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.32INDIRECTOS Y UTILIDADES 15 % 0.35OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 2.67

QUITO, ABRIL DE 2010 VALOR OFERTADO 2.67

000879 FIRMA DEL PREPRESENTANTE LEGAL

Page 60: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RELLENO CON SUELO NATURAL COMPACTADO MECANICAMENTE UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.16COMPACTADORA 2.00 2.84 5.68 0.13 0.71

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.87MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 8.00 2.13 17.04 0.13 2.13ALBANIL 4.00 2.13 8.52 0.13 1.07MAESTRO MAYOR 0.10 2.13 0.21 0.13 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.22MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 4.09INDIRECTOS Y UTILIDADES 15 % 0.61OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 4.70

QUITO, ABRIL DE 2010 VALOR OFERTADO 4.70

000911 FIRMA DEL PREPRESENTANTE LEGAL

Page 61: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE GRAFITIS CON SOLVENTES Y CEPILLO PLASTICO UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOANDAMIOS 2.00 0.10 0.20 0.80 0.16HERRAMIENTAS 0.00 0.00 0.00 0.00 0.17

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.33MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOMAESTRO MAYOR 1.00 2.13 2.13 0.80 1.70PEON 1.00 2.13 2.13 0.80 1.70

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.41MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOAGUARRAS LT 0.95 0.95 0.90TINHER ACRILICO GLN 0.03 7.92 0.24ALGODON HIDROFILO LB 0.03 1.90 0.06

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.20TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 4.94INDIRECTOS Y UTILIDADES 15 % 0.74OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 5.68

QUITO, ABRIL DE 2010 VALOR OFERTADO 5.68

000917 FIRMA DEL PREPRESENTANTE LEGAL

Page 62: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: GRES 30*30 (COLOMBIANO) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.11MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.50 1.07ALBANIL 1.00 2.13 2.13 0.50 1.07MAESTRO MAYOR 0.10 2.13 0.21 0.50 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.24MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.18 6.57 1.18ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00GRES 30X30 M2 1.05 13.00 13.65

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 15.05TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 17.39INDIRECTOS Y UTILIDADES 15 % 2.61OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 20.00

QUITO, ABRIL DE 2010 VALOR OFERTADO 20.00

001009 FIRMA DEL PREPRESENTANTE LEGAL

Page 63: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE ADOQUIN UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.10ANDAMIOS 4.00 0.10 0.40 0.44 0.18

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.28MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.44 0.95ALBANIL 1.00 2.13 2.13 0.44 0.95MAESTRO MAYOR 0.10 2.13 0.21 0.44 0.09

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.99MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.27INDIRECTOS Y UTILIDADES 15 % 0.34OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 2.61

QUITO, ABRIL DE 2010 VALOR OFERTADO 2.61

001013 FIRMA DEL PREPRESENTANTE LEGAL

Page 64: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ENLUCIDO DE FILOS Y FAJAS H=0 - 8,00 M UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.17ANDAMIOS 3.86 0.10 0.39 1.59 0.61

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.78MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 0.48 2.13 1.02 1.59 1.62ALBANIL 0.48 2.13 1.02 1.59 1.62MAESTRO MAYOR 0.05 2.13 0.10 1.59 0.16

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.41MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.02 6.57 0.13CEMENTINA KG 0.29 0.15 0.04

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.17TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 4.36INDIRECTOS Y UTILIDADES 15 % 0.65OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 5.01

QUITO, ABRIL DE 2010 VALOR OFERTADO 5.01

001014 FIRMA DEL PREPRESENTANTE LEGAL

Page 65: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RIEL DE MADERA RUSTICA (L=2.40 M 3 * 12 CM) UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.02

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.02MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 0.09 0.17CARPINTERO 1.00 1.93 1.93 0.09 0.17MAESTRO MAYOR 0.10 2.13 0.21 0.09 0.02

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.35MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOPERNOS 3 PULG U 0.50 0.50 0.25RIELES U 0.45 1.40 0.63

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.88TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.25INDIRECTOS Y UTILIDADES 15 % 0.19OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.44

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.44

001037 FIRMA DEL PREPRESENTANTE LEGAL

Page 66: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: PICADO DE HORMIGON ARMADO UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 7.76

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 7.76MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 4.00 2.13 8.52 14.29 121.71ALBANIL 1.00 2.13 2.13 14.29 30.43MAESTRO MAYOR 0.10 2.13 0.21 14.29 3.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 155.19MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 162.95INDIRECTOS Y UTILIDADES 15 % 24.44OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 187.39

QUITO, ABRIL DE 2010 VALOR OFERTADO 187.39

001048 FIRMA DEL PREPRESENTANTE LEGAL

Page 67: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE BALDOSA DE PIEDRA UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.11ANDAMIOS 2.00 0.10 0.20 0.67 0.13

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.25MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.67 1.42ALBANIL 0.50 2.13 1.07 0.67 0.71MAESTRO MAYOR 0.10 2.13 0.21 0.67 0.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.27MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.52INDIRECTOS Y UTILIDADES 15 % 0.38OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 2.90

QUITO, ABRIL DE 2010 VALOR OFERTADO 2.90

001052 FIRMA DEL PREPRESENTANTE LEGAL

Page 68: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: MAMPOSTERIA DE BLOQUE DE 10 CM UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.15

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.15MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.67 1.42ALBANIL 1.00 2.13 2.13 0.67 1.42MAESTRO MAYOR 0.10 2.13 0.21 0.67 0.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.98MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.19 6.57 1.25ARENA M3 0.03 10.61 0.32BLOQUE DE 10 CM U 13.00 0.21 2.73

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 4.30TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 7.43INDIRECTOS Y UTILIDADES 15 % 1.11OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 8.54

QUITO, ABRIL DE 2010 VALOR OFERTADO 8.54

001068 FIRMA DEL PREPRESENTANTE LEGAL

Page 69: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ADOQUIN ORNAMENTAL NATURAL, E=6CM, F'C=300KG/CM2. UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.18

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.18MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.81 1.72ALBANIL 1.00 2.13 2.13 0.81 1.72MAESTRO MAYOR 0.10 2.13 0.21 0.81 0.17

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.61MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.18 6.57 1.18ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00ADOQUIN ORNAMENTAL NATURAL M2 1.05 8.33 8.75

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 10.15TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 13.93INDIRECTOS Y UTILIDADES 15 % 2.09OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 16.02

QUITO, ABRIL DE 2010 VALOR OFERTADO 16.02

001070 FIRMA DEL PREPRESENTANTE LEGAL

Page 70: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ADOQUIN ORNAMENTAL COLOR, E=6CM, F'C=300KG/CM2 UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.11MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.50 1.07ALBANIL 1.00 2.13 2.13 0.50 1.07MAESTRO MAYOR 0.10 2.13 0.21 0.50 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.24MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.18 6.57 1.18ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00ADOQUIN ORNAMENTAL COLOR M2 1.05 11.68 12.26

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 13.66TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 16.00INDIRECTOS Y UTILIDADES 15 % 2.40OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 18.40

QUITO, ABRIL DE 2010 VALOR OFERTADO 18.40

001071 FIRMA DEL PREPRESENTANTE LEGAL

Page 71: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: MARTELINADO DE PIEDRA UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.28

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.28MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 1.33 2.57ALBANIL 1.00 2.13 2.13 1.33 2.84MAESTRO MAYOR 0.10 2.13 0.21 1.33 0.28

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 5.70MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 5.98INDIRECTOS Y UTILIDADES 15 % 0.90OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 6.88

QUITO, ABRIL DE 2010 VALOR OFERTADO 6.88

001085 FIRMA DEL PREPRESENTANTE LEGAL

Page 72: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ADOQUIN EXAGONAL GRIS UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.15

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.15MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.67 1.42ALBANIL 1.00 2.13 2.13 0.67 1.42MAESTRO MAYOR 0.10 2.13 0.21 0.67 0.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.98MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.18 6.57 1.18ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00ADOQUIN EXAGONAL (20U/M2) M2 1.05 5.90 6.20

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 7.59TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 10.72INDIRECTOS Y UTILIDADES 15 % 1.61OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 12.33

QUITO, ABRIL DE 2010 VALOR OFERTADO 12.33

001095 FIRMA DEL PREPRESENTANTE LEGAL

Page 73: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RECOLOCACION GRADA DE PIEDRA UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.25

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.25MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 0.20 2.13 0.43 1.00 0.43AYUDANTE 1.00 1.93 1.93 1.00 1.93ALBANIL 1.00 2.13 2.13 1.00 2.13MAESTRO MAYOR 0.20 2.13 0.43 1.00 0.43

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.91MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.12 6.57 0.79ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 6.16INDIRECTOS Y UTILIDADES 15 % 0.92OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 7.08

QUITO, ABRIL DE 2010 VALOR OFERTADO 7.08

001103 FIRMA DEL PREPRESENTANTE LEGAL

Page 74: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA DE VIDRIOS (DOS CARAS) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.14MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.71 2.76

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.76MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.89INDIRECTOS Y UTILIDADES 15 % 0.43OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 3.32

QUITO, ABRIL DE 2010 VALOR OFERTADO 3.32

001120 FIRMA DEL PREPRESENTANTE LEGAL

Page 75: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: DESRATIZACION (KG) UNIDAD: KG DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.09

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.09MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 0.04 2.13 0.09 20.00 1.70MAESTRO MAYOR 0.00 2.13 0.00 20.00 0.08

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.79MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTORATICIDA KG 1.00 4.70 4.70

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 4.70TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 6.57INDIRECTOS Y UTILIDADES 15 % 0.99OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 7.56

QUITO, ABRIL DE 2010 VALOR OFERTADO 7.56

001197 FIRMA DEL PREPRESENTANTE LEGAL

Page 76: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: DESINFECCION AMBIENTAL (LT) UNIDAD: LT DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.30ANDAMIOS 1.00 0.10 0.10 1.33 0.13

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.43MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 1.33 5.68MAESTRO MAYOR 0.10 2.13 0.21 1.33 0.28

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 5.96MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOPIX LT 1.00 1.33 1.33

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.33TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 7.73INDIRECTOS Y UTILIDADES 15 % 1.16OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 8.89

QUITO, ABRIL DE 2010 VALOR OFERTADO 8.89

001198 FIRMA DEL PREPRESENTANTE LEGAL

Page 77: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: PINTURA ESMALTE EN MADERA (BROCHA) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.08ANDAMIOS 4.00 0.10 0.40 0.25 0.10

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.18MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.25 0.97PINTOR 1.00 1.93 1.93 0.25 0.48MAESTRO MAYOR 0.10 2.13 0.21 0.25 0.05

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.50MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOTINHER GLN 0.03 9.60 0.29LIJA HJA 0.15 1.01 0.15ESMALTE GLN 0.08 18.25 1.46BROCHA U 1.00 1.20 1.20

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 3.10TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 4.78INDIRECTOS Y UTILIDADES 15 % 0.72OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 5.50

QUITO, ABRIL DE 2010 VALOR OFERTADO 5.50

001257 FIRMA DEL PREPRESENTANTE LEGAL

Page 78: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA Y LAVADO DE HORMIGON (AGUA, DETERGENTE, CEPILLO Y Q UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.07MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.36 1.38

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.38MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTODETERGENTE KG 0.25 1.50 0.38QUIMICO LT 0.25 2.75 0.69

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.06TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.51INDIRECTOS Y UTILIDADES 15 % 0.38OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 2.89

QUITO, ABRIL DE 2010 VALOR OFERTADO 2.89

001319 FIRMA DEL PREPRESENTANTE LEGAL

Page 79: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA Y LAVADO DE MAMPOSTERIAS H=0.00-4.00 M. UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.02

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.02MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.10 0.39MAESTRO MAYOR 0.10 2.13 0.21 0.10 0.02

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.41MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOJABON NO IONICO (NEUTRO) LT 0.01 3.90 0.04

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.04TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 0.47INDIRECTOS Y UTILIDADES 15 % 0.07OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 0.54

QUITO, ABRIL DE 2010 VALOR OFERTADO 0.54

001321 FIRMA DEL PREPRESENTANTE LEGAL

Page 80: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: CONTRAPISO DE H.S. H= 8 CM (SIN RELLENO GRANULAR) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.19CONCRETERA 1SAC 1.00 3.50 3.50 0.15 0.51

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.70MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 8.00 2.13 17.04 0.15 2.48ALBANIL 4.00 2.13 8.52 0.15 1.24MAESTRO MAYOR 0.10 2.13 0.21 0.15 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.75MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.58 6.57 3.81ARENA M3 0.04 10.61 0.42AGUA M3 0.06 0.22 0.01RIPIO M3 0.08 10.61 0.85

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 5.09TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 9.54INDIRECTOS Y UTILIDADES 15 % 1.43OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 10.97

QUITO, ABRIL DE 2010 VALOR OFERTADO 10.97

001326 FIRMA DEL PREPRESENTANTE LEGAL

Page 81: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA REJA METALICA DE PISO UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.14MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.71 2.76

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.76MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.89INDIRECTOS Y UTILIDADES 15 % 0.43OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 3.32

QUITO, ABRIL DE 2010 VALOR OFERTADO 3.32

001652 FIRMA DEL PREPRESENTANTE LEGAL

Page 82: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ESTRUCTURA DE ACERO (INC. ANTICORROSIVO) UNIDAD: KG DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOSOLDADORA 1.00 2.00 2.00 0.13 0.25HERRAMIENTAS 0.00 0.00 0.00 0.00 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.29MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 0.13 0.24SOLDADOR 1.00 1.93 1.93 0.13 0.24AYUDANTE DE MAQUINARIA 1.00 1.93 1.93 0.13 0.24MAESTRO MAYOR 0.10 2.13 0.21 0.13 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.75MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOANTICORROSIVO GLN 0.01 16.05 0.16TINHER GLN 0.01 9.60 0.10ELECTRODOS KG 0.05 2.98 0.15PERFIL METALICO KG 1.00 0.98 0.98

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.39TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.42INDIRECTOS Y UTILIDADES 15 % 0.36OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 2.78

QUITO, ABRIL DE 2010 VALOR OFERTADO 2.78

001664 FIRMA DEL PREPRESENTANTE LEGAL

Page 83: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ADITIVO ACELERANTE PARA FRAGUADO DE HORMIGONES UNIDAD: KG DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.02

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.02MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOALBANIL 1.00 2.13 2.13 0.16 0.34MAESTRO MAYOR 0.10 2.13 0.21 0.16 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.37MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOADITIVO ACELERANTE KG 1.00 1.50 1.50

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.50TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.89INDIRECTOS Y UTILIDADES 15 % 0.28OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 2.17

QUITO, ABRIL DE 2010 VALOR OFERTADO 2.17

001688 FIRMA DEL PREPRESENTANTE LEGAL

Page 84: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: REPARACION DE PUERTA METALICA UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOSOLDADORA 0.34 2.00 0.68 4.00 2.72HERRAMIENTAS 0.00 0.00 0.00 0.00 0.41

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 3.13MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 0.34 1.93 0.66 4.00 2.62SOLDADOR 0.34 1.93 0.66 4.00 2.62AYUDANTE DE MAQUINARIA 0.34 1.93 0.66 4.00 2.62MAESTRO MAYOR 0.03 2.13 0.07 4.00 0.29

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 8.17MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOANTICORROSIVO GLN 0.05 16.05 0.88TINHER GLN 0.03 9.60 0.26ELECTRODOS KG 0.34 2.98 1.01PERFIL METALICO KG 2.74 0.98 2.69TOL NEGRO 1/40 M2 0.72 2.66 1.92

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 6.75TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 18.05INDIRECTOS Y UTILIDADES 15 % 2.71OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 20.76

QUITO, ABRIL DE 2010 VALOR OFERTADO 20.76

001694 FIRMA DEL PREPRESENTANTE LEGAL

Page 85: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE ASFALTO (CAPA DE 6 CM) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.24MARTILLO NEUMATICO 1.00 0.46 0.46 1.00 0.46

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.70MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 1.00 4.26ALBANIL 0.20 2.13 0.43 1.00 0.43MAESTRO MAYOR 0.10 2.13 0.21 1.00 0.21

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.90MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 5.60INDIRECTOS Y UTILIDADES 15 % 0.84OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 6.44

QUITO, ABRIL DE 2010 VALOR OFERTADO 6.44

001710 FIRMA DEL PREPRESENTANTE LEGAL

Page 86: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RESANE DE ENLUCIDOS CAL BARRO ARENA (1:1:1) H=0 - 3.00M UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.22ANDAMIOS 2.00 0.10 0.20 1.00 0.20

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.42MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 1.00 2.13ALBANIL 1.00 2.13 2.13 1.00 2.13MAESTRO MAYOR 0.10 2.13 0.21 1.00 0.21

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.47MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOARENA M3 0.12 10.61 1.27CAL KG 6.00 0.15 0.91BARRO M3 0.02 6.50 0.13AGUA M3 0.01 0.22 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 2.31TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 7.21INDIRECTOS Y UTILIDADES 15 % 1.08OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 8.29

QUITO, ABRIL DE 2010 VALOR OFERTADO 8.29

001742 FIRMA DEL PREPRESENTANTE LEGAL

Page 87: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE PINTURA ESMALTE EN PAREDES UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.10ANDAMIOS 3.00 0.10 0.30 0.33 0.10

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.20MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.33 1.29PINTOR 1.00 1.93 1.93 0.33 0.64

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.93MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOREMOVEDOR GLN 0.05 15.56 0.78

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.78TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.90INDIRECTOS Y UTILIDADES 15 % 0.44OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 3.34

QUITO, ABRIL DE 2010 VALOR OFERTADO 3.34

001829 FIRMA DEL PREPRESENTANTE LEGAL

Page 88: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: MALLA PARA ENLUCIDOS UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.11MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.50 1.07ALBANIL 1.00 2.13 2.13 0.50 1.07MAESTRO MAYOR 0.10 2.13 0.21 0.50 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.24MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOMALLA DE TUMBADO M2 1.00 3.85 3.85

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 3.85TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 6.20INDIRECTOS Y UTILIDADES 15 % 0.93OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 7.13

QUITO, ABRIL DE 2010 VALOR OFERTADO 7.13

001852 FIRMA DEL PREPRESENTANTE LEGAL

Page 89: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: BALDOSA DE PIEDRA CORTADA A MAQUINA UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.30

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.30MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 1.33 2.84ALBANIL 1.00 2.13 2.13 1.33 2.84MAESTRO MAYOR 0.10 2.13 0.21 1.33 0.28

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 5.96MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.10 6.57 0.66ARENA M3 0.01 10.61 0.11AGUA M3 0.01 0.22 0.00BALDOSA DE PIEDRA 20X20 M2 1.10 29.00 31.90

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 32.66TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 38.93INDIRECTOS Y UTILIDADES 15 % 5.84OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 44.77

QUITO, ABRIL DE 2010 VALOR OFERTADO 44.77

001891 FIRMA DEL PREPRESENTANTE LEGAL

Page 90: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE BORDILLO DE HORMIGON UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.09

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.09MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.40 0.85ALBANIL 1.00 2.13 2.13 0.40 0.85MAESTRO MAYOR 0.10 2.13 0.21 0.40 0.09

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.79MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.88INDIRECTOS Y UTILIDADES 15 % 0.28OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 2.16

QUITO, ABRIL DE 2010 VALOR OFERTADO 2.16

001916 FIRMA DEL PREPRESENTANTE LEGAL

Page 91: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: COLOCACION DE PIEDRA REUTILIZADA (INCLUYE REVOCADO) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.21

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.21MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 2.00 3.86MAESTRO MAYOR 0.10 2.13 0.21 2.00 0.43

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.29MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 4.50INDIRECTOS Y UTILIDADES 15 % 0.68OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 5.18

QUITO, ABRIL DE 2010 VALOR OFERTADO 5.18

001980 FIRMA DEL PREPRESENTANTE LEGAL

Page 92: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA DE PUERTAS DE MADERA UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.06

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.06MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 0.67 1.29

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.29MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.35INDIRECTOS Y UTILIDADES 15 % 0.20OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.55

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.55

002005 FIRMA DEL PREPRESENTANTE LEGAL

Page 93: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: TUBERIA NOVAFORT 250 MM UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.05

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.05MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPLOMERO 1.00 1.93 1.93 0.25 0.48AYUDANTE 1.00 1.93 1.93 0.25 0.48

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.97MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOTUBO NOVAFOR 250 MM M 1.00 19.50 19.50POLILIMPIA LT 0.01 4.56 0.05POLIPEGA LT 0.01 9.05 0.09

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 19.64TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 20.65INDIRECTOS Y UTILIDADES 15 % 3.10OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 23.75

QUITO, ABRIL DE 2010 VALOR OFERTADO 23.75

002071 FIRMA DEL PREPRESENTANTE LEGAL

Page 94: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: COLOCACION BORDILLO DE PIEDRA UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.22

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.22MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 1.00 2.13ALBANIL 1.00 2.13 2.13 1.00 2.13MAESTRO MAYOR 0.10 2.13 0.21 1.00 0.21

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.47MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.10 6.57 0.66ARENA M3 0.01 10.61 0.11AGUA M3 0.01 0.22 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.76TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 5.46INDIRECTOS Y UTILIDADES 15 % 0.82OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 6.28

QUITO, ABRIL DE 2010 VALOR OFERTADO 6.28

002090 FIRMA DEL PREPRESENTANTE LEGAL

Page 95: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: COLOCACION DE ADOQUIN DE PIEDRA (INC. MORTERO 1:3) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.26

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.26MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 0.20 2.13 0.43 0.80 0.34AYUDANTE 1.00 1.93 1.93 0.80 1.54ALBANIL 1.00 2.13 2.13 0.80 1.70MAESTRO MAYOR 1.00 2.13 2.13 0.80 1.70

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 5.29MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.12 6.57 0.79ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 6.56INDIRECTOS Y UTILIDADES 15 % 0.98OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 7.54

QUITO, ABRIL DE 2010 VALOR OFERTADO 7.54

002092 FIRMA DEL PREPRESENTANTE LEGAL

Page 96: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: COLOCACION DE BORDILLO DE PIEDRA (INC. MORTERO 1:3) UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.22

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.22MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 1.00 2.13ALBANIL 1.00 2.13 2.13 1.00 2.13MAESTRO MAYOR 0.10 2.13 0.21 1.00 0.21

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.47MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.10 6.57 0.66ARENA M3 0.01 10.61 0.11AGUA M3 0.01 0.22 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.76TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 5.46INDIRECTOS Y UTILIDADES 15 % 0.82OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 6.28

QUITO, ABRIL DE 2010 VALOR OFERTADO 6.28

002135 FIRMA DEL PREPRESENTANTE LEGAL

Page 97: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE BORDILLO DE PIEDRA UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.05

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.05MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.50 1.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.07MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.12INDIRECTOS Y UTILIDADES 15 % 0.17OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.29

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.29

002136 FIRMA DEL PREPRESENTANTE LEGAL

Page 98: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ESCALON RECTO DE PIEDRA MARTELINADA (HUELLA Y CONTRAHUELLA) UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.25

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.25MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 0.20 2.13 0.43 1.00 0.43AYUDANTE 1.00 1.93 1.93 1.00 1.93ALBANIL 1.00 2.13 2.13 1.00 2.13MAESTRO MAYOR 0.20 2.13 0.43 1.00 0.43

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.91MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.12 6.57 0.79ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00ESCALON PIEDRA MARTELINADA M 1.00 50.00 50.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 51.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 56.16INDIRECTOS Y UTILIDADES 15 % 8.42OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 64.58

QUITO, ABRIL DE 2010 VALOR OFERTADO 64.58

002137 FIRMA DEL PREPRESENTANTE LEGAL

Page 99: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ESCALON CURVO DE PIEDRA MARTELINADA (HUELLA Y CONTRAHUELLA) UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.25

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.25MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 0.20 2.13 0.43 1.00 0.43AYUDANTE 1.00 1.93 1.93 1.00 1.93ALBANIL 1.00 2.13 2.13 1.00 2.13MAESTRO MAYOR 0.20 2.13 0.43 1.00 0.43

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.91MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.12 6.57 0.79ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00ESCALON CURVO PIEDRA MARTELIN M 1.00 65.00 65.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 66.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 71.16INDIRECTOS Y UTILIDADES 15 % 10.67OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 81.83

QUITO, ABRIL DE 2010 VALOR OFERTADO 81.83

002138 FIRMA DEL PREPRESENTANTE LEGAL

Page 100: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: COLOCACION DE ADOQUIN TIPO QUITO (ACENTADO CON MORTERO) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.23

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.23MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 0.66 2.13 1.41 1.54 2.16ALBANIL 0.66 2.13 1.41 1.54 2.16MAESTRO MAYOR 0.07 2.13 0.14 1.54 0.21

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.54MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.07 6.57 0.44ARENA M3 0.01 10.61 0.08AGUA M3 0.01 0.22 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.52TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 5.29INDIRECTOS Y UTILIDADES 15 % 0.79OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 6.08

QUITO, ABRIL DE 2010 VALOR OFERTADO 6.08

002153 FIRMA DEL PREPRESENTANTE LEGAL

Page 101: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: COLOCACION DE ESCALON DE PIEDRA UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.27

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.27MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 0.20 2.13 0.43 1.11 0.47AYUDANTE 1.00 1.93 1.93 1.11 2.14ALBANIL 1.00 2.13 2.13 1.11 2.37MAESTRO MAYOR 0.20 2.13 0.43 1.11 0.47

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 5.46MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.12 6.57 0.79ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 6.73INDIRECTOS Y UTILIDADES 15 % 1.01OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 7.74

QUITO, ABRIL DE 2010 VALOR OFERTADO 7.74

002154 FIRMA DEL PREPRESENTANTE LEGAL

Page 102: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ADOQUIN DE GRES TIPO QUITO 26*6*3.5 CM UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.18

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.18MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.80 1.70ALBANIL 1.00 2.13 2.13 0.80 1.70MAESTRO MAYOR 0.10 2.13 0.21 0.80 0.17

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.58MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.18 6.57 1.18ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00ADOQUIN GRES QUITO 26X6X3.5 CM M2 1.05 23.00 24.15

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 25.55TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 29.30INDIRECTOS Y UTILIDADES 15 % 4.40OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 33.70

QUITO, ABRIL DE 2010 VALOR OFERTADO 33.70

002157 FIRMA DEL PREPRESENTANTE LEGAL

Page 103: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: MODULO DE ANDAMIO PARA PLATAFORMA HMAX= 8 M UNIDAD: U/DDETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.02

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.02MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 0.20 0.39MAESTRO MAYOR 0.10 2.13 0.21 0.20 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.43MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOMODULO U 1.00 0.25 0.25

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.25TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 0.70INDIRECTOS Y UTILIDADES 15 % 0.11OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 0.81

QUITO, ABRIL DE 2010 VALOR OFERTADO 0.81

002161 FIRMA DEL PREPRESENTANTE LEGAL

Page 104: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: COLOCACION DE ADOQUIN TIPO EXAGONAL GRIS UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.15

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.15MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 0.66 2.13 1.41 1.00 1.41ALBANIL 0.66 2.13 1.41 1.00 1.41MAESTRO MAYOR 0.07 2.13 0.14 1.00 0.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.95MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 3.10INDIRECTOS Y UTILIDADES 15 % 0.47OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 3.57

QUITO, ABRIL DE 2010 VALOR OFERTADO 3.57

002195 FIRMA DEL PREPRESENTANTE LEGAL

Page 105: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: REJILLA HIERRO FUNDIDO PARA SUMIDERO (55 X 40 CM INC. CERCO) UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.23

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.23MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 0.20 2.13 0.43 1.00 0.43ALBANIL 1.00 2.13 2.13 1.00 2.13MAESTRO MAYOR 1.00 2.13 2.13 1.00 2.13

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.69MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOREJILLA HF Y CERCO U 1.00 85.00 85.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 85.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 89.92INDIRECTOS Y UTILIDADES 15 % 13.49OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 103.41

QUITO, ABRIL DE 2010 VALOR OFERTADO 103.41

002202 FIRMA DEL PREPRESENTANTE LEGAL

Page 106: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: TAPA DE HIERRO FUNDIDO PARA POZO REVISION (55 X 40 CM INC. C UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.21

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.21MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 1.00 2.13ALBANIL 1.00 2.13 2.13 1.00 2.13

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.26MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOTAPA HF U 1.00 80.00 80.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 80.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 84.47INDIRECTOS Y UTILIDADES 15 % 12.67OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 97.14

QUITO, ABRIL DE 2010 VALOR OFERTADO 97.14

002203 FIRMA DEL PREPRESENTANTE LEGAL

Page 107: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO ROTULO UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.10SOLDADORA 0.10 2.00 0.20 0.31 0.06

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.16MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.31 1.19ALBANIL 1.00 2.13 2.13 0.31 0.66MAESTRO MAYOR 0.10 2.13 0.21 0.31 0.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.91MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.07INDIRECTOS Y UTILIDADES 15 % 0.31OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 2.38

QUITO, ABRIL DE 2010 VALOR OFERTADO 2.38

002339 FIRMA DEL PREPRESENTANTE LEGAL

Page 108: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: COLOCACION DE MOJONES/BOLARDOS DE ALUMINIO/HIERRO UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.16

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.16MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.50 1.07ALBANIL 1.00 2.13 2.13 0.50 1.07MAESTRO MAYOR 1.00 2.13 2.13 0.50 1.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.20MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.01 6.57 0.07ARENA M3 0.01 10.61 0.11RIPIO M3 0.01 10.61 0.11

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.28TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 3.63INDIRECTOS Y UTILIDADES 15 % 0.54OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 4.17

QUITO, ABRIL DE 2010 VALOR OFERTADO 4.17

002410 FIRMA DEL PREPRESENTANTE LEGAL

Page 109: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ENLUCIDO HORIZONTAL 1:3 + IMPERMEABILIZANTE UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.15ANDAMIOS 1.00 0.10 0.10 0.67 0.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.22MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.67 1.43ALBANIL 1.00 2.13 2.13 0.67 1.43MAESTRO MAYOR 0.10 2.13 0.21 0.67 0.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.00MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.21 6.57 1.38ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00ADITIVO IMPERM. PUZZOLITH 322 KG 0.30 1.82 0.55

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 2.14TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 5.36INDIRECTOS Y UTILIDADES 15 % 0.80OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 6.16

QUITO, ABRIL DE 2010 VALOR OFERTADO 6.16

002458 FIRMA DEL PREPRESENTANTE LEGAL

Page 110: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: PICADO Y CORCHADO DE ACERAS A=0.20M. E=0.12M. UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.11MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 0.33 1.42ALBANIL 1.00 2.13 2.13 0.33 0.71MAESTRO MAYOR 0.10 2.13 0.21 0.33 0.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.20MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.90 6.57 5.91ARENA M3 0.10 10.61 1.06AGUA M3 0.01 0.22 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 6.97TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 9.28INDIRECTOS Y UTILIDADES 15 % 1.39OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 10.67

QUITO, ABRIL DE 2010 VALOR OFERTADO 10.67

002489 FIRMA DEL PREPRESENTANTE LEGAL

Page 111: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA Y LAVADO DE MAMPOSTERIAS H=4.01-8.00 M. UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.06

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.06MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.29 1.10MAESTRO MAYOR 0.10 2.13 0.21 0.29 0.06

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.16MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOJABON NO IONICO (NEUTRO) LT 0.01 3.90 0.04

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.04TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.26INDIRECTOS Y UTILIDADES 15 % 0.19OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.45

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.45

002501 FIRMA DEL PREPRESENTANTE LEGAL

Page 112: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE CONTRAPISO H.S. (EQUIPO HIDRAULICO) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.16

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.16MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 0.67 2.84ALBANIL 0.20 2.13 0.43 0.67 0.28

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.12MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 3.28INDIRECTOS Y UTILIDADES 15 % 0.49OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 3.77

QUITO, ABRIL DE 2010 VALOR OFERTADO 3.77

002504 FIRMA DEL PREPRESENTANTE LEGAL

Page 113: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: MARTELINADO DE HORMIGON UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.27

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.27MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 1.25 2.41ALBANIL 1.00 2.13 2.13 1.25 2.66MAESTRO MAYOR 0.10 2.13 0.21 1.25 0.27

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 5.34MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 5.61INDIRECTOS Y UTILIDADES 15 % 0.84OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 6.45

QUITO, ABRIL DE 2010 VALOR OFERTADO 6.45

002508 FIRMA DEL PREPRESENTANTE LEGAL

Page 114: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: CORTADO DE PIEDRA CON AMOLADORA UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOAMOLADORA 1.00 0.65 0.65 1.00 0.65HERRAMIENTAS 0.00 0.00 0.00 0.00 0.21

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.86MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 1.00 2.13ALBANIL 1.00 2.13 2.13 1.00 2.13

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.26MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 5.12INDIRECTOS Y UTILIDADES 15 % 0.77OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 5.89

QUITO, ABRIL DE 2010 VALOR OFERTADO 5.89

002513 FIRMA DEL PREPRESENTANTE LEGAL

Page 115: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: DERROCAMIENTO DE MURO DE H. CICLOPEO UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 3.51ANDAMIOS 1.18 0.10 0.12 20.00 2.36

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 5.87MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.18 2.13 2.51 20.00 50.27ALBANIL 0.39 2.13 0.83 20.00 16.61MAESTRO MAYOR 0.08 2.13 0.17 20.00 3.35

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 70.23MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 76.10INDIRECTOS Y UTILIDADES 15 % 11.42OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 87.52

QUITO, ABRIL DE 2010 VALOR OFERTADO 87.52

002609 FIRMA DEL PREPRESENTANTE LEGAL

Page 116: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RELLENO GRANULAR COMPACTADO MANUALMENTE UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.21

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.21MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 8.00 2.13 17.04 0.17 2.84ALBANIL 4.00 2.13 8.52 0.17 1.42MAESTRO MAYOR 0.10 2.13 0.21 0.17 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.30MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOLASTRE M3 1.25 12.63 15.78

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 15.78TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 20.29INDIRECTOS Y UTILIDADES 15 % 3.04OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 23.33

QUITO, ABRIL DE 2010 VALOR OFERTADO 23.33

002617 FIRMA DEL PREPRESENTANTE LEGAL

Page 117: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: COLOCACION DE HOJAS DE ZINC ANTIGUO UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.04MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 0.20 0.39CARPINTERO 1.00 1.93 1.93 0.20 0.39MAESTRO MAYOR 0.10 2.13 0.21 0.20 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.81MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.10 6.57 0.66ARENA M3 0.01 10.61 0.11TACOS FISHER#6 U 4.00 0.16 0.64

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.40TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.26INDIRECTOS Y UTILIDADES 15 % 0.34OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 2.60

QUITO, ABRIL DE 2010 VALOR OFERTADO 2.60

002679 FIRMA DEL PREPRESENTANTE LEGAL

Page 118: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: TRANSPORTE DE MATERIALES (CAMION/TRAILER) UNIDAD: VJEDETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 1.01CAMION 1.00 30.00 30.00 2.86 85.71

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 86.73MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 2.86 12.17CHOFER TIPO D 1.00 2.63 2.63 2.86 7.51MAESTRO MAYOR 0.10 2.13 0.21 2.86 0.61

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 20.29MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 107.02INDIRECTOS Y UTILIDADES 15 % 16.05OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 123.07

QUITO, ABRIL DE 2010 VALOR OFERTADO 123.07

002712 FIRMA DEL PREPRESENTANTE LEGAL

Page 119: MODELO DE APUS

Formulario No. 3NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE ASFALTO (CAPA DE 15 CM) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.49MARTILLO NEUMATICO 1.00 0.46 0.46 2.00 0.92

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 1.41MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 2.00 8.52ALBANIL 0.20 2.13 0.43 2.00 0.85MAESTRO MAYOR 0.10 2.13 0.21 2.00 0.43

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 9.80MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 11.21INDIRECTOS Y UTILIDADES 15 % 1.68OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 12.89

QUITO, ABRIL DE 2010 VALOR OFERTADO 12.89

002726 FIRMA DEL PREPRESENTANTE LEGAL

Page 120: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: COLOCACION DE PISO DE PIEDRA SILLAR UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.27

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.27MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.83 1.78ALBANIL 1.00 2.13 2.13 0.83 1.78MAESTRO MAYOR 1.00 2.13 2.13 0.83 1.78

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 5.33MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.10 6.57 0.66ARENA M3 0.01 10.61 0.11AGUA M3 0.01 0.22 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.76TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 6.36INDIRECTOS Y UTILIDADES 15 % 0.95OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 7.31

QUITO, ABRIL DE 2010 VALOR OFERTADO 7.31

002731 FIRMA DEL PREPRESENTANTE LEGAL

Page 121: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE BASURERO METALICO UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.24ANDAMIOS 3.00 0.10 0.30 1.22 0.37

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.60MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 1.22 2.35CARPINTERO 1.00 1.93 1.93 1.22 2.35

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.71MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 5.31INDIRECTOS Y UTILIDADES 15 % 0.80OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 6.11

QUITO, ABRIL DE 2010 VALOR OFERTADO 6.11

002764 FIRMA DEL PREPRESENTANTE LEGAL

Page 122: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA Y DESBROCE (M2) (H=2 M) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.07MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 2.00 2.13 4.26 0.33 1.42MAESTRO MAYOR 0.10 2.13 0.21 0.33 0.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.49MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.57INDIRECTOS Y UTILIDADES 15 % 0.24OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.81

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.81

002775 FIRMA DEL PREPRESENTANTE LEGAL

Page 123: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ADITIVO ADHESIVO EPOX. HORMIG. NUEVO A VIEJO TIPO SIKADUR 32 UNIDAD: KG DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.23

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.23MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOALBANIL 1.00 2.13 2.13 2.00 4.26MAESTRO MAYOR 0.10 2.13 0.21 2.00 0.43

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.69MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOSIKADUR ADHESIVO KG 1.00 14.53 14.53

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 14.53TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 19.45INDIRECTOS Y UTILIDADES 15 % 2.92OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 22.37

QUITO, ABRIL DE 2010 VALOR OFERTADO 22.37

002848 FIRMA DEL PREPRESENTANTE LEGAL

Page 124: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: COLOCACION DE ADOQUIN TIPO CONCHA PAVE UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.15

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.15MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 0.66 2.13 1.41 1.00 1.41ALBANIL 0.66 2.13 1.41 1.00 1.41MAESTRO MAYOR 0.07 2.13 0.14 1.00 0.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.95MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOADOQUIN CONCHA PAVE M2 1.00 8.50 8.50

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 8.50TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 11.60INDIRECTOS Y UTILIDADES 15 % 1.74OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 13.34

QUITO, ABRIL DE 2010 VALOR OFERTADO 13.34

002859 FIRMA DEL PREPRESENTANTE LEGAL

Page 125: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: MANGUERA POLIETILENO REFORZ. 1 1/2 (INST. ELECT.) UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.01

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.01MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOELECTRICISTA 1.00 1.93 1.93 0.05 0.10AYUDANTE 1.00 1.93 1.93 0.05 0.10

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.19MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOMANGUERA 1 PLG M 1.00 0.35 0.35MANGUERA 1 1/2 M 1.00 0.98 0.98

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.33TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.54INDIRECTOS Y UTILIDADES 15 % 0.23OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.77

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.77

002866 FIRMA DEL PREPRESENTANTE LEGAL

Page 126: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO Y RECOLOCACION DE SUMIDERO DE PIEDRA UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 1.69ANDAMIOS 2.00 0.10 0.20 8.33 1.67

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 3.36MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 8.33 16.08MAESTRO MAYOR 1.00 2.13 2.13 8.33 17.75

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 33.83MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 37.19INDIRECTOS Y UTILIDADES 15 % 5.58OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 42.77

QUITO, ABRIL DE 2010 VALOR OFERTADO 42.77

002889 FIRMA DEL PREPRESENTANTE LEGAL

Page 127: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: MOJON DE HORMIGON D=0.30 M. H=0.45 M. UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.74

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.74MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 7.69 2.13 16.38 0.30 4.96ALBANIL 7.69 2.13 16.38 0.30 4.96MAESTRO MAYOR 7.69 2.13 16.38 0.30 4.96

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 14.89MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.08 6.57 0.50ARENA M3 0.08 10.61 0.82RIPIO M3 0.08 10.61 0.82

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 2.14TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 17.77INDIRECTOS Y UTILIDADES 15 % 2.67OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 20.44

QUITO, ABRIL DE 2010 VALOR OFERTADO 20.44

002941 FIRMA DEL PREPRESENTANTE LEGAL

Page 128: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: REUBICACION DE SUMIDERO DE CALZADA UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 1.13ANDAMIOS 2.00 0.10 0.20 5.56 1.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 2.24MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 5.56 10.72MAESTRO MAYOR 1.00 2.13 2.13 5.56 11.83

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 22.56MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 24.79INDIRECTOS Y UTILIDADES 15 % 3.72OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 28.51

QUITO, ABRIL DE 2010 VALOR OFERTADO 28.51

003013 FIRMA DEL PREPRESENTANTE LEGAL

Page 129: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: DERROCAMIENTO DE MURO DE H. ARMADO UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 6.86ANDAMIOS 5.06 0.10 0.51 9.09 4.60

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 11.46MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 5.06 2.13 10.78 9.09 97.98ALBANIL 1.69 2.13 3.60 9.09 32.72MAESTRO MAYOR 0.34 2.13 0.72 9.09 6.58

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 137.29MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 148.75INDIRECTOS Y UTILIDADES 15 % 22.31OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 171.06

QUITO, ABRIL DE 2010 VALOR OFERTADO 171.06

003016 FIRMA DEL PREPRESENTANTE LEGAL

Page 130: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: SUJECION CABLES ELECTRICOS UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.02ANDAMIOS 2.00 0.10 0.20 0.10 0.02

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.04MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.10 0.21ALBANIL 1.00 2.13 2.13 0.10 0.21MAESTRO MAYOR 0.10 2.13 0.21 0.10 0.02

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.45MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOTORNILLOS 1 A 2 PLG U 4.00 0.08 0.32ALAMBRE GALVANIZADO # 14 KG 0.10 1.12 0.11

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.44TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 0.92INDIRECTOS Y UTILIDADES 15 % 0.14OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.06

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.06

003047 FIRMA DEL PREPRESENTANTE LEGAL

Page 131: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: CANASTILLA DE HIERRO PARA BASE DE POSTES 50 CM UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.19

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.19MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOINSTALADOR 1.00 1.93 1.93 1.00 1.93AYUDANTE 1.00 1.93 1.93 1.00 1.93

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.86MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCANASTILLA DE HIERRO BASE POST U 1.00 3.03 3.03

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 3.03TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 7.08INDIRECTOS Y UTILIDADES 15 % 1.06OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 8.14

QUITO, ABRIL DE 2010 VALOR OFERTADO 8.14

003107 FIRMA DEL PREPRESENTANTE LEGAL

Page 132: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: REPLANTEO A CINTA UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOCINTA 1.00 0.05 0.05 0.07 0.00

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.00MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOALBANIL 2.00 2.13 4.26 0.07 0.28AYUDANTE 0.10 1.93 0.19 0.07 0.01

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.30MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOESTACAS U 0.20 0.15 0.03

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.03TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 0.33INDIRECTOS Y UTILIDADES 15 % 0.05OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 0.38

QUITO, ABRIL DE 2010 VALOR OFERTADO 0.38

003199 FIRMA DEL PREPRESENTANTE LEGAL

Page 133: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: COLOCACION DE ADOQUIN DE CEMENTO UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.15

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.15MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 0.66 2.13 1.41 1.00 1.41ALBANIL 0.66 2.13 1.41 1.00 1.41MAESTRO MAYOR 0.07 2.13 0.14 1.00 0.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.95MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.07 6.57 0.44ARENA M3 0.01 10.61 0.08AGUA M3 0.01 0.22 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.52TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 3.62INDIRECTOS Y UTILIDADES 15 % 0.54OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 4.16

QUITO, ABRIL DE 2010 VALOR OFERTADO 4.16

003228 FIRMA DEL PREPRESENTANTE LEGAL

Page 134: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: COLOCACION DE BASURERO METALICO 0.40X0.40X1.00 UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.32

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.32MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 1.00 2.13ALBANIL 1.00 2.13 2.13 1.00 2.13MAESTRO MAYOR 1.00 2.13 2.13 1.00 2.13

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 6.39MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.10 6.57 0.66ARENA M3 0.01 10.61 0.11AGUA M3 0.01 0.22 0.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.76TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 7.47INDIRECTOS Y UTILIDADES 15 % 1.12OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 8.59

QUITO, ABRIL DE 2010 VALOR OFERTADO 8.59

003382 FIRMA DEL PREPRESENTANTE LEGAL

Page 135: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: DESENCHAMBADO UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.01ANDAMIOS 2.00 0.10 0.20 0.05 0.01

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.02MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.05 0.11MAESTRO MAYOR 1.00 2.13 2.13 0.05 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.21MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 0.23INDIRECTOS Y UTILIDADES 15 % 0.03OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 0.26

QUITO, ABRIL DE 2010 VALOR OFERTADO 0.26

003443 FIRMA DEL PREPRESENTANTE LEGAL

Page 136: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO ESCALON DE PIEDRA (REUTILIZACION) UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.21ANDAMIOS 2.00 0.10 0.20 1.00 0.20

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.41MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 1.00 2.13MAESTRO MAYOR 1.00 2.13 2.13 1.00 2.13

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.26MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 4.67INDIRECTOS Y UTILIDADES 15 % 0.70OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 5.37

QUITO, ABRIL DE 2010 VALOR OFERTADO 5.37

003711 FIRMA DEL PREPRESENTANTE LEGAL

Page 137: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: TUBERIA NOVAFORT 160 MM UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.03MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPLOMERO 1.00 1.93 1.93 0.17 0.32AYUDANTE 1.00 1.93 1.93 0.17 0.32

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.64MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOTUBO NOVAFORT 160 MM M 1.00 11.98 11.98POLILIMPIA LT 0.01 4.56 0.05POLIPEGA LT 0.01 9.05 0.09

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 12.12TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 12.79INDIRECTOS Y UTILIDADES 15 % 1.92OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 14.71

QUITO, ABRIL DE 2010 VALOR OFERTADO 14.71

003731 FIRMA DEL PREPRESENTANTE LEGAL

Page 138: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: BORDILLO HORMIGON PREFABRICADO 50 * 50 * 15 CM 210 KG/CM2 UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.11MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.51 1.08ALBANIL 1.00 2.13 2.13 0.51 1.08MAESTRO MAYOR 0.10 2.13 0.21 0.51 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.26MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.01 6.57 0.07ARENA M3 0.01 10.61 0.11RIPIO M3 0.01 10.61 0.11BORDILLO PREFABRICADO 50x50x15 U 1.00 7.00 7.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 7.28TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 9.65INDIRECTOS Y UTILIDADES 15 % 1.45OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 11.10

QUITO, ABRIL DE 2010 VALOR OFERTADO 11.10

003890 FIRMA DEL PREPRESENTANTE LEGAL

Page 139: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: BORDILLO HORMIGON PREFABRICADO 50 * 27 * 7 CM 210 KG/CM2 UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.11MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.51 1.08ALBANIL 1.00 2.13 2.13 0.51 1.08MAESTRO MAYOR 0.10 2.13 0.21 0.51 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.26MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.01 6.57 0.07ARENA M3 0.01 10.61 0.11RIPIO M3 0.01 10.61 0.11BORDILLO PREFABRICADO 50x27x7 U 1.00 5.25 5.25

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 5.53TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 7.90INDIRECTOS Y UTILIDADES 15 % 1.19OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 9.09

QUITO, ABRIL DE 2010 VALOR OFERTADO 9.09

003896 FIRMA DEL PREPRESENTANTE LEGAL

Page 140: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE VERJA DE HIERRO 50 CM UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.03SOLDADORA 1.00 2.00 2.00 0.07 0.13

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.16MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.07 0.26ALBANIL 1.00 2.13 2.13 0.07 0.14MAESTRO MAYOR 1.00 2.13 2.13 0.07 0.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.54MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 0.70INDIRECTOS Y UTILIDADES 15 % 0.11OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 0.81

QUITO, ABRIL DE 2010 VALOR OFERTADO 0.81

003901 FIRMA DEL PREPRESENTANTE LEGAL

Page 141: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: PINTURA ESMALTE EN METAL (A BROCHA) UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.06ANDAMIOS 4.00 0.10 0.40 0.20 0.08

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.14MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 2.00 1.93 3.86 0.20 0.77PINTOR 1.00 1.93 1.93 0.20 0.39MAESTRO MAYOR 0.10 2.13 0.21 0.20 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.20MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOTINHER GLN 0.03 9.60 0.29LIJA HJA 0.15 1.01 0.15ESMALTE GLN 0.08 18.25 1.46BROCHA U 1.00 1.20 1.20

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 3.10TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 4.44INDIRECTOS Y UTILIDADES 15 % 0.67OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 5.11

QUITO, ABRIL DE 2010 VALOR OFERTADO 5.11

003980 FIRMA DEL PREPRESENTANTE LEGAL

Page 142: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: TAPA DE HIERRO FUNDIDO PARA POZO REVISION (80 X 80 CM INC. C UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.21

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.21MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 1.00 2.13ALBANIL 1.00 2.13 2.13 1.00 2.13

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 4.26MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOTAPA HF 80 x 80 U 1.00 140.00 140.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 140.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 144.47INDIRECTOS Y UTILIDADES 15 % 21.67OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 166.14

QUITO, ABRIL DE 2010 VALOR OFERTADO 166.14

003997 FIRMA DEL PREPRESENTANTE LEGAL

Page 143: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ADITIVO IMPERMEABILIZANTE PARA HORMIGONES Y MORTEROS TIPO SI UNIDAD: KG DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.04

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.04MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOALBANIL 1.00 2.13 2.13 0.33 0.71MAESTRO MAYOR 0.10 2.13 0.21 0.33 0.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.78MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOIMPERMEABILIZANTE KG 1.00 1.85 1.85

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 1.85TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 2.67INDIRECTOS Y UTILIDADES 15 % 0.40OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 3.07

QUITO, ABRIL DE 2010 VALOR OFERTADO 3.07

004108 FIRMA DEL PREPRESENTANTE LEGAL

Page 144: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: RETIRO DE VEGETACION ENTRE MATERIALES INSTALADOS EN ACABADOS UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.02ANDAMIOS 1.00 0.10 0.10 0.10 0.01

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.03MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOAYUDANTE 1.00 1.93 1.93 0.10 0.19ALBANIL 1.00 2.13 2.13 0.10 0.21MAESTRO MAYOR 0.10 2.13 0.21 0.10 0.02

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.43MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOQUIMICO MATAMALEZA LTR 0.10 1.80 0.18

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.18TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 0.64INDIRECTOS Y UTILIDADES 15 % 0.10OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 0.74

QUITO, ABRIL DE 2010 VALOR OFERTADO 0.74

004144 FIRMA DEL PREPRESENTANTE LEGAL

Page 145: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: CERCO Y TAPA DE H.F. PARA POZO DE REVISION D=0,60M UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.05

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.05MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOINSTALADOR 1.00 1.93 1.93 0.50 0.97

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.97MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCERCO METALICO M 1.00 3.50 3.50TAPA HF U 1.00 65.00 65.00CERCO HF U 1.00 30.00 30.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 98.50TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 99.51INDIRECTOS Y UTILIDADES 15 % 14.93OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 114.44

QUITO, ABRIL DE 2010 VALOR OFERTADO 114.44

004152 FIRMA DEL PREPRESENTANTE LEGAL

Page 146: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ADOQUIN VARIOS MODELOS, GRIS 400 KG/CM2, E=8CM UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.18

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.18MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.80 1.70ALBANIL 1.00 2.13 2.13 0.80 1.70MAESTRO MAYOR 0.10 2.13 0.21 0.80 0.17

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 3.58MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.18 6.57 1.18ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00ADOQUIN M2 1.05 10.00 10.50

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 11.90TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 15.65INDIRECTOS Y UTILIDADES 15 % 2.35OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 18.00

QUITO, ABRIL DE 2010 VALOR OFERTADO 18.00

004365 FIRMA DEL PREPRESENTANTE LEGAL

Page 147: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: ADOQUIN VARIOS MODELOS, COLOR 400 KG/CM2, E=8CM UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.11MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.51 1.08ALBANIL 1.00 2.13 2.13 0.51 1.08MAESTRO MAYOR 0.10 2.13 0.21 0.51 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.26MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.18 6.57 1.18ARENA M3 0.02 10.61 0.21AGUA M3 0.01 0.22 0.00ADOQUIN COLOR E=8 CM 400 KG/CM M2 1.05 11.62 12.20

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 13.59TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 15.96INDIRECTOS Y UTILIDADES 15 % 2.39OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 18.35

QUITO, ABRIL DE 2010 VALOR OFERTADO 18.35

004387 FIRMA DEL PREPRESENTANTE LEGAL

Page 148: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: POZO DE REVISION H.S. 210 KG/CM2 H=1,00M - 1.75M, E=0,20M, E UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 5.64ENCOFRADO METALICO POZO 8.00 2.50 20.00 2.00 40.00

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 45.64MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 12.62 2.13 26.88 2.00 53.76ALBANIL 12.62 2.13 26.88 2.00 53.76MAESTRO MAYOR 1.26 2.13 2.68 2.00 5.37

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 112.89MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 15.15 6.57 99.46ARENA M3 1.77 10.61 18.77AGUA M3 0.45 0.22 0.10ACERO REFUERZO KG 18.94 0.85 16.07

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 134.40TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 292.93INDIRECTOS Y UTILIDADES 15 % 43.94OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 336.87

QUITO, ABRIL DE 2010 VALOR OFERTADO 336.87

004391 FIRMA DEL PREPRESENTANTE LEGAL

Page 149: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: POZO DE REVISION H.S. 210 KG/CM2 H=1,76M - 2.25M, E=0,20M, E UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 5.74ENCOFRADO METALICO POZO 10.04 2.50 25.10 1.59 39.84

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 45.58MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 16.17 2.13 34.44 1.59 54.67ALBANIL 16.17 2.13 34.44 1.59 54.67MAESTRO MAYOR 1.62 2.13 3.45 1.59 5.48

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 114.82MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 19.40 6.57 127.36ARENA M3 2.26 10.61 23.97AGUA M3 0.58 0.22 0.13ACERO REFUERZO KG 24.55 0.85 20.83

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 172.29TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 332.68INDIRECTOS Y UTILIDADES 15 % 49.90OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 382.58

QUITO, ABRIL DE 2010 VALOR OFERTADO 382.58

004392 FIRMA DEL PREPRESENTANTE LEGAL

Page 150: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: DERROCAMIENTO DE HORMIGON SIMPLE UNIDAD: M3 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 1.60ANDAMIOS 1.18 0.10 0.12 9.09 1.07

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 2.67MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.18 2.13 2.51 9.09 22.85ALBANIL 0.39 2.13 0.83 9.09 7.55MAESTRO MAYOR 0.08 2.13 0.17 9.09 1.52

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 31.92MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 34.59INDIRECTOS Y UTILIDADES 15 % 5.19OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 39.78

QUITO, ABRIL DE 2010 VALOR OFERTADO 39.78

004636 FIRMA DEL PREPRESENTANTE LEGAL

Page 151: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: POZO DE REVISION H.S. 210 KG/CM2 H=2.26M - 2.75M, E=0,20M, E UNIDAD: U DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 5.46ENCOFRADO METALICO POZO 10.00 2.50 25.00 1.59 39.68

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 45.14MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 15.37 2.13 32.74 1.59 51.97ALBANIL 15.37 2.13 32.74 1.59 51.97MAESTRO MAYOR 1.54 2.13 3.28 1.59 5.21

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 109.14MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 18.44 6.57 121.06ARENA M3 2.15 10.61 22.80AGUA M3 0.55 0.22 0.12ACERO REFUERZO KG 25.00 0.85 21.21

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 165.19TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 319.47INDIRECTOS Y UTILIDADES 15 % 47.92OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 367.39

QUITO, ABRIL DE 2010 VALOR OFERTADO 367.39

004725 FIRMA DEL PREPRESENTANTE LEGAL

Page 152: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: TUBERIA NOVAFORT 110 MM UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.03

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.03MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPLOMERO 1.00 1.93 1.93 0.17 0.32AYUDANTE 1.00 1.93 1.93 0.17 0.32

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 0.64MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOTUBERIA NOVAFORT 110 MM M 1.00 5.00 5.00POLILIMPIA LT 0.01 4.56 0.05POLIPEGA LT 0.01 9.05 0.09

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 5.14TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 5.81INDIRECTOS Y UTILIDADES 15 % 0.87OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 6.68

QUITO, ABRIL DE 2010 VALOR OFERTADO 6.68

004745 FIRMA DEL PREPRESENTANTE LEGAL

Page 153: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: LIMPIEZA DE PISO DE PIEDRA CON MAQUINA INDUSTRIAL A VAPOR, I UNIDAD: M2 DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.05EQUIPO LIMPIEZA A VAPOR 0.10 5.50 0.55 0.25 0.14

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.19MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.25 0.53AYUDANTE 1.00 1.93 1.93 0.25 0.48MAESTRO MAYOR 0.10 2.13 0.21 0.25 0.05

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 1.07MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTO0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 0.00TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 1.26INDIRECTOS Y UTILIDADES 15 % 0.19OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 1.45

QUITO, ABRIL DE 2010 VALOR OFERTADO 1.45

004760 FIRMA DEL PREPRESENTANTE LEGAL

Page 154: MODELO DE APUS

Formulario No. 4NOMBRE DEL PROPONENTE: ING. HECTOR GUERRERO Hoja dePROYECTO: MANTENIMEINTO DE BARRIOS EMBLEMATICO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSRUBRO: BORDILLO HORMIGON PREFABRICADO 50 * 35 * 8 CM 210 KG/CM2 UNIDAD: M DETALLE:EQUIPOS

DESCRIPCION CANTIDAD TARIFA COSTO HORA RENDIMIENTO COSTOHERRAMIENTAS 0.00 0.00 0.00 0.00 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL M 0.11MANO DE OBRA

DESCRIPCION CANTIDAD JORNAL/HR COSTO HORA RENDIMIENTO COSTOPEON 1.00 2.13 2.13 0.51 1.08ALBANIL 1.00 2.13 2.13 0.51 1.08MAESTRO MAYOR 0.10 2.13 0.21 0.51 0.11

0.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00 0.00

SUBTOTAL N 2.26MATERIALES

DESCRIPCION UNIDAD CANTIDAD P. UNITARIO COSTOCEMENTO SC 0.01 6.57 0.07ARENA M3 0.01 10.61 0.11RIPIO M3 0.01 10.61 0.11BORDILLO OREFAVRICADO 50x35x8 1.00 6.00 6.00

0.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.000.00 0.00 0.00 0.00 0.00

SUBTOTAL O 6.28TRANSPORTE

DESCRIPCION UNIDAD CANTIDAD TARIFA COSTO

SUBTOTAL PTOTAL COSTO DIRECTO (M+N+O+P) 8.65INDIRECTOS Y UTILIDADES 15 % 1.30OTROS INDIRECTOS %COSTO TOTAL DEL RUBRO 9.95

QUITO, ABRIL DE 2010 VALOR OFERTADO 9.95

004761 FIRMA DEL PREPRESENTANTE LEGAL

Page 155: MODELO DE APUS

Formulario No. 4NOMBRE DEL OFERENTE: ING. HECTOR GUERREROPROYECTO: MANTENIMIENTO EN BARRIOS EMBLEMATICO BARRIO: SAN MARCOS

Hoja deANALISIS DE PRECIOS UNITARIOS

CUADRO AUXILIAR DE COSTOS DE MANO DE OBRA

CAT. I CAT. II CAT. III CAT. IV CAT. V CHOFER TOPOG. MEP I OEP 1 OEP 2CATEGORIA/ CARGO Inspector

Peón Ayudante Albanil Maestro de Obra Mecánico Operador OperadorJORNAL NOMINAL (1) 8.00 8.00 8.00 8.00 8.00 9.00 8.00 8.00 8.00 8.00 MENSUAL NOMINAL (2) 240.00 240.00 240.00 240.00 240.00 270.00 240.00 240.00 240.00 240.00 ANUAL NOMINAL 2,880.00 2,880.00 2,880.00 2,880.00 2,880.00 3,240.00 2,880.00 2,880.00 2,880.00 2,880.00 COMPONENTE SALARIALCOMPENSACION COSTO VIDATRANSPORTEDECIMO TERCER SUELDO 240.00 240.00 240.00 240.00 240.00 270.00 240.00 240.00 240.00 240.00 DECIMO CUARTO SUELDO 240.00 240.00 240.00 240.00 240.00 240.00 240.00 240.00 240.00 240.00 APORTE PATRONAL (3) 349.92 349.92 349.92 349.92 349.92 393.66 349.92 349.92 350.78 350.78 FONDO DE RESERVA 240.00 240.00 240.00 240.00 240.00 270.00 240.00 240.00 240.00 240.00 OTROS CODIGO TRABAJO (4) COMPENSACIONTOTAL ANUAL 3,949.92 3,949.92 3,949.92 3,949.92 3,949.92 4,413.66 3,949.92 3,949.92 3,950.78 3,950.78 TOTAL MENSUAL 329.16 329.16 329.16 329.16 329.16 367.81 329.16 329.16 329.23 329.23 FACTOR DE SALARIO REAL 1.5532 1.5532 1.5532 1.5532 1.5532 1.5532 1.5532 1.5532 1.5532 1.5532 MENSUAL REAL 511.25 511.25 511.25 511.25 511.25 571.27 511.25 511.25 511.36 511.36 JORNAL REAL DIARIO 17.04 17.04 17.04 17.04 17.04 19.04 17.04 17.04 17.05 17.05

COSTO HORARIO 2.13 2.13 2.13 2.13 2.13 2.38 2.13 2.13 2.13 2.13

QUITO, 30 DE ABRIL DE 2010 ING. HECTOR GUERRERO

NOTAS: NOTA (1): El salario unificado será mayor o igual que el mínimo legal

(2): Se tomará meses de treint adías (3): El aporte patronal incluye IECE, SECAP, etc.(1) FACTOR DE SALARIO REAL: DÍAS PAGADOS/DÍAS TRABAJADOS - 360/232=1.553

Page 156: MODELO DE APUS

Formulario No. 4NOMBRE DEL OFERENTE: ING. HECTOR GUERREROPROYECTO: MANTENIMIENTO EN BARRIOS EMBLEMATICO BARRIO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSCUADRO AUXILIAR: COSTOS INDIRECTOS Y UTILIDAD

Hoja deCOMPONENTES DEL COSTO INDIRECTO VALOR %DIRECCION DE OBRA #VALUE! 4.00%ADMINISTRATIVOS #VALUE! 1.00%LOCALES PROVISIONALES #VALUE! 0.25%VEHICULOS #VALUE! 0.50%SERVICIOS PUBLICOS #VALUE! 1.00%PROMOCION #VALUE! 0.25%GARANTIAS #VALUE! 1.00%SEGUROS #VALUE! 1.00%COSTOS FINANCIEROS #VALUE! 1.00%PREVENCION DE ACCIDENTES #VALUE! 1.00%

UTILIDAD #VALUE! 4.00%TOTAL DE INDIRECTOS #VALUE! 15.00%

2609QUITO, 30 DE ABRIL DE 2010 ING. HECTOR GUERRERO

Page 157: MODELO DE APUS

Formulario No. 4NOMBRE DEL OFERENTE: ING. HECTOR GUERREROPROYECTO: MANTENIMIENTO EN BARRIOS EMBLEMATICO BARRIO: SAN MARCOS

ANALISIS DE PRECIOS UNITARIOSCUADRO AUXILIAR: TARIFAS DE EQUIPOS

DETALLE DEL EQUIPO COMBUSTIBLE LUBRICANTES REPUESTOS MANTENIMIENTO DEPRECIACIÓN OTROS INDICAR

AMOLADORA 0.03 0.02 0.17 0.07 0.34 0.02 0.65ANDAMIOS 0.10 0.10

CAMION 1.50 0.90 7.80 3.30 15.60 0.90 30.00CINTA 0.05COMPACTADORA 0.14 0.09 0.74 0.31 1.48 0.09 2.84COMPRESOR 250 0.09 0.06 0.48 0.20 0.96 0.06 1.85CONCRETERA 1SAC 0.18 0.11 0.91 0.39 1.82 0.11 3.50

2.50EQUIPO LIMPIEZA A VAPOR 0.28 0.16 1.43 0.61 2.86 0.16 5.50MARTILLO NEUMATICO 0.02 0.01 0.12 0.05 0.24 0.01 0.46 0.00

SOLDADORA 0.10 0.06 0.52 0.22 1.04 0.06 2.00 0.00

TEODOLITO 0.67 0.67

VIBRADOR 0.15 0.09 0.78 0.33 1.56 0.09 3.00 0.00VOLQUETA 1.25 0.75 6.50 2.75 13.00 0.75 25.00 0.00

2609QUITO, 30 DE ABRIL DE 2010 ING. HECTOR GUERRERO

TARIFAHORARIA

ENCOFRADO METALICO POZO

Page 158: MODELO DE APUS

Formulario No. 4NOMBRE DEL OFERENTE: ING. HECTOR GUERREROPROYECTO: MANTENIMIENTO EN BARRIOS EMBLEMATICO BARRIO: SAN MARCOS Hoja de

ANALISIS DE PRECIOS UNITARIOSCUADRO AUXILIAR: COSTOS DE MATERIALES

MATERIAL UNIDAD OTROS PRECIO FINAL PRECIO UNITARIO

A.P.V. LT 1.95 1.95ACERO REFUERZO KG 0.85 0.85ACIDO MURIATICO LT 1.75 1.75ADITIVO ACELERANTE KG 1.50 1.50ADITIVO IMPERM. PUZZOLITH 322 KG 1.82 1.82ADITIVO LIGANTE BETONIC LT 6.00 6.00ADOQUIN M2 10.00 10.00ADOQUIN COLOR E=8 CM 400 KG/CM M2 11.62 11.62ADOQUIN CONCHA PAVE M2 8.50 8.50ADOQUIN EXAGONAL (20U/M2) M2 5.90 5.90ADOQUIN GRES QUITO 26X6X3.5 CM M2 23.00 23.00ADOQUIN ORNAMENTAL COLOR M2 11.68 11.68ADOQUIN ORNAMENTAL NATURAL M2 8.33 8.33AGUA M3 0.22 0.22AGUARRAS LT 0.95 0.95ALAMBRE GALVANIZADO # 14 KG 1.12 1.12ALGODON HIDROFILO LB 1.90 1.90ANTICORROSIVO GLN 16.05 16.05ARENA M3 10.61 10.61BALDOSA DE PIEDRA 20X20 M2 29.00 29.00BARRO M3 6.50 6.50BLOQUE DE 10 CM U 0.21 0.21BORDILLO OREFAVRICADO 50x35x8 6.00 6.00BORDILLO PREFABRICADO 50x27x7 U 5.25 5.25BORDILLO PREFABRICADO 50x50x15 U 7.00 7.00BROCHA U 1.20 1.20CAL KG 0.15 0.15CAL/ALBALUX KG 0.18 0.18CANASTILLA DE HIERRO BASE POST U 3.03 3.03CEMENTINA KG 0.15 0.15CEMENTO SC 6.57 6.57CERCO HF U 30.00 30.00CERCO METALICO M 3.50 3.50CHAMBA M2 1.52 1.52CLAVOS 2 A 4 PULG KG 2.24 2.24DETERGENTE KG 1.50 1.50ELECTRODOS KG 2.98 2.98ESCALON CURVO PIEDRA MARTELIN M 65.00 65.00ESCALON PIEDRA MARTELINADA M 50.00 50.00ESMALTE GLN 18.25 18.25ESTACAS U 0.15 0.15ESTUCO PARA INTERIORES GLN 5.45 5.45GRES 30X30 M2 13.00 13.00IMPERMEABILIZANTE KG 1.85 1.85JABON NO IONICO (NEUTRO) LT 3.90 3.90LADRILLO MAMBRON U 0.20 0.20LASTRE M3 12.63 12.63LIJA HJA 1.01 1.01MALLA DE TUMBADO M2 3.85 3.85MANGUERA 1 1/2 M 0.98 0.98MANGUERA 1 PLG M 0.35 0.35MODULO U 0.25 0.25PERFIL METALICO KG 0.98 0.98PERNOS 3 PULG U 0.50 0.50PIEDRA BOLA M3 12.63 12.63PIEDRA SILLAR M2 29.18 29.18PINTURA DE CAUCHO PERMALATEX GLN 15.72 15.72PIX LT 1.33 1.33POLILIMPIA LT 4.56 4.56POLIPEGA LT 9.05 9.05QUIMICO LT 2.75 2.75QUIMICO MATAMALEZA LTR 1.80 1.80RATICIDA KG 4.70 4.70REJILLA HF Y CERCO U 85.00 85.00

Page 159: MODELO DE APUS

Formulario No. 4NOMBRE DEL OFERENTE: ING. HECTOR GUERREROPROYECTO: MANTENIMIENTO EN BARRIOS EMBLEMATICO BARRIO: SAN MARCOS Hoja de

ANALISIS DE PRECIOS UNITARIOSCUADRO AUXILIAR: COSTOS DE MATERIALES

MATERIAL UNIDAD OTROS PRECIO FINAL PRECIO UNITARIO

REMOVEDOR GLN 15.56 15.56RIELES U 1.40 1.40RIPIO M3 10.61 10.61SIKADUR ADHESIVO KG 14.53 14.53SUJETADOR DE BAJANTE U 0.27 0.27TABLA DE MONTE U 1.35 1.35TACOS FISHER#6 U 0.16 0.16TAPA HF U 65.00 65.00TAPA HF U 80.00 80.00TAPA HF 80 x 80 U 140.00 140.00TINHER GLN 9.60 9.60TINHER ACRILICO GLN 7.92 7.92TOL NEGRO 1/40 M2 2.66 2.66TORNILLOS 1 A 2 PLG U 0.08 0.08TUBERIA NOVAFORT 110 MM M 5.00 5.00TUBO NOVAFOR 250 MM M 19.50 19.50TUBO NOVAFORT 160 MM M 11.98 11.98TUBO PVC 110 MM M 3.25 3.25YESO KG 0.51 0.51

QUITO, 30 DE ABRIL DE 2010 ING. HECTOR GUERRERO

Page 160: MODELO DE APUS

Formulario No. 11NOMBRE DEL OFERENTE: ING. HECTOR GUERREROPROYECTO: MANTENIMIENTO EN BARRIOS EMBLEMATICO BARRIO: SAN MARCOS

CRONOGRAMA VALORADO DE TRABAJOS (180 DIAS, 24 SEMANAS)

SEMANASRUBRO UNIDAD CANTIDAD P. UNITARIO P. TOTAL PORCENTAJE INICIO FIN 1 2

#VALUE! -

1 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 1 1 #VALUE!#VALUE! -

2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 1 1 #VALUE! - #VALUE!

3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 2 2 #VALUE!#VALUE! -

4 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 1 1 #VALUE!#VALUE! -

5 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 1 1 #VALUE! - #VALUE!

6 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 2 2 #VALUE! - -

7 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3 3 - -

8 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3 3 - -

9 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 24 24 - -

10 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3 3 - -

11 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 4 4 - -

12 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3 4 - -

13 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 4 4 - -

14 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 4 4 #VALUE! -

15 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 1 1 #VALUE! - -

16 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 4 4 - -

17 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 5 5 - #VALUE!

18 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 2 3 #VALUE! - -

19 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 5 5 - -

20 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 5 5 - -

21 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 6 6 - -

22 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 5 5 - -

23 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 6 6 - -

24 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 3 3 - -

25 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 5 5 - -

26 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 5 5 - -

27 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 5 5 - -

28 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 5 5